JPH0659377U - Rail gripping device - Google Patents

Rail gripping device

Info

Publication number
JPH0659377U
JPH0659377U JP861593U JP861593U JPH0659377U JP H0659377 U JPH0659377 U JP H0659377U JP 861593 U JP861593 U JP 861593U JP 861593 U JP861593 U JP 861593U JP H0659377 U JPH0659377 U JP H0659377U
Authority
JP
Japan
Prior art keywords
rail
space
main body
gripping device
intermediate member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP861593U
Other languages
Japanese (ja)
Other versions
JP2596945Y2 (en
Inventor
克 坂田
和夫 石浦
真二 山本
洋一 中島
信頼 岩木
靖 吉田
英樹 中西
健 上木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Japan Railway Co
Original Assignee
West Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by West Japan Railway Co filed Critical West Japan Railway Co
Priority to JP1993008615U priority Critical patent/JP2596945Y2/en
Publication of JPH0659377U publication Critical patent/JPH0659377U/en
Application granted granted Critical
Publication of JP2596945Y2 publication Critical patent/JP2596945Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

(57)【要約】 【目的】掴み中のレールを落下させることがないと共に
保守点検が簡単であり、また係合片の折損事故のないこ
と。 【構成】本体21は、本体下端から上方へ向かってレー
ル進入用空間24が切り込み形成され、空間24の両外
側に位置する本体部位の夫々には、空間24へ進退する
係合片22,22が枢支26,26されたレール掴み装
置において、係合片22,22の夫々は、空間24の内
で停止する伏倒係止位置Aから空間24の外の起立待機
位置Bまで仰伏揺動するように枢支され、空間24より
外で係合片22,22と本体21との間には、仰伏操作
リンク機構23が配設されたことである。
(57) [Summary] [Purpose] The rail being gripped is not dropped, maintenance is easy, and there is no accidental breakage of the engaging piece. [Structure] In a main body 21, a rail entry space 24 is formed so as to extend upward from a lower end of the main body, and engagement pieces 22, 22 that advance and retreat to the space 24 are formed in each of main body portions located on both outer sides of the space 24. In the rail gripping device having the pivots 26, 26, the engaging pieces 22, 22 respectively sway from the fall-down locking position A that stops in the space 24 to the standing-up standby position B outside the space 24. That is, the supine operation link mechanism 23 is pivotally supported so as to move, and is disposed outside the space 24 between the engagement pieces 22 and 22 and the main body 21.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、鉄道用レールを吊り上げるときに用いるレール掴み装置の改良に関 するものである。 The present invention relates to an improvement of a rail gripping device used when hoisting a rail for railroad.

【0002】[0002]

【従来の技術】[Prior art]

従来、鉄道レールの吊り上げ装置には、図5に示すものがある。この吊り上げ 装置1は、吊りビーム2の両端にレール掴み装置3,3が取り付けられ、吊り金 具4に吊りビーム2をワイヤーロープ5,5で吊ってある。この吊り上げ装置1 は、クレーン(図示は省略)のフック6に吊り金具4を引っかけた状態で吊り下 げられ、レール掴み装置3,3でレール7を掴んだ後にクレーンの操作で吊り上 げられ、所望箇所にレール7を搬送する。 BACKGROUND ART Conventionally, there is a rail rail lifting device shown in FIG. In this hoisting device 1, rail gripping devices 3, 3 are attached to both ends of a hoisting beam 2, and the hoisting beam 2 is hung on a hanger 4 by wire ropes 5, 5. This hoisting device 1 is hoisted with a hook 6 of a crane (not shown) hooked on a hoisting metal 4, and after the rails 7 are gripped by a rail gripping device 3 and 3, the hoisting device 1 is hoisted by operating the crane. The rail 7 is conveyed to a desired place.

【0003】 前記レール掴み装置3は、図6に示すように、本体9の下端9aから上方へ向 かってレール進入用空間10が切り込み形成されている。本体9は、空間10の 両外側に位置する本体部位の夫々に、空間10へ進退する係合片11,11が枢 支12,12されている。係合片11,11より上方の本体部位には、ソレノイ ド13,13が取り付けられている。各ソレノイド13は、その出力端13aが リンク14を介して係合片11の上端に連結されている。ソレノイド13,13 は、その出力端13a,13a同士がセパレータ15で連結されている。As shown in FIG. 6, the rail gripping device 3 is formed with a space 10 for entering a rail, which is formed by cutting from a lower end 9 a of a main body 9 upward. In the main body 9, engagement pieces 11 and 11 that advance and retreat to the space 10 are pivotally supported 12 and 12 at main body portions located on both outer sides of the space 10. Solenoids 13, 13 are attached to the main body portion above the engaging pieces 11, 11. The output end 13 a of each solenoid 13 is connected to the upper end of the engagement piece 11 via a link 14. The solenoids 13 and 13 have their output ends 13a and 13a connected to each other by a separator 15.

【0004】 上記ソレノイド13,13の間には、ロック装置16が設けられている。この ロック装置16は、本体9に取り付けたソレノイド(図示は省略)と、このソレ ノイドの出力端に取り付けたロックピース17とからなり、降下したセパレータ 15(同図(A)参照)の上方へロックピース17を前進させることにより、セ パレータ15の上昇を阻止して係合片11,11が開くのを防止するようにして ある。A lock device 16 is provided between the solenoids 13, 13. The lock device 16 is composed of a solenoid (not shown) attached to the main body 9 and a lock piece 17 attached to the output end of this solenoid, and is arranged above the descended separator 15 (see FIG. 7A). By moving the lock piece 17 forward, the rising of the separator 15 is prevented and the engagement pieces 11, 11 are prevented from opening.

