JPH068602U - Formwork for concrete building - Google Patents

Formwork for concrete building

Info

Publication number
JPH068602U
JPH068602U JP5165992U JP5165992U JPH068602U JP H068602 U JPH068602 U JP H068602U JP 5165992 U JP5165992 U JP 5165992U JP 5165992 U JP5165992 U JP 5165992U JP H068602 U JPH068602 U JP H068602U
Authority
JP
Japan
Prior art keywords
wall
formwork
hole
mold
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5165992U
Other languages
Japanese (ja)
Inventor
佑造 小林
Original Assignee
佑造 小林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 佑造 小林 filed Critical 佑造 小林
Priority to JP5165992U priority Critical patent/JPH068602U/en
Publication of JPH068602U publication Critical patent/JPH068602U/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】 【目的】 柱と壁を一体に形成するコンクリート建造物
成形用型枠を構成し、現場での壁用型枠の構築作業を軽
減し、工期の短縮をはかる。 【構成】 既設階スラブ上に設置する柱用捨型枠1の壁
当接部2に、長さ方向に所定間隔をおいて並列して透孔
3を穿設する。壁当接部2縁に沿って断面L字状の取付
金具7、10を固定する。取付金具7、10に壁用型枠
5、6を設置してコンクリート建造物成形用型枠13を
構成する。
(57) [Abstract] [Purpose] To form a concrete building formwork that integrally forms columns and walls, reduce the construction work of the wall formwork on site, and shorten the construction period. [Structure] Through holes 3 are bored in parallel with each other at a predetermined interval in the length direction in a wall abutting portion 2 of a pillar scrap frame 1 installed on an existing floor slab. The mounting brackets 7 and 10 having an L-shaped cross section are fixed along the edges of the wall contact portion 2. The molds for walls 5 and 6 are installed on the fittings 7 and 10 to form a mold 13 for molding a concrete structure.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、コンクリート建造物の梁と壁とを構築する、あるいは柱と壁とを 構築する為の鉄筋コンクリート造の建造物成形用型枠に関する。 The present invention relates to a reinforced concrete building formwork for building beams and walls of concrete structures, or for building columns and walls.

【0002】[0002]

【従来の技術】[Prior art]

従来、鉄筋コンクリート造の建造物で鋼板製の柱用捨型枠及び梁用捨型枠を用 いる場合で、柱用捨型枠あるいは梁用捨型枠に壁用型枠を構築する際には、柱用 捨型枠あるいは梁用捨型枠の壁当接面を全面に亘り開口とし、構築現場で、柱用 捨型枠あるいは梁用捨型枠に壁用型枠用の板材を固定してコンクリート建造物成 形用型枠を構築していた。 Conventionally, in the case of using a steel scrap column and a beam scrap frame in a reinforced concrete structure, when constructing a wall scrap frame on a pillar scrap beam or a scrap beam form, Open the entire wall abutting surface of the column waste formwork or the beam waste formwork, and fix the plate material for the wall formwork to the column waste formwork or the beam wasteform form at the construction site. Was constructing a formwork for concrete construction.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

前記従来の技術では、柱用捨型枠あるいは梁用捨型枠の壁当接面を全面に亘り 開口とするので、該部で柱用捨型枠あるいは梁用捨型枠が分割され、構造的に弱 くなる問題点があった。更に、構築現場での壁用型枠を所定壁厚に応じて組立て る作業や、壁用型枠と柱用捨型枠とを連結する作業、壁用型枠と梁用型枠とを連 結する作業等が繁雑になる問題点があった。 In the above-mentioned conventional technique, since the wall abutting surface of the column waste form frame or the beam waste form frame is opened over the entire surface, the column waste form frame or the beam waste form frame is divided at this portion, and the structure There was a problem that it became weak. Furthermore, the work of assembling the wall formwork according to the predetermined wall thickness at the construction site, the work of connecting the wall formwork and the column waste formwork, and the connection of the wall formwork and the beam formwork. There was a problem that the work to tie it was complicated.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

然るにこの考案は、透孔を穿設した柱用捨型枠あるいは梁用捨型枠に、壁用捨 型枠を設置したので、あるいは透孔を穿設した柱用捨型枠あるいは梁用捨型枠に 、取付金具を固定したので、前記問題点を解決した。 However, in this invention, the scrap frame for the wall or the scrap frame for the beam having the through hole is installed with the scrap frame for the wall, or the scrap frame for the column or the scrap beam for the beam having the through hole is formed. Since the mounting bracket was fixed to the mold, the above problems were solved.

