JPH0676543U - Partition formwork space holder - Google Patents

Partition formwork space holder

Info

Publication number
JPH0676543U
JPH0676543U JP1805193U JP1805193U JPH0676543U JP H0676543 U JPH0676543 U JP H0676543U JP 1805193 U JP1805193 U JP 1805193U JP 1805193 U JP1805193 U JP 1805193U JP H0676543 U JPH0676543 U JP H0676543U
Authority
JP
Japan
Prior art keywords
square pipe
partitioning
formwork
hole
partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1805193U
Other languages
Japanese (ja)
Inventor
捷也 鈴木
Original Assignee
株式会社エヌ・エス・ピー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社エヌ・エス・ピー filed Critical 株式会社エヌ・エス・ピー
Priority to JP1805193U priority Critical patent/JPH0676543U/en
Publication of JPH0676543U publication Critical patent/JPH0676543U/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】 【目的】 仕切り用型枠の下部に大きな圧力が加わった
場合でも仕切り用型枠が変形することのないように仕切
り用型枠を固定する仕切り用型枠間隔保持具を提供する
ことを目的とする。 【構成】 複数の長尺筒状のパイプ(2、3、4)の所
定位置に通孔(7、8、9)を設け、前記パイプをその
一を他に挿入し、重合する通孔に固定ピン(6)を貫通
させることによりパイプとパイプとを連結固定する構成
としている。
(57) [Summary] [Purpose] A partition formwork space retainer that fixes the partitioning formwork so that the partitioning formwork will not be deformed even when a large pressure is applied to the bottom of the partitioning formwork. The purpose is to provide. [Structure] A plurality of long tubular pipes (2, 3, 4) are provided with through holes (7, 8, 9) at predetermined positions, and one of the pipes is inserted into the other through hole for polymerization. The pipes are connected and fixed by penetrating the fixing pin (6).

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は布基礎成型時に仕切り用型枠等の間隔を保持する間隔保持具に関す るものである。 The present invention relates to a space holder that holds a space between partitioning molds and the like when forming a cloth foundation.

【0002】[0002]

【従来の技術】[Prior art]

一般に、住宅用の布基礎に玄関等の出入口用の段差や間仕切り通風孔を設ける 際には、対向配置されたコンクリート型枠の間に一対の仕切り用型枠を挟入して いた。そして、仕切り用の型枠を固定するには、その天板をコンクリート型枠の 上棧にクサビ止具や浮上り防止金具で固定していた。 In general, when a step for entrances and exits and partition ventilation holes are provided on a cloth foundation for a house, a pair of partition forms are sandwiched between concrete forms that are arranged opposite to each other. Then, in order to fix the partition formwork, the top plate was fixed to the upper joint of the concrete formwork with wedge stoppers or floating prevention metal fittings.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかし、上記技術においては、仕切り用型枠の天板をコンクリート型枠の上棧 にクサビ止具や浮上り防止金具で固定するだけであるので、仕切り用型枠の下部 に大きな圧力が加わった場合には仕切り用型枠が変形するおそれがあるという問 題があった。本考案は上記の問題を解決するためになされたものであって、その 目的は仕切り用型枠の下部に大きな圧力が加わった場合でも仕切り用型枠が変形 することのないように仕切り用型枠を支持する間隔保持具を提供することにある 。 However, in the above technology, since the top plate of the partitioning formwork is only fixed to the upper joint of the concrete formwork by the wedge stopper and the lifting prevention metal fitting, a large pressure is applied to the lower part of the partitioning formwork. In that case, there was a problem that the partition formwork could be deformed. The present invention has been made to solve the above problems, and its purpose is to prevent the partition form from being deformed even when a large pressure is applied to the bottom of the partition form. The object is to provide a space holder for supporting the frame.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

上記の目的を達成するために、本考案では、複数の長尺筒状のパイプの所定位 置に通孔を設け、前記パイプの一を他に挿入し、重合する通孔に固定ピンを貫通 させることによりパイプとパイプとを連結固定する構成を採用している。 In order to achieve the above-mentioned object, in the present invention, a plurality of long tubular pipes are provided with through holes at predetermined positions, one of the pipes is inserted into the other, and a fixing pin is passed through the through hole to be polymerized. By adopting this configuration, a structure is adopted in which the pipes are connected and fixed.

