JPH0685860U - Temporary floor drainage equipment used when constructing standard apartment houses - Google Patents

Temporary floor drainage equipment used when constructing standard apartment houses

Info

Publication number
JPH0685860U
JPH0685860U JP2770993U JP2770993U JPH0685860U JP H0685860 U JPH0685860 U JP H0685860U JP 2770993 U JP2770993 U JP 2770993U JP 2770993 U JP2770993 U JP 2770993U JP H0685860 U JPH0685860 U JP H0685860U
Authority
JP
Japan
Prior art keywords
floor
drainage
opening
temporary
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2770993U
Other languages
Japanese (ja)
Inventor
俊彦 長井
義美 兎澤
正則 斎
春義 小川
俊弘 中村
伸哉 西澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2770993U priority Critical patent/JPH0685860U/en
Publication of JPH0685860U publication Critical patent/JPH0685860U/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

(57)【要約】 【目的】 排水作業を効率化し、低コストで排水を処理
して、規格型集合住宅の施工のローコスト化を図ること
のできる規格型集合住宅を施工するときに用いる仮設用
床排水設備を提供することを目的とする。 【構成】 建設中のマンションMに適用する仮設用の床
排水設備Aであって、コンクリートを打設する階の直下
階8の床版1に設けた仮設の開口部2の下面に、開口部
2を覆い、かつ排水孔3を備えた集水樋4を取り付け、
この排水孔3には排水管5の一端を取り付けるととも
に、排水管5の他端をこのマンションMの外部へと通じ
るようにバルコニーの排水樋に配設し、さらに集水樋4
と開口部2の下面との間にはパッキン材6を介装する構
成とした。
(57) [Summary] [Purpose] Temporary construction used when constructing standard apartment houses that can streamline drainage work and treat the wastewater at low cost to reduce the cost of construction of standard apartment houses. The purpose is to provide floor drainage. [Structure] A floor drainage facility A for temporary construction applied to a condominium M under construction, in which an opening is provided on the lower surface of a temporary opening 2 provided on a floor slab 1 on a floor 8 directly below the floor on which concrete is to be placed. Attaching a water collecting gutter 4 covering 2 and having a drainage hole 3,
One end of the drain pipe 5 is attached to the drain hole 3, and the other end of the drain pipe 5 is arranged in the drain gutter of the balcony so as to communicate with the outside of the condominium M.
A packing material 6 is interposed between the lower surface of the opening 2 and the lower surface of the opening 2.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、例えばマンション等の規格型集合住宅を施工するときに、雨水や、 コンクリート打設時に滴り落ちる水等を排水するのに好適な規格型集合住宅を施 工するときに用いる仮設用床排水設備に関するものである。 The present invention is a temporary floor for use when constructing a standard type apartment house such as an apartment, which is suitable for draining rainwater or water dripping when pouring concrete. It concerns drainage facilities.

【0002】[0002]

【従来の技術】[Prior art]