【0005】 このように構成されたレール掴み装置3,3を備えた吊り上げ装置1(図5参 照)でレール7を掴む作業は、次の手順に従って行われる。先ず、図6(B)に 示すように、ロック装置16のソレノイドに通電してロックを解除し、その後に 、係合片開閉用のソレノイド13,13に通電してセパレータ15を引き上げて 係合片11,11を開かせ、先端爪11a,11aを空間10から後退させて待 機状態にする。The work of gripping the rail 7 with the lifting device 1 (see FIG. 5) including the rail gripping devices 3 and 3 configured as described above is performed according to the following procedure. First, as shown in FIG. 6 (B), the solenoid of the lock device 16 is energized to release the lock, and then the solenoids 13 and 13 for opening and closing the engaging pieces are energized to pull up the separator 15 to engage. The pieces 11, 11 are opened, and the tip claws 11a, 11a are retracted from the space 10 to be in a standby state.

【0006】 次に、待機状態のレール掴み装置3をクレーン(図示は省略)の操作でレール 7の上方へ移動させた後に降下させ、空間10にレール7の頭部7aを進入させ る。続けて、同図(A)に示すように、ソレノイド13,13の通電を切ってセ パレータ15を下げて係合片11,11を閉じさせることにより、先端爪11a ,11aを空間10内へ前進さる。その後に、ロック装置16のソレノイドの通 電を切ってロックピース17を前進させてロック状態とし、セパレータ15の上 昇を阻止する。この状態でレール掴み装置3をクレーンで吊り上げると、レール 7の頭部下面7b,7bに係合片11,11の先端爪11a,11aを係止させ た掴み状態でレール7を吊り上げる。Next, the rail gripping device 3 in the standby state is moved to the upper side of the rail 7 by the operation of a crane (not shown) and then lowered, and the head portion 7 a of the rail 7 enters the space 10. Then, as shown in FIG. 3A, the energization of the solenoids 13 and 13 is cut off, the separator 15 is lowered, and the engaging pieces 11 and 11 are closed to move the tip claws 11a 1 and 11a into the space 10. Move forward. After that, the solenoid of the lock device 16 is turned off to move the lock piece 17 forward so that the lock piece 17 is locked to prevent the separator 15 from rising. When the rail gripping device 3 is lifted by a crane in this state, the rail 7 is lifted in a gripped state in which the tip claws 11a and 11a of the engaging pieces 11 and 11 are locked to the head lower surfaces 7b and 7b of the rail 7.

【0007】 続けて、レール掴み装置3で掴んだレール7をクレーンの操作で所望箇所の上 方へ移動させ、その後にクレーンでレール掴み装置3を降下させて所望箇所にレ ールを置く。次に、ロック装置16のソレノイドに通電してロックを解除し、そ の後に、ソレノイド13,13に通電してセパレータ15を引き上げて係合片1 1,11を開かせる。最後に、待機状態のレール掴み装置3をクレーンで吊り上 げて1回の掴み作業を完了する。Subsequently, the rail 7 gripped by the rail gripping device 3 is moved upward by a crane operation, and then the rail gripping device 3 is lowered by the crane to place a rail at the desired position. Next, the solenoid of the lock device 16 is energized to release the lock, and then the solenoids 13 and 13 are energized to pull up the separator 15 to open the engaging pieces 11 and 11. Finally, the rail gripping device 3 in the standby state is lifted by a crane to complete one gripping work.

【0008】[0008]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところが、前記従来のレール掴み装置3には、次の様な問題点がある。 (a)レール吊り下げ中はソレノイド13,13が非通電状態であるため、ロッ ク装置16のソレノイドが故障又は誤作動したときには、係合片11,11の先 端爪11a,11aに加わったレール7の自重で係合片11,11が開き、掴み 中のレール7を落下させることがある。非常に重たいレール7の落下は、非常に 危険である。 However, the conventional rail gripping device 3 has the following problems. (A) Since the solenoids 13 and 13 are not energized while the rail is suspended, when the solenoid of the locking device 16 malfunctions or malfunctions, it is applied to the tip claws 11a and 11a of the engaging pieces 11 and 11. The engaging pieces 11 and 11 may be opened by the weight of the rail 7, and the rail 7 being gripped may be dropped. Falling of a very heavy rail 7 is very dangerous.

【0009】 (b)レール7を吊り下げときに、係合片11,11の先端爪11a,11aに 加わるレール7の自重及び衝撃等の大きな外力は、係合片11,11を介してセ パレータ15及びロックピース17に伝達される。この大きな力が累積的に加わ ると、セパレータ15及びロックピース17に疲労破壊が生じ、掴み中のレール 7を落下させることがある。(B) When the rail 7 is suspended, a large external force such as an own weight of the rail 7 applied to the tip claws 11a, 11a of the engaging pieces 11, 11 and a shock is applied via the engaging pieces 11, 11. It is transmitted to the parator 15 and the lock piece 17. When this large force is cumulatively applied, fatigue breakage occurs in the separator 15 and the lock piece 17, and the rail 7 being gripped may be dropped.

