JPH0674745U - Daihiki connector for concrete formwork - Google Patents

Daihiki connector for concrete formwork

Info

Publication number
JPH0674745U
JPH0674745U JP2204993U JP2204993U JPH0674745U JP H0674745 U JPH0674745 U JP H0674745U JP 2204993 U JP2204993 U JP 2204993U JP 2204993 U JP2204993 U JP 2204993U JP H0674745 U JPH0674745 U JP H0674745U
Authority
JP
Japan
Prior art keywords
daihiki
fitted
hooks
support
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2204993U
Other languages
Japanese (ja)
Inventor
忠義 菅原
Original Assignee
忠義 菅原
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 忠義 菅原 filed Critical 忠義 菅原
Priority to JP2204993U priority Critical patent/JPH0674745U/en
Publication of JPH0674745U publication Critical patent/JPH0674745U/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】 【目的】大引、および大引とサポートの連結を容易確実
に行い、コンクリート型枠を堅固に組立て支持して作業
性および安全性を向上したコンクリート型枠用大引の連
結具を提供する。 【構成】台板(1)上の前後の左右に、前後および左右
の対向側へ突出する爪片(2)、(3)を設けたフツク
(4)、(5)、(6)、(7)を固設してその前方フ
ツク(4)、(5)と後方フツク(6)、(7)の間に
は1個のI形大引(8)の下端部または上端部に嵌着す
る狭幅溝(9)を、左側フツク(4)、(6)と右側フ
ツク(5)、(7)の間には接触並列する2個のI形大
引(8)、(8)の下端部または上端部に嵌着する広幅
溝(10)をそれぞれ形成し、台板(1)の下面にはサ
ポート(11)の孔(12)内に嵌合する連結軸(1
3)を突設してコンクリート型枠用大引の連結具を構成
する。
(57) [Summary] [Purpose] A concrete pulling form puller that improves the workability and safety by firmly and firmly connecting and supporting the large pulling rods and the supports. Provide a connector. [Structure] Hooks (4), (5), (6), (6) provided with claw pieces (2), (3) protruding to the front, rear, left, and right opposite sides on the base plate (1) on the front and rear 7) is fixed, and is fitted between the front hooks (4) and (5) and the rear hooks (6) and (7) at the lower end or the upper end of one I-shaped large pull (8). The narrow groove (9) is formed between the left hooks (4) and (6) and the right hooks (5) and (7) in contact with each other. A wide groove (10) fitted to the lower end or the upper end is formed, and a connecting shaft (1) fitted in the hole (12) of the support (11) is formed on the lower surface of the base plate (1).
3) is projected to form a connecting tool for concrete formwork.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、コンクリート型枠を構成するI形大引を連結するコンクリート型枠 用大引の連結具に関するものである。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a connecting tool for concrete formwork, which connects I-shaped formwork forming a concrete formwork.

【0002】[0002]

【従来の技術】[Prior art]

従来のこの種のコンクリート型枠用大引には、木製の角材を使用している。そ して、 The conventional timber bar is used for this type of concrete formwork grab. And

【0003】 (1) 図13および図14に示すように大引(イ)、(イ)を突合せて使用 する場合には、その大引(イ)、(イ)の接続側端部にわたし両面に桟木または ベニヤ板(ロ)を当てて釘止め(ハ)し、更に、下方にサポート(ニ)の頂板( ホ)を当て釘(ヘ)を頂板(ホ)の釘孔に通して大引(イ)、(イ)に打付け、 大引(イ)、(イ)とサポート(ニ)を連結して床のコンクリート型枠(ト)を 構成する。(1) As shown in FIG. 13 and FIG. 14, when the large pulls (a) and (a) are used in abutment with each other, the connection ends of the large pulls (a) and (a) are Apply a peg or a veneer plate (b) to both sides to fix it (c), and then attach the top plate (e) of the support (d) to the bottom and insert a nail (f) into the nail hole of the top plate (e) to pull it up. (A), (a) are struck, and Daihiki (a), (a) and support (d) are connected to form a concrete formwork (g) for the floor.