近年、例えばマンション等の規格型集合住宅においては、その価格が直接、需 要者である一般庶民にはねかえるため、価格を抑さえるために、その施工に際す る費用のローコスト化が必須の課題となっている。このようなマンション施工に 際するローコスト化には、使用材料の共通化,ユニット化、構造の工夫による施 工の容易化等、様々な工夫が施されているが、ローコスト化にも限界があるのが 現状である。 さて、このようなマンションを建設するに際してその床版をコンクリート造と する場合には、組み立てた型枠内にコンクリートを打設して形成しているのは周 知のことである。このとき、打設したコンクリートを養生している間、この型枠 からは、コンクリートに混ぜた水が直下階に滴り落ちる。 従来、このようにしてコンクリート打設階から滴り落ちた水や、側方から吹き 込んだ雨水等の排水を放置しておくと、直下階の床版が汚れてしまうため、作業 員が寄せ集めて、例えばバルコニーの排水孔に流し込むなどして処理している。 In recent years, for example, standard type apartments such as condominiums are directly priced to ordinary people who are demanders, so it is essential to reduce the cost of construction in order to suppress the price. Has become an issue. In order to reduce the cost of such condominium construction, various measures have been taken, such as standardization of materials used, unitization, and easy construction by devising the structure, but there is a limit to the cost reduction. is the current situation. Now, when building a condominium like this, if the floor slab is made of concrete, it is well known that concrete is placed in the assembled formwork. At this time, while curing the cast concrete, the water mixed with the concrete drips from the formwork to the floor directly below. Conventionally, if the water dripping from the concrete pouring floor and the drained water such as rainwater blown from the side are left as they are, the floor slab on the floor directly below will be soiled, and the workers will collect them. For example, it is processed by pouring it into the drainage hole of the balcony.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、上述したような従来の排水作業においては、寄せ集めた排水を バルコニーの排水孔等に流し込むときに、バルコニーが汚れてしまい、バルコニ ーも清掃しなければならなくなり、手間がかかってしまう。 また、例えば、各階における床板の施工作業をサイクル化して、これを各階で 繰り返すことにより施工の効率化を図ろうとしても、作業員が定期的に前記排水 作業をしなければならないため、施工サイクルが中断されて効率化の妨げとなる うえ人員コストがかかり、この結果マンション施工のローコスト化の妨げになる という問題がある。 本考案は、以上のような点を考慮してなされたもので、排水作業を効率化し、 低コストで排水を処理して、規格型集合住宅の施工のローコスト化を図ることの できる規格型集合住宅を施工するときに用いる仮設用床排水設備を提供すること を目的とする。 However, in the conventional drainage work described above, when the collected drainage is poured into the drainage holes of the balcony, the balcony becomes dirty and the balcony has to be cleaned, which is troublesome. Also, for example, if the floor board construction work on each floor is cycled and the construction efficiency is improved by repeating this on each floor, the worker must regularly perform the drainage work. However, there is a problem in that the cost will be interrupted and the efficiency will be hindered and the personnel cost will be increased, and as a result, the low cost of condominium construction will be hindered. The present invention has been made in consideration of the above points, and it is a standard type housing that can streamline drainage work, treat wastewater at low cost, and reduce the cost of construction of standard type housing. The purpose is to provide a temporary floor drainage system used when constructing a house.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

本考案は、3階以上の階層を有しているとともに各階に複数の住戸が順次隣接 するように配置されていることにより、多数の住戸が左右方向に連続しかつ上下 方向に重ねられて設けられており、それら多数の住戸のうちの少なくとも上下に 重なる住戸どうしは平面プランおよび立面プラン共に同一に形成されてなる規格 型集合住宅を施工するときに用いる仮設用床排水設備であって、コンクリートを 打設する階の直下階の床版に型枠パネル等の資材搬送用の仮設の開口部が形成さ れ、該開口部の下面には、該開口部を覆いかつ排水孔を備えた集水樋が取付けら れ、該集水樋の前記排水孔には排水管の一端が取付けられて、該排水管の他端が この規格型集合住宅の外部へと通じるように配されてなり、さらに前記集水樋と 開口部の下面との間にはパッキン材が介装されていることを特徴としている。 Since the present invention has three or more floors and a plurality of dwelling units are arranged adjacent to each other in order on each floor, a large number of dwelling units are provided continuously in the left-right direction and vertically stacked. Among these many dwelling units, at least the upper and lower dwelling units are temporary floor drainage facilities to be used when constructing standard type apartment houses with the same plan and elevation plan. A temporary opening for material transportation such as formwork panels was formed on the floor slab directly below the floor where concrete was placed, and the lower surface of the opening covered the opening and was provided with a drainage hole. A water collecting gutter is attached, one end of a drain pipe is attached to the drain hole of the water collecting gutter, and the other end of the drain pipe is arranged so as to communicate with the outside of this standard type housing complex. , Further with the water collecting gutter and the lower surface of the opening It is characterized in that the packing material is interposed between.

