JPH0680390A - Working equipment for construction material - Google Patents

Working equipment for construction material

Info

Publication number
JPH0680390A
JPH0680390A JP9590992A JP9590992A JPH0680390A JP H0680390 A JPH0680390 A JP H0680390A JP 9590992 A JP9590992 A JP 9590992A JP 9590992 A JP9590992 A JP 9590992A JP H0680390 A JPH0680390 A JP H0680390A
Authority
JP
Japan
Prior art keywords
arm
post
pair
plate portion
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9590992A
Other languages
Japanese (ja)
Other versions
JPH08666B2 (en
Inventor
Takanori Nakada
高昇 中田
Tadashi Otani
忠 大谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NAKADAGUMI KK
Shokusan Jutaku Sogo Co Ltd
Original Assignee
NAKADAGUMI KK
Shokusan Jutaku Sogo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NAKADAGUMI KK, Shokusan Jutaku Sogo Co Ltd filed Critical NAKADAGUMI KK
Priority to JP9590992A priority Critical patent/JPH08666B2/en
Publication of JPH0680390A publication Critical patent/JPH0680390A/en
Publication of JPH08666B2 publication Critical patent/JPH08666B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To reduce the labor by suspending construction materials such as panels toward construction members under construction so as to facilitate attachment thereto. CONSTITUTION:A height adjusting equipment 19 where a base 3 to be fixed to the floor and a jack 4 are provided at the lower end of a post 2, a locking means 20 to be locked to the structural member on the upstairs side is provided at the upper end of the post 2 is provided, a first arm 46 is fixed to a sleeve shaft 40 mounted on the post 2, and a shaft rod 58 to be pivotably supported by bearing pieces 60, 61 and supporting shafts 64, 65 is interposed between the tip of the first arm 46 and the base of a second arm 57. A holding means 81 which mounts the construction materials and easily holds them is mounted on the lower end hook of a wire rope 80 of the winch 78 mounted on the tip of the arm 72, the winch 78 lifts/lowers and holds the materials by the switch at the base end of the cord, and the materials are moved by slightly pushing/ pulling the arm 72.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は鉄骨鉄筋コンクリート建
築物のパネル、間柱などの建築材料の建付作業に用いる
装置に関し、特に中層及低層建築物を建築するに際し、
装置を折畳んで持ち運び、狭少な場所や柱に接近した外
壁部分でも容易に移動して建付け得る作業装置に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus used for the construction work of building materials such as panels and studs of steel-framed reinforced concrete buildings, and particularly when building middle-rise and low-rise buildings,
The present invention relates to a working device that can be folded and carried, and can be easily moved and installed even in a narrow space or an outer wall portion near a pillar.

【0002】[0002]

【従来の技術】従来、この種の作業装置は高層建築物の
建築に際して大規模作業の効率化のため、手元の携帯用
スイッチ盤で前後左右に走行する台車上で前方に突出し
た伸縮自在なアームが昇降し、アーム先端側には左右上
下に角度調節自在な材料把持手段が設けられたロボット
と称する多種類の作業装置が提案されている。
2. Description of the Related Art Conventionally, in order to improve the efficiency of large-scale work when constructing a high-rise building, a work device of this type has a portable switch panel at hand, which extends forward and backward on a trolley traveling forward, backward, leftward and rightward. There have been proposed various types of working devices called robots in which an arm moves up and down, and a material gripping means whose angle can be adjusted vertically and horizontally is provided on the tip side of the arm.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記の
如き従来技術であるロボット作業装置は大重量で嵩張っ
ており大型の作業用リフトがない低層狭少な建築物の建
築に当っては持ち上げ不可能である。更に、前記ロボッ
トのアーム自体は伸縮自在であっても水平方向に旋回折
曲しないので柱に接近した外壁パネルを内部作業床面か
ら隣家との狭い隙間を通過して建付ける作業は困難性を
伴うものであり、必然的に熟練作業員の重労働に頼る結
果となっていた。
However, the conventional robot working apparatus as described above is heavy and bulky and cannot be lifted when building a low-rise narrow building without a large work lift. Is. Furthermore, even if the robot arm itself is expandable and contractible, it does not rotate and bend in the horizontal direction, so it is difficult to construct an outer wall panel approaching a pillar through a narrow gap between the inner working floor and the next house. This was accompanied by an inevitable result of relying on the heavy labor of skilled workers.

【0004】本発明は従来技術の有する問題点に鑑みて
なされたものであり、装置の部材を取外すようにして容
易に解体し上階側床面と梁材との間に支柱(ポスト)を
圧着固定し、支柱に枢着して回動する複数個からなる水
平なアームは360°の範囲に手動で角度自在に回動且
つ折畳むことができ、アームの全長を半径とする如何な
る位置にも材料を移動配設するようになし、更に柱や材
料積重物などの障害物裏側の狭少な位置でも廻り込んで
移動しながら建付けることを目的とするものである。
The present invention has been made in view of the problems of the prior art, and is easily disassembled by removing the members of the apparatus to form columns (posts) between the upper floor and the beams. A horizontal arm composed of a plurality of parts that are fixed by crimping and pivotally attached to a column can be manually pivoted and folded freely within a 360 ° range, and the arm can be placed at any position whose radius is the entire length of the arm. The material is designed not to be moved and arranged, and is intended to be installed while moving around even in a narrow position on the back side of an obstacle such as a pillar or a material stack.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
本発明における建築用作業装置は円形管からなるポスト
の下端部には床面に配設する台を具えたジャッキを有
し、ポスト上端部には上端が梁材等と固定する圧着係止
部を具えた高さ調節機を設ける。ポストの所望高さ位置
には回動自在なスリーブ軸を介装し、スリーブ軸には第
1のアームを水平に固設する。第1のアーム先端には軸
受片を突設し、軸受片には軸杆の突片より設けた支軸を
軸挿する。前記軸杆の支軸位置と直径方向に対向する位
置には突片を突出して支軸を起立し、この支軸には第2
のアーム基端より突出した軸受片を介装する。第2のア
ーム先端に設けた軸受片には第3のアーム基端に設けた
支軸付突片を介装して3個のアームを回動及び旋回折曲
可能に設ける。
In order to achieve the above-mentioned object, a working apparatus for construction according to the present invention has a jack having a pedestal arranged on the floor at the lower end of a post made of a circular tube, and the upper end of the post. A height adjuster equipped with a crimping and locking part whose upper end is fixed to a beam or the like is provided on the part. A rotatable sleeve shaft is provided at a desired height position of the post, and a first arm is horizontally fixed to the sleeve shaft. A bearing piece is projectingly provided at the tip of the first arm, and a support shaft provided by the projecting piece of the shaft rod is axially inserted into the bearing piece. At a position diametrically opposed to the support shaft position of the shaft rod, a projecting piece is projected to raise the support shaft, and the support shaft has a second
The bearing piece protruding from the base end of the arm is interposed. A bearing piece provided at the tip of the second arm is provided with a protrusion with a support shaft provided at the base end of the third arm, and three arms are provided so as to be pivotable and turnable.