【0005】[0005]

【作用】[Action]

この考案の構成に基づいて以下に作用を説明する。まず、布基礎成型時に、対 向する一対のコンクリート型枠の上棧に天板を載架することにより一対の仕切り 用型枠をコンクリート型枠間に段差や間仕切り通風孔の巾に合わせて取着する。 そして、仕切り用型枠の天板をコンクリート型枠の上棧にクサビ止具や浮上り防 止金具で固定し、さらに本考案の型枠間隔保持具を仕切り用型枠間に仮設し、支 持板を仕切り用型枠の下部に当接させることにより仕切り用型枠を支持固定する 。こうすれば、コンクリート打設時に仕切り用型枠の下部に大きな圧力が加わっ た場合でも仕切り用型枠が変形することがない。 The operation will be described below based on the configuration of the present invention. First, at the time of forming the cloth foundation, by mounting the top plate on the upper shaft of the pair of facing concrete formwork, the pair of partitioning formwork is installed according to the step or the width of the partition ventilation hole between the concrete formwork. To wear. Then, fix the top plate of the partitioning formwork to the upper joint of the concrete formwork with wedge stoppers or floating prevention metal fittings, and then temporarily install the formwork spacing retainer of the present invention between the partitioning formworks. The partition formwork is supported and fixed by bringing the holding plate into contact with the lower part of the partition formwork. In this way, the partitioning formwork will not be deformed even if a large pressure is applied to the lower part of the partitioning formwork during concrete pouring.

【0006】[0006]

【実施例】【Example】

以下、この考案を具体化した仕切り用型枠間隔保持具の一実施例を図1、図3 乃至図8に基づいて説明する。 An embodiment of a partitioning mold spacing holder embodying the present invention will be described below with reference to FIGS. 1 and 3 to 8.

【0007】 さて、この実施例の仕切り用型枠間隔保持具1は、端面の形が同一で大きさの 異なる長尺四角筒状の角パイプ2、角パイプ3、角パイプ4よりなり、角パイプ 2と角パイプ4の一端には支持板5が溶接固定されている。角パイプ2は、図3 に示すようにその図示右端には長方形状の支持板5が溶接固定されている。そし て左端側には通孔7が設けられている。角パイプ3は、図4に示すように角パイ プ2の内側に挿入可能なように角パイプ2より端面が小さく形成されており、両 端と中央部に4つの通孔8a、8b、8c、8dが設けられている。そして、角 パイプ3には中央右部にはマーキング15と指示線17aが、右端部にはマーキ ング16と指示線17bが刻印されている。角パイプ4は、図5に示すように、 角パイプ3の内側に挿入可能なように角パイプ3より端面が小さく形成されてお り、その図示左端には支持板5が溶接固定されている。そして、角パイプ4には 右端に通孔9cが、中央右部に通孔9a、9bが設けられている。さらに、角パ イプ4には左端部にマーキング11とマーキング14、指示線18a、18bが 、中央右部にマーキング12と指示線18cが、右端部にマーキング13と指示 線18dがそれぞれ刻印されている。角パイプ3は角パイプ2の内側に、角パイ プ4は角パイプ3の内側にそれぞれ挿入され、重合する通孔に固定ピン6を貫通 させることにより各パイプが固定される。固定ピン6は、略コ字状に形成され、 角パイプ2、角パイプ3に設けられた突片10の孔10aにそれぞれ緩挿されて いる。The partitioning mold spacing holder 1 of this embodiment is composed of a long rectangular tubular square pipe 2, square pipe 3 and square pipe 4 having the same end faces and different sizes. A support plate 5 is welded and fixed to one ends of the pipe 2 and the square pipe 4. As shown in FIG. 3, the rectangular pipe 2 has a rectangular support plate 5 welded and fixed to the right end thereof. A through hole 7 is provided on the left end side. As shown in FIG. 4, the square pipe 3 has a smaller end surface than the square pipe 2 so that it can be inserted inside the square pipe 2, and four through holes 8a, 8b, 8c are formed at both ends and the central portion. , 8d are provided. The square pipe 3 is engraved with a marking 15 and an instruction line 17a at the center right portion, and a marking 16 and an instruction line 17b at the right end portion. As shown in FIG. 5, the square pipe 4 has a smaller end surface than the square pipe 3 so that it can be inserted inside the square pipe 3, and a supporting plate 5 is welded and fixed to the left end of the square pipe 4. . The square pipe 4 is provided with a through hole 9c at the right end and through holes 9a and 9b at the center right part. Further, the corner pipe 4 has markings 11 and 14, marking lines 18a and 18b at the left end, marking 12 and marking line 18c at the center right part, and marking 13 and marking line 18d at the right end. There is. The square pipe 3 is inserted inside the square pipe 2, and the square pipe 4 is inserted inside the square pipe 3, and the fixing pins 6 are inserted into the overlapping holes to fix the pipes. The fixing pin 6 is formed in a substantially U shape and is loosely inserted into the holes 10a of the projecting pieces 10 provided on the square pipe 2 and the square pipe 3, respectively.