【0005】[0005]

【作用】[Action]

本考案の規格型集合住宅を施工するときに用いる仮設用床排水設備では、コン クリートを打設する階から直下階の床版上に滴り落ちる、いわゆるのろ排水や雨 水等を開口部に流し込むと、この水は集水樋の排水孔から排水管に流れ込み、こ の排水管の他端から規格型集合住宅の外部へと排水される。 In the temporary floor drainage system used when constructing the standard type apartment house of the present invention, so-called loose drainage or rainwater drips from the floor where the concrete is placed onto the floor slab directly below the floor. When poured, this water flows into the drain pipe from the drainage hole of the water collection gutter, and is drained from the other end of this drain pipe to the outside of the standard apartment house.

【0006】[0006]

【実施例】【Example】

以下、本考案を図1ないし図5に示す実施例を参照して説明する。ここでは、 例えば、建設中のマンションに本考案の規格型集合住宅を施工するときに用いる 仮設用床排水設備を適用する場合の実施例を用いて説明する。 ここで、それに先だって、まず施工されるマンションの一例を図2および図3 を参照して説明する。 Hereinafter, the present invention will be described with reference to the embodiments shown in FIGS. Here, for example, description will be given using an example in which a temporary floor drainage facility used when constructing the standard type apartment house of the present invention is applied to a condominium under construction. Prior to that, an example of a condominium to be constructed will be described with reference to FIGS. 2 and 3.

【0007】 図2および図3に示すマンション(規格型集合住宅)Mは、ローコスト化を主 眼として設計されたものである。 マンションMに配置された各住戸Jは、平面プランのみならず立面プランが、 細部が異なるのみの3タイプに限定され、しかも1階から最上階に至るまで全く 同一タイプの住戸Jが上下に重なった構成とされている。 このように規格化、単純化、共通化が徹底して図られていることにより、この マンションMでは、その設計作業が大幅に簡略化され、軽減化される。また、そ の施工も各住戸J毎,各階毎の繰り返し作業が多くなることから、工程管理が容 易になって労務費や現場管理費の削減を図ることができ、また、作業効率の向上 と施工精度の向上が期待できる。さらには、各住戸J内の機器,器具類等を共通 化することによりこれらを一括大量購入することが可能になり、その費用を削減 することができる。これら諸々の経費節減効果の集積によって建設コストの削減 を充分に実現し得るものである。The condominium (standard type apartment house) M shown in FIGS. 2 and 3 is designed to reduce cost. Each dwelling unit J placed in the condominium M is limited to three types, not only the plan but also the elevation plan, but the details are different, and the dwelling units J of exactly the same type from the first floor to the top floor It is configured to overlap. As a result of thorough standardization, simplification, and commonization, the design work of the condominium M is greatly simplified and reduced. In addition, since the number of repetitive works for each unit J and each floor also increases, it is possible to simplify process management and reduce labor costs and site management costs, and improve work efficiency. And improvement of construction accuracy can be expected. Furthermore, by making the equipment, instruments, etc. in each dwelling unit J common, it is possible to purchase these in bulk at one time, and the cost can be reduced. By accumulating these various cost-saving effects, construction cost reduction can be fully realized.

【0008】 次に、図1および図4に示す、本考案に係る規格型集合住宅を施工するときに 用いる仮設用床排水設備について説明する。 これらの図に示すように、建設すべきマンションMのコンクリート造の床版1 には、予め仮設の開口部2が形成されている。開口部2の上端縁部には段部2a が形成されている。この開口部2は、例えば平面視600mm×200mm程度 の矩形で、本来、下層階から上層階へ型枠パネル等の資材を移送するために設け られたものである。 開口部2の下面には、開口部2を覆い、かつ排水孔3を備えた集水樋4と、排 水孔3にその一端が取付けられた排水管5とから構成される排水設備(仮設用床 排水設備)Aが設けられている。Next, a temporary floor drainage facility used when constructing the standard apartment house according to the present invention shown in FIGS. 1 and 4 will be described. As shown in these figures, a concrete floor slab 1 of a condominium M to be constructed is provided with a temporary opening 2 in advance. A step 2 a is formed at the upper edge of the opening 2. The opening 2 is, for example, a rectangle of about 600 mm × 200 mm in plan view, and is originally provided for transferring materials such as formwork panels from the lower floor to the upper floor. On the lower surface of the opening 2, a drainage facility including a water collecting trough 4 covering the opening 2 and having a drainage hole 3 and a drainage pipe 5 having one end attached to the drainage hole 3 (temporary installation Floor drainage equipment) A is installed.