【0004】 (2) 一方、図15に示すように、大引(イ)、(イ)を抱合せて使用する 場合には、大引(イ)、(イ)の重合部において、数本の釘(ハ)を一方の大引 (イ)より他方の大引(イ)に向けて斜め方向に打込み大引(イ)、(イ)にわ たしてその釘(ハ)により大引(イ)、(イ)を連結し、その連結した大引(イ )、(イ)を上記と同様に使用して床のコンクリート型枠を構成している。(2) On the other hand, as shown in FIG. 15, in the case of using Daihiki (a) and (i) together, several wires are used in the superposed section of Daihiki (a) and (i). Drive the nail (c) diagonally from one of the large pulls (a) toward the other of the large pulls (a). A) and (A) are connected, and the connected Daihiki (A) and (A) are used in the same manner as above to form a concrete formwork for the floor.

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

上記従来のコンクリート型枠の大引装置においては、 In the conventional concrete form pulling apparatus,

【0006】 (1) 大引が木製の角材であるから、節があつたり、日割れしたりして強度 にばらつきがある。(1) Since Daihiki is a wooden lumber, its strength varies due to knots and sun cracks.

【0007】 (2) 大引が四角形であるから、持ち難くて作業性が悪い。(2) Since the hajime is square, it is difficult to hold and the workability is poor.

【0008】 (3) 大引、および大引とサポートの連結は、釘を打付けたり、または番線 で縛り付けて行つているから、連結が不安全である。(3) The connection of Daihiki and the connection of Daihiki and the support is unsafe because nails are struck or the support is tied with a tie wire.

【0009】 (4) 大引の連結に使用する釘、桟木、ベニヤ板、番線等は一度限りの使用 で、その都度不要材となるから、不経済である。(4) It is uneconomical to use nails, shackles, plywood, numbered wires, etc., which are used for connecting large hauls only once and become unnecessary materials each time.

【0010】 (5) 作業後、釘、桟木、ベニヤ板、番線等の不要材が作業現場に散らかつ て残り、足もとが危険である。(5) After the work, unnecessary materials such as nails, splints, veneer boards, and number wires are scattered on the work site and remain unsafe.

【0011】 (6) サポートを釘止めで大引に固定するから、大引へのサポートの固定が 不確実で、そのサポートが大引より外れるおそれがあつて安全上に問題がある点 である。(6) Since the support is fixed to the Daihiki with nails, it is uncertain that the support is fixed to the Daihiki, and the support may come off from the Daihiki, which is a safety problem. .

【0012】[0012]

【課題を解決するための手段】[Means for Solving the Problems]

本考案は、大引、および大引とサポートの連結を容易確実に行い、コンクリー ト型枠を堅固に組立て支持して作業性および安全性を向上したコンクリート型枠 用大引の連結具を提供することを目的とする。 The present invention provides a connecting tool for a concrete formwork, which facilitates and reliably connects the formwork and the support, and firmly assembles and supports the concrete formwork to improve workability and safety. The purpose is to do.

【0013】 すなわち、台板(1)上の前後の左右に、前後および左右の対向側へ突出する 爪片(2)、(3)を設けたフツク(4)、(5)、(6)、(7)を固設して その前方フツク(4)、(5)と後方フツク(6)、(7)の間には1個のI形 大引(8)の下端部または上端部に摺動可能に嵌着する狭幅溝(9)を、左側フ ツク(4)、(6)と右側フツク(5)、(7)の間には接触並列する2個のI 形大引(8)、(8)の下端部または上端部に摺動可能に嵌着する広幅溝(10 )をそれぞれ形成し、台板(1)の下面にはサポート(11)の孔(12)内に 着脱可能に嵌合する連結軸(13)を突設してコンクリート型枠用大引の連結具 を構成し、大引、および大引とサポートの連結を容易確実に行い、コンクリート 型枠を堅固に組立て支持して作業性および安全性を向上する目的を、I形大引を 使用し、そのI形大引に連結具を嵌着して該連結具の連結軸にサポートの孔を嵌 合し、連結具により大引、および大引とサポートを連結してサポートで大引を支 持することにより実現した。That is, the hooks (4), (5), (6) provided with the claw pieces (2), (3) protruding to the front, rear, left, and right opposite sides on the front and rear, and the left and right on the base plate (1). , (7) are fixed, and the space between the front hooks (4), (5) and the rear hooks (6), (7) is at the lower end or the upper end of one I-shaped Daihiki (8). A narrow groove (9) slidably fitted is provided between the left hooks (4) and (6) and the right hooks (5) and (7) in contact with each other to form two I-shaped pulling wires ( 8), wide grooves (10) slidably fitted to the lower end or the upper end of (8) are formed, respectively, and the lower surface of the base plate (1) is inserted into the hole (12) of the support (11). A connecting shaft (13) that can be detachably fitted is projected to form a connecting tool for a concrete formwork, and the concrete form can be easily and reliably connected to the concrete form. For the purpose of firmly assembling and supporting the frame to improve workability and safety, an I-shaped Daihiki is used, and a connecting tool is fitted to the I-shaped Daihiki and the connecting shaft of the connecting tool is provided with a support hole. It was realized by fitting the above, connecting the Daihiki with a connecting tool, and connecting the Daihiki to the support and supporting the Daihiki with the support.