【0005】 即ちこの考案は、既設階スラブ上に設置する柱用捨型枠の壁当接部に、長さ方 向に所定間隔をおいて並列して透孔を穿設し、前記壁当接部縁に沿って壁用型枠 を設置したことを特徴としたコンクリート建造物成形用型枠である。また、梁用 捨型枠の壁当接部に、長さ方向に所定間隔をおいて並列して透孔を穿設し、前記 壁当接部縁に沿って壁用型枠を設置したことを特徴としたコンクリート建造物成 形用型枠である。That is, according to the present invention, through holes are formed in parallel with each other at predetermined intervals in the length direction in the wall abutting portion of the pillar formwork installed on the existing floor slab, and It is a formwork for concrete construction characterized in that a formwork for walls is installed along the edge of the contact part. Further, through holes are formed in parallel with each other in the lengthwise direction at predetermined intervals in the wall abutting portion of the beam discarding frame, and the wall forming frame is installed along the edge of the wall abutting portion. It is a formwork for concrete building that is characterized by.

【0006】 また、既設階スラブ上に設置する柱用捨型枠の壁当接部に、長さ方向に所定間 隔をおいて並列して透孔を穿設し、前記壁当接部縁に沿って取付金具を固定した ことを特徴としたコンクリート建造物成形用型枠である。また、梁用捨型枠の壁 当接部に、長さ方向に所定間隔をおいて並列して透孔を穿設し、前記壁当接部縁 に沿って取付金具を固定したことを特徴としたコンクリート建造物成形用型枠で ある。Further, through holes are formed in parallel with each other at a predetermined interval in the length direction in the wall abutting portion of the pillar formwork to be installed on the existing floor slab, and the wall abutting portion edge is formed. It is a concrete structure molding formwork characterized in that mounting brackets are fixed along it. In addition, through holes are formed in parallel with each other in the lengthwise direction at predetermined intervals in the wall abutting portion of the beam discard frame, and mounting brackets are fixed along the edges of the wall abutting portion. It is a mold for molding concrete structures.

【0007】 更に、透孔の口径は形成される壁の厚さより大形とし、前記透孔の設置間隔は 透孔の口径より大形としたコンクリート建造物成形用型枠である。前記における 口径とは、透孔が円形の場合にはその口径を指し、透孔が円形以外の形状の場合 には壁当接部の長さ方向に直角な方向の長さを指す。Further, the diameter of the through hole is larger than the thickness of the wall to be formed, and the installation interval of the through holes is larger than the diameter of the through hole. The above-mentioned diameter refers to the diameter when the through hole is circular, and refers to the length in the direction perpendicular to the length direction of the wall contact portion when the through hole has a shape other than the circular shape.

【0008】[0008]

【作用】[Action]

所定間隔をおいて透孔を穿設したので、コンクリート打設前後で柱用捨型枠及 び梁用型枠は所定の形状を保つことができる。また、透孔を穿設したので、透孔 を挿通して、柱用捨型枠と壁用型枠との間、及び柱用捨型枠と壁用型枠との間に 配筋できると共に、梁用捨型枠と壁用型枠との内側に、及び梁用捨型枠と壁用型 枠との内側にコンクリートを一体に打設できる。 Since the through-holes are formed at a predetermined interval, the column scrap mold and the beam mold can maintain a predetermined shape before and after the concrete is poured. Further, since the through hole is formed, it is possible to insert the through hole to arrange the bar between the column scrap mold and the wall mold and between the pillar scrap mold and the wall mold. It is possible to cast concrete inside the beam waste form and the wall form and inside the beam waste form and the wall form.

【0009】 また、柱用型枠あるいは梁用型枠に取付金具を固定した場合には、透孔を穿設 した面を補強できると共に、壁用型枠の取付位置を示し、壁用型枠との取付を簡 略化できる。Further, when the mounting metal fitting is fixed to the pillar formwork or the beam formwork, the surface having the through holes can be reinforced and the mounting position of the wall formwork is indicated. Installation with can be simplified.

【0010】[0010]

【実施例1】 図1乃至図4に基づいてこの考案の実施例を説明する。Embodiment 1 An embodiment of the present invention will be described with reference to FIGS. 1 to 4.

【0011】 既設階のスラブ上に設置できる柱用捨型枠1の壁当接部2に沿って、柱用捨型 枠1の長さ方向に、口径D1 の円形の透孔3、3を所定間隔をおいて並列して穿 設する。前記において、透孔3の口径D1 は形成される予定の壁の厚さT1 より 大きく形成されている。また、前記において、隣接する透孔3、3の中心間の距 離L1 は透孔3の口径D1 より大きく形成されている。Along the wall abutment portion 2 of the pillar formwork 1 that can be installed on the slab on the existing floor, in the length direction of the pillar formwork 1, a circular through hole 3, 3 having a diameter D 1 is formed. Are drilled in parallel at predetermined intervals. In the above, the diameter D 1 of the through hole 3 is formed larger than the thickness T 1 of the wall to be formed. Further, in the above description, the distance L 1 between the centers of the adjacent through holes 3, 3 is formed larger than the diameter D 1 of the through hole 3.