【0009】 図1に示したように、集水樋4は、平面視略矩形の底部4aと、この底部4a の周囲縁部から上方に延びる立ち上がり部4bと、この立ち上がり部4bの上端 部に沿って形成されたフランジ部4cとから形成された受け皿状の形状とされて いる。 底部4aの中央部には下方に延出する筒状の排水孔3が設けられており、この 底部4aは、排水孔3を最下部として排水孔3に向けて緩やかに傾斜した形状と されている。 このような集水樋4は、開口部2の下面に、フランジ部4cに沿って配設され た環状のパッキン材6を介して、例えばボルトなどで着脱自在に取り付けられて いる。このパッキン材6により、排水が集水樋4と床版1との間から漏れること を防ぐことができる。As shown in FIG. 1, the water collecting trough 4 includes a bottom portion 4a having a substantially rectangular shape in plan view, a rising portion 4b extending upward from a peripheral edge portion of the bottom portion 4a, and an upper end portion of the rising portion 4b. It has a saucer-like shape formed from a flange portion 4c formed along the same. A cylindrical drain hole 3 extending downward is provided at the center of the bottom portion 4a, and the bottom portion 4a has a shape that is gently inclined toward the drain hole 3 with the drain hole 3 as the lowermost portion. There is. Such a water collecting trough 4 is detachably attached to the lower surface of the opening 2 through, for example, an annular packing material 6 arranged along the flange portion 4c with a bolt or the like. The packing material 6 can prevent drainage from leaking between the water collecting trough 4 and the floor slab 1.

【0010】 前記したように、集水樋4の排水孔3の下端部には、排水管5の一端が取り付 けられている。この排水管5は、例えば市販の塩化ビニール製のパイプからなり 、集水樋4と排水管5の接続部から排水が漏れないように、排水管5内に集水樋 4の排水孔3が挿入された形態とされている。この排水管5の他端は、例えば図 示しないバルコニーの本設の排水樋に直接排水するように配設されている。As described above, one end of the drain pipe 5 is attached to the lower end of the drain hole 3 of the water collecting trough 4. The drain pipe 5 is made of, for example, a commercially available vinyl chloride pipe, and the drain hole 3 of the water collecting trough 4 is provided in the drain pipe 5 so that drainage does not leak from the connection portion of the water collecting trough 4 and the drain pipe 5. It is in the inserted form. The other end of the drainage pipe 5 is disposed so as to directly drain the drainage pipe 5 to a main drainage gutter of a balcony (not shown).

【0011】 次に、上記のような構成からなる排水設備Aを、建設中のマンションに適用す る方法について説明する。 図4に示したように、マンションMの床版1を形成するために、コンクリート Cを上層階(コンクリートを打設する階)7に打設する際には、すでに床版1を 形成した直下階8の床版1の開口部2に排水設備Aを取付けておく。Next, a method of applying the drainage facility A configured as described above to a condominium under construction will be described. As shown in FIG. 4, when the concrete C is placed on the upper floor (floor where concrete is placed) 7 to form the floor slab 1 of the condominium M, directly below the floor slab 1 already formed. The drainage facility A is attached to the opening 2 of the floor slab 1 on the floor 8.

【0012】 そして、支保工9,9,…で支持された上層階7の床型枠10にコンクリート Cを打設する。このとき、開口部2を形成すべき箇所には、床型枠10上に型枠 11を組んでおく。この型枠11の裏面側には開口部2の段部2aを形成するた めの桟木11aを固定しておく。Then, concrete C is poured into the floor formwork 10 of the upper floor 7 supported by the supporting works 9, 9, .... At this time, a mold 11 is assembled on the floor mold 10 at the place where the opening 2 is to be formed. A crosspiece 11a for forming the stepped portion 2a of the opening 2 is fixed to the back surface side of the frame 11.