【0014】[0014]

【実施例】【Example】

図1乃至図12は、本考案の一実施例を示し、その構成を図面について説明す れば、(a)はコンクリート型枠用大引の連結具を示し、(1)は連結具(a) の横長四角形の台板で、その台板(1)上の前後の左右の四隅部に、前後および 左右の対向側へ突出する爪片(2)、(3)を設けたフツク(4)、(5)、( 6)、(7)を固設してその前方フツク(4)、(5)と後方フツク(6)、( 7)の間には1個のI形大引(8)の下端部または上端部に摺動可能に嵌着する 狭幅溝(9)を、左側フツク(4)、(6)と右側フツク(5)、(7)の間に は接触して並列する2個のI形大引(8)、(8)の下端部または上端部に摺動 可能に嵌着する広幅溝(10)をそれぞれ形成し、台板(1)の下面中央部には サポート(11)の孔(12)内に着脱可能に嵌合する連結軸(13)を突設し 、台板(1)の両側部の中央に釘孔(14)を、前後部の中間両側に釘孔(15 )をそれぞれ穿設する。 1 to 12 show an embodiment of the present invention, the structure of which will be described with reference to the drawings. (A) shows a pulling tool for concrete formwork, and (1) shows a connecting tool (a). ) A hook (4) having a horizontally long quadrangular base plate provided with claw pieces (2) and (3) projecting to the front and rear and left and right opposite sides at four front and rear left and right corners on the base plate (1). , (5), (6), (7) are fixed and one I-shaped pulling hook (8) is provided between the front hooks (4), (5) and the rear hooks (6), (7). ) A narrow groove (9) slidably fitted to the lower end or the upper end is provided between the left side hooks (4) and (6) and the right side hooks (5) and (7) in parallel. A wide groove (10) slidably fitted to the lower end or the upper end of each of the two I-shaped pulls (8) and (8) is formed, and the central portion of the lower surface of the base plate (1) is formed. Support (11 A connecting shaft (13) that is detachably fitted is provided in the hole (12) of the base plate (1) so that a nail hole (14) is formed at the center of both side portions of the base plate (1) and a nail hole ( 15) are drilled respectively.

【0015】 (A)は床のコンクリート型枠を示し、(8)はI形大引で、アルミニウム等 の金属より成つて上下端部の外側に突縁(16)を形成したH形断面の大引本体 (17)の上下の空所内に木製角材(18)をそれぞれ嵌合し固定して構成し、 該I形大引(8)の上下方向の中間位置には通孔(19)を適当間隔になして適 宜に穿設する。(20)は連結ボルトで、L字形に形成してその長片(21)の 先端部にねじ(22)を設け、該連結ボルト(20)の長片(21)をI形大引 (8)の一端部の通孔(19)に挿通し、短片(23)を上記通孔(19)の内 側に位置する通孔(19)に嵌合して長片(21)の突出ねじ(22)にナツト (24)を螺着し、その長片(21)のねじ(22)部をI形大引(8)より前 方へ突出させて連結ボルト(20)をI形大引(8)の端部に固定する。(25 )は連結具(a)の固定用釘である。(A) shows a concrete formwork of the floor, (8) is an I-shaped large drawing, H-shaped cross section made of a metal such as aluminum and having projecting edges (16) formed on the outer sides of the upper and lower ends. Wooden square timbers (18) are fitted and fixed in the upper and lower voids of the Daihiki body (17), respectively, and a through hole (19) is formed at an intermediate position in the vertical direction of the I-shaped Daihiki (8). Drill at appropriate intervals. Reference numeral (20) is a connecting bolt, which is formed in an L shape and is provided with a screw (22) at the tip of the long piece (21), and the long piece (21) of the connecting bolt (20) is I-shaped. ) Is inserted into the through hole (19) at one end, and the short piece (23) is fitted into the through hole (19) located on the inner side of the through hole (19) so that the protruding screw () of the long piece (21) ( The nut (24) is screwed onto the nut (22), the screw (22) of the long piece (21) is projected forward from the I-shaped pull (8), and the connecting bolt (20) is pulled into the I-shaped pull (8). Fix at the end of 8). (25) is a nail for fixing the connector (a).