【0010】 (c)開閉用のソレノイド13,13及びロック装置16が有るため、その保守 点検等に多くの手間が必要となる。(C) Since the solenoids 13 and 13 for opening and closing and the lock device 16 are provided, much labor is required for maintenance and inspection.

【0011】 (d)開閉用のソレノイド13,13又はロック装置16のソレノイドの故障に より係合片11,11が閉じた状態を維持することがある。このときに、レール 7の上方に待機しているレール掴み装置3を降下させると、閉状態の係合片11 ,11の先端爪11a,11aにレール7を衝突させるため、先端爪11a,1 1aの折損事故が発生する。(D) The engagement pieces 11, 11 may be kept in a closed state due to a failure of the opening / closing solenoids 13, 13 or the solenoid of the lock device 16. At this time, when the rail gripping device 3 standing by above the rail 7 is lowered, the rail 7 collides with the tip claws 11a, 11a of the engagement pieces 11, 11 in the closed state. A breakage accident of 1a occurs.

【0012】 本考案は、上記問題点を解決するために、掴み中のレールを落下させることが ないと共に保守点検が簡単であり、また係合片の折損事故のないレール掴み装置 の提供を目的とする。In order to solve the above-mentioned problems, the present invention aims to provide a rail gripping device which does not drop a rail being gripped, is easy to maintain and inspect, and has no accidental breakage of an engaging piece. And

【0013】[0013]

【課題を解決するための手段】[Means for Solving the Problems]

本考案が採用した手段は、本体は、本体下端から上方へ向かってレール進入用 空間が切り込み形成され、この空間の両外側に位置する本体部位の夫々には、こ の空間へ進退する係合片が枢支されたレール掴み装置において、前記係合片の夫 々は、前記空間の内で停止する伏倒係止位置から前記空間の外の起立待機位置ま で仰伏揺動するように枢支され、前記空間より外で前記係合片と本体との間には 、仰伏操作リンク機構が配設されている。 According to the means adopted by the present invention, the main body is formed with a rail entry space cut upward from the lower end of the main body, and the main body parts located on both outer sides of this space are engaged with each other to advance and retreat to this space. In the rail gripping device in which the pieces are pivotally supported, each of the engagement pieces is laid on the back and forth from a fall-down locking position that stops inside the space to a standing-up standby position outside the space. A supine operation link mechanism is pivotally supported and is disposed outside the space between the engagement piece and the main body.

【0014】 前記仰伏操作リンク機構は、伏倒係止位置の係合片が前記機構以外の外力を受 けて起立待機位置へ仰起揺動できる遊びを設けることもある。In the supine operation link mechanism, there may be provided a play in which the engaging piece in the receding locking position can receive an external force other than the mechanism to erect and swing to the stand-by standby position.

【0015】 前記伏倒操作リンク機構は、前記空間より上方の本体部位で上下摺動自在に支 持した中間部材と、前記空間の両外側に配置されてこの中間部材と前記係合片と を連結した連結部材と、この中間部材と前記本体との間に配置されて中間部材を 下方へ付勢するバネと、この中間部材と前記本体との間に配置されて中間部材を 引き上げる引き上げ操作具とを備えることもある。The fold-down operation link mechanism includes an intermediate member vertically slidably supported at a main body portion above the space, and an intermediate member disposed on both outer sides of the space and the engaging piece. A connecting member that is connected, a spring that is arranged between the intermediate member and the main body and urges the intermediate member downward, and a pull-up operation tool that is arranged between the intermediate member and the main body and pulls up the intermediate member. It may also be equipped with.

【0016】 前記レール進入用空間は、前記係合片の片方だけがレール係合状態であっても 、このレール係合状態を維持できる幅寸法としてあることもある。The rail entrance space may have a width dimension capable of maintaining the rail engagement state even when only one of the engagement pieces is in the rail engagement state.

【0017】 前記本体には、前記レール進入用空間内に前記係合片が仰伏揺動が可能な状態 にまでレールが進入したことを確認する検知器が取り付けることもある。A detector may be attached to the main body for confirming that the rail has entered the space for entering the rail so that the engaging piece can oscillate on the back and forth.

【0018】[0018]

【作用】[Action]

レール進入用空間に進入したレールを係合片で係止して吊り上げると、係合片 には、レールの自重により大きなモーメントが係合片の伏倒方向へ作用する。こ のモーメンの方向は、係合片を起立させる方向と逆である。そのため、係合片は 、空間の内で停止する伏倒係止位置から移動することがなく、レールに対する係 止状態を維持する。 When the rail that has entered the rail entry space is locked by the engagement piece and lifted up, a large moment acts on the engagement piece in the falling direction of the engagement piece due to the weight of the rail. The direction of this moment is opposite to the direction in which the engaging piece is raised. Therefore, the engagement piece does not move from the fallen locking position where it stops in the space, and maintains the locked state with respect to the rail.

【0019】 仰伏操作リンク機構に遊びを設けてあるときには、レールを掴んでいない係合 片が伏倒係止位置のまま降下してレールに衝突しても、係合片は伏倒係止位置か ら起立待機位置へ仰起揺動する。When a play is provided in the supine operation link mechanism, even if the engaging piece that does not grip the rail descends and collides with the rail in the falling locking position, the engaging piece is locked in the falling position. Swing up from the position to the stand-by standby position.