【0008】 さて、この実施例の仕切り用型枠間隔保持具1の長さの調節方法を図6乃至図 7に基づいて以下に説明する。 この実施例の仕切り用型枠間隔保持具1は、5段階に長さが調節可能であり、 その目印として、角パイプ3と角パイプ4に上述したようなマーキングと指示線 が刻印されている。例えば図6に示すように、Fの長さにする時には、まず角パ イプ3を角パイプ2に挿入し、角パイプ2の端面を指示線17aに合わせ、次に 角パイプ4を角パイプ3に挿入し、角パイプ3の端面を指示線18bに合わせる 。この位置で通孔7、通孔8c及び通孔9bが重合しており、固定ピン6を挿入 することにより、角パイプ2、角パイプ3、角パイプ4が相互に連結固定される 。もっと短くAの長さにする時には、角パイプ2と角パイプ3の位置はそのまま で、角パイプ3の端面を角パイプ4の指示線18aに合わせれば、通孔7、通孔 8c及び通孔9aが重合する。逆にもう少し長くBの長さにする時には、角パイ プ2と角パイプ3の位置はそのままで、角パイプ3の端面を角パイプ4の指示線 18cに合わせれば、通孔7と通孔8c、通孔8aと通孔9bとがそれぞれ重合 する。さらに長くCの長さにずる時には角パイプ2と角パイプ3の位置はそのま まで、角パイプ3の端面を角パイプ4の指示線18dに合わせれば、通孔7と通 孔8c、通孔8aと通孔9cとがそれぞれ重合する。最長の長さのDにするには 、図7に示すように、角パイプ2の端面を角パイプ3の指示線17bに合わせ、 角パイプ3の端面を角パイプ4の指示線18dに合わせる。すると通孔7と通孔 8d、通孔8aと9cとがそれぞれ重合する。Now, a method of adjusting the length of the partitioning frame interval holder 1 of this embodiment will be described below with reference to FIGS. 6 to 7. The partitioning frame interval holder 1 of this embodiment can be adjusted in length in 5 steps, and as the mark, the square pipe 3 and the square pipe 4 are engraved with the above-mentioned markings and indicator lines. . For example, as shown in FIG. 6, when making the length F, first insert the square pipe 3 into the square pipe 2, align the end face of the square pipe 2 with the indicator line 17a, and then set the square pipe 4 into the square pipe 3. , And the end face of the square pipe 3 is aligned with the indicator line 18b. At this position, the through hole 7, the through hole 8c and the through hole 9b are superposed, and by inserting the fixing pin 6, the square pipe 2, the square pipe 3 and the square pipe 4 are connected and fixed to each other. When making the length A shorter, by keeping the positions of the square pipes 2 and 3 unchanged and aligning the end face of the square pipe 3 with the indicator line 18a of the square pipe 4, the through hole 7, the through hole 8c, and the through hole 8c. 9a polymerizes. On the contrary, when making the length B a little longer, the positions of the square pipe 2 and the square pipe 3 remain the same, and if the end face of the square pipe 3 is aligned with the indicator line 18c of the square pipe 4, the through holes 7 and 8c are formed. The through holes 8a and the through holes 9b are polymerized. When the length is further shifted to C, the positions of the square pipes 2 and 3 are kept as they are, and if the end face of the square pipe 3 is aligned with the indicator line 18d of the square pipe 4, the through hole 7, the through hole 8c, and the through hole are formed. 8a and the through hole 9c are polymerized. In order to obtain the longest length D, as shown in FIG. 7, the end surface of the square pipe 2 is aligned with the indicator line 17b of the square pipe 3, and the end surface of the square pipe 3 is aligned with the indicator line 18d of the square pipe 4. Then, the through hole 7 and the through hole 8d and the through holes 8a and 9c are polymerized.