【0012】 前記壁当接部2に形成される予定の壁の厚さT1 に応じた間隔をおいて壁用型 枠5、6を配置する。前記壁用型枠5の端縁部5aの内側に断面L字状の取付金 具7の一片8を固着すると共に、取付金具7の他片9は壁用型枠5の外側に突出 するように位置させる。同様に、前記壁用型枠6の端縁部6aの内側に断面L字 状の取付金具10の一片11を固着すると共に、取付金具10の他片12は壁用 型枠5の外側に突出するように位置させる。The wall molds 5 and 6 are arranged at intervals according to the thickness T 1 of the wall to be formed in the wall abutting portion 2. One piece 8 of the attachment tool 7 having an L-shaped cross section is fixed to the inside of the edge 5a of the wall form 5, and the other piece 9 of the attachment 7 is projected to the outside of the wall form 5. Located in. Similarly, one piece 11 of the mounting bracket 10 having an L-shaped cross section is fixed to the inside of the edge portion 6a of the wall forming frame 6, and the other piece 12 of the mounting bracket 10 projects to the outside of the wall forming frame 5. Position it as you would.

【0013】 次に、壁用型枠5を連結した取付金具7の他片9及び壁用型枠6を連結した取 付金具10の他片12を前記壁当接部2に夫々固着する。前記において、取付金 具7の他片9の側縁9aは前記透孔3の端縁より外側に位置している。同様に取 付金具10の他片12の側縁12aは前記透孔3の端縁より外側に位置している 。即ち、透孔3の両端部は取付金具7の他片9及び取付金具10の他片12によ って塞がれている(図2(b))。Next, the other piece 9 of the mounting member 7 to which the wall form 5 is connected and the other piece 12 of the mounting member 10 to which the wall form 6 is connected are fixed to the wall abutting portion 2, respectively. In the above description, the side edge 9a of the other piece 9 of the mounting member 7 is located outside the edge of the through hole 3. Similarly, the side edge 12a of the other piece 12 of the mounting member 10 is located outside the edge of the through hole 3. That is, both ends of the through hole 3 are closed by the other piece 9 of the mounting member 7 and the other piece 12 of the mounting member 10 (FIG. 2 (b)).

【0014】 以上のようにして、柱用型枠1と壁用型枠5、6が連結したコンクリート建造 物成形用型枠13を構成する(図1、図2(a))。As described above, the concrete structure forming frame 13 in which the column frame 1 and the wall frames 5 and 6 are connected to each other is configured (FIG. 1 and FIG. 2A).

【0015】 次に前記実施例に基づくこの考案のコンクリート建造物成形用型枠13の使用 について説明する。Next, the use of the concrete structure forming mold 13 of the present invention based on the above embodiment will be described.

【0016】 所定の柱用鉄筋14を配筋した既設階スラブ上に、柱用鉄筋14が柱用捨型枠 1内に位置するように、コンクリート建造物成形用型枠13を設置する。壁用鉄 筋15を前記壁用型枠5、6内に配筋すると共に、壁用鉄筋15の一部15aを 透孔3、3内を通して柱用鉄筋14側に突出させ柱用鉄筋14内に定着させる。 他の配筋及び型枠を構築した後、所定のフォームタイ、クランプで各型枠を締め て、コンクリート建造物成形用型枠13内に所定のコンクリートを打設する。こ の際コンクリートは柱用捨型枠1と壁用型枠5、6の間とを連通し、柱と壁とが 一体となったコンクリート躯体を構築できる。また、前記において、透孔3は所 定間隔をおいて穿設してあるので、コンクリート建造物成形用型枠13の輸送時 、現場での組み立て時、及びコンクリート打設時に柱用捨型枠1が歪むおそれが なく所定の形状を保つことができる。A concrete structure forming formwork 13 is installed on an existing floor slab in which predetermined pillar reinforcements 14 are laid out so that the pillar reinforcements 14 are located in the waste formwork 1 for columns. The reinforcing bars 15 for walls are laid in the molds 5 and 6 for walls, and a part 15a of the reinforcing bars 15 for walls is projected through the through holes 3 and 3 toward the reinforcing bars 14 for pillars. Fix it on. After constructing other reinforcements and formwork, each formwork is clamped with a predetermined form tie and clamp, and a predetermined concrete is placed in the concrete structure forming formwork 13. At this time, the concrete can be connected between the scrap mold 1 for the pillar and the molds 5 and 6 for the wall to construct a concrete skeleton in which the pillar and the wall are integrated. Further, in the above description, since the through holes 3 are bored at a predetermined interval, the waste formwork for pillars is used at the time of transporting the concrete structure forming formwork 13, at the site assembly, and at the time of placing concrete. It is possible to maintain a predetermined shape without the risk of 1 being distorted.