【0020】 伏倒操作リンク機構が中間部材を下方へ付勢するバネを備えているときには、 引き上げ操作具が引き下げ状態になると、このバネの力により中間部材を下方へ 強制的に押し下げて係合片を起立状態とする。When the fall-down operation link mechanism is provided with a spring for urging the intermediate member downward, when the pull-up operation tool is pulled down, the force of this spring forcibly pushes the intermediate member downward to engage it. Put the piece upright.

【0021】 係合片の片方だけがレール係止の状態であっても、このレール係止を維持でき るレール進入用空間の幅寸法のときには、一方の係合片が破損してもレール係止 は維持される。Even if only one of the engaging pieces is in the rail locking state, when the width of the rail entry space is such that the rail locking can be maintained, even if one of the engaging pieces is damaged, the rail engaging Stop is maintained.

【0022】 本体に検知器が取り付けられているときには、レール進入用空間内に、係合片 が仰伏揺動が可能な状態となるまでレールが進入したことを確認できる。When the detector is attached to the main body, it is possible to confirm that the rail has entered the space for entering the rail until the engaging piece is in a state where it can oscillate on the back and forth.

【0023】[0023]

【実施例】【Example】

以下、本考案に係るレール掴み装置(以下、「本案掴み装置」という)を図面 に示す実施例に基づいて説明する。図1乃至図4は本案掴み装置の実施例を示す ものであって、図1は係合片の係止解除状態を示す側面断面図であり、図2は係 合片の係止可能な状態を示す側面断面図であり、図3は係合片の係止状態を示す 正面図であり、図4は係合片の吊下げ状態を示す側面図である。 Hereinafter, a rail gripping device according to the present invention (hereinafter, referred to as "main gripping device") will be described based on an embodiment shown in the drawings. 1 to 4 show an embodiment of the gripping device of the present invention, FIG. 1 is a side sectional view showing an unlocked state of an engaging piece, and FIG. 2 is a state in which the engaging piece can be locked. 3 is a front view showing the engagement state of the engagement piece, and FIG. 4 is a side view showing the suspension state of the engagement piece.

【0024】 本案掴み装置20は、従来と同様に吊りビーム2(図3参照)の両端に1組づ つ取り付けられる。本案掴み装置20は、図1に示す如く、鋼板等を溶接等で接 合して成る本体21と、本体21の下方寄りに枢支した係合片22,22と、係 合片22,22を操作する仰伏操作リンク機構23とを備えている。The gripping device 20 of the present invention is attached to both ends of the suspension beam 2 (see FIG. 3) one by one, as in the conventional case. As shown in FIG. 1, the grip device 20 of the present invention includes a main body 21 formed by joining steel plates by welding or the like, engagement pieces 22 and 22 pivotally supported on the lower side of the main body 21, and engagement pieces 22 and 22. And a supine operation link mechanism 23 for operating.

【0025】 前記本体21は、その下端から上方へ向かってレール進入用空間24が切り込 み形成され、その下端に係合片22用のストッパー25,25を設けてある。こ の空間24は、何らかの故障等で係合片22の片方だけがレール係止状態(図示 は省略)であっても、このレール係止状態を維持できる幅寸法Wとなっている。 本体21の前後板21a,21bの間には、前記係合片22,22及び仰伏操作 リンク機構23が配設してある。The main body 21 has a rail entry space 24 cut upward from the lower end thereof, and stoppers 25, 25 for the engaging pieces 22 are provided at the lower end thereof. The space 24 has a width W that can maintain the rail locked state even if only one of the engaging pieces 22 is in the rail locked state (not shown) due to some trouble or the like. Between the front and rear plates 21a and 21b of the main body 21, the engaging pieces 22 and 22 and the supine operation link mechanism 23 are arranged.

【0026】 前記係合片22,22は、前記空間24の両外側に位置する本体部位の夫々に 枢支26,26され、前記ストッパー25,25に当接して空間24の内で停止 する伏倒係止位置A(図2参照)から空間24の外の起立待機位置B(図1参照 )まで仰伏揺動するようになっている。The engaging pieces 22, 22 are pivotally supported 26, 26 respectively on the main body portions located on both outer sides of the space 24, and come into contact with the stoppers 25, 25 to stop the inside of the space 24. It is designed so that it can lie down and oscillate from a fall locking position A (see FIG. 2) to a stand-by standby position B (see FIG. 1) outside the space 24.

【0027】 前記仰伏操作リンク機構23は、前記空間24より上方の本体部位で上下摺動 自在に支持31した中間部材28と、前記空間24の両外側に配置されてこの中 間部材28と係合片22,22とを連結した連結部材29,29と、この中間部 材28と本体21との間に配置されて中間部材28を下方へ付勢するバネ32と 、この中間部材28と本体21との間に配置されて中間部材28を引き上げる引 き上げ操作具30とを備えている。The supine operation link mechanism 23 includes an intermediate member 28 that is vertically slidably supported 31 at a main body portion above the space 24, and an intermediate member 28 that is arranged on both outer sides of the space 24. Connecting members 29 and 29 connecting the engaging pieces 22 and 22, a spring 32 arranged between the intermediate member 28 and the main body 21 to urge the intermediate member 28 downward, and the intermediate member 28. A pull-up operation tool 30 that is disposed between the main body 21 and the intermediate member 28 is provided.

