JPS587886Y2 - scaffolding equipment - Google Patents

scaffolding equipment

Info

Publication number
JPS587886Y2
JPS587886Y2 JP1978089417U JP8941778U JPS587886Y2 JP S587886 Y2 JPS587886 Y2 JP S587886Y2 JP 1978089417 U JP1978089417 U JP 1978089417U JP 8941778 U JP8941778 U JP 8941778U JP S587886 Y2 JPS587886 Y2 JP S587886Y2
Authority
JP
Japan
Prior art keywords
scaffolding
pipe
insert
supported
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1978089417U
Other languages
Japanese (ja)
Other versions
JPS5510803U (en
Inventor
宏一 古谷
Original Assignee
岡部株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 岡部株式会社 filed Critical 岡部株式会社
Priority to JP1978089417U priority Critical patent/JPS587886Y2/en
Publication of JPS5510803U publication Critical patent/JPS5510803U/ja
Application granted granted Critical
Publication of JPS587886Y2 publication Critical patent/JPS587886Y2/en
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 本考案は高層コンクリート構築体のベランダ等張出部の
施工に際し用いられる足場装置に関する。
[Detailed Description of the Invention] The present invention relates to a scaffolding device used when constructing overhanging parts such as balconies of high-rise concrete structures.

従来、高層コンクリートの構築体のベランダ等張出部の
施工時に用いられた足場枠は■構築体外周に地上より積
層して全面に亙り立設するか、又は、■ベランダ張出部
の構築体の打設コンクリート硬化をよってその後に該構
築体又はベランダのコンクリートの下部に係止固定する
ので、作業能率の低下のみならず、■の場合にあっては
被施工個所以外の構築体外周に不必要な足場枠を地上よ
り積層して立設しなければならず、余分な資材、人員等
を必要とするほか、足場枠全体の積層荷重によって安全
性が常時維持されないという欠点があった。
Conventionally, the scaffolding frames used when constructing overhanging parts such as balconies of high-rise concrete structures were: ■ Laminated from the ground around the outer periphery of the structure and erected over the entire surface, or ■ Construction of balcony overhangs. After the poured concrete has hardened, it is then fixed to the lower part of the concrete of the structure or balcony, which not only reduces work efficiency but also causes damage to the outer periphery of the structure other than the area to be constructed. The necessary scaffolding frames must be stacked and erected from the ground, which requires extra materials, personnel, etc., and has the disadvantage that safety cannot be maintained at all times due to the stacked load of the entire scaffolding frame.

又■の場合には型枠組立て時における作業足場がないと
いう欠点があった。
In addition, in case (2), there was a drawback that there was no work scaffolding for assembling the formwork.

これらの欠点を補うために、構築体の打設コンクリート
の型枠パネルの組立てと同時に足場枠を併設していくと
いう足場装置の考案がなされた。
In order to compensate for these shortcomings, a scaffolding device was devised in which a scaffolding frame is installed at the same time as the cast concrete formwork panels of the structure are assembled.

しかし乍らかする足場装置においても、張出しベランダ
を構築するために必要とする足場枠組はサポート、大引
、根太並に型枠等の構成と一体のものであったために、
前記、サポート、大引、根太並に型枠等を撤去する時は
、足場枠を撤去しなければならず、ベランダの其の後の
工事、例えば吹付塗装作業を行う時は再び足場枠を組立
て構成しなければならないという二重の手間を要すると
いう欠点が見出された。
However, even with the scaffolding equipment mentioned above, the scaffolding framework required to construct an overhanging veranda was integrated with the support, joists, formwork, etc.
As mentioned above, when removing supports, joists, formwork, etc., the scaffolding frame must be removed, and when carrying out subsequent work on the balcony, such as spray painting, the scaffolding frame must be reassembled. It was found that the disadvantage is that it requires double effort to configure.

そこで本考案はこのような欠点を補足し、迅速にしてか
つ充分な安全性を保有する足場装置を提供するものであ
り、本考案によれば、足場枠は、サポート、大引、根太
並に型枠パネルの撤去に際しても、撤去することなく、
足場枠は、その債、その後のベランダの仕上作業に続け
て使用できるものである。
Therefore, the present invention compensates for these shortcomings and provides a scaffolding device that is quick and has sufficient safety. Even when removing formwork panels, there is no need to remove them.
The scaffolding frame can be used continuously for the bond and subsequent finishing work on the veranda.