【0006】前記第3のアーム先端よりロープでウイン
チを吊下し、ウインチのワイヤロープ下端には床プレー
トなどの材料を掴む数種類の把持手段を選択的に設け
る。そして、ウインチより引出したコードは適宜アーム
に設けた掛け金具を介して基端に設けた携帯用スイッチ
盤により材料を掴んで配設箇所に適合するよう上下動さ
せて調節する。
A winch is suspended from the tip of the third arm by a rope, and several kinds of gripping means for gripping a material such as a floor plate are selectively provided at the lower end of the wire rope of the winch. Then, the cord pulled out from the winch is adjusted by moving it up and down so as to fit the material by grasping the material with a portable switch board provided at the base end through a hanging metal fitting provided on the arm.

【0007】[0007]

【作用】施工すべき範囲内の梁材直下の床位置にポスト
を仮起立し、ポスト上端部に螺挿した調節具を回転上昇
させ、調節具上端の係止部を梁材下面に接触させる。そ
れから、ポスト下端部のジャッキを回動して前記係止部
を梁材に圧着係止する。
[Operation] The post is temporarily erected at the floor position directly below the beam within the range to be constructed, and the adjuster screwed on the upper end of the post is rotated and raised, and the locking part at the upper end of the adjuster is brought into contact with the lower surface of the beam. . Then, the jack at the lower end of the post is rotated to crimp and lock the locking portion to the beam member.

【0008】起立したポストのスリーブ軸に設けたブラ
ケットに第1のアーム基端をボルト止めする。第1のア
ーム先端の軸受片には軸杆に設けた支軸を上側から差し
込んで180°の角度範囲に亘り旋回自在に枢着する。
軸杆の前記軸受片とは対向位置に設けた支軸には第2の
アーム基端に設けた軸受片を上側から差し込んで180
°の角度範囲に亘り旋回自在に枢着する。施工する建築
物の床面積が狭いか、作業をより容易にするため狭い床
の範囲内にパネルを敷設する場合は第2のアームまでを
装着するだけでよい。これはスリーブ軸で第1のアーム
を全方位方向に回動配置することができ、第2のアーム
は軸杆を介在させているために第1のアームの両側面に
重合するまで旋回させて折畳状態とすることができ、材
料を第1、第2の長さ範囲のあらゆる位置に移動配設で
きるからである。
The first arm base end is bolted to a bracket provided on the sleeve shaft of the upright post. A support shaft provided on a shaft rod is inserted into the bearing piece at the tip of the first arm from the upper side, and is pivotally attached over an angle range of 180 °.
The bearing piece provided at the base end of the second arm is inserted into the support shaft provided at the position opposite to the bearing piece of the shaft rod from the upper side, and 180
It is pivotally pivoted over an angle range of °. When the floor area of the building to be constructed is small or the panel is laid within the narrow floor area to make the work easier, it is sufficient to install up to the second arm. This is because the first arm can be pivotally arranged in all directions by the sleeve shaft, and the second arm can be rotated until it overlaps with both side surfaces of the first arm because the rod is interposed. This is because it can be folded and the material can be moved and disposed at any position within the first and second length ranges.

【0009】第2のアーム先端に軸受片を設け、これに
第3のアーム基端の支軸を上側から差し込んで枢着する
と、第3のアームは第2のアームに対して両側方に直角
方向まで回動する。第2、第3のアームを軽く手押しす
るとポストに対して容易に旋回しながら材料を所望位置
に移動可能である。
When a bearing piece is provided at the tip of the second arm and a support shaft of the base end of the third arm is inserted and pivotally attached to the bearing piece from above, the third arm is perpendicular to both sides of the second arm. Rotate to the direction. When the second and third arms are lightly pushed by hand, the material can be moved to a desired position while easily turning with respect to the post.

【0010】アーム先端よりロープで吊下げたウインチ
を設け、ウインチのワイヤロープ下端には把持手段を設
ける。この把持手段で材料を掴むと、ウインチのスイッ
チで作動させながら、所望高さに持ち上げ位置を保持し
て移動する。
A winch suspended from the arm tip by a rope is provided, and a gripping means is provided at the lower end of the wire rope of the winch. When the material is grasped by the grasping means, the material is lifted to a desired height and moved while being operated by a winch switch.

【0011】材料の把持手段は数個の種類があり、床パ
ネルの場合は1個また2個の把持手段を用いて水平に保
持しながら配設位置に移動し、壁パネルの場合は長手方
向一端部を把持して吊下げながら移動して取付け作業の
容易化する。
There are several kinds of gripping means for the material. In the case of the floor panel, one or two gripping means are used to move horizontally to the disposing position while holding horizontally, and in the case of the wall panel, the longitudinal direction. It facilitates installation work by gripping one end and moving it while suspending.

【0012】[0012]

【実施例】実施例について図面を参照して説明する。図
1において、支柱1は円形管からなるポスト2を垂直に
配置し、ポスト2の下部には基台3と一体的なジャッキ
4が装着される。基台3は床部5に載置する台板6の中
心より上部にジャッキのオネジ部7を刻設した軸杆8を
起立する。軸杆8の下部には半径方向に4個の補強リブ
9を突設する。基台3は不用意な滑り移動を防止するた
めリブ9に穿設した孔と適宜な構造材との間にターンバ
ックルを有するワイヤロープ10を張設してもよい。
EXAMPLES Examples will be described with reference to the drawings. In FIG. 1, a post 1 is a vertically arranged post 2 formed of a circular tube, and a jack 4 integral with a base 3 is attached to a lower portion of the post 2. The base 3 has a shaft rod 8 in which a male screw portion 7 of a jack is engraved above the center of a base plate 6 placed on the floor 5. Four reinforcing ribs 9 are provided on the lower part of the shaft rod 8 in a radial direction. The base 3 may have a wire rope 10 having a turnbuckle stretched between a hole formed in the rib 9 and an appropriate structural material in order to prevent accidental sliding movement.

