JPH0672334B2 - Spinning machine supply method - Google Patents

Spinning machine supply method

Info

Publication number
JPH0672334B2
JPH0672334B2 JP3299260A JP29926091A JPH0672334B2 JP H0672334 B2 JPH0672334 B2 JP H0672334B2 JP 3299260 A JP3299260 A JP 3299260A JP 29926091 A JP29926091 A JP 29926091A JP H0672334 B2 JPH0672334 B2 JP H0672334B2
Authority
JP
Japan
Prior art keywords
shino
winding
main
machine
maki
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3299260A
Other languages
Japanese (ja)
Other versions
JPH0525720A (en
Inventor
英仁郎 荒木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Jidoshokki Seisakusho KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Jidoshokki Seisakusho KK filed Critical Toyoda Jidoshokki Seisakusho KK
Priority to JP3299260A priority Critical patent/JPH0672334B2/en
Publication of JPH0525720A publication Critical patent/JPH0525720A/en
Publication of JPH0672334B2 publication Critical patent/JPH0672334B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は精紡機の篠供給方法に
係り、詳しくはドラフトパートへ篠を供給する本篠巻を
内外2列に吊架するとともに、更にそれらの外側に前記
本篠巻と交換するための予備篠巻を吊架するようにした
精紡機における篠供給方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for supplying Shinobu to a spinning machine, and more specifically, to suspend the Shinoshinomaki for supplying Shino to the draft part in two rows inside and outside, and further to the outside of them. The present invention relates to a Shino feeding method in a spinning machine in which a spare Shino roll for suspension is suspended.

【0002】[0002]

【従来の技術】精紡機では高い位置のクリールに吊架さ
れた篠巻より篠を引出し、下方のドラフトパートへ供給
するようにしている。この場合、篠巻は精紡機のスピン
ドルゲージに比べてかなり大きな径となっているため、
一般に、内外2列に配設されたクリールレールに篠巻が
吊り下げられている。そして、篠のドラフトパートへの
供給が進み、篠巻が空ないしは空に近づくと新しい篠巻
と交換する必要がある。この交換(篠替)については、
台車によって運ばれた篠巻を作業者が手作業によって行
うか、予めクリール棚に載置されている予備篠巻を同じ
く作業者が交換するということが古くから行われてい
る。又、前記内外2列のクリールレールとは別にその外
側に更に1本のレールを設け、これに予備篠巻を吊架し
ておき、必要に応じて作業者が前記交換作業を行うとい
う形式のものもある。この形式によれば、予備篠巻レー
ルを搬送式とし、粗紡工程あるいは精紡機一端部より自
動的に搬入でき、搬出もできることから実用的なものと
して評価されている。
2. Description of the Related Art In a spinning machine, a shinomaki is pulled out from a shinomaki suspended on a creel at a high position and is supplied to a lower draft part. In this case, Shino-maki has a considerably larger diameter than the spindle gauge of the spinning machine.
In general, Shino rolls are suspended on creel rails arranged in two rows, inside and outside. Then, as the supply to Shino's draft part progresses, and Shino-maki becomes empty or approaches the sky, it is necessary to replace it with a new Shino-maki. For this exchange
It has long been practiced for an operator to manually carry out Shino-maki carried by a dolly, or for the worker to replace a spare Shino-maki that is previously placed on a creel shelf. Further, in addition to the inner and outer two rows of creel rails, one rail is further provided on the outer side of the creel rail, and a spare shinomaki is hung on this rail, and the worker performs the exchange work as needed. There are also things. According to this type, the spare Shino-Maki rail is of a transport type and can be automatically loaded and unloaded from the roving process or one end of the spinning frame, and is therefore evaluated as a practical one.

【0003】ところで、篠巻は大径であり重量も3kg
前後あって扱い難く、クリールが高位置にあることも重
なって篠巻交換(篠替)は作業者にとって重労働であ
る。 このようなことから篠巻を自動的にクリールのハンガー
に吊架する装置が考えられるようになり、例えば、昭和
58年5月17日公開の特開昭58−81631号公報
には図15に示すように、予備篠巻レール91に懸架さ
れている予備篠巻92を、ドラフトパート93に篠を供
給している本篠巻と交換するについて、空になった篠巻
を予備篠巻レール91に自動的に吊架する装置が提案さ
れている。この装置は自動篠替機94の取出腕95の昇
降、前後動の作動により空篠巻96を取出しかつ予備篠
巻レール91に吊架し、代って該レール91の予備篠巻
92をクリールに吊架するようになっている。
By the way, Shinomaki has a large diameter and weighs 3 kg.
It is difficult to handle because it is in front and behind, and because the creel is in a high position, the exchange of Shino rolls (Shinome change) is a heavy labor for workers. For this reason, a device for automatically suspending Shino-maki on a hanger of a creel has come to be considered. For example, in Japanese Patent Laid-Open No. 58-81631 published on May 17, 1983, FIG. As shown, the spare Shino-maki 92 suspended from the spare Shino-Maki rail 91 is replaced with the main Shino-Maki that supplies Shino to the draft part 93. A device for automatically suspending the suspension has been proposed. This apparatus takes out the empty Shino winding 96 by suspending the empty Shino winding 96 by lifting and lowering the take-out arm 95 of the automatic Shining machine 94 and moving it back and forth, and instead creels the spare Shino winding 92 of the rail 91. It is designed to be hung on the.

【0004】そして、この装置はクリールの外側に吊架
された篠巻と、予備篠巻レール91に吊架された予備篠
巻92との交換のみが可能なため、空になった本篠巻9
6を必ず外側レール98に吊架させる必要がある。その
ため、内外2列に吊架する本篠巻96,97の巻玉径に
差をもたせた状態でドラフトパート93に篠を供給して
おき、内側の列に吊架された本篠巻96が空になったと
きに、自動篠替機94の作動に先立って篠入替機99が
内側の空の本篠巻96を外側に、中玉の本篠巻97を内
側にそれぞれ入替えるようになっている。
Since this device can only replace the Shino-maki suspended on the outside of the creel and the spare Shino-maki 92 suspended on the spare Shino-maki rail 91, the empty Shino-maki becomes empty. 9
It is necessary to suspend 6 on the outer rail 98. For this reason, the Shinozaki 96, which is suspended in the inner row, is supplied to the draft part 93 in a state where the diameters of the main Shinozaki 96, 97 suspended in two rows are different. When emptied, the Shino transfer machine 99 replaces the empty Honshinomaki 96 on the inside and the Honshinomaki 97 on the inside, respectively, prior to the operation of the automatic Shino-changing machine 94. ing.