【0016】 (11)はサポート、(12)はサポート(11)内の孔、(26)はサポー ト(11)の頂板、(27)は丸パイプより成る根太、(28)は床堰板、(2 9)は床堰板(28)上に構築したコンクリート床である。なお、連結具(a) の連結軸(13)の長さは、根太(27)の直径よりも短く形成する。(11) is a support, (12) is a hole in the support (11), (26) is a top plate of the support (11), (27) is a joist made of a round pipe, and (28) is a floor dam plate. , (29) are concrete floors constructed on the floor dam plate (28). The length of the connecting shaft (13) of the connecting tool (a) is shorter than the diameter of the joist (27).

【0017】 その連結具の使用法を説明する。The usage of the connecting tool will be described.

【0018】 (1) 大引(8)、(8)を突合せて使用する場合には、図4乃至図6に示 すように大引(8)、(8)の下端部にそれぞれ連結具(a)の狭幅溝(9)を 嵌合して必要数の連結具(a)を嵌着すると共に、一方の大引(8)の上端部に 1個の連結具(a)を上下反対にして嵌着しておく。(1) When the Daihiki (8) and (8) are used in abutment with each other, connecting tools are attached to the lower ends of the Daihiki (8) and (8), respectively, as shown in FIGS. 4 to 6. Fit the required number of connectors (a) by fitting the narrow groove (9) of (a), and move one connector (a) up and down on the upper end of one of the large pulls (8). Reverse and fit.

【0019】 そして、大引(8)、(8)を突合せ、一方の大引(8)の連結ボルト(20 )のナツト(24)をねじ戻して連結ボルト(20)の短片(23)を通孔(1 9)内より抜出した後、連結ボルト(20)をその長片(21)を軸とし外側へ 180°回動させて該連結ボルト(20)の短片(23)を他方の大引(8)の 通孔(19)内に差込み、その後、該連結ボルト(20)のナツト(24)を ねじ込んで連結ボルト(20)を大引(8)に固定する。Then, the Daihiki (8) and (8) are butted, and the nut (24) of the connecting bolt (20) of one Daihiki (8) is unscrewed to remove the short piece (23) of the connecting bolt (20). After the connection bolt (20) is pulled out from the through hole (19), the connecting bolt (20) is rotated 180 ° outwardly about the long piece (21) of the connecting bolt (20) so that the short piece (23) of the connecting bolt (20) becomes larger. The nut (24) of the connecting bolt (20) is screwed into the through hole (19) of the pull (8) to fix the connecting bolt (20) to the large pull (8).

【0020】 次いで、上下の連結具(a)を他方の大引(8)側へ移動し、図4の右側部に 示すように大引(8)、(8)にまたがせて嵌着した後、上下より釘(25)を 連結具(a)の釘孔(14)に通し大引(8)の角材(18)に打込んで大引( 8)、(8)を連結ボルト(20)および上下の連結具(a)により連結固定す る。Next, the upper and lower connecting tools (a) are moved to the other side of the large pull (8), and are fitted over the large pulls (8) and (8) as shown in the right side of FIG. After that, the nails (25) are passed through the nail holes (14) of the connecting tool (a) from above and below and driven into the square bar (18) of the Daihiki (8) to connect the Daihiki (8) and (8) to the connecting bolt ( 20) and the upper and lower connectors (a).