【0013】前記軸杆8には環部材11を介装してリブ
9に係合させ、環部材11の上側軸杆部には折畳みレバ
ー12を枢着し、メネジを刻設した駆動環13を螺装し
てジャッキを形成する。レバー付駆動環13の上側のオ
ネジ部7には環部材14を介装する。上下の両環部材1
1、14を設けることにより駆動環のレバーによる回動
を円滑にする。環部材14上のメネジ部7にはスリーブ
15を嵌入したポスト下端部を介装する。該スリーブ1
5によりポスト2は軸杆8の軸線方向に動揺することな
く装着される。
A ring member 11 is provided on the shaft rod 8 so as to be engaged with a rib 9, and a folding lever 12 is pivotally attached to an upper shaft rod portion of the ring member 11, and a drive ring 13 is engraved with a female screw. To form a jack. A ring member 14 is provided on the male thread 7 on the upper side of the drive ring 13 with lever. Upper and lower ring members 1
Providing 1 and 14 facilitates the rotation of the drive ring by the lever. The lower end portion of the post in which the sleeve 15 is fitted is interposed in the female screw portion 7 on the ring member 14. The sleeve 1
5, the post 2 is mounted without shaking in the axial direction of the rod 8.

【0014】ポスト2の上端部にはメネジ環16より下
方に伸長して外径が小径のスリーブ17が嵌入固着され
る。メネジ環16にはオネジ杆18を螺装して高さ調整
機19が設けられる。オネジ杆18の上端には係止手段
20が設けられる。係止手段20は図1、図2に示す如
く、オネジ杆上端に固着した平板部21の一側部を上方
内側にコ字状に折曲して溝部22を形成し、平板部21
の下面両側部にはそれぞれ一対のナット23、24、2
3a、24aを突設する。一方、前記溝部22と対応す
る位置には断面コ字状の可動部25が設けられ、その下
面両側部にナット26、26aと突出する。そして、両
側部の各ナット23、24、26、及び23a、24
a、26aにハンドルを有する鍔付きボルト27、27
aを螺装した構成のものである。この係止手段20は平
板部21を手に持って回動することにより高さ調整機1
9を介して上昇し、H型鋼材からなる梁28の下側フラ
ンジ29に平板部21が接触する。このとき、ボルト2
7、27aを回動して溝22と可動部25の溝25aと
でフランジ29の両側縁と係合する。それから、ポスト
下部のレバー12で駆動環13を回動して強固に圧着固
定する。
At the upper end of the post 2, a sleeve 17 that extends downward from the female thread ring 16 and has a small outer diameter is fitted and fixed. A height adjuster 19 is provided by screwing a male thread rod 18 on the female thread ring 16. Locking means 20 is provided at the upper end of the male screw rod 18. As shown in FIGS. 1 and 2, the locking means 20 has a groove 22 formed by bending one side portion of the flat plate portion 21 fixed to the upper end of the male screw rod upward inward to form a groove portion 22.
A pair of nuts 23, 24, 2 on both sides of the lower surface of the
3a and 24a are projected. On the other hand, a movable portion 25 having a U-shaped cross section is provided at a position corresponding to the groove portion 22, and nuts 26 and 26a project from both sides of the lower surface thereof. Then, the nuts 23, 24, 26 and 23a, 24 on both sides
a, 26a with a flanged bolt 27, 27 having a handle
It has a configuration in which a is screwed. The locking means 20 is rotated by holding the flat plate portion 21 in the hand to adjust the height adjuster 1.
9 and the flat plate portion 21 comes into contact with the lower flange 29 of the beam 28 made of H-shaped steel. At this time, bolt 2
By rotating 7 and 27a, the groove 22 and the groove 25a of the movable portion 25 are engaged with both side edges of the flange 29. Then, the drive ring 13 is rotated by the lever 12 at the lower part of the post to firmly crimp and fix it.

【0015】図3は他の実施例の係止手段20aであ
る。オネジ軸杆18上端に平板21aが固設され、この
平板21aの上面4隅に先尖り状の突子30を起立して
梁材のフランジ29にジャッキ押圧力で係止させたもの
である。
FIG. 3 shows a locking means 20a of another embodiment. A flat plate 21a is fixedly provided on the upper end of the male screw shaft rod 18, and pointed protrusions 30 are erected at the four corners of the upper surface of the flat plate 21a and are locked to the flange 29 of the beam member by a jack pressing force.

【0016】ポスト2の適所の高さ位置のピン孔32に
はピン33を貫通させ、ピン33上のポスト部分には座
環34とボールベアリング35介装する。前記座環34
には掛孔37を穿った複数の突片38を突設する。これ
は屋上にポストを起立するとき、ロープ39を張設する
ものである。
A pin 33 is passed through a pin hole 32 at a proper height position of the post 2, and a seat ring 34 and a ball bearing 35 are interposed in the post portion on the pin 33. The seat ring 34
A plurality of projecting pieces 38 having hooking holes 37 are provided to protrude. This is to stretch the rope 39 when the post is erected on the roof.

【0017】前記ボールベアリング上部のポスト部には
図1、図4に示す如くスリーブ軸40を回動自在に介装
する。スリーブ軸40は筒部材41の上下端部内側面に
環状のコア42を固着して円滑にポスト2周面を回動さ
せる。筒部材41の周面の長手方向にボルト孔を有する
断面U字状の筐体43とその両側部に補強板44とから
なるブラケット45を固設する。
A sleeve shaft 40 is rotatably interposed in the post portion above the ball bearing as shown in FIGS. The sleeve shaft 40 fixes the annular core 42 to the inner surfaces of the upper and lower ends of the tubular member 41 to smoothly rotate the circumferential surface of the post 2. Brackets 45, each of which is composed of a casing 43 having a U-shaped cross section having a bolt hole in the longitudinal direction of the peripheral surface of the tubular member 41 and reinforcing plates 44 on both sides thereof, are fixed.