【0028】 この引き上げ操作具30は、圧縮空気の給排又は電動モータの正逆回転等で出 力軸30aが進退するものである。引き上げ操作具30は、前進位置と後退位置 を検出するリミットスイッチ又は近接スイッチ等からなる進退位置検出器33が 取り付けられている。引き上げ操作具30と中間部材28との連結は、ピン34 と長孔35等からなる遊びが設けられている。この遊びは、前記空間24にレー ル7が進入するとき、伏倒係止位置A(図2参照)の係合片22,22にレール 7が衝突すると、係合片22,22が引き上げ操作具30の拘束を受けることな く起立待機位置B(図1参照)へ仰起揺動させることができる量を言う。The pull-up operation tool 30 is one in which the output shaft 30a is advanced and retracted by supplying and discharging compressed air, rotating the electric motor forward and backward, or the like. The pull-up operation tool 30 is provided with an advancing / retreating position detector 33 including a limit switch or a proximity switch for detecting the advancing position and the retracting position. The pulling operation tool 30 and the intermediate member 28 are connected to each other by providing a play including a pin 34 and an elongated hole 35. This play is such that when the rail 7 collides with the engaging pieces 22 and 22 at the falling locking position A (see FIG. 2) when the rail 7 enters the space 24, the engaging pieces 22 and 22 are pulled up. This is the amount that can be raised and swung to the stand-by standby position B (see FIG. 1) without being restrained by the tool 30.

【0029】 前記本体21の前板21aには、図3及び図4に示す如く、空間24内にレー ル7が進入して係合片22,22が仰伏揺動が可能な状態となったことを確認す るリミットスイッチ又は近接スイッチ等からなる検知器36が取り付けてある。 検知器36は、レール7の頭部7aの進入位置を検知するようにしてある。As shown in FIGS. 3 and 4, the rail 7 enters the space 24 in the front plate 21 a of the main body 21 so that the engaging pieces 22, 22 can lie on the back and forth. A detector 36 such as a limit switch or a proximity switch for confirming the above is attached. The detector 36 detects the entry position of the head 7a of the rail 7.

【0030】 図3に示すように本案掴み装置20を吊りビーム2の両端に備えた(図は一方 のみを示す)吊り上げ装置37でレール7を掴む作業は、次の手順に従って行わ れる。先ず、図1に示すように、引き上げ操作具30の出力軸30aを上方へ後 退させることにより、係合片22,22を起立待機位置Bで待機させる。As shown in FIG. 3, the operation of gripping the rail 7 with the lifting device 37 provided with the gripping device 20 of the present invention at both ends of the hanging beam 2 (the drawing shows only one side) is performed according to the following procedure. First, as shown in FIG. 1, by retracting the output shaft 30a of the pulling-up operation tool 30 upward, the engaging pieces 22, 22 are made to stand by at the standing-standby position B.

【0031】 次に、待機状態の本案掴み装置20をクレーン(図示は省略)の操作でレール 7の上方へ移動させた後に降下させ、空間24にレール7の頭部7aを進入させ る。なお、前記引き上げ操作具30が誤作動して出力軸30aが下方へ前進した 状態であっても、引き上げ操作具30と中間部材28との連結箇所にピン34及 び長孔35等からなる遊びが設けられているため、レール7は係合片22,22 を起立待機位置Bまで押し上げて空間24内へ進入することができる。Next, the gripping device 20 of the present invention in the standby state is moved to the upper side of the rail 7 by the operation of a crane (not shown) and then lowered, so that the head 7 a of the rail 7 enters the space 24. Even if the pull-up operation tool 30 malfunctions and the output shaft 30a is advanced downward, a play formed by the pin 34 and the long hole 35 and the like is formed at the connection portion between the pull-up operation tool 30 and the intermediate member 28. Since the rail 7 is provided, the rail 7 can push up the engaging pieces 22 and 22 to the stand-by standby position B and enter the space 24.

【0032】 続けて、図1及び図3に示す如く、空間24の上方までレール7が進入したこ とを検知器36(図3参照)で検知したならば、引き上げ操作具30の出力軸3 0aを下方へ前進させる。すると、バネ32は、図2に示す如く、その反発弾性 力で中間部材28を下方へ付勢して連結部材29,29を降下させ、係合片22 ,22を伏倒係止位置Aまで伏倒させる。この状態で本案掴み装置20がクレー ンで吊り上げると、図4に示す如く、レール頭部7aと空間24の天井との間に 5mm程度の隙間が形成した状態でレール頭部下面7b,7bに係合片22,2 2の先端を係止させた掴み状態でレール7を吊り上げる。レール頭部7aと空間 24の天井との隙間が形成されたことは、検知器36で検知される。この検知に もとづいて引き上げ操作具30がロックされ、作動しない状態となる。Subsequently, as shown in FIGS. 1 and 3, when the detector 36 (see FIG. 3) detects that the rail 7 has entered above the space 24, the output shaft 3 of the pull-up operation tool 30. 0a is advanced downward. Then, as shown in FIG. 2, the spring 32 urges the intermediate member 28 downward by its repulsive elastic force to lower the connecting members 29, 29, and brings the engaging pieces 22, 22 to the falling locking position A. Lie down. When the gripping device 20 of the present invention is lifted by the crane in this state, as shown in FIG. 4, the rail head lower surface 7b, 7b is formed on the rail head lower surface 7b, 7b with a gap of about 5 mm formed between the rail head 7a and the ceiling of the space 24. The rail 7 is lifted in a gripped state in which the tips of the engaging pieces 22 and 22 are locked. The detector 36 detects that a gap is formed between the rail head 7a and the ceiling of the space 24. Based on this detection, the pulling-up operation tool 30 is locked and becomes inoperative.