【0017】 前記実施例において、透孔3は円形としたが、横方向の最大長さをD1 とし、 所定間隔をあけて穿設すれば他の形状でも可能である。Although the through hole 3 is circular in the above-described embodiment, other shapes can be used if the maximum length in the lateral direction is D 1 and the holes are formed at predetermined intervals.

【0018】 また、前記実施例において壁用型枠5、6に取付金具7、10を固着してた後 に、柱用捨型枠1の壁当接部2に取付金具7、10を固着したが、取付金具7、 10を柱用捨型枠1の壁当接部2に固着した後、取付金具7、10に壁用型枠5 、6を設置することもできる。In addition, in the above-described embodiment, after the mounting metal fittings 7 and 10 are fixed to the wall molds 5 and 6, the mounting metal fittings 7 and 10 are fixed to the wall abutting portion 2 of the column waste mold 1. However, it is also possible to install the wall molds 5 and 6 on the mounting brackets 7 and 10 after fixing the mounting brackets 7 and 10 to the wall abutting portion 2 of the column scrap frame 1.

【0019】 また、前記実施例において組み上がった状態のコンクリート建造物成形用型枠 13を既設階スラブ上に設置したが、柱用捨型枠1に取付金具7、10を固着し 、どちらか一方の取付金具、例えば取付金具10に壁用型枠6を固着しあるいは 当接した状態で、既設階スラブ上に設置し、所定の壁用鉄筋15を配筋した後に 他方の壁用型枠5を取付金具7に固着しあるいは当接して、コンクリート建造物 成形用型枠13を構成することもできる(図4)。In addition, although the assembled concrete building formwork 13 in the above-mentioned embodiment is installed on the existing floor slab, the mounting fittings 7 and 10 are fixed to the scrap formwork 1 for the pillar. The wall formwork 6 is fixed or abutted on one mounting fixture, for example, the mounting fixture 10, and is installed on the existing floor slab, and after arranging a predetermined wall reinforcing bar 15, the other wall formwork It is also possible to fix or abut 5 to the mounting member 7 to form a concrete structure molding formwork 13 (FIG. 4).

【0020】 また、前記実施例において、壁用型枠5、6と柱用捨型枠1とは取付金具7、 10を介して固着したが、図3に示すように壁用型枠5、6の端縁を夫々外側に 直角に屈曲して、固定部5b、6bを形成することもできる。この場合には、取 付金具7、10は不要であり、固定部5b、6bを柱用捨型枠1の壁当接部2に 固着する。この場合には取付金具7、10は不要とすることができる。Further, in the above-described embodiment, the wall molds 5 and 6 and the column scrap mold 1 are fixed to each other via the mounting brackets 7 and 10. However, as shown in FIG. The fixing portions 5b and 6b can be formed by bending the edges of 6 outwardly at right angles. In this case, the mounting brackets 7 and 10 are not necessary, and the fixing portions 5b and 6b are fixed to the wall abutting portion 2 of the column scrap frame 1. In this case, the mounting brackets 7 and 10 can be omitted.

【0021】 更に、前記実施例において、柱用型枠1と壁用型枠5、6とを連結してコンク リート建造物成形用型枠13を構成したが、柱用型枠1に取付金具7、10を固 定してコンクリート建造物成形用型枠17を構成することもできる(図5(a) (b))。この場合には、コンクリート建造物成形用型枠17を構築現場に設置 して、所定の壁用鉄筋を配置すると共に取付金具7、10の他片9、12に所定 の壁用型枠5、6を当接掛止し、壁用型枠5、6をフォームタイその他で形状を 保つように補強する。この場合の壁用型枠5、6は鋼板製、木製その他の材質い ずれでも可能である。Further, in the above-mentioned embodiment, the concrete form 1 and the wall forms 5 and 6 are connected to each other to form the concrete structure forming form 13. It is also possible to fix 7 and 10 to form the concrete structure molding frame 17 (FIGS. 5A and 5B). In this case, the concrete structure forming formwork 17 is installed on the construction site, the predetermined wall reinforcing bars are arranged, and the other pieces 9 and 12 of the mounting brackets 7 and 10 are provided with the predetermined wall formwork 5, 6 is abutted and locked, and the wall forms 5, 6 are reinforced with foam ties or the like so as to maintain the shape. In this case, the wall molds 5 and 6 can be made of steel plate, wood, or any other material.

【0022】[0022]

【実施例2】 図6乃至図10に基づきこの考案の他の実施例について説明する。Second Embodiment Another embodiment of the present invention will be described with reference to FIGS. 6 to 10.