【0018】前記ブラケット45には第1のアーム46
の基端側の縦枠51をボルト47と2個のナット48で
固定する。アーム46は軽量溝形鋼材や山形鋼材で成形
する。アーム46は上下の長く水平な溝形鋼材からなる
水平枠49、50と両端の溝形鋼材からなる縦枠51、
52とにより長方形状に形成し、上下の鋼材間には補強
材53で強固に形成する。下枠50の前部には取付片5
4に一端を枢着した手押し用のレバー55を折畳み可能
に設け、先端にはケーブルの掛け片56を設ける。
A first arm 46 is attached to the bracket 45.
The vertical frame 51 on the base end side of is fixed with bolts 47 and two nuts 48. The arm 46 is made of lightweight channel steel or chevron steel. The arm 46 includes horizontal upper and lower horizontal frames 49 and 50 made of channel steel, and vertical frames 51 made of channel steel at both ends.
52 and 52 to form a rectangular shape, and a reinforcing material 53 is firmly formed between the upper and lower steel materials. A mounting piece 5 is attached to the front part of the lower frame 50.
4, a lever 55 for pushing a hand, one end of which is pivotally attached, is provided so as to be foldable, and a cable hanging piece 56 is provided at the tip.

【0019】第1のアーム46と第2のアーム57とは
図1、図5に示す如く軸杆58を介在させて両者を枢着
する。アーム46の先端側縦枠52端面の上下部には軸
受片60、61を前方に突出する。一方介在する軸杆の
上下部には突片62、63を突出し、この突片より下方
に向って支軸64、65を設ける。そして上下の支軸6
4、65を前記軸受片60、61の軸孔に挿入して枢支
する。軸杆58の前記支軸とは直径方向の相対向位置で
僅か下部に突片60a、61aを突出する。この上下両
突片60a、61aに支軸64a、65aを起立する。
一方第2のアーム57の基端側縦枠66の上下部より後
方に軸受片60a、61aを突設する。この軸受片60
a、61aを支軸64a、65aに嵌合して第2のアー
ムを枢支する。第2のアーム57はアーム46の如く、
上下の枠67、68と前後の縦枠66と69とにより僅
かに先細状で長方形状アーム57に形成し、中間部に補
強枠70を設ける。尚前記下側の突片と軸受片との間に
はボールベアリングを設けて円滑に旋回させる。
The first arm 46 and the second arm 57 are pivotally attached to each other with an axial rod 58 interposed as shown in FIGS. Bearing pieces 60, 61 project forward from the upper and lower portions of the end surface of the vertical frame 52 on the tip side of the arm 46. On the other hand, projecting pieces 62, 63 project from the upper and lower parts of the intervening shaft rod, and support shafts 64, 65 are provided downward from the projecting pieces. And the upper and lower support shafts 6
4, 65 are inserted into the shaft holes of the bearing pieces 60, 61 and are pivotally supported. Projecting pieces 60a and 61a project slightly below the diametrically opposed positions of the shaft rod 58 and the support shaft. The support shafts 64a and 65a are erected on the upper and lower projecting pieces 60a and 61a.
On the other hand, bearing pieces 60a and 61a are provided so as to project rearward from the upper and lower portions of the base-side vertical frame 66 of the second arm 57. This bearing piece 60
The second arm is pivotally supported by fitting a and 61a to the support shafts 64a and 65a. The second arm 57, like the arm 46,
The upper and lower frames 67 and 68 and the front and rear vertical frames 66 and 69 form a slightly tapered rectangular arm 57, and a reinforcing frame 70 is provided in the middle portion. A ball bearing is provided between the lower protruding piece and the bearing piece to smoothly rotate.

【0020】前記第1と第2のアーム及び、軸杆58と
は図5に示す如く、軸杆の支軸65と軸受片61aを結
ぶ軸線は第1のアームと、軸受片6を結ぶ軸線に対して
両側に向って直角方向まで旋回し、前記軸杆58の支軸
65と軸受片61aの軸線に対して第2のアーム57は
両側に向って直角方向まで旋回する。従って、第2のア
ーム57は第1のアーム46の両側に重合する360°
の角度まで旋回する。
As shown in FIG. 5, the first and second arms and the shaft rod 58 are connected to each other by an axis line connecting the support shaft 65 of the shaft rod and the bearing piece 61a with an axis line connecting the first arm and the bearing piece 6. With respect to both sides, the second arm 57 turns to the right angle with respect to the axis of the support shaft 65 of the shaft rod 58 and the bearing piece 61a. Therefore, the second arm 57 overlaps both sides of the first arm 46 by 360 °.
Turn to the angle.

【0021】前記第2のアーム57の下枠68には手動
用レバー55aが設けられると共に先端下部にはケーブ
ルを掛けるかウインチを吊下する掛片56aが設けられ
る。
A manual lever 55a is provided on the lower frame 68 of the second arm 57, and a hanging piece 56a for hanging a cable or hanging a winch is provided at the lower end of the tip.

【0022】第2のアームの先端側縦枠69には上下一
対の軸受片60b、61bを突設すする。これに枢着す
る第3のアーム72には基端側縦枠の上下部に一対の突
片62b、63bと該突片より下方に向って支軸64
b、65bが設けられ、そして、夫々軸受片に支軸が挿
入されて枢着される。第3のアーム72は水平な上枠7
4の先端に基端を縦枠73の下端に接続した下枠75の
先端が固設され、補強枠76はトラス状に連結される。
そして先端に設けた掛片77の孔にはウインチ78を吊
下するロープ79が結接される。第3のアーム72は第
2のアームの軸線の両側に直角位置まで回動する。これ
により、狭少な位置や柱の裏側位置に配設する壁パネル
や床パネルを容易に移動して取付けることが可能であ
る。また、ウインチ78に換えてチェーンブロックを用
いてもよい。
A pair of upper and lower bearing pieces 60b, 61b are provided on the vertical frame 69 on the tip side of the second arm so as to project therefrom. The third arm 72 pivotally attached to this has a pair of projecting pieces 62b, 63b at the upper and lower parts of the base end side vertical frame and a support shaft 64 directed downward from the projecting pieces.
b and 65b are provided, and a spindle is inserted into each of the bearing pieces and pivotally attached thereto. The third arm 72 has a horizontal upper frame 7.
The front end of the lower frame 75, whose base end is connected to the lower end of the vertical frame 73, is fixed to the front end of 4, and the reinforcing frame 76 is connected in a truss shape.
A rope 79 for suspending the winch 78 is connected to the hole of the hanging piece 77 provided at the tip. The third arm 72 pivots on both sides of the axis of the second arm to a right angle position. As a result, it is possible to easily move and attach the wall panel or the floor panel arranged at the narrow position or the position on the back side of the pillar. A chain block may be used instead of the winch 78.