【0033】 続けて、本案掴み装置20で掴んだレール7をクレーンの操作で所望箇所の上 方へ移動させ、その後にクレーンで本案掴み装置20を降下させることにより、 図2に示すように所望箇所にレール7を置く。次に、レール頭部7aと空間24 の天井との隙間が形成されていないことが検知器36で検知されと、図1に示す ように引き上げ操作具30の出力軸30aを上方へ後退させ、係合片22,22 を起立待機位置Bで待機させて係合片22,22を開かる。最後に、待機状態の 本案掴み装置20をクレーンで吊り上げて1回の掴み作業を完了する。Subsequently, the rail 7 gripped by the gripping device 20 of the present invention is moved upward by a crane to a desired position, and then the gripping device 20 of the present invention is lowered by the crane to obtain the desired position as shown in FIG. Put the rail 7 in the place. Next, when the detector 36 detects that the gap between the rail head 7a and the ceiling of the space 24 is not formed, the output shaft 30a of the pull-up operation tool 30 is retracted upward as shown in FIG. The engagement pieces 22, 22 are made to stand by at the standing-up standby position B and the engagement pieces 22, 22 are opened. Finally, the gripping device 20 in the standby state is lifted by a crane to complete one gripping work.

【0034】 前記手順の操作は、適所に設けたシーケンサー(図示は省略)の出力に基づい て行うことも、又は手動の操作ですることもできる。The operation of the above procedure can be performed based on the output of a sequencer (not shown) provided in place, or can be a manual operation.

【0035】 本案掴み装置20は、上記構成に限定されるものではなく、実施の態様に応じ て変更することも可能である。例えば、前記仰伏操作リンク機構23を、図示は 省略したが、次のように変更することである。エアーシリンダー等からなる2個 の引き上げ操作具30,30を本体21に取り付け、各引き上げ操作具30の出 力軸30aと係合片22とを連結部材29で連結することである。また、引き上 げ操作具30と中間部材28との連結部の遊びを無くして、前記バネ32を省略 することである。The gripping device 20 of the present invention is not limited to the above-mentioned configuration, and may be modified according to the embodiment. For example, although not shown in the drawing, the supine operation link mechanism 23 is changed as follows. Two lifting operation tools 30, 30 including air cylinders are attached to the main body 21, and the output shaft 30a of each lifting operation tool 30 and the engaging piece 22 are connected by the connecting member 29. In addition, the play of the connecting portion between the pull-up operation tool 30 and the intermediate member 28 is eliminated, and the spring 32 is omitted.

【0036】[0036]

【考案の効果】[Effect of device]

以上詳述した如く、本案掴み装置は、次の如き実用的効果を有する。 レールを係合片で係止して吊り上げると、係合片は、空間の内で停止する伏倒 係止位置から移動することがなく、レールに対する係止状態を維持する。その結 果、本案掴み装置は、安全にレールを掴んで吊り上げることができる。 As described in detail above, the grip device of the present invention has the following practical effects. When the rail is locked by the engaging piece and lifted up, the engaging piece maintains the locked state with respect to the rail without moving from the fallen locking position where it stops in the space. As a result, the gripping device of the present invention can safely grab and lift the rail.

【0037】 仰伏操作リンク機構に遊びを設けてあるときには、レールを掴んでいない係合 片が伏倒係止位置のまま降下しても、係合片が伏倒係止位置から起立待機位置へ 仰起揺動する。その結果、本案掴み装置は、係合片の折損事故がなくなる。When the supine operation link mechanism is provided with play, even if the engaging piece that is not gripping the rail descends in the falling locking position, the engaging piece moves from the falling locking position to the stand-by standby position. Shake to erect. As a result, the gripping device of the present invention eliminates the accidental breakage of the engagement piece.

【0038】 伏倒操作リンク機構が中間部材を下方へ付勢するバネを備えているときには、 強制的に係合片を起立状態とすることができる。その結果、本案掴み装置は、円 滑に動作する。When the downturn operation link mechanism includes a spring for urging the intermediate member downward, the engaging piece can be forcibly set up. As a result, the gripping device of the present invention operates smoothly.

【0039】 係合片の片方だけがレール係止の状態であっても、このレール係止を維持でき るレール進入用空間の幅寸法のときには、一方の係合片が破損してもレール係止 は維持される。その結果、本案掴み装置は、安全にレールを掴んで吊り上げるこ とができる。Even if only one of the engaging pieces is in the rail locking state, if the width of the rail entry space is such that the rail locking can be maintained, even if one of the engaging pieces is damaged, the rail engaging Stop is maintained. As a result, the gripping device of the present invention can safely grip and lift the rail.

【0040】 本体に検知器が取り付けられているときには、レール進入用空間内に係合片が 仰伏揺動が可能な状態にまでレールが進入したこと及び係合片がレールに係止し たことが確認できる。その結果、本案掴み装置は、安全且つ円滑に操作すること ができる。When the detector is attached to the main body, the engagement piece is inserted into the space for entering the rail to a state where it can oscillate and the engagement piece is locked to the rail. You can confirm that. As a result, the gripping device of the present invention can be operated safely and smoothly.