【0005】[0005]

【発明が解決しようとする課題】前記従来の篠替方法で
は、自動篠替機94の篠替作業に先立って内外2列の本
篠巻の入替作業を行う篠入替機99が必須となり、篠入
替機99を装備するために機高が高くなる。そして、そ
れに伴い予備篠巻レール91も高くなり、自動篠替機9
4の取出腕95の昇降量も大きくなる。
In the above-mentioned conventional Shino replacing method, the Shino replacing machine 99 for replacing the inner and outer rows of two main Shino rolls is indispensable prior to the automatic Shino replacing machine 94 replacing operation. Since the replacement machine 99 is equipped, the machine height becomes high. As a result, the spare Shino-Maki rail 91 also becomes higher, and the automatic Shino-Shin machine 9
The vertical movement amount of the take-out arm 95 of No. 4 also becomes large.

【0006】又、近年、精紡機の高速化、省エネルギー
化のため、精紡機揚がりの管糸は小パッケージ化してお
り、それにともないスピンドルゲージ(スピンドルピッ
チ)も小さくなっている。一方において、篠巻径は、篠
替周期の延長のために大径化が望まれている。しかし、
前記の篠替方法を実施するための篠供給方法では、篠替
時にクリールの外側列に吊架される本篠巻を隣接する本
篠巻と接触しないようにするためには、本篠巻の最大篠
巻径をスピンドルピッチの2倍より小さくしなければな
らず、篠巻径の大径化という要求を満たすことができな
い。
Further, in recent years, in order to speed up the spinning machine and save energy, the spinning yarn for spinning the spinning machine has been made into a small package, and accordingly, the spindle gauge (spindle pitch) has become smaller. On the other hand, it is desired to increase the diameter of the Shino winding in order to extend the replacement cycle. But,
In the Shino feeding method for carrying out the Shino replacing method, in order to prevent the main Shino winding suspended on the outer row of the creel from contacting the adjacent Shino winding when changing the Shino winding, The maximum diameter of the Shino winding must be smaller than twice the spindle pitch, and the demand for increasing the diameter of the Shino winding cannot be satisfied.

【0007】この発明は前記従来の問題点に鑑みてなさ
れたものであって、その目的はクリールにスピンドルピ
ッチの2倍より大径の本篠巻を吊架して篠供給を行うこ
とができ、しかも、篠替時において空になった篠巻のク
リールからの取り出し及び予備篠巻のクリールへの吊架
作業が容易となる精紡機の篠供給方法を提供することに
ある。
The present invention has been made in view of the above-mentioned problems of the prior art, and an object thereof is to suspend a main reel having a diameter larger than twice the spindle pitch on a creel to supply the reel. Moreover, it is an object of the present invention to provide a shino feeding method for a spinning machine, which makes it easy to take out an empty shinomaki creel and suspend it from a spare shinomaki at the time of replacement.

【0008】[0008]

【課題を解決するための手段】前記の目的を達成するた
め本発明では、ドラフトパートへ篠を供給する本篠巻を
機台の長手方向に沿って内外2列に吊架するようにした
精紡機において、機台の長手方向に隣接する本篠巻相互
の篠巻量に所定量の差を設けて各本篠巻の篠をそれぞれ
前記ドラフトパートへ供給するようにした。又、前記所
定量の差は満玉の巻量の半分が好ましい。
In order to achieve the above-mentioned object, in the present invention, the main Shino-maki for supplying Shino to the draft part is suspended in two rows inside and outside along the longitudinal direction of the machine base. In the spinning machine, a predetermined amount of difference is provided in the amount of shino winding between the main shino windings adjacent to each other in the longitudinal direction of the machine base so that the shino windings of the respective main windings are supplied to the draft part. Further, it is preferable that the difference of the predetermined amount is half the winding amount of a full ball.

【0009】[0009]

【作用】本篠巻は機台長手方向に隣接する本篠巻相互の
篠巻量に所定の差を設けた状態で、精紡機機台の長手方
向に沿って内外2列に吊架され、機台の運転に伴って篠
がドラフトパートへ供給される。機台長手方向に隣接す
る本篠巻相互の篠巻量に所定の差があるため、空ないし
それに近づいた本篠巻を予備篠巻と交換するときには、
その本篠巻の両側に吊架された本篠巻は予備篠巻より篠
巻量が所定量だけ少なくなっている。すなわち、機台長
手方向に沿って最大篠巻径の状態の本篠巻が連続して並
ぶことはないため、本篠巻の最大篠巻径をスピンドルピ
ッチの2倍より大きくすることが可能となる。
The main shinomaki is suspended in two rows inside and outside along the longitudinal direction of the spinning machine base with a predetermined difference in the amount of shinoroll between adjacent main shinomaki in the machine longitudinal direction. Shino is supplied to the draft part with the operation of the machine base. Since there is a predetermined difference in the amount of Shino winding between adjacent Shino windings in the machine longitudinal direction, when replacing empty or approaching Shino winding with a spare Shino winding,
The amount of shinomaki of the main shinomaki suspended on both sides of the main shinomaki is smaller than that of the spare shinomaki by a predetermined amount. In other words, since the main Shino winding with the maximum Shino winding diameter does not line up continuously along the machine longitudinal direction, the maximum Shino winding diameter of the main Shino winding can be made larger than twice the spindle pitch. Become.

【0010】[0010]