【0023】前記ウインチ78のワイヤロープ80下端
に設けたフックには材料把持手段が設けられる。把持手
段は材料を移動及び取付易いように水平または水垂方向
に掴んで保持しながら移動する。
A material gripping means is provided on the hook provided at the lower end of the wire rope 80 of the winch 78. The gripping means moves while holding and holding the material horizontally or in a water drop direction so that the material can be easily moved and attached.

【0024】図6は第1の把持手段81であって、同長
のリンク杆82、83と該リンク杆の2倍の長さのリン
ク杆84、85の1/2の位置を軸杆86、87、8
8、89の一端で枢着してパンタグラフ式の等長平行リ
ンク機構を形成し、リンク杆84、85の伸長部先端に
は補強リブ90を介してフィンガ91を下方に突設す
る。各軸杆86、87、88、89の他端にはリンク杆
82a、83a、84a、85aからなる前記リンク機
構と同一構成の平行リンク機構を枢着する。そして、8
4a、85aの先端にも補強リブを有するフィンガ91
aを設ける。軸杆87、88にはハンドル92を有する
ボルト93を螺挿する。ハンドルを回動することにより
材料95を夫々両側の一対のフィンガ91、91aで挾
持する。軸86の中央部にはリング96を設け、リング
96にはウインチのワイヤロープ下端に設けたフックで
掛け吊りする。この把持手段81は主として床パネルか
らなる材料95を水平に持ち上げて移動し配設するため
に使用される。
FIG. 6 shows the first gripping means 81, in which the link rods 82, 83 having the same length and the link rods 84, 85 having a length twice that of the link rods are located at a half position of the shaft rod 86. , 87, 8
A pantograph-type equal-length parallel link mechanism is pivotally attached at one end of 8, 89, and a finger 91 is projected downward from the extension of the link rods 84, 85 via a reinforcing rib 90. At the other end of each shaft rod 86, 87, 88, 89, a parallel link mechanism having the same structure as the link mechanism including the link rods 82a, 83a, 84a, 85a is pivotally mounted. And 8
Fingers 91 having reinforcing ribs on the tips of 4a and 85a
a is provided. A bolt 93 having a handle 92 is screwed into the shaft rods 87 and 88. By rotating the handle, the material 95 is held by the pair of fingers 91, 91a on both sides. A ring 96 is provided at the center of the shaft 86, and the ring 96 is hung and hung by a hook provided at the lower end of the wire rope of the winch. This gripping means 81 is used for horizontally lifting, moving and arranging the material 95 mainly consisting of floor panels.

【0025】図7、8、9は第2の把持手段81aであ
って、パネル材料95の一側縁から他側縁近傍に達する
長方形状平板部98の両側中央部より方形状の切込99
を切欠し、平板部98の一側の両伸長部100の端縁よ
りパネル厚さに相当する長さの側壁部101と側壁部1
01下端より内側方に支持板部102とをU字形状に折
曲し、これによって形成された溝部分でパネルを挾持す
る。前記両伸長部100には2個のナット103、10
4を突設して、一端にハンドル105と鍔106を有す
るボルト107を螺挿する。平板部98の他側の両伸長
部108先端部上面の両側部より夫々一対の細長いガイ
ド板109の基端部を溶着し、このガイド板109はパ
ネル材料95の側縁部分に達する長さとする。
7, 8 and 9 show a second gripping means 81a, which is a rectangular cut 99 from the center of both sides of a rectangular flat plate portion 98 which extends from one side edge of the panel material 95 to the vicinity of the other side edge.
The side wall portion 101 and the side wall portion 1 having a length corresponding to the panel thickness from the end edges of the two extension portions 100 on one side of the flat plate portion 98
01 The support plate portion 102 and the support plate portion 102 are bent inward from the lower end, and the panel is held by the groove portion formed thereby. There are two nuts 103, 10 on each of the extension parts 100.
4 is projected, and a bolt 107 having a handle 105 and a collar 106 is screwed into one end. The base end portions of a pair of elongated guide plates 109 are welded from both sides of the upper surface of the tip end portion of both extension portions 108 on the other side of the flat plate portion 98, and the guide plate 109 has a length reaching the side edge portion of the panel material 95. .

【0026】前記ガイド板109に案内されてボルト1
07で移動締結される可動部110が形成される。可動
部110は両端がU字状に折曲されて覆板111を有す
る上板部112と垂直に折曲された側壁板部113と側
壁板部下端より内側方に折曲された支持板部114から
形成されている。そして、上板部112の上面には前記
ボルト107を螺挿する2個のナット115、116が
突設される。このような構成からなる可動部110はボ
ルト107をハンドルで回動することにより、ガイド板
109の両側部分を挟む覆板付上板部112が内側方向
に引き寄せられ、両側壁板部101、113と両支持板
部102、114とによりパネル材料95を確実に挾持
する。平板部98の中央部分にはリング118を有する
U字環119が固設され、ウインチのワイヤロープ先端
に設けたフックに掛け止めされる。
The bolt 1 is guided by the guide plate 109.
The movable part 110 which is moved and fastened at 07 is formed. The movable part 110 is bent at both ends in a U shape and has an upper plate part 112 having a cover plate 111, a side wall plate part 113 vertically bent, and a support plate part bent inward from the lower end of the side wall plate part. It is formed from 114. Two nuts 115 and 116, into which the bolt 107 is screwed, are projectingly provided on the upper surface of the upper plate portion 112. In the movable portion 110 having such a configuration, the upper plate portion 112 with a cover plate that sandwiches both side portions of the guide plate 109 is pulled inward by rotating the bolt 107 with the handle, and the side wall plate portions 101 and 113 are formed. The panel material 95 is securely held by the support plates 102 and 114. A U-shaped ring 119 having a ring 118 is fixed to the central portion of the flat plate portion 98, and is hooked on a hook provided at the tip of the wire rope of the winch.