【0041】 本案掴み装置は、ロック装置が不要なため、構造が簡単となり保守点検が簡単 である。The gripping device of the present invention does not require a locking device, so that the structure is simple and maintenance is easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に係る掴み装置の実施例を示す側面断面
図であって、係合片の係止解除状態を示すものである。
FIG. 1 is a side sectional view showing an embodiment of a gripping device according to the present invention, showing an unlocked state of an engagement piece.

【図2】同実施例を示す側面断面図であって、係合片の
係止状態を示すものである。
FIG. 2 is a side sectional view showing the same embodiment, showing the engagement state of the engagement pieces.

【図3】同実施例を示す正面図であって、係合片の係止
可能な状態を示すものである。
FIG. 3 is a front view showing the embodiment, showing a state in which the engagement piece can be locked.

【図4】同実施例を示す側面図であって、係合片の吊下
げ状態を示すものである。
FIG. 4 is a side view showing the embodiment, showing a suspended state of the engagement piece.

【図5】従来のレールの吊り上げ装置を示す正面図であ
る。
FIG. 5 is a front view showing a conventional rail lifting device.

【図6】従来の掴み装置を示すものであって、(A)は
掴み上げることができる状態を示す側面断面図、(B)
は係合片の係止解除状態を示す側面断面図である。
6A and 6B show a conventional gripping device, in which FIG. 6A is a side sectional view showing a state in which the gripping device can be lifted up;
[Fig. 4] is a side sectional view showing an unlocked state of an engagement piece.

【符号の説明】[Explanation of symbols]

21…本体 22…係合片 23…仰伏操作リンク機構 24…レール進入空間 26…枢支 28…中間部材 29…連結部材 30…引き上げ操作具 32…バネ 36…検知器 A…伏倒係止位置 B…起立待機位置 21 ... Main body 22 ... Engaging piece 23 ... Lie down operation link mechanism 24 ... Rail entry space 26 ... Pivot 28 ... Intermediate member 29 ... Connecting member 30 ... Lifting operation tool 32 ... Spring 36 ... Detector A ... Tilt-down locking Position B: Standing standby position

フロントページの続き (72)考案者 山本 真二 大阪市北区芝田2丁目4番24号 西日本旅 客鉄道株式会社内 (72)考案者 中島 洋一 大阪市北区芝田2丁目4番24号 西日本旅 客鉄道株式会社内 (72)考案者 岩木 信頼 大阪市北区芝田2丁目4番24号 西日本旅 客鉄道株式会社内 (72)考案者 吉田 靖 大阪市北区芝田2丁目4番24号 西日本旅 客鉄道株式会社内 (72)考案者 中西 英樹 大阪市北区芝田2丁目4番24号 西日本旅 客鉄道株式会社内 (72)考案者 上木 健 大阪市北区本庄西3丁目8−20 有限会社 三愛内Front page continuation (72) Shinji Yamamoto, 2-4-24 Shibata, Kita-ku, Osaka City, West Japan Railway Company (72) Yoichi Nakajima 2-4-2-4, Shibata, Kita-ku, Osaka City, West Japan Passenger Railway Co., Ltd. (72) Creator Iwaki Shinobu 2-4-24 Shibata, Kita-ku, Osaka City West Japan Travel Passenger Railway Co., Ltd. (72) Yasushi Yoshida 2-4-2-4 Shibata, Kita-ku, Osaka City West Japan Travel Passenger Railway Co., Ltd. (72) Inventor Hideki Nakanishi 2-4-24 Shibata, Kita-ku, Osaka-shi West Japan Travel Co., Ltd. (72) Inventor Ken Ueki 3-8-20 Honjo Nishi, Kita-ku, Osaka Company Sanai

Claims (5)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 本体は、本体下端から上方へ向かってレ
ール進入用空間が切り込み形成され、この空間の両外側
に位置する本体部位の夫々には、この空間へ進退する係
合片が枢支されたレール掴み装置において、前記係合片
の夫々は、前記空間の内で停止する伏倒係止位置から前
記空間の外の起立待機位置まで仰伏揺動するように枢支
され、前記空間より外で前記係合片と本体との間には、
仰伏操作リンク機構が配設されたことを特徴とするレー
ル掴み装置。
1. The main body is formed with a rail entry space cut upward from the lower end of the main body, and an engagement piece for advancing and retracting to and from the space is pivotally supported at each of the main body portions located on both outer sides of this space. In the rail gripping device described above, each of the engagement pieces is pivotally supported so as to oscillate in a supine manner from a fall-down locking position that stops in the space to a standing-up standby position outside the space, More outwardly between the engagement piece and the body,
A rail gripping device having a lie-down operation link mechanism.
【請求項2】 前記仰伏操作リンク機構は、伏倒係止位
置の係合片が前記機構以外の外力を受けて起立待機位置
へ仰起揺動できる遊びを設けてある請求項1記載のレー
ル掴み装置。
2. The back-and-forth operation link mechanism is provided with a play in which an engaging piece at a fall-down locking position can receive an external force other than the mechanism to raise and swing to an upright standby position. Rail gripping device.
【請求項3】 前記伏倒操作リンク機構は、前記空間よ
り上方の本体部位で上下摺動自在に支持した中間部材
と、前記空間の両外側に配置されてこの中間部材と前記
係合片とを連結した連結部材と、この中間部材と前記本
体との間に配置されて中間部材を下方へ付勢するバネ
と、この中間部材と前記本体との間に配置されて中間部
材を引き上げる引き上げ操作具とを備えた請求項1又は
2記載のレール掴み装置。
3. The fall-down operation link mechanism includes an intermediate member that is slidably supported in a main body portion above the space, and the intermediate member and the engaging piece that are disposed on both outer sides of the space. A connecting member that connects the intermediate member and a spring that is arranged between the intermediate member and the main body and urges the intermediate member downward; and a pulling-up operation that is arranged between the intermediate member and the main body and pulls up the intermediate member. The rail gripping device according to claim 1 or 2, further comprising a tool.
【請求項4】 前記レール進入用空間は、前記係合片の
片方だけがレール係合状態であっても、このレール係合
状態を維持できる幅寸法としてある請求項1,2又は3
記載のレール掴み装置。
4. The rail-introducing space has a width dimension capable of maintaining the rail engagement state even when only one of the engagement pieces is in the rail engagement state.
Rail gripping device described.
【請求項5】 前記本体には、前記レール進入用空間内
に前記係合片が仰伏揺動が可能な状態にまでレールが進
入したことを確認する検知器が取り付けられている請求
項1,2,3又は4記載のレール掴み装置。
5. A detector is attached to the main body for confirming that the rail has entered the space for entering the rail so that the engaging piece can oscillate on the back and forth. , 2, 3 or 4 rail gripping device.
JP1993008615U 1993-01-22 1993-01-22 Rail grabber Expired - Lifetime JP2596945Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993008615U JP2596945Y2 (en) 1993-01-22 1993-01-22 Rail grabber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993008615U JP2596945Y2 (en) 1993-01-22 1993-01-22 Rail grabber