【実施例】以下この発明を具体化した一実施例を図面に
従って説明する。精紡機のクリール1には機台の左右両
側にそれぞれ内外2列の本篠巻レール2,3が機台長手
方向と平行に配設されている。前記本篠巻レール2,3
にはそれぞれスピンドルピッチの倍のピッチを保ってハ
ンガー4,5が装備され、該ハンガー4,5に吊架され
た本篠巻から引出された篠は篠ガイド6及びガイドロッ
ド7を経てドラフトパート8へ供給されるようになって
いる。クリール1からはさらに支持ブラケット9が外方
へ延出され、その先端には搬送レール10が前記本篠巻
レール2,3に平行に延設されている。搬送レール10
には千鳥状に配設されたハンガー11,12を備えたマ
ガジン13が走行可能に吊架されている。前記千鳥状に
配設されたハンガー11,12が予備篠巻列に相当す
る。前記各ハンガー4,5,11,12は篠巻を上下動
することによりハンガー4,5,11,12に吊架した
り、外したりすることができる構造となっている。1つ
のマガジン13に装備されるハンガー11,12の数は
限定されるものではないが、予備篠巻列の占める空間を
できる限り小さくするため図2に示すように、隣接する
ハンガー11,12のピッチが本篠巻レール2,3のハ
ンガーと同一ピッチとなる状態でしかもハンガー11,
12に吊架される満篠巻Fが接触しないように千鳥状に
配設されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. On the creel 1 of the spinning machine, two main and outer rows of main rails 2 and 3 are arranged parallel to the longitudinal direction of the machine base on both left and right sides of the machine base. Honshinomaki rails 2, 3
Each of them is equipped with hangers 4 and 5 at a pitch twice the spindle pitch. Shino drawn from the main shinomaki suspended from the hangers 4 and 5 passes through the shino guide 6 and the guide rod 7 and then the draft part. It is designed to be supplied to 8. A support bracket 9 is further extended outward from the creel 1, and a carrier rail 10 is provided at the tip of the support bracket 9 so as to extend in parallel with the main shinomaki rails 2, 3. Transport rail 10
A magazine 13 including hangers 11 and 12 arranged in a zigzag shape is suspended in the carriage so that the magazine 13 can run. The hangers 11 and 12 arranged in a zigzag form correspond to the spare shinomo row. Each of the hangers 4, 5, 11, and 12 has a structure that can be suspended or removed from the hangers 4, 5, 11, and 12 by moving the Shino-maki up and down. Although the number of hangers 11 and 12 mounted on one magazine 13 is not limited, as shown in FIG. In the condition that the pitch is the same as the hanger of Honshinomaki rails 2 and 3, the hanger 11,
It is arranged in a staggered manner so that the Masushino winding F suspended on 12 does not come into contact.

【0011】すなわち近年、精紡機の高速化、省エネル
ギー化のため、精紡機揚がりの管糸が小パッケージ化し
ており、それにともないスピンドルゲージGも小さくな
っている。一方において、最大篠巻径Dは、篠替周期の
延長のために大径化が望まれている。従って、D≧2G
の場合、1列の予備篠巻では本実施例のように千鳥状に
なる。
That is, in recent years, in order to speed up the spinning machine and save energy, the spinning yarn for spinning the spinning machine has been made into a small package, and the spindle gauge G has been reduced accordingly. On the other hand, it is desired that the maximum Shino winding diameter D be increased in order to extend the Shino replacement cycle. Therefore, D ≧ 2G
In this case, the single row of spare Shino-maki has a zigzag pattern as in this embodiment.

【0012】また、1列の予備篠巻にて、精紡機片側2
列の本篠巻本数を確保することができないので、1個お
きに位置する内外2列の本篠巻からなる第1の本篠巻群
と、それと交互に位置する本篠巻からなる第2の本篠巻
群との2種類に分けられる。すなわち、機台の長手方向
と直交する方向に並んだ奇数列の本篠巻からなる本篠巻
群と、偶数列の本篠巻からなる本篠巻群とに分けられ
る。そして、両本篠巻群の本篠巻の篠巻量に所定量の差
を設けた状態で紡出が行われる。この実施例では図2
(a)に示すように、1個おきに満篠巻Fと満篠巻(満
玉)Fの巻量の半分の篠巻量の中玉篠巻Mとを吊架した
状態で紡出が開始される。紡出が継続されて一方の本篠
巻群を構成する中玉篠巻Mが空の状態となった時点で当
該本篠巻群を構成する空の篠巻について篠替えすること
になる。このとき紡出開始時の満篠巻Fは図2(b)に
示すように中玉篠巻Mとなる。従って、ボビンハンガー
4,5の間隔が狭くとも予備篠巻列の満篠巻Fと本篠巻
レール2,3の空篠巻Eとの交換時に、満篠巻Fが本篠
巻と接触するのを防止することができる。このことも満
篠巻径の大径化を促進する。
[0012] In addition, in one row of spare Shino-maki, one side of the spinning machine 2
Since it is not possible to secure the number of Honshino-maki in a row, the first Honshino-maki group composed of two Honshino-maki windings located inside and outside every other one, and the second Honshino-maki arranged alternately. It is divided into two types, the Honshinomaki group. That is, it is divided into a Honshino winding group consisting of odd-numbered Honshino windings arranged in a direction orthogonal to the longitudinal direction of the machine base and a Honshino winding group consisting of even-numbered Honshino windings. Then, spinning is performed in a state where a difference of a predetermined amount is provided in the amount of the main winding of the both main winding groups. In this embodiment, FIG.
As shown in (a), spinning is performed while suspending every other Mitsunomaki F and Minoshinomaki M, which is half the amount of Mitsunomaki (full-ball) F. Be started. When the spinning process is continued and the middle ball Shinanomaki M that constitutes one Honshinomaki group becomes empty, the empty Shinanomaki that constitutes the Honshinomaki group is replaced. At this time, the Manami Shino roll F at the start of spinning becomes the middle ball Shinano roll M as shown in FIG. Therefore, even if the bobbin hangers 4 and 5 are closely spaced, the Masushino winding F comes into contact with the Homoshino winding F when replacing the Masushino winding F of the spare Shino winding row and the empty Shino winding E of the Honshino winding rails 2 and 3. Can be prevented. This also promotes an increase in the Mitsuno winding diameter.

【0013】次に予備篠巻列の満篠巻Fと本篠巻列の空
篠巻Eとを交換するための自動篠替機14について説明
する。自動篠替機14は空篠巻Eを本篠巻列から取出し
てマガジン13のハンガー11,12に吊架する作用を
なす空篠巻移載装置15と、予備篠巻列から満篠巻Fを
取外し前記本篠巻列の空篠巻Eが取外された位置に満篠
巻Fを吊架する作用をなす満篠巻移載装置16とを装備
し、精紡機機台前面に延設されたガイドレール17に係
合するガイドローラ18を介して精紡機機台に沿って走
行するようになっている。
Next, the automatic transfer device 14 for exchanging the full Shino winding F of the spare Shino winding and the empty Shino winding E of the main Shino winding will be described. The automatic Shino transfer machine 14 takes out the empty Shino roll E from the main Shino roll and suspends it on the hangers 11, 12 of the magazine 13, and the empty Shino roll transfer device 15 and the spare Shino roll F Equipped with a Masushino winding transfer device 16 that suspends the Masushino winding F at the position where the Sky Shino winding E of the main Shino winding is removed, and extends to the front of the spinning machine base. It runs along the spinning machine frame via the guide rollers 18 that engage with the formed guide rails 17.