【0021】 一方、大引(8)、(8)に嵌着した他の連結具(a)は、図3の左側部に示 すようにそれぞれ大引(8)の適当位置まで移動させて上記と同様に釘(25) により固定する。On the other hand, as shown in the left side of FIG. 3, the other connecting tools (a) fitted to the Daihiki (8) and (8) are respectively moved to appropriate positions of the Daihiki (8). Secure with nails (25) as above.

【0022】 その後、上記各連結具(a)の連結軸(13)にそれぞれサポート(11)の 孔(12)を嵌合しサポート(11)を立設してサポート(11)により大引( 8)を支持し、該大引(8)上に根太(27)を組合せ該根太(27)上に床堰 板(28)を敷設して型枠(A)を構成する。After that, the holes (12) of the support (11) are fitted into the connecting shafts (13) of the respective connecting tools (a), the support (11) is erected, and the support (11) pulls the support (11). 8) is supported, the joists (27) are combined on the Daihiki (8), and the floor dam plate (28) is laid on the joists (27) to form the form (A).

【0023】 (2) 大引(8)、(8)を抱合せて使用する場合には、図8乃至図10に 示すように、大引(8)、(8)の下端部にそれぞれ連結具(a)の狭幅溝(9 )を嵌合して必要数の連結具(a)を嵌着しておく。(2) When tying and using the Daihiki (8) and (8), as shown in FIGS. 8 to 10, connecting tools are attached to the lower ends of the Daihiki (8) and (8), respectively. The narrow groove (9) of (a) is fitted and the required number of connectors (a) are fitted.

【0024】 そして、図9に示すように、他方の大引(8)の連結ボルト(20)の突出ね じ(22)部を一方の大引(8)の通孔(19)内に差込んで大引(8)、(8 )を接触並列した後、その大引(8)、(8)の重合部の上下においてそれぞれ 連結具(a)の広幅溝(10)を嵌着し、釘(25)を連結具(a)の両側釘孔 (15)にそれぞれ通し両大引(8)の角材(18)に打込んで大引(8)、( 8)を連結ボルト(20)および上下の連結具(a)により連結固定する。Then, as shown in FIG. 9, the protruding screw (22) of the connecting bolt (20) of the other large pull (8) is inserted into the through hole (19) of the one large pull (8). After pulling in and pulling the Daihiki (8) and (8) into contact with each other, the wide grooves (10) of the connecting tool (a) are fitted respectively above and below the overlapping portion of the Daihiki (8) and (8). The nails (25) are inserted through the nail holes (15) on both sides of the connector (a) and driven into the square bar (18) of the two pullers (8) to connect the pullers (8) and (8) to the connecting bolt (20). And the upper and lower connectors (a) are connected and fixed.

【0025】 その後は、上記と同様に操作し、大引(8)をサポート(11)により支持し て型枠(A)を構成する。After that, the same operation as above is performed to support the Daihiki (8) by the support (11) to form the form (A).

【0026】 その際、工事の端部等において大引(8)、(8)を若干ずらせ抱合せて使用 する場合には、大引(8)、(8)を所要にずらせた状態になし、図9に示すよ うに他方の大引(8)の連結ボルト(20)の突出ねじ(22)部を一方の大引 (8)の適当通孔(19)内に差込んで大引(8)、(8)を接触並列した後、 その大引(8)、(8)の重合部の両端部の上下においてそれぞれ連結具(a) の広幅溝(10)を嵌着し、上記と同様に釘(25)により固定して大引(8) 、(8)を連結ボルト(20)および両側上下の連結具(a)により連結固定す ると、その大引(8)を上記と同様に使用して型枠(A)を構成することができ る。At that time, when the Daihiki (8) and (8) are used while being slightly shifted at the end of the construction and the like, the Daihiki (8) and (8) are not in the necessary shifted state. As shown in FIG. 9, the protruding screw (22) of the connecting bolt (20) of the other large pull (8) is inserted into the appropriate through hole (19) of the one large pull (8) and the large pull (8) is inserted. ), (8) are contacted in parallel, and then the wide groove (10) of the connector (a) is fitted at the upper and lower ends of the overlapped portions of the large pulls (8) and (8), respectively. Then, fix it with nails (25) and connect the haiki (8) and (8) with the connecting bolt (20) and the upper and lower connectors (a) on both sides. Can be used to form a form (A).