【0027】図10、11、12に示す第3の把持手段
81bは床また壁パネルなどの材料95の一側縁部を挾
持して移動するものである。材料95の端面に配置する
上板部120の一端縁より材料の側面に圧接する断面L
字状の一方の押圧板121を形成し、平板部120と押
圧板121の内面には摩擦性のあるゴム材122を接着
する。前記平板部120の両端部近傍には長手方向に対
して直角方向に支持板123を起立する。支持板123
の一端部より押圧板121に亘って下方が細くなった補
強リブ124を溶着する。両補強リブ124の上部より
ナット部125を固着して、これにボルト126の先端
を螺装する。
The third gripping means 81b shown in FIGS. 10, 11 and 12 is for holding and moving one side edge portion of the material 95 such as a floor or a wall panel. A cross section L pressed against the side surface of the material from one edge of the upper plate portion 120 arranged on the end surface of the material 95.
One pressing plate 121 having a character shape is formed, and a rubber material 122 having frictional properties is bonded to the inner surfaces of the flat plate portion 120 and the pressing plate 121. Support plates 123 are erected in the vicinity of both ends of the flat plate portion 120 in a direction perpendicular to the longitudinal direction. Support plate 123
A reinforcing rib 124, which is narrowed downward from one end of the pressing plate 121, is welded. A nut portion 125 is fixed from the upper portion of both the reinforcing ribs 124, and the tip of a bolt 126 is screwed into this.

【0028】前記両支持板123の平板部より張り出し
た他端部には支軸127で上端部を枢着した保持リブ1
28を設ける。両保持リブ128の支軸の下部にはナッ
ト部125aを突出する。そしてハンドル129を有す
る鍔130つきの前記ボルト126を螺装する。両保持
リブ128の内側端縁には内面に先尖り突子131を有
する可動押圧板132を固着する。そして、平板部12
0の上面中央部にはリング133を有するU字環134
を固着したものである。この把持手段81bはボルト1
26を弛緩して、両押圧板121、132を材料の両側
面に配置する。そして、ボルト126を緊締してゆくと
押圧板121のゴム面で材料の一側面を圧着し、一方、
可動押圧板132は支軸127を中心として回動しなが
ら材料95の他側面を圧接すると共に突止131で材料
を係止する。このようにして材料を吊り下げながら移動
して配設する。
The other end of the support plate 123, which extends from the flat plate portion of the support plate 123, has a support rib 127 whose upper end is pivotally attached to the holding rib 1.
28 is provided. A nut portion 125a is projected from the lower portion of the support shaft of both the holding ribs 128. Then, the bolt 126 with the collar 130 having the handle 129 is screwed. A movable pressing plate 132 having a pointed protrusion 131 on its inner surface is fixed to the inner edges of both the holding ribs 128. Then, the flat plate portion 12
A U-shaped ring 134 having a ring 133 at the center of the upper surface of 0
Is fixed. This gripping means 81b is the bolt 1
26 is relaxed and both pressure plates 121, 132 are placed on opposite sides of the material. Then, as the bolt 126 is tightened, one side of the material is pressure-bonded with the rubber surface of the pressing plate 121, while
The movable pressing plate 132 presses the other side surface of the material 95 while rotating around the support shaft 127, and locks the material with the stop 131. In this way, the material is suspended and moved and disposed.

【0029】[0029]

【発明の効果】本発明は上述のとおり構成されているの
で、次に記載する効果を奏する。
Since the present invention is configured as described above, it has the following effects.

【0030】本発明装置の支柱はポスト下部のジャッキ
で上端の係止手段を上階側構造材に強固に係止起立可能
であり、係止手段は高さ調整機で上下動するので上階側
床材高さが建築物によって異なる場合でも容易に起立装
着可能である。
The post of the device of the present invention can firmly raise the upper end locking means to the upper floor side structural member by the jack under the post, and the locking means moves up and down by the height adjuster, so the upper floor Even when the height of the side floor material differs depending on the building, it can be easily installed upright.

【0031】支柱に枢着した第1の水平なアームは全方
位方向に回動し、第1のアームに軸杆を介在して枢着さ
れた第2のアームは第1のアームの両側面に重合するま
で360°の全方位方向に旋回するので、アームの全長
を半径とする範囲で如何な位置にも材料を吊り下げ移動
して容易に配設することが可能である。更に、アームの
枢着部はベアリングを介在させているので、アームを作
業員が軽く手押しすることにより回動旋回させることが
できる。
The first horizontal arm pivotally attached to the support column rotates in all azimuth directions, and the second arm pivotally attached to the first arm with an axial rod interposed therebetween has both side surfaces of the first arm. Since it is swiveled in all azimuth directions of 360 ° until it is superposed on the material, it is possible to suspend and move the material to any position within the range in which the entire length of the arm is the radius and to easily dispose the material. Further, since the bearing is interposed at the pivotal attachment portion of the arm, the arm can be pivoted and swung by a slight manual pushing of the arm.

【0032】第2のアームに第3のアームを枢着して材
料を移動すると構造用柱の裏で接近した隣家との狭少な
外壁位置に壁パネルを配設する場合でも第3のアームを
狭少部に挿入するようにして移動することにより極めて
容易に建付けることができる。
When the third arm is pivotally attached to the second arm and the material is moved, the third arm is installed even when the wall panel is arranged at a narrow outer wall position with the adjacent house approaching behind the structural column. It can be built very easily by moving it so that it is inserted into the narrowed portion.

【0033】隣家と接近した外壁パネルを配設するとき
は上階側に装置を起立し、第3の把持手段で材料の長方
向上端を挾持して吊下しながら所定位置まで下降させて
取付けることができる。また第2の把持手段で材料の長
手方向一端部を挟着して略縦方向に保持しながら移動さ
せてもよい。
When arranging the outer wall panel close to the adjacent house, the apparatus is erected on the upper floor side, and the third gripping means holds the upper end of the material in the longitudinal direction and suspends the material to lower it to a predetermined position for mounting. be able to. Alternatively, one end of the material in the longitudinal direction may be clamped by the second gripping means and the material may be moved while being held in the substantially vertical direction.