【0014】自動篠替機14には該篠替機14に固定さ
れたシリンダ19のピストンロッド19aに連結され、
シリンダ19の作動により水平状態を保持したまま昇降
移動する昇降基板20が配設されている。図3,4に示
すように、昇降基板20の上面左右両側には支柱21が
立設され、該支柱21の上下両側には機枠に垂直に固定
されたレール22と係合して昇降基板20が水平状態を
保持するように規制する規制ローラ23,24が取付け
られている。又、自動篠替機14の左右両側上部には、
一端がバランスウェイト25に他端が前記支柱21にそ
れぞれ連結されたテープ26を案内するためのプーリ2
7が回転自在に支承されている。すなわち、シリンダ1
9の作動により昇降基板20が水平状態を保持したまま
円滑に昇降移動されるようになっている。
The automatic transfer machine 14 is connected to a piston rod 19a of a cylinder 19 fixed to the transfer machine 14,
An elevating board 20 is provided which moves up and down while the horizontal state is maintained by the operation of the cylinder 19. As shown in FIGS. 3 and 4, columns 21 are erected on the left and right sides of the upper surface of the elevator board 20, and rails 22 fixed vertically to the machine frame are engaged with the upper and lower sides of the columns 21 to engage the elevator board. Regulation rollers 23 and 24 are regulated so as to regulate 20 so as to maintain a horizontal state. In addition, on the upper left and right sides of the automatic transfer machine 14,
A pulley 2 for guiding a tape 26, one end of which is connected to the balance weight 25 and the other end of which is connected to the column 21.
7 is rotatably supported. That is, cylinder 1
By the operation of 9, the elevating board 20 can be smoothly moved up and down while maintaining the horizontal state.

【0015】前記昇降基板20上には空篠巻移載装置1
5と満篠巻移載装置16とが隣接して配設されている。
空篠巻移載装置15は前記昇降基板20上に回転自在に
配設された支軸28の上端に水平に固定され、回動機構
により回動される回動基板29と、該回動基板29上に
配設され篠巻の芯であるボビンの底部に嵌入可能なペッ
グ30,31をそれぞれ予備篠巻列と本篠巻列との間を
移動させるためのリンク機構32,33とから構成され
ている。前記回動基板29の回動機構は図5,6に示す
ように前記昇降基板20上に固設された支軸34に対し
て回動可能に支承された回動レバー35と、一端が前記
回動レバー35の先端に他端が前記回動基板29の下面
にそれぞれピン36a,36bにより回動可能に連結さ
れたリンク36と、基端が前記昇降基板20上に回動可
能に固定されるとともにピストンロッド37aの先端が
前記回動レバー35のほぼ中央部にピン連結されたシリ
ンダ37とから構成されている。すなわち、回動レバー
35、リンク36及び回動基板29がリンク機構を構成
しシリンダ37の作動によるピストンロッド37aの出
没により回動基板29が支軸28を中心として回動する
ようになっている。
On the elevating substrate 20, there is an empty Shino transfer device 1
5 and the Mitsushino winding transfer device 16 are arranged adjacent to each other.
The empty transfer device 15 is horizontally fixed to the upper end of a support shaft 28 rotatably arranged on the elevating board 20, and is rotated by a rotating mechanism. 29, link mechanisms 32 and 33 for moving pegs 30 and 31 that can be fitted into the bottom of a bobbin, which is the core of the Shino winding, between the preliminary Shino winding row and the main Shino winding row, respectively. Has been done. As shown in FIGS. 5 and 6, the turning mechanism of the turning board 29 has a turning lever 35 rotatably supported on a support shaft 34 fixedly mounted on the elevating board 20, and one end of the turning lever 35. A link 36 having the other end at the tip of the turning lever 35 rotatably connected to the lower surface of the turning board 29 by pins 36a and 36b, and a base end rotatably fixed on the elevating board 20. At the same time, the tip of the piston rod 37a is composed of a cylinder 37 which is pin-connected to substantially the center of the rotary lever 35. That is, the rotation lever 35, the link 36, and the rotation base plate 29 constitute a link mechanism, and the rotation base plate 29 rotates about the support shaft 28 due to the piston rod 37a protruding and retracting due to the operation of the cylinder 37. .

【0016】前記回動基板29の上面には前記ペッグ3
0,31を前後動するためのリンク機構32,33の平
行4節リンクの固定リンクに相当する支持ブラケット3
8,39が固設されている。各支持ブラケット38,3
9にはそれぞれ前記ペッグ30,31を有する支持板4
0,41に対して先端部がピン連結された2本のリンク
42,43,44,45がその基端において回動可能に
支承されている。すなわち、支持ブラケット38、支持
板40及びリンク42,43が1つのリンク機構32を
構成し、支持ブラケット39、支持板41及びリンク4
4,45が他のリンク機構33を構成している。リンク
42は支持ブラケット38に対して回転自在に支承され
た回動軸46に対して一体回動可能に固定され、該回動
軸46には回動レバー47が一体回転可能に連結されて
いる。回動レバー47はその先端部において、基端が前
記回動基板29上に立設された支柱48(図4に図示)
にブラケットを介して固定されたシリンダ49のピスト
ンロッド49aに連結されている。又、ペッグ30を駆
動するリンク機構32とペッグ31を駆動するリンク機
構33とを連動させるため、リンク44とリンク42と
は連結部材50により連結されている。連結部材50の
連結位置は、ペッグ30が内側の本篠巻レール2と対応
する位置まで前進する際にペッグ31が少し遅れて前進
し最終的に外側の本篠巻レール3と対応する位置で停止
するように定められている。
The peg 3 is provided on the upper surface of the rotating substrate 29.
Support bracket 3 corresponding to a fixed link of parallel four-bar links of link mechanisms 32 and 33 for moving 0 and 31 back and forth
8,39 are fixed. Each support bracket 38, 3
9 is a support plate 4 having the pegs 30 and 31 respectively.
Two links 42, 43, 44, 45, whose distal ends are pin-connected to 0, 41, are rotatably supported at their base ends. That is, the support bracket 38, the support plate 40, and the links 42 and 43 constitute one link mechanism 32, and the support bracket 39, the support plate 41, and the link 4 are included.
4, 45 constitute another link mechanism 33. The link 42 is integrally rotatably fixed to a rotary shaft 46 rotatably supported by the support bracket 38, and a rotary lever 47 is integrally rotatably connected to the rotary shaft 46. . The pivot lever 47 has a base end at its tip end, which has a base end erected on the pivot base plate 29 (shown in FIG. 4).
Is connected to a piston rod 49a of a cylinder 49 fixed via a bracket. Further, the link 44 and the link 42 are connected by the connecting member 50 in order to interlock the link mechanism 32 for driving the peg 30 and the link mechanism 33 for driving the peg 31. The connecting position of the connecting member 50 is such that when the peg 30 moves forward to a position corresponding to the inner Honoshimaki rail 2, the peg 31 moves forward with a slight delay and finally corresponds to the outer Honoshimaki rail 3. It is set to stop.