【0023】 断面略U状で、上端部を屈曲し水平部24、24を形成した梁用捨型枠21の 下面21aの壁当接部22に沿って、梁用捨型枠21の長さ方向に、口径D2 の 円形の透孔23、23を所定間隔をおいて並列して穿設する。前記において、透 孔3の口径D2 は形成される予定の壁の厚さT2 より大きく形成されている。ま た、前記において、隣接する透孔3、3の中心間の距離L2 は透孔3の口径D2 より大きく形成されている。The length of the scrap frame 21 for a beam is along the wall contact portion 22 of the lower surface 21 a of the scrap frame 21 for a beam, which has a substantially U-shaped cross section and is bent at its upper end to form horizontal portions 24, 24. In the direction, circular through holes 23 having a diameter D 2 are formed in parallel at predetermined intervals. In the above, the diameter D 2 of the through hole 3 is formed larger than the thickness T 2 of the wall to be formed. Further, in the above description, the distance L 2 between the centers of the adjacent through holes 3 and 3 is formed to be larger than the diameter D 2 of the through holes 3.

【0024】 前記壁当接部22に形成される予定の壁の厚さT2 に応じた間隔をおいて壁用 型枠25、26を配置する。前記壁用型枠25の上端縁部25aの内側に断面L 字状の取付金具27の一片28を固着すると共に、取付金具27の他片29は壁 用型枠25の外側に突出するように位置させる。同様に、前記壁用型枠26の上 端縁部26aの内側に断面L字状の取付金具30の一片31を固着すると共に、 取付金具30の他片32は壁用型枠25の外側に突出するように位置させる。The wall forms 25 and 26 are arranged at intervals according to the thickness T 2 of the wall to be formed in the wall abutting portion 22. One piece 28 of the mounting bracket 27 having an L-shaped cross section is fixed to the inside of the upper edge 25a of the wall forming frame 25, and the other piece 29 of the mounting bracket 27 is projected to the outside of the wall forming frame 25. Position it. Similarly, one piece 31 of the mounting bracket 30 having an L-shaped cross section is fixed to the inside of the upper edge portion 26a of the wall forming frame 26, and the other piece 32 of the mounting bracket 30 is attached to the outside of the wall forming frame 25. Position so that it projects.

【0025】 次に、前記壁用型枠25を連結した取付金具27の他片29及び壁用型枠26 を連結した取付金具30の他片32を前記壁当接部22に夫々固着する。前記に おいて、取付金具27の他片29の側縁29aは前記透孔23の端縁より外側に 位置している。同様に取付金具30の他片32の側縁32aは前記透孔23の端 縁より外側に位置している。即ち、透孔23の両端部は取付金具27の他片29 及び取付金具30の他片32により塞がれている(図7(b))。Next, the other piece 29 of the mounting member 27 to which the wall form 25 is connected and the other piece 32 of the mounting member 30 to which the wall form 26 is connected are fixed to the wall abutting portion 22, respectively. In the above description, the side edge 29a of the other piece 29 of the mounting member 27 is located outside the edge of the through hole 23. Similarly, the side edge 32a of the other piece 32 of the mounting member 30 is located outside the edge of the through hole 23. That is, both ends of the through hole 23 are closed by the other piece 29 of the mounting member 27 and the other piece 32 of the mounting member 30 (FIG. 7B).

【0026】 以上のようにして、梁用型枠31と壁用型枠25、26が連結したコンクリー ト建造物成形用型枠33を構成する(図6、図7(a))。As described above, the concrete building mold 33 in which the beam mold 31 and the wall molds 25 and 26 are connected is configured (FIG. 6, FIG. 7A).

【0027】 次に前記実施例に基づくこの考案の使用に付いて説明する。Next, the use of this invention based on the above embodiment will be described.

【0028】 梁用捨型枠21の壁当接部22に取付金具27及び取付金具30を固着し、一 方の壁用型枠26のみを取付金具30に固着した状態(図8)で、既設階スラブ 上に構築した柱用型枠あるいは他の梁用型枠に梁用捨型枠21を掛止する(図示 していない)。所定の壁用鉄筋35を配筋し、壁用鉄筋35の一部35aを透孔 23、23内を通して梁用捨型枠21側に突出させる。 また、梁用捨型枠21内に所定の梁用鉄筋34を配筋し、壁用鉄筋35の一部3 5aを梁用鉄筋34内に定着させる。次に取付金具27に壁用型枠25を固着す る(図7(a))。In a state in which the mounting bracket 27 and the mounting bracket 30 are fixed to the wall abutting portion 22 of the beam scrap 21 and only one of the wall molds 26 is fixed to the mounting bracket 30 (FIG. 8), The beam form 21 is hooked to the column form or other beam form constructed on the existing floor slab (not shown). A predetermined wall reinforcing bar 35 is laid out, and a part 35a of the wall reinforcing bar 35 is projected through the through holes 23, 23 toward the beam scrap frame 21 side. Further, a predetermined beam reinforcing bar 34 is laid in the beam scrap frame 21, and a part 35a of the wall reinforcing bar 35 is fixed in the beam reinforcing bar 34. Next, the wall form 25 is fixed to the mounting bracket 27 (FIG. 7A).