Publications (2)

Publication Number Publication Date
JPH0659377U true JPH0659377U (en) 1994-08-19
JP2596945Y2 JP2596945Y2 (en) 1999-06-28

Family

ID=11697862

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993008615U Expired - Lifetime JP2596945Y2 (en) 1993-01-22 1993-01-22 Rail grabber

Country Status (1)

Country Link
JP (1) JP2596945Y2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08192985A (en) * 1994-11-18 1996-07-30 Penta Ocean Constr Co Ltd Carrying method of long material and device thereof
JP2001328576A (en) * 2000-03-15 2001-11-27 Toomasu Kk Wheel locking device, bicycle parking machine using this device, bicycle parking lot management system provided with this bicycle parking machine, and rental method for bicycle using this bicycle parking machine
JP2007070022A (en) * 2005-09-06 2007-03-22 High Frequency Heattreat Co Ltd Conveying device
JP2009019350A (en) * 2007-07-10 2009-01-29 East Japan Railway Co Stopper metal fitting for rail dismounting operation
JP2011106262A (en) * 2009-11-13 2011-06-02 Edilon) (Sedra Gmbh Alignment frame

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08192985A (en) * 1994-11-18 1996-07-30 Penta Ocean Constr Co Ltd Carrying method of long material and device thereof
JP2001328576A (en) * 2000-03-15 2001-11-27 Toomasu Kk Wheel locking device, bicycle parking machine using this device, bicycle parking lot management system provided with this bicycle parking machine, and rental method for bicycle using this bicycle parking machine
JP2007070022A (en) * 2005-09-06 2007-03-22 High Frequency Heattreat Co Ltd Conveying device
JP2009019350A (en) * 2007-07-10 2009-01-29 East Japan Railway Co Stopper metal fitting for rail dismounting operation
JP4667428B2 (en) * 2007-07-10 2011-04-13 東日本旅客鉄道株式会社 Stopper bracket for rail removal work
JP2011106262A (en) * 2009-11-13 2011-06-02 Edilon) (Sedra Gmbh Alignment frame

Also Published As

Publication number Publication date
JP2596945Y2 (en) 1999-06-28

Similar Documents

Publication Publication Date Title
US4703595A (en) Coupler for hanging precast concrete panels from a hoist
GB2072741A (en) Device for suspending from a crane or other hoist a prefabricated concrete block
JPH0659377U (en) Rail gripping device
US6325434B1 (en) Tongs apparatus equipped with supplemental-holding-force apparatus
JPH09278348A (en) Hanging clamp
US7134701B1 (en) Frame for lifting beams and other elongated loads
JPH06144769A (en) Bobbin hoisting fixture
JP3074520B2 (en) Automatic sling removal device for suspended loads
CN112853830B (en) Automatic two-way locking mechanism of rail
US4911313A (en) Linkage lifting apparatus
JP3074373B2 (en) Clamping and lifting device
JP2806247B2 (en) Hanging jig
JP3696325B2 (en) Pile driver leader undulation method and apparatus
JP3092920B1 (en) Suspension
CN219585635U (en) Workpiece grabbing module and transferring equipment
JP4268268B2 (en) Suspension jig and suspension method for building panel
CN220664645U (en) Engine main hook module, gearbox clamping module, front axle hook module and engine power assembly lifting appliance comprising same
JPS6141741Y2 (en)
JP2792751B2 (en) Slab tongs with non-power operated safety hackers
JPH02502714A (en) automatic scissor type grab
JP3028436B2 (en) How to change the suspended load
SU1477599A1 (en) Double cableway
JPH0530075Y2 (en)
JPH04272088A (en) Clamping type hanger tool
JPH0321518Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080423

Year of fee payment: 9