【0017】従って、シリンダ49が作動されてピスト
ンロッド49aが引込まれることにより、リンク機構3
2,33が連動して回動されペッグ30,31はそれぞ
れ直立状態に保持されたまま図1に鎖線で示す本篠巻レ
ール2,3と対応する位置まで前進移動される。なお、
両リンク42,43が屈折状に形成されているのはドラ
フトパート8へ当接しないためである。
Accordingly, the cylinder 49 is operated and the piston rod 49a is pulled in, whereby the link mechanism 3
When the pegs 30 and 31 are held in the upright state, the pegs 30 and 31 are moved forward to the positions corresponding to the main shinowaki rails 2 and 3 shown by the chain line in FIG. In addition,
Both links 42 and 43 are formed in a bent shape because they do not contact the draft part 8.

【0018】なお、本篠巻位置及び予備篠巻位置におけ
るボビン下端とペッグ30,31との間隔cが全て同一
となるように設計されている。 次に満篠巻移載装置16について説明する。満篠巻移載
装置16は空篠巻移載装置15に隣接して配設され、空
篠巻移載装置15と同様に篠巻の芯であるボビンの底部
に嵌入し得る2個のペッグ51,52がリンク機構5
3,54によりそれぞれ独立して前後動できるようにな
っている。リンク機構53,54はそれぞれ前記空篠巻
移載装置15のリンク機構32,33と同様に平行4節
リンクから構成されているが、固定リンクとしての支持
ブラケット55,56が回動基板29ではなく変位機構
により変位される基板57上に固設されている点が前記
空篠巻移載装置15と異なっている。リンク機構53は
固定リンクとしての支持ブラケット55と、該支持ブラ
ケット55に基端が回動可能に連結されたリンク58,
59と、該リンク58,59の先端に水平状態となるよ
うに連結されペッグ51を有する支持板60とから構成
されている。リンク機構54は固定リンクとしての支持
ブラケット56と、該支持ブラケット56に基端が回動
可能に連結された2個のリンク61,62と、該リンク
61,62の先端に水平状態となるように連結されペッ
グ52を有する支持板63とから構成されている。リン
ク58が一体回転可能に固定された回動軸64には回動
レバー65が一体回転可能に連結され、該回動レバー6
5は基端が前記基板57上に立設された支柱66(図4
に図示)にブラケットを介して固定されたシリンダ67
のピストンロッド67aに連結されている。又、リンク
機構53とリンク機構54とを連動するため、リンク5
8とリンク61とが連結部材68により連結されてい
る。
It is to be noted that the intervals c between the lower ends of the bobbins and the pegs 30 and 31 are designed to be the same at the main shino-roll position and the preliminary shino-roll position. Next, the Mitsushino roll transfer device 16 will be described. The Mitsushino winding transfer device 16 is arranged adjacent to the Sorashino winding transfer device 15, and like the Sorashino winding transfer device 15, two pegs that can be fitted into the bottom of the bobbin that is the core of the Shino winding. 51 and 52 are link mechanisms 5
3, 54 can be independently moved back and forth. The link mechanisms 53 and 54 are each composed of parallel four-bar links similarly to the link mechanisms 32 and 33 of the Shinoshino winding transfer device 15, but the support brackets 55 and 56 as fixed links are not provided on the rotating substrate 29. It is different from the Kushino winding transfer device 15 in that it is fixedly mounted on the substrate 57 that is displaced by a displacement mechanism instead. The link mechanism 53 includes a support bracket 55 as a fixed link, and a link 58 whose base end is rotatably connected to the support bracket 55.
59, and a support plate 60 having a peg 51 connected to the ends of the links 58, 59 in a horizontal state. The link mechanism 54 includes a support bracket 56 as a fixed link, two links 61 and 62 whose base ends are rotatably connected to the support bracket 56, and horizontal ends of the links 61 and 62. And a support plate 63 having a peg 52 connected thereto. A rotary lever 65 is rotatably connected to a rotary shaft 64 to which the link 58 is integrally rotatably fixed.
5 is a column 66 whose base end is erected on the substrate 57 (see FIG.
Cylinder 67 fixed via bracket to
Is connected to the piston rod 67a. Further, since the link mechanism 53 and the link mechanism 54 are linked, the link 5
8 and the link 61 are connected by a connecting member 68.

【0019】次に基板57の変位機構について説明す
る。基板57を前記空篠巻移載装置15の回動基板29
と同様回転移動により所定位置に変位させることも可能
であるが、この実施例の自動篠替機14は機枠の幅が狭
いため前記回転中心が機枠外となるのでこの実施例の装
置においては4節リンク機構からなる変位機構を採用し
ている。図7,8に示すように昇降基板20上に支軸6
9,70が垂直状態に固設され、両支軸69,70には
リンク71,72の基端が回動可能に支承され、両リン
ク71,72の他端はリンクとして作用する基板57の
下面に対してピン73,74により回動可能に連結され
ている。リンク71は基端が昇降基板20上に固定され
たシリンダ75のピストンロッド75aに連結されてい
る。従ってシリンダ75の作動により4節リンク機構が
変位されその一部を構成する基板57が所定の位置間を
変位するようになる。
Next, the displacement mechanism of the substrate 57 will be described. The substrate 57 is used as the rotating substrate 29 of the Sorashino winding transfer device 15.
Although it is possible to displace it to a predetermined position by rotational movement similarly to the above, since the automatic shinning machine 14 of this embodiment has a narrow machine frame, the center of rotation is outside the machine frame. A displacement mechanism consisting of a four-bar linkage is used. As shown in FIGS.
9 and 70 are vertically fixed, the base ends of links 71 and 72 are rotatably supported by both support shafts 69 and 70, and the other ends of both links 71 and 72 are of a base plate 57 that acts as a link. The lower surface is rotatably connected by pins 73 and 74. A base end of the link 71 is connected to a piston rod 75a of a cylinder 75 fixed on the elevating board 20. Therefore, the operation of the cylinder 75 causes the four-bar linkage mechanism to be displaced, so that the substrate 57 forming a part thereof is displaced between predetermined positions.