以下図面にもとづいて説明すると、第1〜3図に示すも
のは、大引に角パイプを使用したもので、該角パイプか
ら足場用横架丸パイプを懸吊支持した場合の足場装置の
実施例である。
Explaining the following based on the drawings, the one shown in Figs. 1 to 3 uses a square pipe for the drawer, and the implementation of the scaffolding device when a horizontal round pipe for scaffolding is suspended and supported from the square pipe. This is an example.

コンクリート構築体Aより側方に張出し突設するベラン
ダBを構築する時、サポート上に載置された大引角パイ
プ1と該大引角パイプ1と直交して根太角パイプ2が載
置され、更に型枠板3が載置配列されている。
When constructing a verandah B that projects laterally from the concrete structure A, a large square pipe 1 is placed on a support, and a joist square pipe 2 is placed perpendicular to the large square pipe 1. , furthermore, formwork plates 3 are placed and arranged.

該型枠板3.3の各端縁にはインサート4に装着された
締結具5と螺合された連結杆6の挿通する半円弧の切り
欠きがなされ、該半円弧は互いに型枠板の端縁が当接し
て円孔7を形成する。
Each edge of the formwork plate 3.3 has a semicircular arc notch through which a connecting rod 6 screwed with a fastener 5 attached to the insert 4 is inserted, and the semicircular arcs are mutually connected to each other on the formwork plate. The edges abut to form a circular hole 7.

また連結杆6の先端には後述の転倒り字状をなす足場用
横架材の懸吊具8の水平部9に穿設された孔10の径よ
り稍大きい径を有する鍔11が形成されて孔10内に若
干動きを許すように前記連結杆6は嵌挿されている。
Further, at the tip of the connecting rod 6, a collar 11 is formed which has a diameter slightly larger than the diameter of a hole 10 drilled in a horizontal part 9 of a hanging device 8 of a horizontal scaffolding member having an inverted shape, which will be described later. The connecting rod 6 is fitted into the hole 10 so as to allow some movement.

なお前記孔10の穿設位置は前記足場用横架材の懸吊具
8によって懸吊される足場用横架丸パイプ12.12の
荷重バランスを考慮して偏心位置に穿設されている。
Note that the hole 10 is bored at an eccentric position in consideration of the load balance of the horizontal scaffold round pipes 12 and 12 suspended by the suspension tool 8 of the scaffold horizontal member.

つぎに、前記足場用横架材の懸吊具8には、前記水平部
9を中間として左右2枚の長短な側板13゜13′が折
曲げられ、長手側板13の中程より先端に向けてクラン
プ取付板14が取付けられてをり、該取付板14には背
面状にクランプ15.15が設けられている。
Next, on the suspension device 8 of the horizontal scaffolding member, two long and short side plates 13° 13' on the left and right are bent with the horizontal part 9 in the middle, and are bent from the middle of the longitudinal side plate 13 toward the tip. A clamp mounting plate 14 is attached to the mounting plate 14, and a clamp 15.15 is provided on the back side of the mounting plate 14.

さらに、前記左右2枚の側板13,13’の上部寄りに
はスリット16.16が穿設され、該スリット16゜1
6には楔片17が貫挿されるようになっている。
Furthermore, slits 16.16 are bored near the top of the two left and right side plates 13, 13', and the slits 16.16
A wedge piece 17 is inserted through the hole 6.

このようにして、構成されている足場用横架材の懸吊具
8を、今、最上段の型枠板3の端縁に切り欠いた半円弧
内に、インサート4と締結具5を介して螺合された連結
杆6を当接させつ・、転倒り字状をなす懸吊具8の水平
部9と両側板13.13’とのなす開口部内に大引の角
ノ4.イブ1を収納する如く跨載させる。
In this way, the suspending device 8 of the horizontal scaffolding member constructed in this manner is now placed within the semicircular arc cut out at the edge of the uppermost form board 3 via the insert 4 and the fastener 5. While abutting the connecting rod 6 screwed together, a large corner hole 4. Place Eve 1 astride it to store it.

しかして両側板13.13’に穿設したスリット16゜
16を貫挿して楔片17で大引角パイプ1に係止固定す
る。
Then, it is inserted through the slits 16.degree. 16 formed in the side plates 13 and 13' and fixed to the large draw angle pipe 1 with the wedge pieces 17.