【0029】 また、他の配筋及び型枠を構築した後、所定のフォームタイ、クランプで各型 枠を締めて、コンクリート建造物成形用型枠33内に所定のコンクリートを打設 する。この際コンクリートは梁用捨型枠21と壁用型枠25、26の間とを連通 し、梁と壁とが一体となったコンクリート躯体を構築できる。この際、実施例1 と同様に、透孔23は所定間隔をおいて穿設してあるので、コンクリート建造物 成形用型枠33の輸送時、現場での組み立て時、及びコンクリート打設時に梁用 捨型枠21が歪むおそれがなく所定の形状を保つことができる。After constructing other reinforcements and molds, each mold is tightened with a predetermined form tie and clamp, and a predetermined concrete is placed in the concrete structure forming mold 33. At this time, the concrete communicates between the scrap mold 21 for the beam and the molds 25, 26 for the wall to construct a concrete frame in which the beam and the wall are integrated. At this time, as in the first embodiment, since the through holes 23 are formed at a predetermined interval, the beam is used at the time of transportation of the concrete structure forming form 33, at the site of assembly, and at the time of placing concrete. It is possible to maintain the predetermined shape without the risk that the scrap frame 21 will be distorted.

【0030】 前記実施例において、透孔23の他の構成、及び壁用型枠25、26の他の構 成については、実施例1と同様である。In the above-described embodiment, the other configurations of the through holes 23 and the wall frames 25 and 26 are the same as those of the first embodiment.

【0031】 また、前記実施例において壁用型枠25、26に取付金具27、30を固着し てた後に、梁用捨型枠21の壁当接部2に取付金具27、30を固着したが、取 付金具27、30を梁用捨型枠21の壁当接部22に固着した後、取付金具27 、30に壁用型枠25、26を設置することもできる。Further, in the above-described embodiment, after the mounting brackets 27 and 30 are fixed to the wall molds 25 and 26, the mounting brackets 27 and 30 are fixed to the wall abutting portion 2 of the beam discard frame 21. However, it is also possible to install the wall molds 25, 26 on the mounting brackets 27, 30 after fixing the mounting brackets 27, 30 to the wall abutting portion 22 of the beam scrap frame 21.

【0032】 また、前記実施例において、梁用捨型枠21と壁用型枠25、26とを連結し てコンクリート建造物成形用型枠33を構成したが、梁用捨型枠21に取付金具 27、30を固定してコンクリート建造物成形用型枠37を構成することもでき る(図9(a)(b))。この場合には、コンクリート建造物成形用型枠37を 構築現場に設置して、所定の壁用鉄筋を配置すると共に取付金具27、30の他 片29、32に所定の壁用型枠25、26を当接掛止し、壁用型枠25、26を フォームタイその他で形状を保つように補強する。また、この場合の壁用型枠2 5、26は鋼板製、木製その他の材質いずれでも可能である。Further, in the above-described embodiment, the concrete form forming mold 33 is constituted by connecting the beam scrap mold 21 and the wall molds 25 and 26, but is attached to the beam scrap mold 21. It is also possible to fix the metal fittings 27 and 30 to form a concrete structure molding form 37 (Figs. 9 (a) and 9 (b)). In this case, a concrete building forming frame 37 is installed at the construction site, a predetermined wall reinforcing bar is arranged, and the other pieces 29, 32 of the mounting brackets 27, 30 are provided with the predetermined wall form 25, 26 is abutted and locked, and the wall forms 25, 26 are reinforced by foam ties or the like so as to maintain the shape. Further, in this case, the wall molds 25 and 26 can be made of a steel plate, wood, or any other material.