【0009】 次に、この実施例の間隔保持具1の使用態様を図8に基づいて説明する。 まず、対向配置された一対のコンクリート型枠22の上棧に、一対の仕切り用 型枠21が、段差や間仕切り通風孔の巾に合わせて取着される。そして、仕切り 用型枠の天板がコンクリート型枠22の上棧にクサビ止具や浮上り防止金具で固 定された上で、さらに仕切り用型枠21間にこの実施例の間隔保持具1が挟入さ れる。間隔保持具1は支持板5が仕切り用型枠21に当接するように適当な長さ に調節される。この状態で、布基礎コンクリート23が打設され、その圧力が仕 切り用型枠21に加わる。しかし、仕切り用型枠21はクサビ止具や浮上り防止 金具で天板が固定されているだけでなく、この実施例の間隔保持具1で下部でも 支持されているので変形するおそれがない。Next, a manner of use of the spacing member 1 of this embodiment will be described with reference to FIG. First, the pair of partitioning molds 21 is attached to the upper shaft of the pair of concrete molds 22 that are arranged to face each other, in accordance with the steps and the widths of the partition ventilation holes. Then, the top plate of the partitioning formwork is fixed to the upper shaft of the concrete formwork 22 with wedge stoppers or floating prevention metal fittings, and then the spacing holder 1 of this embodiment is placed between the partitioning formwork 21. Is inserted. The space holder 1 is adjusted to have an appropriate length so that the support plate 5 contacts the partitioning mold 21. In this state, the cloth foundation concrete 23 is poured and the pressure is applied to the partitioning mold 21. However, the partitioning mold 21 is not only deformed because the top plate is fixed not only by the wedge stoppers or the lifting prevention metal fittings but also by the interval holder 1 of this embodiment at the lower part.

【0010】 次に、この考案の別の実施例を図2に基づいて説明する。 さて、この別の実施例の間隔保持具19は、両端の支持板20が折り曲げられ 、中央部に凹部が形成されている。Next, another embodiment of the present invention will be described with reference to FIG. Now, in the spacing member 19 of this another embodiment, the support plates 20 at both ends are bent, and a recess is formed in the central portion.