【0027】 (3) 大引(8)、(8)を並列にして使用する場合には、図11および図 12に示すように大引(8)、(8)を若干ずらせ、その他方の大引(8)の連 結ボルト(20)の突出ねじ(22)部を一方の大引(8)の通孔(19)内に 差込んで大引(8)、(8)を接触並列し、その後、その大引(8)、(8)の 上端部の両側に連結具(a)の広幅溝(10)を、下端部には必要数の連結具( a)の広幅溝(10)をそれぞれ嵌着すると、それらの連結具(a)を所要位置 において釘(25)により大引(8)、(8)に固定して大引(8)、(8)を 連結ボルト(20)および両側上下の連結具(a)により連結固定し、その大引 (8)、(8)を上記と同様に使用して型枠(A)を構成することができる。(3) When the Daihiki (8) and (8) are used in parallel, the Daihiki (8) and (8) are slightly shifted as shown in FIG. 11 and FIG. Insert the protruding screw (22) of the connecting bolt (20) of the Daihiki (8) into the through hole (19) of one of the Daihiki (8) to contact the Daihiki (8) and (8) in parallel. Then, the wide grooves (10) of the connector (a) are provided on both sides of the upper ends of the large pulls (8) and (8), and the required number of the wide grooves (10) of the connector (a) are provided at the lower end. ) Are respectively fitted, the connecting tools (a) are fixed to the large pulls (8), (8) by the nails (25) at the required positions, and the large pulls (8), (8) are connected to the connecting bolts (20). ) And connecting tools (a) above and below both sides, and fixed and connected, and the molds (A) can be constructed by using the large pulls (8) and (8) in the same manner as above.

【0028】[0028]

【考案の効果】[Effect of device]

本考案のコンクリート型枠用大引の連結具は、下記のような利点がある。 INDUSTRIAL APPLICABILITY The concrete pulling tool for concrete formwork has the following advantages.

【0029】 (1) I形の大引を使用するため、大引が持易く、安全で作業性が良い。(1) Since the I-shaped pulling rod is used, the pulling rod is easy to hold, safe and workable.

【0030】 (2) 連結具の台板上の前後の左右に、前後および左右の対向側へ突出する 爪片を設けたフツクを固設してその前方フツクと後方フツクの間には1個のI形 大引の下端部または上端部に嵌着する狭幅溝を、左側フツクと右側フツクの間に は接触並列する2個のI形大引の下端部または上端部に嵌着する広幅溝をそれぞ れ形成した。従つて、(2) A hook provided with claw pieces projecting to the front and rear and left and right opposite sides is fixedly provided on the front and rear left and right on the base plate of the connecting tool, and one hook is provided between the front and rear hooks. The narrow groove that fits on the lower end or the upper end of the I-shaped Daihiki is placed in contact between the left and right hooks. Each groove was formed. Therefore,

【0031】 (イ) 大引を突合せ、抱合せ、または並列の何れになす場合も、連結具を兼 用で使用でき、連結具は1種類でよくて運搬、収納、取扱い上便利で作業能率を 向上する。(B) Whether the daihiki is butt-jointed, tie-in, or parallel, the connector can be used in combination, and only one type of connector is required, which is convenient for transportation, storage, and handling, and improves work efficiency. improves.

【0032】 (ロ) 大引が1個、または2個抱合せの何れの場合にも、連結具の溝が大引 の下端部または上端部に嵌着して大引に連結具が取付けられるから、大引への連 結具の取付けは容易である上に、確実堅固である。(B) Since the groove of the connecting tool is fitted to the lower end or the upper end of the Daihiki, the connecting tool is attached to the Daihiki regardless of whether one or two Daihiki are tied together. Attaching the coupling to the Daihiki is easy and reliable.

【0033】 (ハ) 2個抱合せ、または2個並列の大引に連結具を嵌着するとき、大引へ の連結具の取付けが確実堅固である上に、連結具により2個の大引を抱持して2 個の大引を堅実に並列保持する。(C) When tying two connecting pieces to each other or fitting two connecting pieces in parallel with each other, the connecting piece is surely and firmly attached to the connecting piece, and the connecting piece has two connecting pieces. Hold and hold two Daihiki in parallel.