【0033】 更に、前記実施例において、図10に示すように、柱用捨型枠1、梁用捨型枠 21及び壁用型枠25、26を一体に形成することもできる。即ち、実施例1の 柱用捨型枠1に梁掛止用の切り欠き部4を形成し、所定位置に取付金具7、10 を固着する。また実施例2の梁用捨型枠21の所定位置に取付金具27、30を 固着する。柱用捨型枠1、1を所定位置に設置し、一方の壁用型枠2の両側縁部 を柱用捨型枠1、1の取付金具30、30に夫々当接し重ねる。次に所定の壁用 鉄筋(図示していない)を配筋した後、他の壁用型枠25の両側縁部を柱用捨型 枠1、1の取付金具27、27に夫々当接し重ねる。次に梁用捨型枠21の両端 部21a、21aを夫々柱用捨型枠1、1の切り欠き部4に掛止すると共に、取 付金具27、30と壁用型枠25、26の夫々の上端部25a、26aとを当接 し重ねて、コンクリート建造物成形用型枠38を構成する(図10)。Further, in the above-described embodiment, as shown in FIG. 10, the column waste mold 1, the beam waste mold 21, and the wall molds 25 and 26 may be integrally formed. That is, the notch 4 for locking the beam is formed in the scrap frame 1 for the pillar of the first embodiment, and the mounting brackets 7 and 10 are fixed at predetermined positions. Further, the mounting brackets 27 and 30 are fixed to the predetermined positions of the scrap frame 21 of the second embodiment. The scrap frames 1 and 1 for columns are installed at predetermined positions, and the both side edges of the mold 2 for one wall are brought into contact with the mounting brackets 30 and 30 of the scrap models 1 and 1 for column, respectively, and are stacked. Next, after arranging a predetermined wall reinforcing bar (not shown), both side edges of the other wall form 25 are brought into contact with the mounting brackets 27, 27 of the column scrap frames 1, 1 respectively to be overlapped. . Next, both ends 21a and 21a of the beam scrap 21 are hooked to the notches 4 of the pillar scrap molds 1 and 1, respectively, and the fittings 27 and 30 and the wall molds 25 and 26 are The respective upper ends 25a and 26a are brought into contact with each other and overlapped to form a concrete structure forming form 38 (FIG. 10).

【0034】[0034]

【考案の効果】[Effect of device]

この考案は、柱用捨型枠の壁当接部に、長さ方向に所定間隔をおいて並列して 透孔を穿設すると共に壁当接部縁に沿って壁用捨型枠を固定したので、「柱と壁 」「梁と壁」「柱と梁と壁」を一体に形成するコンクリート建造物成形用型枠を 構成できる効果がある。更に、現場での壁用型枠の構築作業を軽減できるので、 工期の短縮をはかることができる効果がある。 In this invention, through holes are formed in parallel with each other in the lengthwise direction at predetermined intervals in the wall abutment portion of the column scrap frame, and the wall scrap frame is fixed along the edge of the wall abutment portion. Therefore, there is an effect that it is possible to construct a concrete structure forming formwork that integrally forms “pillar and wall”, “beam and wall”, and “pillar and beam and wall”. Further, since the work of constructing the wall formwork on the site can be reduced, there is an effect that the construction period can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の実施例の組み立て図である。FIG. 1 is an assembly diagram of an embodiment of the present invention.

【図2】(a)は同じく使用状態の横断面図であり、
(b)は同じく柱用捨型枠の壁当接部の拡大正面図であ
る。
FIG. 2 (a) is a cross-sectional view of the same use state,
(B) is an enlarged front view of the wall abutting portion of the post-use scrap frame.

【図3】同じく他の壁型枠の斜視図である。FIG. 3 is a perspective view of another wall form of the same.

【図4】同じく組み立て途中の斜視図である。FIG. 4 is a perspective view of the same during assembly.

【図5】この考案の他の実施例で、(a)は斜視図、
(b)は正面図である。
FIG. 5 is a perspective view of another embodiment of the present invention,
(B) is a front view.

【図6】この考案の他の実施例の組み立て図である。FIG. 6 is an assembly view of another embodiment of the present invention.

【図7】(a)は同じく使用状態の縦断面図であり、
(b)は同じく梁用捨型枠の壁当接部の拡大底面図であ
る。
FIG. 7 (a) is a vertical cross-sectional view of the same use state,
(B) is an enlarged bottom view of the wall abutting portion of the scrap frame for the beam.

【図8】同じく組み立て途中の斜視図である。FIG. 8 is a perspective view of the same during assembly.

【図9】この考案の他の実施例で、(a)は斜視図、
(b)は底面図である。
FIG. 9 is another embodiment of the present invention, (a) is a perspective view,
(B) is a bottom view.

【図10】この考案の他の実施例の組み立て図である。FIG. 10 is an assembly view of another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 柱用捨型枠 2 壁当接部 3 透孔 5、6 壁用型枠 7、10 取付金具 13 コンクリート建造物成形用型枠 17 コンクリート建造物成形用型枠 21 梁用捨型枠 22 壁当接部 23 透孔 25、26 壁用型枠 27、30 取付金具 33 コンクリート建造物成形用型枠 37 コンクリート建造物成形用型枠 38 コンクリート建造物成形用型枠 1 Pillar Formwork 2 Wall Abutment 3 Through Hole 5, 6 Wall Formwork 7, 10 Mounting Bracket 13 Concrete Building Formwork 17 Concrete Building Formwork 21 Beam Disposing Formwork 22 Wall Abutting part 23 Through hole 25, 26 Wall formwork 27, 30 Mounting bracket 33 Concrete building formwork 37 Concrete building formwork 38 38 Concrete building formwork