【0013】 さて、上層階7の床型枠10にコンクリートCを打設すると、コンクリートC に混ぜられた水,いわゆる「のろ排水」が直下階8の床版1上に滴り落ちる。 そして、作業者が、床版1上に滴り落ちた水や側方から侵入した雨水等をかき 集めて開口部2から排水設備Aの集水樋4に流し込む。すると、この水は集水樋 4の排水孔3から排水管5に流れ込み、排水管5の他端(図示なし)からバルコ ニーの排水管へと排出される。Now, when concrete C is placed on the floor formwork 10 on the upper floor 7, water mixed with the concrete C, so-called “soil drainage”, drips onto the floor slab 1 on the floor 8 directly below. Then, the operator collects the water dripping on the floor slab 1 and the rainwater that has entered from the side and pours it into the water collecting trough 4 of the drainage facility A through the opening 2. Then, this water flows into the drain pipe 5 from the drain hole 3 of the water collecting trough 4, and is discharged from the other end (not shown) of the drain pipe 5 to the drain pipe of the balcony.

【0014】 この後、上層階7のコンクリートCが養生して所定の強度が発現した時点で、 床型枠10,型枠11を解体し、所定数の支保工9を残して他の支保工9を撤去 する。すると上層階7には、直下階8と同様の床版1が構成され、型枠11の内 方には蓋部材12が形成される。なお、この蓋部材12は、開口部2を使用する ときには取り外しておくものである。After that, when the concrete C on the upper floor 7 is cured and a predetermined strength is developed, the floor formwork 10 and the formwork 11 are disassembled, and a predetermined number of support works 9 are left, and another support work is performed. Remove 9. Then, on the upper floor 7, a floor slab 1 similar to the floor 8 directly below is constructed, and a lid member 12 is formed inside the formwork 11. The lid member 12 is to be removed when the opening 2 is used.

【0015】 そして、直下階8の床版1から排水設備Aを取り外し、これを上層階7の床版 1に転用して取り付け、上記と同様にしてさらに上層の階の床版1を形成してい く。Then, the drainage facility A is removed from the floor slab 1 on the floor 8 directly below and is diverted and attached to the floor slab 1 on the upper floor 7, and the floor slab 1 on the upper floor is formed in the same manner as above. To go.

【0016】 また、床版1から排水設備Aを取り外した後には、下層階13の床版1のよう に、開口部2を塞ぐ塞ぎ板14を開口部2の段部2aに載置すれば、落下防止と することができる。このとき開口部2に段部2aを設けたので、塞ぎ板14と床 版1とを面一とすることができ、作業者がつまずくなどの危険を防ぐことができ る。 そして、図5に示すように、最終的には、開口部2に、前記蓋部材12を嵌め 込み、その上面にコンクリートCを打設して、作業用の開口部2を塞ぐことによ り、床版1が形成される。Further, after removing the drainage equipment A from the floor slab 1, if the closing plate 14 for closing the opening 2 is placed on the step 2 a of the opening 2 as in the floor slab 1 on the lower floor 13. It can be prevented from falling. At this time, since the step portion 2a is provided in the opening portion 2, the closing plate 14 and the floor slab 1 can be flush with each other, and the risk of tripping the operator can be prevented. Then, as shown in FIG. 5, finally, by fitting the lid member 12 into the opening 2 and placing concrete C on the upper surface thereof to close the working opening 2. The floor slab 1 is formed.

【0017】 上記の作業を予め定められた人員の作業員が所定日数で順次実施するように施 工サイクルを設定し、この施工サイクルを、下層階から上層階へ順次各施工階で 繰り返すことにより、図2および図3に示したマンションMの床版1の施工が完 了する。By setting a working cycle such that the above-mentioned work is carried out by a predetermined number of workers in sequence for a predetermined number of days, and repeating this construction cycle from the lower floor to the upper floor in each construction floor in sequence. The construction of the floor slab 1 of the condominium M shown in FIGS. 2 and 3 is completed.