【0011】 そして、この別の実施例の間隔保持具19は、前述した第一実施例の場合と同 様に、一対の仕切り用型枠間に挟入され、仕切り用型枠を支持できる。そして、 特に仕切り用型枠に把手が装着されていて、第一実施例の間隔保持具では支障の ある場合に支持板の凹部に把手を収容することにより、仕切り用型枠を確実に支 持できるものである。The spacing member 19 of this other embodiment is sandwiched between a pair of partitioning molds and can support the partitioning mold, as in the case of the first embodiment described above. In particular, when a handle is attached to the partition form, and the space holder of the first embodiment has a problem, the handle is housed in the recess of the support plate to securely support the partition form. It is possible.

【0012】 なお、この考案は前記各実施例の構成に限定されるものではなく、この考案の 趣旨から逸脱しない範囲で各部の構成を任意に変更して具体化することも可能で ある。The present invention is not limited to the configurations of the above-described embodiments, and the configurations of the respective parts can be arbitrarily modified and embodied without departing from the spirit of the invention.

【0013】[0013]

【考案の効果】[Effect of device]

以上詳述したように本考案によれば、仕切り用型枠をその下部で支持固定でき 、コンクリート打設時に仕切り用型枠の下部に大きな圧力が加わった場合でも仕 切り用型枠が変形することがないという優れた効果を奏する。 As described above in detail, according to the present invention, the partition formwork can be supported and fixed at the lower part thereof, and the partition formwork can be deformed even when a large pressure is applied to the lower part of the partition formwork during concrete pouring. It has the excellent effect of never happening.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案を具体化した第一実施例の仕切り用型枠
間隔保持具の斜視図である。
FIG. 1 is a perspective view of a partitioning frame interval holder according to a first embodiment of the present invention.

【図2】第一実施例の別例の仕切り用型枠間隔保持具の
斜視図である。
FIG. 2 is a perspective view of a partitioning mold interval holder according to another example of the first embodiment.

【図3】第一実施例の仕切り用型枠間隔保持具の角パイ
プ2の(a)正面図、(b)平面図、(c)図3(b)
におけるA−A断面図、(d)右側面図である。
3 (a) is a front view, FIG. 3 (b) is a plan view, and FIG. 3 (b) is a square pipe 2 of a partitioning mold spacing holder according to the first embodiment.
FIG. 4A is a sectional view taken along line AA in FIG.

【図4】第一実施例の仕切り用型枠間隔保持具の角パイ
プ3の(a)平面図、(b)図4(a)におけるB−B
断面図である。
FIG. 4A is a plan view of the square pipe 3 of the partitioning frame interval holder of the first embodiment, and FIG. 4B is a BB line in FIG. 4A.
FIG.

【図5】第一実施例の仕切り用型枠間隔保持具の角パイ
プ4の(a)平面図、(b)正面図、(c)図5(a)
におけるC−C拡大断面図、(d)左側面図である。
5 (a) is a plan view, FIG. 5 (b) is a front view, and FIG. 5 (a) is a front view of a square pipe 4 of a partitioning mold spacing holder according to the first embodiment.
6 is an enlarged cross-sectional view taken along line CC of FIG.

【図6】第一実施例の仕切り用型枠間隔保持具をFの長
さに調節した状態を示す(a)平面図、(b)正面図で
ある。
6 (a) is a plan view and FIG. 6 (b) is a front view showing a state where the partitioning frame interval holder of the first embodiment is adjusted to the length of F. FIG.

【図7】第一実施例の仕切り用型枠間隔保持具をDの長
さに調節した状態を示す(a)平面図、(b)正面図で
ある。
7 (a) is a plan view and FIG. 7 (b) is a front view showing a state in which the partitioning mold interval holder of the first embodiment is adjusted to a length D.

【図8】第一実施例の仕切り用型枠間隔保持具の使用状
態を示す断面図である。
FIG. 8 is a cross-sectional view showing a usage state of the partitioning frame interval holder of the first embodiment.