【0034】規格の大きいパネル材料を移動させるとき
は第2のアーム先端に設けたウインチのワイヤロープ下
端に第2の把持手段を接続して材料の一端部を挾持し、
第3のアーム先端よりウインチのワイヤロープ下端に第
3の把持手段を設けて材料の一端縁を挾持して材料を水
平に保持しながら移動すると安定させて材料を操作する
ことができる。
When a panel material having a large standard is to be moved, a second gripping means is connected to the lower end of the wire rope of the winch provided at the tip of the second arm to hold one end of the material,
A third gripping means is provided on the lower end of the wire rope of the winch from the tip of the third arm to clamp the one edge of the material and move the material while holding the material horizontally, so that the material can be stably operated.

【0035】支柱を建築物の屋上に起立するときは、床
面に配置する基台とポスト上部の座環に設けた掛孔より
四方にワイヤロープを張設することにより強固に支柱を
立設でき材料の移動作業を容易に行なうことができる。
When the pillars are to be erected on the rooftop of the building, the pillars are firmly erected by tensioning wire ropes in four directions from the base holes arranged on the floor and the hook holes provided in the seat ring at the upper part of the post. The material can be easily moved.

【図面の簡単な説明】[Brief description of drawings]

【図1】建築物の床面と上階側構造材との間に支柱を圧
着起立し、支柱に回動自在に枢着したアームには材料を
挾持する把持手段を接続したウインチを吊下した状態を
示す一部切欠全体側面図である。
[Fig. 1] A strut is crimped upright between a floor of a building and a structural material on the upper floor side, and a winch in which a gripping means for holding the material is connected to an arm pivotally attached to the strut is suspended. It is a partial notch whole side view which shows the state which carried out.

【図2】支柱上端に設けた係止手段の底面図である。FIG. 2 is a bottom view of a locking means provided at the upper end of a column.

【図3】係止手段の他の実施例である。FIG. 3 is another embodiment of the locking means.

【図4】スリーブ軸のブラケットに第1のアームの取付
けた平面図である。
FIG. 4 is a plan view in which the first arm is attached to the bracket of the sleeve shaft.

【図5】第1のアームの両側面に第2のアームを重合し
て折畳んだ状態を示す平面図である。
FIG. 5 is a plan view showing a state in which a second arm is overlapped with both side surfaces of the first arm and folded.

【図6】リンク機構にパンタグラフ式の第1の材料把持
手段を示す全体斜視図である。
FIG. 6 is an overall perspective view showing a pantograph-type first material holding means in a link mechanism.

【図7】第2の把持手段の側面図である。FIG. 7 is a side view of a second grip means.

【図8】第2の把持手段の平面図である。FIG. 8 is a plan view of a second grip means.

【図9】第2の把持手段の正面図である。FIG. 9 is a front view of a second grip means.

【図10】第3の把持手段の側面図である。FIG. 10 is a side view of a third grip means.

【図11】第3の把持手段の平面図である。FIG. 11 is a plan view of a third grip means.

【図12】第3の把持手段の正面図である。FIG. 12 is a front view of a third grip means.

【符号の説明】[Explanation of symbols]

1 支柱 2 ポスト 3 基台 4 ジャッキ 5 床部 8 上部にオネジを有する軸杆 11 環部材 13 レバー付駆動杆 16 メネジ環 20、20a 係止手段 27、27a ボルト 28 梁 34 座環 40 スリーブ軸 45 ブラケット 46、57、72 アーム 58 軸杆 78 ウインチ 81、81a、81b 把持手段 DESCRIPTION OF SYMBOLS 1 Support 2 Post 3 Base 4 Jack 5 Floor 8 Axle rod with male thread on top 11 Ring member 13 Drive rod with lever 16 Female thread ring 20, 20a Locking means 27, 27a Bolt 28 Beam 34 Seat ring 40 Sleeve shaft 45 Brackets 46, 57, 72 Arms 58 Shafts 78 Winches 81, 81a, 81b Grasping means