【0034】 (3) 連結具の台板の下面にサポートへの連結軸を突設したから、サポート の孔を上記連結軸に嵌合してサポートにより大引を支持すると、連結具の大引へ の嵌着と相俟つて連結具を介して大引とサポートが確実に連結保持され、作業し 易い上に、安全上有益である。(3) Since the connecting shaft to the support is projected on the lower surface of the base plate of the connecting tool, when the hole of the support is fitted into the connecting shaft and the large pull is supported by the support, the large pull of the connecting tool is pulled. In addition to the fitting, the large pull and the support are securely connected and held by the connecting tool, which is easy to work and is beneficial for safety.

【0035】 (4) 連結具は、何回も転用できる上に、半永久的に使用し得て経済的であ る。(4) The connector is economical as it can be diverted many times and can be used semi-permanently.

【0036】 (5) 型枠の組立てに従来のような不要材が無いので、作業現場は何時も片 付いて綺麗で危険性が無く、足もとは安全である。(5) Since there is no unnecessary material used for assembling the formwork, the work site is always clean and clean, there is no danger, and the feet are safe.

【0037】 (6) 簡単小型に構成して容易安価に製作できる。(6) It can be easily and inexpensively manufactured with a simple and compact structure.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例に係るコンクリート型枠用大
引の連結具の正面図である。
FIG. 1 is a front view of a concrete pulling tool for a concrete formwork according to an embodiment of the present invention.

【図2】同上平面図である。FIG. 2 is a plan view of the same.

【図3】同上側面図である。FIG. 3 is a side view of the same.

【図4】同上連結具を使用しI形大引を突合せにして型
枠を構成した状態の正断面図である。
FIG. 4 is a front cross-sectional view showing a state in which a mold is configured by using the above-mentioned connecting tool and abutting I-shaped Daihiki.

【図5】同上大引支持要部の拡大平面図で、中間部を切
欠し、一部を切断して示す。
FIG. 5 is an enlarged plan view of the main part of the Daihiki support, showing an intermediate part cut away and a part cut away.

【図6】同上側断面図である。FIG. 6 is an upper sectional view of the same.

【図7】同上分解斜面図である。FIG. 7 is an exploded perspective view of the same as above.

【図8】その連結具を使用して2個の大引を抱合せに連
結した状態の要部の正面図で、中間部を切欠して示す。
FIG. 8 is a front view of a main part in a state where two large hauls are connected to each other by using the connecting tool and a middle part is cut away.

【図9】同上平面図で、中間部を切欠し、一部を切断し
て示す。
FIG. 9 is a plan view of the same as above, in which a middle portion is cut away and a part is cut away.

【図10】同上側断面図である。FIG. 10 is an upper sectional view of the same.

【図11】その連結具を使用して2個の大引を並列に接
触連結した状態の正面図で、中間部を切欠して示す。
FIG. 11 is a front view showing a state in which two Daihikis are contact-connected in parallel by using the connecting tool, and a middle portion is cut away.

【図12】同上平面図で、中間部を切欠し、一部を切断
して示す。
FIG. 12 is a plan view of the same as above, in which a middle portion is cut away and a part is cut away.

【図13】従来の大引を突合せにして型枠を構成した状
態の正断面図である。
FIG. 13 is a front cross-sectional view showing a state in which a mold is constructed by butting conventional Daihiki.

【図14】同上大引連結部の平面図である。FIG. 14 is a plan view of the Daihiki connecting section.

【図15】従来の2個の大引を抱合せに連結した状態の
連結部の平面図である。
FIG. 15 is a plan view of a connecting portion in a state in which two conventional large hauls are connected to a tie.

【符号の説明】[Explanation of symbols]

a 連結具 A コンクリート型枠 1 台板 2 爪片 3 爪片 4 フツク 5 フツク 6 フツク 7 フツク 8 I形大引 9 狭幅溝 10 広幅溝 11 サポート 12 孔 13 連結軸 14 釘孔 15 釘孔 16 突縁 17 大引本体 18 木製角材 19 通孔 20 連結ボルト 21 長片 22 ねじ 23 短片 24 ナツト 25 釘 26 頂板 27 根太 28 床堰板 29 コンクリート床 イ 大引 ロ 桟木またはベニヤ板 ハ 釘止め ニ サポート ホ 頂板 ヘ 釘 ト コンクリート型枠 a Connecting tool A Concrete formwork 1 Base plate 2 Claw piece 3 Claw piece 4 Hook 5 Hook 6 Hook 7 Hook 8 I-shaped large pull 9 Narrow groove 10 Wide groove 11 Support 12 hole 13 Connecting shaft 14 Nail hole 15 Nail hole 16 Projection edge 17 Daihiki main body 18 Wooden square bar 19 Through hole 20 Connecting bolt 21 Long piece 22 Screw 23 Short piece 24 Nut 25 Nail 26 Top plate 27 Joist 28 Floor dam plate 29 Concrete floor I Daihiki Ro pier or plywood Ha nailing Nisupportho Top plate nail concrete formwork