【0020】次に前記自動篠替機14による篠替作業を
説明する。紡出が進み図9(a)に示すように1個おき
の本篠巻からなる一方の群の本篠巻が空篠巻Eとなり他
方の群の本篠巻が中玉篠巻Mとなると、精紡機機台の一
端から自動篠替機14が走行を開始し、所定の篠替位置
に停止して図9(a)に示す状態となる。このとき各ペ
ッグ30,31はマガジン13に装備されたハンガー1
1,12と対向し、ペッグ51,52はマガジン13に
吊架された満篠巻Fの直下に位置している。次いで空篠
巻移載装置15のシリンダ37が作動されそのピストン
ロッド37aが引込まれ、回動基板29が支軸28を中
心に図9(a)の反時計方向に回転され図9(b)に示
す状態となる。次にシリンダ49が作動してそのピスト
ンロッド49aが引込まれ、回動レバー47を介してリ
ンク機構32,33が精紡機機台側へ傾動され、ペッグ
30,31がそれぞれ本篠巻レール2,3に吊架された
空篠巻Eの直下位置まで前進し、図10(a)及び図1
2(a)に示す状態となる。この状態でシリンダ19が
作動され、そのピストンロッド19aが所定量突出した
後再び引込まれる。これにより昇降基板20が昇降移動
され、それに伴い全ペッグ30,31,51,52が一
斉に上昇しかつ直ちに降下するので、各ペッグ30,3
1,51,52には空篠巻E及び満篠巻Fがそれぞれ嵌
挿され図12(b)に示す状態となる。
Next, a description will be given of the changing operation by the automatic changing machine 14. As the spinning progresses, as shown in FIG. 9 (a), one group consisting of every other Honshinomaki becomes the empty Shinanomaki E and the other group becomes the Honshinomaki M. The automatic transfer machine 14 starts traveling from one end of the spinning machine base, stops at a predetermined transfer position, and becomes the state shown in FIG. 9 (a). At this time, each peg 30, 31 is a hanger 1 mounted on the magazine 13.
The pegs 51 and 52 are located directly below the Masushino winding F suspended in the magazine 13 so as to oppose the Nos. 1 and 12. Next, the cylinder 37 of the empty transfer device 15 is actuated and the piston rod 37a thereof is pulled in, and the rotating substrate 29 is rotated about the support shaft 28 in the counterclockwise direction of FIG. The state becomes as shown in. Next, the cylinder 49 is actuated to pull in the piston rod 49a, the link mechanisms 32 and 33 are tilted toward the spinning machine base side through the turning lever 47, and the pegs 30 and 31 are respectively moved to the main winding rails 2. 10A and FIG.
The state shown in 2 (a) is obtained. In this state, the cylinder 19 is operated, and the piston rod 19a thereof is projected again by a predetermined amount and then retracted again. As a result, the elevating board 20 is moved up and down, and all the pegs 30, 31, 51, 52 are simultaneously raised and simultaneously descended accordingly.
The empty winding E and the full winding F are respectively inserted into 1, 51 and 52, and the state shown in FIG.

【0021】次にシリンダ49が作動されてそのピスト
ンロッド49aが突出され、前傾状態にあったリンク機
構32,33が元の位置に復帰する。一方この間に満篠
巻移載装置16のシリンダ75が作動されてそのピスト
ンロッド75aが突出し基板57が変位され、図10
(b)に示す状態となる。次にシリンダ67が作動され
そのピストンロッド67aが引込まれて満篠巻移載装置
16のリンク機構53,54が精紡機機台側へ傾動さ
れ、ペッグ51,52が前進して満篠巻Fを前記空篠巻
Eが取外された本篠巻レール2,3のハンガー4,5の
直下位置まで移送し、図11(a)に示す状態となる。
この状態で前記と同様にして昇降基板20が昇降移動さ
れ、全ペッグ30,31,51,52が一斉に上昇しか
つ直ちに降下する。これによりハンガー4,5に満篠巻
Fが吊架されて図13に示す状態となる。このとき空篠
巻移載装置15のペッグ30,31はマガジン13に吊
架されたハンガー11,12と対応状態にないため空篠
巻Eはそのままペッグ30,31上に載置されたままと
なる。
Next, the cylinder 49 is actuated and the piston rod 49a thereof is projected, and the link mechanisms 32 and 33 that were in the forward tilted state are returned to their original positions. On the other hand, during this period, the cylinder 75 of the Mitsuno winding transfer device 16 is actuated, the piston rod 75a thereof is projected, and the substrate 57 is displaced.
The state shown in FIG. Next, the cylinder 67 is actuated, the piston rod 67a is pulled in, the link mechanisms 53, 54 of the Mitsuno winding transfer device 16 are tilted toward the spinning machine base side, the pegs 51, 52 move forward, and the Masushino winding F moves. 11 is transferred to a position directly below the hangers 4 and 5 of the main Shino winding rails 2 and 3 from which the empty Shino winding E has been removed, and the state shown in FIG.
In this state, the elevating board 20 is moved up and down in the same manner as described above, and all the pegs 30, 31, 51, 52 are simultaneously raised and immediately lowered. As a result, the Masushino winding F is suspended on the hangers 4 and 5, and the state shown in FIG. 13 is obtained. At this time, since the pegs 30 and 31 of the empty Shino winding transfer device 15 are not in a state corresponding to the hangers 11 and 12 suspended in the magazine 13, the empty Shino winding E remains as it is placed on the pegs 30 and 31. Become.