なお符号Cは打設コンクリートである。つぎに、このよ
うにして大引の角パイプ1に跨載して吊下支持された1
足場用横架材懸吊具8の長手側板13側に取付板14で
背面状に取付けられたクランプ15.15に足場用横架
丸パイプ12.12を支持するのである。
Note that the code C indicates poured concrete. Next, the 1 which was suspended and supported by straddling the large square pipe 1 in this way
A horizontal round pipe 12.12 for a scaffold is supported by a clamp 15.15 attached to the longitudinal side plate 13 side of the horizontal scaffold suspension member 8 by a mounting plate 14 in a rear-like manner.

なお第3図に示したものは他の実施例を示すものであっ
て、この実施例にあっては、大引に角の木材1′が使用
された場合である。
Note that FIG. 3 shows another embodiment, and in this embodiment, a corner piece of wood 1' is used for the main drawer.

即ち足場用横架材懸吊具8は前述の如き転倒り字状のも
のと異なり、インサート4と締結具5を介して螺合され
た連結杆6に恰も千手状をなす大引との引掛片18が設
けられ、該引掛片18には大引角材1′との保合支持の
ためボルト19が設けられているものである。
That is, the scaffolding horizontal material suspension device 8 is different from the above-mentioned upside-down shape, and has a connecting rod 6 that is screwed together with the insert 4 and the fastener 5, and has a 1,000-arm-shaped main puller. A hooking piece 18 is provided, and a bolt 19 is provided on the hooking piece 18 for securing and supporting the large square piece 1'.

なお足場用横架丸パイプ12を支持するクランプ15は
連結杆6の下端に取付けられている。
A clamp 15 that supports the horizontal round pipe 12 for scaffolding is attached to the lower end of the connecting rod 6.

さらに、第4〜7図に示すものは、大引に丸パイプを使
用したもので、該丸パイプから足場用横架丸パイプを懸
吊支持した場合の足場装置の他の実施例である。
Furthermore, what is shown in FIGS. 4 to 7 is another embodiment of the scaffolding device in which a round pipe is used for the pull-out, and a horizontal round pipe for scaffolding is suspended and supported from the round pipe.

コンクリート構築体Aより側方に張出し突設するベラン
ダBを構築する時、サポート上に載置された2本の大引
丸パイプ20.20と、該大引丸パイプ20.20と直
交して根太角パイプ2が順次載置され、上段に型枠板3
が載置、構成される。
When constructing a veranda B that protrudes laterally from the concrete structure A, the two large round pipes 20.20 placed on the supports and the two large round pipes 20.20 perpendicular to the large round pipes 20.20 are The joist square pipes 2 are placed one after another, and the formwork board 3 is placed on the upper stage.
is placed and configured.

該型枠板3,3の各端縁にはインサート4に装着された
締結具5と螺合された足場枠用吊下杆21の挿通する半
円弧の切り欠きがなされ、該半円弧は型枠板3,3の端
縁が互いに当接して円孔7を形成する。
A semi-circular notch is formed on each edge of the formwork plates 3, 3, through which the scaffolding frame suspension rod 21 screwed with the fastener 5 attached to the insert 4 is inserted, and the semicircular arc is The edges of the frame plates 3, 3 abut against each other to form a circular hole 7.

そして、前記インサート4と螺合された足場枠用吊下杆
21下端には足場用横架の2本の丸パイプ12.12を
緊締する2枚の座金片23.23が取付けられている。
Two washer pieces 23.23 for tightening the two round pipes 12.12 of the horizontal scaffolding frame are attached to the lower end of the suspension rod 21 for the scaffolding frame screwed together with the insert 4.

また、本考案の足場枠用吊下杆21は前述の如く、大引
材として2本の丸パイプ20.20を用いた時に使用さ
れるものであって、第6〜7図に示すような構造のブラ
ケット24によって始めて両者の取付装着が可能となる
のである。
In addition, as mentioned above, the hanging rod 21 for scaffolding frame of the present invention is used when two round pipes 20 and 20 are used as the main lumber, and is as shown in FIGS. 6 and 7. It is only through the structural bracket 24 that the two can be attached.

即ち、ブラケット24は一枚の鉄片の中心に足場枠用吊
下杆21の径より稍大きい円寸法を有する挿通孔25を
折り返して形成し、該挿通孔25と他方端との中間部に
は、座金ボルト26の挿通孔27を夫々形成した折曲げ
片の2片を溶接して1片とし、さらに、座金ボルト26
の挿通孔27の左右には2本の大引丸パイプ20.20
と安定して当接するために浅い円弧28 、28を切り
欠きしている。
That is, the bracket 24 is formed by folding back an insertion hole 25 having a circular dimension slightly larger than the diameter of the suspension rod 21 for the scaffolding frame in the center of a piece of iron, and a hole is formed in the middle part between the insertion hole 25 and the other end. , two bent pieces each having an insertion hole 27 for the washer bolt 26 are welded into one piece, and the washer bolt 26 is welded into one piece.
There are two large round pipes 20.20 on the left and right of the insertion hole 27.
Shallow circular arcs 28, 28 are cut out in order to stably abut the two.