【0018】 上述した排水設備Aでは、コンクリートCを打設した上層階7から直下階8の 床版1上に滴り落ちた水や側方から侵入した雨水等を、作業者がかき集めて開口 部2から排水設備Aの集水樋4に流し込むと、この水は集水樋4の排水孔3から 排水管5に流れ込み、排水管5の他端(図示なし)からバルコニーの排水樋を介 して外部に排出される。これにより、排水の処理作業が効率化されるので、予め 定められた人員の作業員が所定日数で順次実施するように施工サイクルを設定し 、この施工サイクルを、下層階から上層階へ順次各施工階で繰り返してマンショ ンMの床版1を施工するに際して、従来のように排水の処理のためにわざわざ手 間をかける必要がないので、前記施工サイクルが中断されることなく、効率よく 施工作業を行うことができるうえ人員コストを低減することができ、これにより マンションMの施工のローコスト化を図ることができる。 また、排水設備Aを順次上層階へ転用することができるので、この点からもロ ーコスト化することができる。 また、開口部2の上端縁部に段部2aを設けたので、ここに、開口部2を塞い で落下防止とするための塞ぎ板14をかけたときに、塞ぎ板14と床版1とを面 一とすることができ、作業者がつまずくなどの危険を防ぐことができる。In the drainage facility A described above, the operator scrapes water dripping on the floor slab 1 from the upper floor 7 on which the concrete C has been cast to the floor slab 1 on the floor 8 directly below or rainwater that has entered from the side, and the opening When it is poured from 2 into the drainage gutter 4 of the drainage facility A, this water flows into the drainage pipe 5 from the drainage hole 3 of the drainage gutter 4, and from the other end (not shown) of the drainage pipe 5 through the drainage gutter of the balcony. Is discharged to the outside. This will improve the efficiency of the wastewater treatment work.Therefore, set a construction cycle so that a predetermined number of workers will carry out the work in a predetermined number of days in sequence, and carry out this construction cycle sequentially from the lower floors to the upper floors. When repeatedly constructing the floor slab 1 of the Mansion M on the construction floor, there is no need to take the trouble of treating the wastewater as in the conventional method, so that the construction cycle is not interrupted and the construction is efficiently performed. In addition to being able to perform work, the personnel cost can be reduced, which can reduce the construction cost of the condominium M. Moreover, since the drainage facility A can be sequentially diverted to the upper floors, the low cost can be achieved also from this point. Further, since the step portion 2a is provided at the upper edge portion of the opening portion 2, when the closing plate 14 for closing the opening portion 2 to prevent the fall is applied, the closing plate 14 and the floor slab 1 are It is possible to prevent the danger of workers tripping over.

【0019】[0019]

【考案の効果】[Effect of device]