【0022】次にシリンダ67が作動されそのピストン
ロッド67aが突出し、リンク機構53,54が元の位
置に復帰する。その後、シリンダ75が作動されて突出
位置にあったピストンロッド75aが引込まれ、基板5
7が原位置に復帰してペッグ51,52がマガジン13
に吊架されたハンガー11,12と対向する状態とな
る。基板57が原位置に復帰後、シリンダ37が作動さ
れてそのピストンロッド37aが突出され、回動基板2
9が回動されて原位置に復帰する。これによりペッグ3
0,31上に載置された空篠巻Eがマガジン13に吊架
されたハンガー11,12と対応する図11(b)に示
す状態となる。この状態でシリンダ19が作動されて昇
降基板20が昇降され、ペッグ30,31,51,52
が一斉に上昇しかつ直ちに降下する。そしてペッグ3
0,31に挿入されていた空篠巻Eがハンガー11,1
2に吊架され、篠替えの1サイクルが完了する。次いで
自動篠替機14が次の篠替え位置まで移動し、以下前記
と同様に篠替え作業を繰り返す。
Next, the cylinder 67 is operated, the piston rod 67a thereof projects, and the link mechanisms 53 and 54 return to their original positions. After that, the cylinder 75 is operated to pull in the piston rod 75a that was in the protruding position, and the substrate 5
7 returns to the original position and pegs 51 and 52 are in the magazine 13
It is in a state of facing the hangers 11 and 12 suspended on the. After the substrate 57 is returned to the original position, the cylinder 37 is operated and the piston rod 37a thereof is projected, so that the rotating substrate 2
9 is rotated and returns to the original position. This makes peg 3
The sky Shino roll E placed on 0 and 31 is in the state shown in FIG. 11B corresponding to the hangers 11 and 12 suspended in the magazine 13. In this state, the cylinder 19 is actuated and the elevating board 20 is moved up and down to move the pegs 30, 31, 51, 52.
Rises all at once and falls immediately. And peg 3
The sky Shinano winding E inserted in 0,31 is the hanger 11,1
Suspended on No.2, one cycle of Shino changing is completed. Next, the automatic transfer machine 14 moves to the next transfer position, and the transfer operation is repeated in the same manner as described above.

【0023】篠替え作業時に内側の本篠巻レール2から
空篠巻Eを取出す際と、満篠巻Fを内側の本篠巻レール
2へ供給する際に空篠巻E、満篠巻Fが篠ガイド6と当
接することになるが、図14に示すように篠ガイド6を
回動可能とし、空篠巻E及び満篠巻Fの通過後は両側の
ばね76により自動的に原位置に戻るようにすれば何ら
支障は生じない。
The empty Shino winding E and the Mana Shino winding F are used when the empty Shino winding E is taken out of the inner Shino winding rail 2 and when the Mana Shino winding F is supplied to the inner Shino winding rail 2 at the time of changing over. Will contact the Shino guide 6, but as shown in FIG. 14, the Shino guide 6 can be rotated, and after passing the empty Shino winding E and the Mano Shino winding F, the springs on both sides automatically move the original position. No problem will occur if you return to.

【0024】なお、この発明は前記実施例に限定される
ものではなく、例えば、紡出開始時に本篠巻レール2,
3に吊架される本篠巻の篠巻量の差は満玉の巻量の半分
にかぎらず、1個おきに吊架される一方の本篠巻群を満
篠巻とし、他方の本篠巻群を7分玉や6分玉とし2つの
本篠巻群の篠巻量の差を満玉の巻量の3割あるいは4割
としてもよい。この場合は次の篠替により新たに本篠巻
レール2,3に吊架された満篠巻と、紡出継続中の本篠
巻との篠巻量の差が満玉の巻量の7割あるいは6割とな
る。そして、その次の篠替完了後は再び篠巻量の差が満
玉の巻量の3割あるいは4割となる。また、1列の予備
篠巻列は千鳥状とする必要はなく、満篠巻径Dとスピン
ドルゲージGとの関係がD<2Gの場合は完全に一直線
となりうる。
The present invention is not limited to the above embodiment, and for example, the main winding rail 2, at the start of spinning.
The difference in the amount of Shino winding of the main Shino roll suspended on 3 is not limited to half the amount of full balls, and one Shino roll group suspended every other one is set as Mano Shina roll, and the other book The Shino-roll group may have 7-minute balls or 6-minute balls, and the difference in the Shino-roll amount between the two main Shino-roll groups may be 30% or 40% of the full-roll amount. In this case, the difference in the amount of Shinano winding that is newly suspended on the Shinano winding rails 2 and 3 by the next Shino replacement and the amount of Shino winding that is still spinning is 7 It will be 60% or 60%. Then, after the completion of the next Shino change, the difference in Shino winding amount becomes 30% or 40% of the winding amount of the full ball again. Further, it is not necessary for the single preliminary winding row to be in a zigzag shape, and when the relationship between the full winding diameter D and the spindle gauge G is D <2G, they can be perfectly aligned.

【0025】[0025]

【発明の効果】以上詳述したように、本発明によれば本
篠巻レールに吊架されてドラフトパートへ篠を供給する
本篠巻が、機台の長手方向に隣接する本篠巻相互の篠巻
量に所定量の差があるため、満篠巻の巻径すなわち本篠
巻の最大巻径をスピンドルピッチの2倍より大径とする
ことができ、篠替周期を延長することができるとともに
小パッケージ、高速化にともなう小スピンドルゲージの
場合でも、満篠巻径は従来と同様大きなものを使用した
いという要求にも応ずることができる。また、篠替時
に、同じ本篠巻レールに吊架された隣接する本篠巻の間
隔が大きいため篠巻が精紡機長手方向に揺れても相互に
接触せず、篠が毛羽立つことがない。また、篠替時には
内外2列の本篠巻を一度に篠替えするので、内側の本篠
巻を水平方向に取り出す際に取り出し方向に障害となる
篠巻がなくなり篠替が簡単となる。また、篠替時には本
篠巻の半分ずつ篠替えされるため、1列の予備篠巻で対
応できる。
As described in detail above, according to the present invention, the main Shino rolls that are suspended on the main Shino roll rail and supply the Shino to the draft part are mutually adjacent in the longitudinal direction of the machine base. Since there is a predetermined difference in the amount of Shino winding, the winding diameter of full Shino winding, that is, the maximum winding diameter of main Shino winding can be made larger than twice the spindle pitch, and the Shino replacement cycle can be extended. In addition, even in the case of a small package and a small spindle gauge that accompanies higher speeds, it is possible to meet the demand to use a large Masushino winding diameter as before. In addition, since the distance between adjacent Honoshimaki suspended on the same Honshinomaki rail is large at the time of replacement, the Shino-maki do not come into contact with each other even when they shake in the longitudinal direction of the spinning machine, and the shino-maki does not fluff. Further, since the inner and outer rows of the main Shino-maki are changed at once at the time of changing the Shino-Kin, the Shino-Maki becomes easy because there is no obstruction in the take-out direction when the inner Shino-Maki is taken out in the horizontal direction. In addition, since one half of the main shinomaki is replaced at the time of replacement, one row of spare shinomaki can be used.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の方法を実施する装置を示す側面図で
ある。
1 is a side view showing an apparatus for carrying out the method of the present invention.