一方、ブラケット24に形成した挿通孔25を挿通する
前記足場枠用吊下杆21の途中適当長さ個所にはブラケ
ット24との係止を位置定めするストッパリング29が
嵌着されている。
On the other hand, a stopper ring 29 for positioning the stopper ring 29 to be engaged with the bracket 24 is fitted at an appropriate length in the middle of the suspension rod 21 for the scaffold frame, which is inserted through the insertion hole 25 formed in the bracket 24.

該ストッパリング29の嵌着位置はインサート4が打設
コンクリ−)C内に埋設される長さ寸法とする。
The fitting position of the stopper ring 29 is such that the length of the insert 4 is buried in the poured concrete (C).

このようにして形成されたブラケット24の挿通孔25
及び挿通孔27に予め吊下杆21と座金ボルト26を夫
々挿通させて1組とした組合せ体とし、数組合せ体の吊
下杆21を前記型枠板3の端縁に切り欠きした半円弧に
当接させるとともにブラケット24の2つの浅い切り欠
き円弧28.28内に大引丸パイプ20.20を当接さ
せ、さらに該大引丸パイプ20.20上に挿通孔27を
挿通している座金ボルト26と溶接された3型座金30
を冠着し、ブラケット24の挿通孔27外に突出したボ
ルト26とナツトを螺合して、組合せ体を大引丸パイプ
20.20に強個に緊締支持させる。
The insertion hole 25 of the bracket 24 formed in this way
The suspension rod 21 and the washer bolt 26 are respectively inserted into the insertion hole 27 in advance to form a combination, and several combinations of the suspension rod 21 are cut into the edge of the form plate 3 to form a semicircular arc. At the same time, a large round pipe 20.20 is brought into contact with the two shallow notched circular arcs 28.28 of the bracket 24, and an insertion hole 27 is inserted above the large round pipe 20.20. Type 3 washer 30 welded to washer bolt 26
The bolts 26 protruding from the insertion holes 27 of the brackets 24 are screwed together with nuts to firmly tighten and support the assembled body on the round pipes 20 and 20.

この時、前記吊下杆21は、ストッパリング29により
、ブラケット24の挿通孔25の上部開口周縁によって
吊下係止される。
At this time, the suspension rod 21 is suspended from the upper opening periphery of the insertion hole 25 of the bracket 24 by the stopper ring 29 .

こうして、大引丸パイプ20,20.20’、20’に
ブラケツ) 24.24を介して緊締支持された吊下杆
21,21の下端には、前記、座金ボルト26と溶接さ
れた3型座金30と同様の形状をなす座金片23.23
が取付けられており、該座金片23.23により2本の
足場用横架丸パイプ12,12緊締支持される。
In this way, at the lower ends of the hanging rods 21, 21, which are tightly supported by the large round pipes 20, 20. Washer piece 23.23 having the same shape as washer 30
is attached, and the two horizontal round pipes 12, 12 for scaffolding are tightly supported by the washer pieces 23, 23.

なお、大引丸パイプ20,20.20’、20’と夫々
のブラケット24.24による大引丸パイプ20,20
.20’、20’との緊締支持は互いのブラケツ) 2
4.24の挿通孔25.25同志が隣接する状態で夫々
の吊下杆21.21を挿通するのが、該吊下杆21,2
1に懸吊される足場用横架丸パイプ12.12との荷重
バランス土星しい。
In addition, the Oibikimaru pipes 20, 20, 20, 20', 20' and the respective brackets 24, 24
.. 20' and 20' are tightened and supported by each other's brackets) 2
The suspension rods 21, 2 are inserted through the respective suspension rods 21.21 with the insertion holes 25.25 of 4.24 adjacent to each other.
Load balance with horizontal round pipe 12.12 for scaffolding suspended from 1 Saturn.