以上説明したように、本考案の規格型集合住宅を施工するときに用いる仮設用 床排水設備によれば、コンクリートを打設した階から直下階の床版上に滴り落ち た水や側方から侵入した雨水等を、作業者がかき集めて開口部から集水樋に流し 込むと、この水は集水樋の排水孔から排水管に流れ込み、排水管の他端から外部 に排出される。これにより、排水の処理作業が効率化されるので、予め定められ た人員の作業員が所定日数で順次実施するように施工サイクルを設定し、この施 工サイクルを、下層階から上層階へ順次各施工階で繰り返して規格型集合住宅を 施工するに際して、従来のように排水の処理のためにわざわざ手間をかける必要 がないので、前記施工サイクルが中断されることなく、効率よく施工作業を行う ことができるうえ人員コストを低減することができ、これにより規格型集合住宅 の施工のローコスト化を図ることができる。また、この仮設用床排水設備を順次 上層階へ転用することにより、さらにローコスト化を図ることが可能となる。 As explained above, according to the temporary floor drainage system used when constructing the standard type apartment house of the present invention, water dripping onto the floor slab on the floor directly below the floor where concrete is placed and from the side When the operator collects the invading rainwater and pours it into the water collecting trough through the opening, this water flows from the drain hole of the water collecting trough into the drain pipe, and is discharged to the outside from the other end of the drain pipe. By doing so, the wastewater treatment work will be more efficient.Therefore, the construction cycle is set so that the workers with a predetermined number of workers will carry out the work in a predetermined number of days in sequence, and this work cycle is carried out sequentially from the lower floors to the upper floors. When repeatedly constructing standard type housing on each construction floor, there is no need to take the trouble of treating wastewater as in the past, so the construction cycle is not interrupted and construction work is performed efficiently. In addition to being able to reduce the personnel cost, it is possible to reduce the construction cost of a standard type housing complex. In addition, by gradually converting this temporary floor drainage system to the upper floors, it becomes possible to further reduce costs.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に係る規格型集合住宅を施工するときに
用いる仮設用床排水設備の一例を示す正断面図である。
FIG. 1 is a front sectional view showing an example of a temporary floor drainage facility used when constructing a standard type apartment house according to the present invention.

【図2】同設備を適用して建設中の規格型集合住宅を示
す平面図である。
FIG. 2 is a plan view showing a standard type apartment house under construction applying the same equipment.

【図3】同規格型集合住宅を示す正面図である。FIG. 3 is a front view showing the standard type apartment house.

【図4】同規格型集合住宅に、仮設用床排水設備を取り
付けた状態を示す正断面図である。
FIG. 4 is a front cross-sectional view showing a state where temporary floor drainage equipment is attached to the standard type apartment house.

【図5】同規格型集合住宅において、開口部を塞いだ状
態を示す正断面図である。
FIG. 5 is a front cross-sectional view showing a state in which the opening is closed in the standard type apartment house.

【符号の説明】[Explanation of symbols]

2 開口部 3 排水孔 4 集水樋 5 排水管 6 パッキン材 7 上層階(コンクリートを打設する階) 8 直下階 A 排水設備(仮設用床排水設備) J 住戸 M マンション(規格型集合住宅) 2 Opening 3 Drainage hole 4 Water collection gutter 5 Drain pipe 6 Packing material 7 Upper floor (floor where concrete is laid) 8 Directly below floor A Drainage facility (temporary floor drainage facility) J Dwelling Unit M Mansion (standard apartment complex)

───────────────────────────────────────────────────── フロントページの続き (72)考案者 小川 春義 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)考案者 中村 俊弘 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)考案者 西澤 伸哉 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Haruyoshi Ogawa, 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Toshihiro Nakamura 1-3-2, Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Shinya Nishizawa 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 3階以上の階層を有しているとともに各
階に複数の住戸が順次隣接するように配置されているこ
とにより、多数の住戸が左右方向に連続しかつ上下方向
に重ねられて設けられており、それら多数の住戸のうち
の少なくとも上下に重なる住戸どうしは平面プランおよ
び立面プラン共に同一に形成されてなる規格型集合住宅
を施工するときに用いる仮設用床排水設備であって、コ
ンクリートを打設する階の直下階の床版に型枠パネル等
の資材搬送用の仮設の開口部が形成され、該開口部の下
面には、該開口部を覆いかつ排水孔を備えた集水樋が取
付けられ、該集水樋の前記排水孔には排水管の一端が取
付けられて、該排水管の他端がこの規格型集合住宅の外
部へと通じるように配されてなり、さらに前記集水樋と
開口部の下面との間にはパッキン材が介装されているこ
とを特徴とする規格型集合住宅を施工するときに用いる
仮設用床排水設備。
1. A plurality of dwelling units are consecutive in the left-right direction and stacked in the up-down direction by having three or more floors and arranging a plurality of dwelling units on each floor so as to be adjacent to each other. Of the many dwelling units, at least the upper and lower dwelling units are temporary floor drainage facilities to be used when constructing standard type apartment houses with the same plan and elevation plan. , A temporary opening for transporting materials such as formwork panels is formed in the floor slab immediately below the floor where concrete is placed, and the lower surface of the opening is provided with a drain hole covering the opening. A water collecting gutter is attached, one end of a drainage pipe is attached to the drainage hole of the water collecting gutter, and the other end of the drainage pipe is arranged so as to communicate with the outside of this standard type housing complex. Furthermore, between the water collecting gutter and the lower surface of the opening. A temporary floor drainage facility used when constructing a standard apartment house, characterized in that a packing material is inserted in the interior.
JP2770993U 1993-05-26 1993-05-26 Temporary floor drainage equipment used when constructing standard apartment houses Withdrawn JPH0685860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2770993U JPH0685860U (en) 1993-05-26 1993-05-26 Temporary floor drainage equipment used when constructing standard apartment houses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2770993U JPH0685860U (en) 1993-05-26 1993-05-26 Temporary floor drainage equipment used when constructing standard apartment houses