Claims (5)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 既設階スラブ上に設置する柱用捨型枠の
壁当接部に、長さ方向に所定間隔をおいて並列して透孔
を穿設し、前記壁当接部縁に沿って壁用型枠を設置した
ことを特徴としたコンクリート建造物成形用型枠。
1. A through hole is formed in a wall abutting part of a column scrap frame installed on an existing floor slab in parallel at a predetermined interval in a length direction, and a hole is formed at an edge of the wall abutting part. A formwork for molding concrete structures, characterized in that a formwork for walls is installed along it.
【請求項2】 梁用捨型枠の壁当接部に、長さ方向に所
定間隔をおいて並列して透孔を穿設し、前記壁当接部縁
に沿って壁用型枠を設置したことを特徴としたコンクリ
ート建造物成形用型枠。
2. A through hole is formed in the wall abutment portion of the beam form frame in parallel at a predetermined interval in the length direction, and the wall form frame is formed along the edge of the wall abutment portion. A mold for molding concrete structures characterized by being installed.
【請求項3】 既設階スラブ上に設置する柱用捨型枠の
壁当接部に、長さ方向に所定間隔をおいて並列して透孔
を穿設し、前記壁当接部縁に沿って取付金具を固定した
ことを特徴としたコンクリート建造物成形用型枠。
3. A through hole is formed in parallel in the wall abutting portion of a pillar formwork installed on an existing floor slab at a predetermined interval in the length direction, and the wall abutting portion has an edge at the edge thereof. A mold for molding concrete structures, characterized by fixing mounting brackets along it.
【請求項4】 梁用捨型枠の壁当接部に、長さ方向に所
定間隔をおいて並列して透孔を穿設し、前記壁当接部縁
に沿って取付金具を固定したことを特徴としたコンクリ
ート建造物成形用型枠。
4. A through hole is formed in the wall abutting portion of the beam form frame in parallel at predetermined intervals in the lengthwise direction, and a mounting bracket is fixed along the edge of the wall abutting portion. A mold for molding a concrete structure, which is characterized by that.
【請求項5】 透孔の口径は形成される壁の厚さより大
形とし、前記透孔の設置間隔は透孔の口径より大形とし
た請求項1乃至4のいづれか1項に記載のコンクリート
建造物成形用型枠。
5. The concrete according to claim 1, wherein the diameter of the through hole is larger than the thickness of the wall to be formed, and the installation interval of the through holes is larger than the diameter of the through hole. Formwork for building structures.
JP5165992U 1992-06-30 1992-06-30 Formwork for concrete building Pending JPH068602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5165992U JPH068602U (en) 1992-06-30 1992-06-30 Formwork for concrete building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5165992U JPH068602U (en) 1992-06-30 1992-06-30 Formwork for concrete building

Publications (1)

Publication Number Publication Date
JPH068602U true JPH068602U (en) 1994-02-04

Family

ID=12893010

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5165992U Pending JPH068602U (en) 1992-06-30 1992-06-30 Formwork for concrete building

Country Status (1)

Country Link
JP (1) JPH068602U (en)

Similar Documents

Publication Publication Date Title
US20080005991A1 (en) Concrete Wall Formwork Module
JP3959517B2 (en) Steel frame mounting hardware and mounting method
KR20140006330A (en) Floor structure and modular unit of modular building and method for manufacturing the same
EA005174B1 (en) Formwork for precast concrete panels
JPH068602U (en) Formwork for concrete building
JP3878546B2 (en) Construction method of cross girder integrated concrete slab
JPS5953977B2 (en) How to build pillars
JP3321670B2 (en) Mold setting equipment for ready-mixed concrete
KR102002054B1 (en) Crossbeam support for corner portion of form panel system
KR0127910Y1 (en) Form panel
JP2001026933A (en) Extremely thin metal form panel, form using it and construction method of foundation
JPH0724524Y2 (en) Fixtures for concrete formwork and concrete formwork
JP2543752Y2 (en) Formwork connection bracket
JPH06341167A (en) Working method for concrete structure
JPH07268881A (en) Method of concrete casting, and formwork
JPH0617482A (en) Permanent form made of steel plate for construction
KR200198576Y1 (en) A sheeting panel of a plastics
JPH0128190Y2 (en)
JPH077384Y2 (en) Panels for surface formation of concrete foundations
JPH03295979A (en) Frame and construction method using frame thereof
JPH05230837A (en) Concrete expendable form construction method
JPH02171441A (en) Beam structure for building
JP3082147B2 (en) Construction method of reinforced concrete structures
JPH03169919A (en) Construction of continuous footing
JPS5923159Y2 (en) Formwork equipment for manufacturing walls and floor slabs of buildings