このように、本考案によれば、足場枠組は、コンクリー
トCの打設前は、サポート、大引、根太並に型枠板と、
大引丸パイプ20.20からブラケット、吊下杆、座金
ボルトの組み合せ体とによって吊下支持され、コンクリ
ートCの硬化後は該打設コンクJ−) C内に埋設され
たインサート4と螺合した足場枠用吊下杆21によって
のみ足場用横架丸パイプ12.12が吊下支持される。
As described above, according to the present invention, the scaffolding framework, before concrete C is poured, includes supports, main pullers, joists, and formwork boards.
It is suspended and supported from the large round pipe 20.20 by a combination of a bracket, a hanging rod, and a washer bolt, and after the concrete C has hardened, it is screwed into the insert 4 buried in the poured concrete J-) C. The horizontal round pipes 12 and 12 for scaffolding are suspended and supported only by the suspension rods 21 for scaffolding frames.

なお、足場用横架丸パイプ12.12の張出し先端には
直交クランプ15によって、手摺パイプ31が上、下方
向に延長して取付けられる。
Note that a handrail pipe 31 is attached to the overhanging tip of the horizontal round pipe for scaffolding 12.12 by an orthogonal clamp 15 so as to extend upward and downward.

以上、述べた如く、本考案による足場装置は、サポート
、大引、根太並に型枠板の撤去に際しても、何等吊下支
持位置を移動させたり、或いは、とりこわすことなく続
けて足場用横架材を吊下支持させて、ベランダの諸工事
を進行できるというはなはだすぐれた実用的効果を奏す
るものである。
As mentioned above, the scaffolding device according to the present invention can be used as a horizontal scaffolding device without moving the suspension support position or tearing down the support, even when removing supports, joists, and formwork boards. This has an excellent practical effect in that various works on the veranda can be carried out by suspending and supporting the frame members.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は足場用横架材懸吊具により大引角パイプより足
場用横架丸パイプを吊下支持した図、第2図は第1図の
矢印り方向よりみた正面図、第3図は大引に角材を使用
した場合の他の実施例図、第4図は大引丸パイプに組み
合せ体で足場用横架丸パイプを吊下支持した場合の他の
実施例図、第5図はコンクリート硬化後、吊下杆によっ
て足場用横架丸パイプを吊下支持した図、第6図はブラ
ケットと、吊下杆と、大引丸パイプの関係を示す説明図
、第7図は第6図のブラケットの正面図である。 1・・・・・・大引角パイプ、1′・・・・・・角材、
2・・・・・・根太角パイプ、3,3・・・・・・型枠
板、4・・・・・・インサート、5・・・・・・締結具
、6・・・・・・連結杆、7・・・・・・型枠板の円孔
、8・・・・・・足場用横架材懸吊具、9・・・・・・
水平部、10・・・・・・孔、11・・・・・・鍔、1
2・・・・・・足場用横架丸パイプ、13.13’・・
・・・・側板、14・・・・・・クランプ取付板、15
.15・・・・・・クランプ、16゜16・・・・・・
スリット、17・・・・・・楔片、18・・・・・・千
手状の引掛片、19・・・・・・ポルl−,20,20
,20’、20’・・・・・・大引丸パイプ、21・・
・・・・足場枠用吊下杆、23.23・・・・・・座金
片、24・・・・・・ブラケット、25・・・・・・吊
下杆の挿通孔、26・・・・・・座金ボルト、27・・
・・・・座金ボルトの挿通孔、28・・・・・・浅い切
り欠き円弧、29・・・・・・ストッパリング、30・
・・・・・3型座金、31・・・・・・手摺パイプ、A
・・・・・・コンクリート構築体、B・・・・・・ベラ
ンダ、C・・・・・・コンクリート。
Figure 1 is a diagram of a scaffolding horizontal round pipe suspended from a large rectangular pipe using a scaffolding horizontal member hanging device, Figure 2 is a front view seen from the direction of the arrow in Figure 1, and Figure 3. Figure 4 is another example in which a square timber is used for the Ohiki, Figure 4 is another example in which a horizontal round pipe for scaffolding is suspended and supported in combination with the Ohiki round pipe, and Figure 5. Figure 6 is an explanatory diagram showing the relationship between the brackets, suspension rods, and large round pipes; Figure 7 is FIG. 7 is a front view of the bracket of FIG. 6; 1... Large square pipe, 1'... Square timber,
2... Joist square pipe, 3, 3... Form board, 4... Insert, 5... Fastener, 6... Connecting rod, 7... Circular hole in form board, 8... Horizontal material suspension device for scaffolding, 9...
Horizontal part, 10...hole, 11...tsuba, 1
2...Horizontal round pipe for scaffolding, 13.13'...
...Side plate, 14...Clamp mounting plate, 15
.. 15... Clamp, 16°16...
Slit, 17...Wedge piece, 18...Thousand-shaped hook piece, 19...Poll l-, 20, 20
, 20', 20'...Obikimaru pipe, 21...
... Suspension rod for scaffolding frame, 23.23 ... Washer piece, 24 ... Bracket, 25 ... Suspension rod insertion hole, 26 ... ...Washer bolt, 27...
...Insertion hole for washer bolt, 28...Shallow notch arc, 29...Stopper ring, 30.
...Type 3 washer, 31...Handrail pipe, A
... Concrete structure, B ... Veranda, C ... Concrete.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 構築体本体から外方に張り出して構築されるコンクリー
ト中に、その下方から埋設されるように設けられるイン
サートと、該インサートに締結具を介して、型枠板の下
方に突出するように設けられる連結杆と、該連結杆の下
部の大径の鍔を介して吊下げられる懸吊具とからなり、
該懸吊具は上部の水平部分が前記の鍔に係止され、左右
に垂下される側板の間に大引パイプを支持し、かつ、長
手側板の下端部にクランプ部材を形威し、該クランプに
より足場用横架パイプを支持するもので、上記した構成
を有する懸吊支持部材を複数個直線状に設けて、足場用
横架パイプを複数個所で支持して、構築体の外方に突出
するように固定支持するようにしたことを特徴とする足
場支持装置。
An insert is provided so as to be buried from below in the concrete that is constructed so as to extend outward from the main body of the structure, and an insert is provided so as to protrude below the form board through a fastener to the insert. Consisting of a connecting rod and a hanging device suspended via a large-diameter collar at the bottom of the connecting rod,
The hanging device has an upper horizontal portion locked to the collar, supports a large pipe between side plates hanging left and right, and has a clamp member formed at the lower end of the longitudinal side plate. Scaffolding horizontal pipe is supported by a plurality of hanging support members having the above-mentioned configuration are provided in a straight line, and the scaffolding horizontal pipe is supported at multiple locations and protrudes outward from the structure. A scaffolding support device characterized in that it is fixedly supported so as to
JP1978089417U 1978-06-30 1978-06-30 scaffolding equipment Expired JPS587886Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1978089417U JPS587886Y2 (en) 1978-06-30 1978-06-30 scaffolding equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1978089417U JPS587886Y2 (en) 1978-06-30 1978-06-30 scaffolding equipment