Publications (1)

Publication Number Publication Date
JPH0685860U true JPH0685860U (en) 1994-12-13

Family

ID=12228531

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2770993U Withdrawn JPH0685860U (en) 1993-05-26 1993-05-26 Temporary floor drainage equipment used when constructing standard apartment houses

Country Status (1)

Country Link
JP (1) JPH0685860U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009119518A1 (en) * 2008-03-28 2009-10-01 東芝プラントシステム株式会社 Temporary drainage facility and temporary drainage method
WO2009119516A1 (en) * 2008-03-26 2009-10-01 東芝プラントシステム株式会社 Floor slab penetration structure and method of repairing floor slab penetrating hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009119516A1 (en) * 2008-03-26 2009-10-01 東芝プラントシステム株式会社 Floor slab penetration structure and method of repairing floor slab penetrating hole
JP5172948B2 (en) * 2008-03-26 2013-03-27 東芝プラントシステム株式会社 Floor slab penetration structure and repair method of floor slab penetration hole
WO2009119518A1 (en) * 2008-03-28 2009-10-01 東芝プラントシステム株式会社 Temporary drainage facility and temporary drainage method
JP5172949B2 (en) * 2008-03-28 2013-03-27 東芝プラントシステム株式会社 Temporary drainage facility and temporary drainage method

Similar Documents

Publication Publication Date Title
US7992236B2 (en) Mock shower drain and associated methods
US8925123B2 (en) Segmented drain systems
KR101776805B1 (en) Prefabricated bridge drainage system
EP1165909A1 (en) Demountable modular floor for watertight raised decks
US6698148B1 (en) Demountable modular floor for watertight raised decks
JPH0685860U (en) Temporary floor drainage equipment used when constructing standard apartment houses
JP2001011927A (en) Drain piping structure in wooden house
KR101231693B1 (en) Catch basin for adjustable bridge and its construction method
US20210238875A1 (en) Gutter system for a swimming pool and swimming pool having the gutter system
JP3927649B2 (en) Emergency toilet structure
JPH06307096A (en) Construction method for temporary roof in building works
JPH084358A (en) Tent structure
JP3889497B2 (en) Molding method for concrete basement
GB2030203A (en) Forming drainage passages
KR20100125168A (en) An apparatus for collecting water and removing sewage in a bridge and constructing method using the same
JP2733560B2 (en) Slab construction method
KR20060029830A (en) Method of drainage trench construction and structure thereof
JPH0346070Y2 (en)
KR102337379B1 (en) Drainage Equipment for Underground Parking Lot
US6152652A (en) Apparatus and method for installing a dynamometer pit in cementitious material
KR102105970B1 (en) A movable toilet and method for thereof
JP7553965B2 (en) Water collecting device
JPH06336831A (en) Work method for drainage ditch formwork for balcony of standard type multi-habitation dwelling
SU1735544A1 (en) Method of reinforcing multi-storey buildings with basement
AU2003100694A4 (en) Road pit lid

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 19971106