【符号の説明】[Explanation of symbols]

1…仕切り用型枠間隔保持具、2,3,4…パイプ、5
…支持板、6…固定ピン、7,8,9…通孔、
1 ... partitioning frame interval holders, 2, 3, 4 ... pipe, 5
... Support plate, 6 ... Fixing pin, 7, 8, 9 ... Through hole,

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 複数の長尺筒状のパイプ(2、3、4)
の所定位置に通孔(7、8、9)を設け、前記パイプの
一を他に挿入し、重合する通孔に固定ピン(6)を貫通
させることによりパイプとパイプとを連結固定すること
を特徴とする仕切り用型枠間隔保持具。
1. A plurality of long tubular pipes (2, 3, 4)
Through holes (7, 8, 9) are provided at predetermined positions of the pipe, one of the pipes is inserted into the other, and the fixing pin (6) is inserted through the through hole to be overlapped to fix the pipe and the pipe together. A mold spacing tool for partitioning.
【請求項2】 両端に支持板(5)を設けたことを特徴
とする請求項1に記載の仕切り用型枠間隔保持具。
2. The partitioning frame interval holder according to claim 1, wherein support plates (5) are provided at both ends.
【請求項3】 重合する通孔の組合せを変更することに
より、長さを変更可能にしたことを特徴とする請求項1
に記載の仕切り用型枠間隔保持具。
3. The length can be changed by changing the combination of through holes that are polymerized.
The partitioning frame interval holder described in.
JP1805193U 1993-04-09 1993-04-09 Partition formwork space holder Pending JPH0676543U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1805193U JPH0676543U (en) 1993-04-09 1993-04-09 Partition formwork space holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1805193U JPH0676543U (en) 1993-04-09 1993-04-09 Partition formwork space holder

Publications (1)

Publication Number Publication Date
JPH0676543U true JPH0676543U (en) 1994-10-28

Family

ID=11960903

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1805193U Pending JPH0676543U (en) 1993-04-09 1993-04-09 Partition formwork space holder

Country Status (1)

Country Link
JP (1) JPH0676543U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180082102A (en) * 2017-01-10 2018-07-18 백문자 A support pipe with clamp for construction

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0325163A (en) * 1989-06-21 1991-02-01 Hooshin Purodakuto Kk Concrete mold posture regulator and concrete mold posture regulating method by using this regulator

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0325163A (en) * 1989-06-21 1991-02-01 Hooshin Purodakuto Kk Concrete mold posture regulator and concrete mold posture regulating method by using this regulator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180082102A (en) * 2017-01-10 2018-07-18 백문자 A support pipe with clamp for construction

Similar Documents

Publication Publication Date Title
US6322047B1 (en) Waler clamp assembly for a concrete wall form
US3481575A (en) Prefabricated wall form
US2715257A (en) Brace arrangement for concrete wall form
JPH0676543U (en) Partition formwork space holder
JP7134854B2 (en) Partition frame set for communication port
KR101825296B1 (en) Variable mold
JP2563887B2 (en) Precast concrete board manufacturing method
JPH08277589A (en) Concrete form
KR100452580B1 (en) Form install system at inside corner of structure
JP7220578B2 (en) anchor bolt retainer
JP2955251B2 (en) Member connecting device such as scaffolding and shoring
CN220848797U (en) Reinforcing steel bar positioning device
JP2005054354A (en) Sliding type deck plate and slab construction method
JP3094654U (en) Anchor bolt support device
JP2565008Y2 (en) Wire mesh plate for jointing concrete
JPH04166560A (en) System mold
JP2547371Y2 (en) Concrete formwork fixture
JPH0138201Y2 (en)
JP2017095993A (en) Anchor bolt positioning ruler and installation method thereof
JPH0414597Y2 (en)
JPH0355682Y2 (en)
JPH0140906Y2 (en)
JP2879437B1 (en) Formwork installation members on retaining walls
IL137268A (en) Multipurpose modular concrete form
JPS60439Y2 (en) Formwork panel support fittings