Publications (2)

Publication Number Publication Date
JPS5510803U JPS5510803U (en) 1980-01-24
JPS587886Y2 true JPS587886Y2 (en) 1983-02-12

Family

ID=29016795

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1978089417U Expired JPS587886Y2 (en) 1978-06-30 1978-06-30 scaffolding equipment

Country Status (1)

Country Link
JP (1) JPS587886Y2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5314927A (en) * 1976-07-27 1978-02-10 Koyo Kikai Sangiyou Kk Method of executing overhang

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5314927A (en) * 1976-07-27 1978-02-10 Koyo Kikai Sangiyou Kk Method of executing overhang

Also Published As

Publication number Publication date
JPS5510803U (en) 1980-01-24

Similar Documents

Publication Publication Date Title
US5918843A (en) Scaffold bracket
JPS587886Y2 (en) scaffolding equipment
KR101707037B1 (en) A structure for assembled system scaffold and erecting method thereof
JP2003293458A (en) Hanging fixture structure for housing unit
JPS6212028Y2 (en)
JPS6136698Y2 (en)
JPS6243080Y2 (en)
JPH0227079Y2 (en)
JPH0754480A (en) Prefabricated scaffolding and assembling and disassembling method thereof
JPS6242049Y2 (en)
JPH0635054Y2 (en) Scaffolding equipment
JP3081653U (en) Baseboard panel fixture
JPH0736995Y2 (en) Scaffolding equipment
JPH0630967Y2 (en) Connection structure of columns and beams
JP2536802Y2 (en) Construction rain shelter
US20230265645A1 (en) Modular space frame support system, work platform system and methods of erecting the same
JPH037471Y2 (en)
JPS6237893Y2 (en)
JPS6322269Y2 (en)
JPH0119718Y2 (en)
JPH0327166Y2 (en)
JPH0532562Y2 (en)
JPH0536041Y2 (en)
JPS5910269Y2 (en) Handrail support for scaffolding frame
JP2024035126A (en) Scaffold base and temporary scaffold assembly method