【図2】(a)は紡出開始時の本篠巻の巻量の関係を示
す概略平面図であり、(b)は篠替時における本篠巻と
予備篠巻の関係を示す概略平面図である。
FIG. 2 (a) is a schematic plan view showing the relationship of the winding amount of the main Shino winding at the start of spinning, and FIG. 2 (b) is a schematic plan view showing the relationship of the main Shino winding and the spare Shino winding at the time of replacement. It is a figure.

【図3】図10(b)に対応する状態の自動篠替機の要
部正面図である。
FIG. 3 is a front view of essential parts of the automatic transfer machine in a state corresponding to FIG. 10 (b).

【図4】同じく平面図である。FIG. 4 is a plan view of the same.

【図5】空篠巻移載装置の要部側面図である。FIG. 5 is a side view of a main part of the Sorashino winding transfer device.

【図6】空篠巻移載装置の回動機構を示す平面図であ
る。
FIG. 6 is a plan view showing a rotating mechanism of the empty Shino transfer device.

【図7】満篠巻移載装置の要部側面図である。FIG. 7 is a side view of a main part of the Mitsuno winding transfer device.

【図8】満篠巻移載装置の変位機構を示す平面図であ
る。
FIG. 8 is a plan view showing a displacement mechanism of the Mitsushino winding transfer device.

【図9】篠替え作業の作動順序を示す概略平面図であ
る。
FIG. 9 is a schematic plan view showing the operation sequence of the changing operation.

【図10】篠替え作業の作動順序を示す概略平面図であ
る。
FIG. 10 is a schematic plan view showing the operation sequence of the changing operation.

【図11】篠替え作業の作動順序を示す概略平面図であ
る。
FIG. 11 is a schematic plan view showing the operation sequence of the changing operation.

【図12】作用を説明する概略側面図である。FIG. 12 is a schematic side view illustrating the operation.

【図13】作用を説明する概略側面図である。FIG. 13 is a schematic side view illustrating the operation.

【図14】篠ガイドの退避機構を示す平面図である。FIG. 14 is a plan view showing a retracting mechanism of a shino guide.

【図15】従来の自動篠替え装置を示す側面図である。FIG. 15 is a side view showing a conventional automatic switching device.

【符号の説明】[Explanation of symbols]

2,3…本篠巻レール、4,5,11,12…ハンガ
ー、8…ドラフトパート、14…自動篠替機、15…空
篠巻移載装置、16…満篠巻移載装置、30,31,5
1,52…ペッグ、F…満篠巻、M…中玉篠巻、E…空
篠巻。
2, 3 ... Honshinomaki rail, 4, 5, 11, 12 ... Hanger, 8 ... Draft part, 14 ... Automatic Shino transfer machine, 15 ... Sky Shino transfer device, 16 ... Mitsuno transfer device, 30 , 31, 5
1,52 ... Pegs, F ... Manami Maki, M ... Nakadama Mino, E ... Sora Mino.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ドラフトパートへ篠を供給する本篠巻を
機台の長手方向に沿って内外2列に吊架するようにした
精紡機において、機台の長手方向に隣接する本篠巻相互
の篠巻量に所定量の差を設けて各本篠巻の篠をそれぞれ
前記ドラフトパートへ供給する精紡機の篠供給方法。
1. A spinning machine configured to suspend two main shinomaki rolls for supplying shinobu to a draft part in two rows inside and outside along the longitudinal direction of the machine base. The method of supplying the shinomaki of the main spinning machine to each of the draft parts with a predetermined difference in the amount of shinomaki.
【請求項2】 前記所定量の差は満玉の巻量の半分であ
る請求項1に記載の篠供給方法。
2. The Shino feeding method according to claim 1, wherein the difference of the predetermined amount is half the winding amount of full balls.
JP3299260A 1991-11-14 1991-11-14 Spinning machine supply method Expired - Lifetime JPH0672334B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3299260A JPH0672334B2 (en) 1991-11-14 1991-11-14 Spinning machine supply method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3299260A JPH0672334B2 (en) 1991-11-14 1991-11-14 Spinning machine supply method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP24260884A Division JPS61119728A (en) 1984-10-23 1984-11-16 Method for doffing sliver in spinning machine

Publications (2)

Publication Number Publication Date
JPH0525720A JPH0525720A (en) 1993-02-02
JPH0672334B2 true JPH0672334B2 (en) 1994-09-14

Family

ID=17870238

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3299260A Expired - Lifetime JPH0672334B2 (en) 1991-11-14 1991-11-14 Spinning machine supply method

Country Status (1)

Country Link
JP (1) JPH0672334B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5881631A (en) * 1981-11-04 1983-05-17 Howa Mach Ltd Changing method for roving bobbins in spinning frame

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5881631A (en) * 1981-11-04 1983-05-17 Howa Mach Ltd Changing method for roving bobbins in spinning frame

Also Published As

Publication number Publication date
JPH0525720A (en) 1993-02-02

Similar Documents

Publication Publication Date Title
JPH0672334B2 (en) Spinning machine supply method
JP2906735B2 (en) Doffing device in roving machine
JPH0585659B2 (en)
JP2503963B2 (en) Shining machine for spinning machines
JPH0585658B2 (en)
JPH0261117A (en) Method for doffing of spinning machine and apparatus therefor
JPH0525721A (en) Apparatus for transferring roving bobbin in spinning frame
JPH0377291B2 (en)
JP3074945B2 (en) Pipe replacement method and pipe replacement device in roving machine
JP2684777B2 (en) Coarse yarn end position alignment device
JPS61102429A (en) Bobbin changing in speed frame
JPH0523586Y2 (en)
JPS594575A (en) Horizontal carrier for sliver bobbin
JPS62215025A (en) Conveying method for roving bobbins
JPS591733A (en) Method for loading roving bobbin transferring magazine with roving bobbin in fine spinning machine and apparatus therefor
JPS5943570B2 (en) Tube change method and device for spinning machine
JPS61174432A (en) Doffer for roving frame
JPH0823092B2 (en) How to replace a spinning machine
JPH05195346A (en) Sliver exchanger of fine spinning machine
JPH0515809B2 (en)
JPS60167940A (en) Method for doffing in fly frame
JPS61145082A (en) Lap feeding apparatus
JPS61201030A (en) Full bobbin doffer and conveyor
JPH07100890B2 (en) Remaining thread bobbin take-out device of Shino-changing machine
JPS5881624A (en) Roving frame