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 円管状ポストの下端部に基台と一体的な
ジャッキを設け、ポストの上端部に螺装した高さ調整機
の上端には上階側構造材に固定する係止手段を設け、前
記ポストには座環を介してブラケット付スリーブ軸を回
動自在に介装し、ブラケットには水平な第1のアームの
基端を固定し、該アーム先端に設けた上下一対の軸受片
には軸杆に設けた上下一対の突片付支軸を装着し、該軸
杆の前記支軸と相対向する位置に設けた一対の支軸片に
は第2のアーム基端に設けた一対の軸受片を介装し、第
2のアーム先端の一対の軸受片には第3のアーム基端の
一対の支軸を装着し、第3のアーム先端には、ロープを
介してワイヤロープ下端に材料把持手段を設けたウイン
チを接続した建築材料用作業装置。
1. A jack integral with a base is provided at the lower end of a circular tubular post, and a locking means for fixing to a structural member on the upper floor is provided at the upper end of a height adjuster screwed to the upper end of the post. A sleeve shaft with a bracket is rotatably mounted on the post via a seat ring, a base end of a horizontal first arm is fixed to the bracket, and a pair of upper and lower bearings provided at the tip of the arm. A pair of upper and lower projection support shafts provided on the shaft rod is mounted on the piece, and a pair of support shafts provided at positions opposite to the support shaft of the shaft rod are provided at the second arm base end. And a pair of bearing pieces at the tip of the second arm, and a pair of support shafts at the base end of the third arm, and a wire at the tip of the third arm via a rope. A working device for building materials with a winch connected to the lower end of the rope.
【請求項2】 把持手段は一対の等長のリンク杆を4個
の軸杆で枢着し、下側の2個のリンク杆は交叉して伸長
し、両伸長部先端には材料を挾持する圧接フィンガーを
設け、前記軸杆の相対向する両側の軸杆にはハンドル付
ボルトを螺装したことを特徴とする請求項1記載の建築
材料用作業装置。
2. The gripping means pivotally attaches a pair of equal-length link rods with four shaft rods, two lower link rods extend in a crossed manner, and a material is held at the ends of both extension portions. 2. The working apparatus for building materials according to claim 1, wherein a pressure-applying finger is provided, and bolts with a handle are screwed on the shaft rods on both sides of the shaft rod that face each other.
【請求項3】 前記把持手段は材料表面に配置する平板
部と、該平板部の一側縁より材料に圧接して支持するコ
字状の挾持部を折曲げ形成し、平板部の他側には材料の
他側縁部を圧接支持する断面コ字状の挾持部を配置し、
両挾持部にはナット部を突設し、ナット部にはハンドル
を有した鍔付ボルトを螺装し、平板部中央部には吊り下
げ用の接続環を設けた請求項1記載の建築材料用作業装
置。
3. The gripping means is formed by bending a flat plate portion arranged on the surface of the material and a U-shaped holding portion for pressing and supporting the material from one side edge of the flat plate portion, and the other side of the flat plate portion. A holding part with a U-shaped cross section for pressing and supporting the other side edge of the material is arranged in
The building material according to claim 1, wherein a nut portion is projectingly provided on both holding portions, a flanged bolt having a handle is screwed on the nut portion, and a connecting ring for hanging is provided at a central portion of the flat plate portion. Work equipment.
【請求項4】 一対の保持板を起立した平板部の1側縁
より挾持板部を折曲し、平板部と挾持板の内面に摩擦性
ゴム材を張設し、平板部の他側には上端が保持板に枢着
されたリブに突子付挾持板を設け、前記両保持板とリブ
上部に設けたナット部にはハンドルを有する鍔付ボルト
を螺装した把持手段である請求項1記載の建築材料用作
業装置。
4. A sandwiching plate portion is bent from one side edge of a flat plate portion on which a pair of holding plates are erected, and a friction rubber material is stretched on the inner surfaces of the flat plate portion and the sandwiching plate. Is a gripping means in which a rib having a top end pivotally attached to a holding plate is provided with a holding plate with a projection, and a nut portion provided on both of the holding plates and the rib is screwed with a flanged bolt having a handle. The working device for building materials according to 1.
JP9590992A 1992-03-23 1992-03-23 Working equipment for building materials Expired - Lifetime JPH08666B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9590992A JPH08666B2 (en) 1992-03-23 1992-03-23 Working equipment for building materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9590992A JPH08666B2 (en) 1992-03-23 1992-03-23 Working equipment for building materials

Publications (2)

Publication Number Publication Date
JPH0680390A true JPH0680390A (en) 1994-03-22
JPH08666B2 JPH08666B2 (en) 1996-01-10

Family

ID=14150424

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9590992A Expired - Lifetime JPH08666B2 (en) 1992-03-23 1992-03-23 Working equipment for building materials

Country Status (1)

Country Link
JP (1) JPH08666B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0986860A (en) * 1995-09-28 1997-03-31 Natl House Ind Co Ltd Work execution method for floor panel
FR2841887A1 (en) * 2002-07-08 2004-01-09 Conseils Et D Assistance Des T Jib crane for moving objects in a horizontal plane has vertical tower to which main arm is connected for rotation about main axis, and second arm connected to main arm for rotation about second axis, adjustable via tie rod
KR200449215Y1 (en) * 2008-03-12 2010-06-24 에스티엑스조선해양 주식회사 Hose for refraction hanger
US7878347B2 (en) * 2007-12-14 2011-02-01 Gorbel, Inc. Lifting apparatus with compensation means
CN113735008A (en) * 2021-08-31 2021-12-03 国网河南省电力公司博爱县供电公司 Electrified installation hoisting accessory of power supply line post-mounted equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0986860A (en) * 1995-09-28 1997-03-31 Natl House Ind Co Ltd Work execution method for floor panel
FR2841887A1 (en) * 2002-07-08 2004-01-09 Conseils Et D Assistance Des T Jib crane for moving objects in a horizontal plane has vertical tower to which main arm is connected for rotation about main axis, and second arm connected to main arm for rotation about second axis, adjustable via tie rod
US7878347B2 (en) * 2007-12-14 2011-02-01 Gorbel, Inc. Lifting apparatus with compensation means
KR200449215Y1 (en) * 2008-03-12 2010-06-24 에스티엑스조선해양 주식회사 Hose for refraction hanger
CN113735008A (en) * 2021-08-31 2021-12-03 国网河南省电力公司博爱县供电公司 Electrified installation hoisting accessory of power supply line post-mounted equipment
CN113735008B (en) * 2021-08-31 2023-02-03 国网河南省电力公司博爱县供电公司 Electrified installation hoisting accessory of power supply line post-mounted equipment

Also Published As

Publication number Publication date
JPH08666B2 (en) 1996-01-10

Similar Documents

Publication Publication Date Title
JP2593349B2 (en) Crane device and method of using the same
JPH0680390A (en) Working equipment for construction material
JP2008115683A (en) Temporary guide device for wall surface work and setting method thereof
JP3069835B2 (en) Uchigumi scaffold structure
JPH0729107Y2 (en) Simple crane
JPS637650Y2 (en)
JPH0319567Y2 (en)
JP3806837B2 (en) Temporary cantilevered roof structure
JPH08282970A (en) Device for disassembling or assembling temporary mast
CN220487147U (en) Positioning device for curtain wall construction
CN216471723U (en) Movable side crane for installing submarine pipeline
CN221298556U (en) Construction hanging basket outer cantilever device
JPS6219667Y2 (en)
KR102334835B1 (en) An apparatus for supporting bulb plate and a method of construcring bulb plate using the same
JPS5834188Y2 (en) Scaffolding for internal maintenance of spherical tanks
JPH0637269U (en) Working equipment for building materials
JP2572842Y2 (en) Aerial work vehicle
JPH0623992U (en) Working equipment for building materials
JP2021046781A (en) Assembly frame body of temporary building
JPH08290374A (en) Movable working platform equipment
JPH08119537A (en) Reel device
JPH02289761A (en) Suspended scaffold for steel erection work and steel erection construction method
JPH09215451A (en) Film spreading machine for transportable greenhouse and spreading of film for greenhouse using the same
JPH03267470A (en) Equipment and method for construction work of plate-shaped body
JPH066379U (en) Work equipment for building materials mounted on columns