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 台板上の前後の左右に、前後および左右
の対向側へ突出する爪片を設けたフツクを固設してその
前方フツクと後方フツクの間には1個のI形大引の下端
部または上端部に摺動可能に嵌着する狭幅溝を、左側フ
ツクと右側フツクの間には接触並列する2個のI形大引
の下端部または上端部に摺動可能に嵌着する広幅溝をそ
れぞれ形成し、上記台板の下面にはサポートの孔内に着
脱可能に嵌合する連結軸を突設してなるコンクリート型
枠用大引の連結具。
1. A hook having claw pieces projecting to the front, rear, left, and right opposite sides is fixedly mounted on the base plate in the front-rear and left-right directions, and one I-shaped large-sized member is provided between the front hook and the rear hook. A narrow groove slidably fitted to the lower end or the upper end of the pull is slidable to the lower end or the upper end of two I-shaped Daihiki which are in parallel between the left hook and the right hook. A large-drawing connecting tool for concrete formwork, each of which is formed with a wide groove to be fitted therein, and has a connecting shaft which is detachably fitted into a hole of a support on the lower surface of the base plate.
JP2204993U 1993-04-01 1993-04-01 Daihiki connector for concrete formwork Pending JPH0674745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2204993U JPH0674745U (en) 1993-04-01 1993-04-01 Daihiki connector for concrete formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2204993U JPH0674745U (en) 1993-04-01 1993-04-01 Daihiki connector for concrete formwork

Publications (1)

Publication Number Publication Date
JPH0674745U true JPH0674745U (en) 1994-10-21

Family

ID=12072076

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2204993U Pending JPH0674745U (en) 1993-04-01 1993-04-01 Daihiki connector for concrete formwork

Country Status (1)

Country Link
JP (1) JPH0674745U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019090291A (en) * 2017-11-17 2019-06-13 株式会社福田組 Connection structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6173044A (en) * 1984-09-18 1986-04-15 Seiko Electronic Components Ltd Lithium niobate resonator

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6173044A (en) * 1984-09-18 1986-04-15 Seiko Electronic Components Ltd Lithium niobate resonator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019090291A (en) * 2017-11-17 2019-06-13 株式会社福田組 Connection structure

Similar Documents

Publication Publication Date Title
US4104356A (en) Tilt-up panel bracket
US5435610A (en) Subfloor panel driving device and method
US6343453B1 (en) Composite wooden beam and method for producing said beam
KR20180062151A (en) U bolt type fixture unit of construction material
CA1247156A (en) Tightening and clamping device
JPH06294210A (en) Connecting device of beams for concrete formwork
JPH0674745U (en) Daihiki connector for concrete formwork
JP4350580B2 (en) Wood lumber for construction
US2360105A (en) Scaffold
JP3020190U (en) Metal fittings for wooden members in wooden buildings
JPH0315711Y2 (en)
CN210550950U (en) Nail puller
JP3045667B2 (en) Flooring for scaffolding
JPH0755237Y2 (en) Safety handrail device for opening
JPH0726496U (en) Connecting bracket for temporary slab material
US1763677A (en) Falsework clamp
JPH09209568A (en) Form corner part assembling device
JPH0119718Y2 (en)
JPH0119691Y2 (en)
JP2939760B2 (en) Separator fixture for reinforced concrete casting formwork
JP2540425B2 (en) Floor frame support device
GB1571796A (en) Handrails
JPS587886Y2 (en) scaffolding equipment
JP3517510B2 (en) Construction method to modify the founding surface of existing concrete retaining wall, and log decorative panel unit used for the method
JPH0752286Y2 (en) Piping sleeve support bracket