water
processing oil
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP159292A
Other languages
Japanese (ja)
Other versions
JPH07121496B2 (en
Inventor
Tetsuo Sumi
鉄夫 住
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NAAKU KK
Original Assignee
NAAKU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NAAKU KK filed Critical NAAKU KK
Priority to JP159292A priority Critical patent/JPH07121496B2/en
Publication of JPH0647649A publication Critical patent/JPH0647649A/en
Publication of JPH07121496B2 publication Critical patent/JPH07121496B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lasers (AREA)

Abstract

PURPOSE:To let mixed cutting oil be uniform in concentration by providing a mixing tank in which measured stock solution is mixed with water so as to be stirred, and the mixture is diluted by a definite ratio while being mixed to produce cutting oil. CONSTITUTION:A stock solution tank 1 storing stock solution for cutting oil is provided. A measuring tank 2 is provided, which measures a definite amount of stock solution supplied from the stock solution tank 1 by the use of means detecting for level, volume, weight and the like. And next, an amount of water corresponding to measured stock solution is supplied, and both the solution and water are stirred and mixed so as to be diluted by a definite ratio, so that mixed cutting oil is thereby produced in a mixing tank 3. In order to smoothly perform cutting work such as cutting, grinding and the like, mixed cutting oil which is so produced that stock solution is diluted so as to be automatically mixed, is automatically or manually supplied to process machines.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、切削、研削等の工作加
工を円滑に行うために、原液を希釈化して適正濃度に自
動調合して生成される調合加工油を、加工機に自動又は
手動補給するための装置に関するものである。
BACKGROUND OF THE INVENTION The present invention provides a processing machine that automatically prepares a blended processing oil produced by diluting an undiluted solution and automatically blending it to an appropriate concentration in order to smoothly perform machining such as cutting and grinding. The present invention relates to a device for manual replenishment.

【0002】[0002]

【従来の技術】切削、研削等の加工においては、通常、
加工油の利用を必要とし、その主たる機能は、冷却する
こと、及び潤滑することによって機械操作を容易にする
ことにある。
2. Description of the Related Art Normally, in the processing such as cutting and grinding,
It requires the use of processing oils, the main function of which is to facilitate machine operation by cooling and lubricating.

【0003】即ち、冷却機能は、加工機と被加工材との
摩擦接触によって発生した熱、又は工作に変形から生じ
る熱を、奪い取ることであって、この冷却機能は、加工
油の能力に依存すると云われている。
That is, the cooling function is to take away the heat generated by the frictional contact between the processing machine and the workpiece or the heat generated by the deformation of the work, and the cooling function depends on the capacity of the processing oil. It is said that.

【0004】また潤滑機能は、加工機の摩耗および動力
消費量を減少させるために、加工機の切削、研削等工具
と、被加工材との界面を潤滑することであって、この潤
滑機能は、加工油の能力に依存すると云われている。
The lubricating function is to lubricate the interface between the tool such as cutting and grinding of the processing machine and the work material in order to reduce the wear and power consumption of the processing machine. It is said that it depends on the ability of processing oil.

【0005】更に他には、加工油の刃先への到達するた
めの機能、いわゆる浸透性も、加工油の能力に依存する
と云われている。
Furthermore, it is said that the function of the processed oil to reach the cutting edge, so-called permeability, also depends on the capacity of the processed oil.

【0006】そして、前記加工油には、通常、原液を、
そのまま使用する不水溶性加工油と、水で希釈して使用
する水溶性加工油とがある。
[0006] The processing oil is usually a stock solution,
There are water-insoluble processing oil that is used as it is and water-soluble processing oil that is used by diluting with water.

【0007】本発明は、主として、後者の水溶性加工油
に関する。
The present invention mainly relates to the latter water-soluble processing oil.

【0008】ところで、この水溶性加工油は、その原液
を通常10〜100倍に希釈したもので、希釈濃度は加
工の目的、工作物の種類、油剤の種類等によって異なる
が、加工性、防錆性、冷却効果等の諸条件を満足させ、
かつ経済性を考慮してその油分濃度の適正値が設定され
る。
By the way, this water-soluble processing oil is usually prepared by diluting the stock solution 10 to 100 times, and although the dilution concentration varies depending on the purpose of processing, the type of workpiece, the type of oil agent, etc. Satisfies various conditions such as rust resistance and cooling effect,
In addition, an appropriate value for the oil content is set in consideration of economy.

【0009】通常、水溶性加工油は、その種類を問わ
ず、一度加工に供したものを繰り返し循環使用するので
あるが、この循環使用過程において、水分が蒸散し油分
が濃化する傾向にあり、一方原油材成分は飛散したり、
被加工材に付着し持ち出されつつその量が減少するもの
である。
Normally, regardless of the type of water-soluble processing oil, once processed, it is used once and repeatedly circulated. In the process of cyclical use, water tends to evaporate and the oil content tends to thicken. On the other hand, the crude oil component is scattered,
The amount is reduced while adhering to the work material and being taken out.

【0010】したがって、適正濃度に調合した水溶性加
工油を、随時補充する必要がある。
Therefore, it is necessary to replenish the water-soluble processing oil prepared at an appropriate concentration as needed.

【0011】尚、水溶性加工油を補充する場合に、原液
を加工性、冷却効果等の諸条件を満足するような適正濃
度になるように希釈することが重要である。
When replenishing the water-soluble processing oil, it is important to dilute the stock solution to an appropriate concentration so as to satisfy various conditions such as processability and cooling effect.

【0012】ところで、前記加工油の調合は、その都
度、濃度計で計測しつつ、その計測値をもとに、バルブ
調整作業を介して原液及び水を計量し、かつ撹拌、混合
することによって行っていた。
By the way, the blending of the processing oil is carried out by measuring the concentration of the processing oil each time, and measuring the undiluted solution and water through the valve adjusting work based on the measured value and stirring and mixing. I was going.

【0013】また液体計量混合方式として、特開昭63
―143930号の液体の混合比率の設定調整とその吐
出又は噴出方式及びその装置、特開昭63―27853
8号の液体計量混合装置等が散見される。
A liquid metering and mixing system is disclosed in Japanese Patent Laid-Open No. 63-63
-143930 Liquid-mixing ratio setting adjustment and its ejection or ejection method and its device, JP-A-63-27853
Liquid measuring and mixing equipment such as No. 8 can be seen here and there.

【0014】[0014]

【発明が解決しようとする課題】調合加工油を生成する
に際して、前述の如く、加工油の調合を、濃度計で計測
しつつ、その計測値をもとに、バルブ調整作業を介し
て、原液及び水を計量し、その後、この原液及び水を撹
拌、混合する作業を、その都度行うことは、大変に面倒
なものであり、効率が悪く、また当然、加工油の濃度の
ばらつきを生じ易い。
As described above, when a mixed processing oil is produced, the mixing ratio of the processing oil is measured with a densitometer, and based on the measured value, the stock solution is adjusted through a valve adjusting operation. It is very troublesome and inefficient to measure the water and the water, and then mix and mix the undiluted solution and the water each time, and naturally, the concentration of the processing oil tends to vary. .

【0015】また先行技術文献は、システムが複雑であ
ること、液体の混合であり、本発明の如く、加工油の希
釈調整とは、その内容を異にするものであります。
Further, the prior art documents are that the system is complicated and that liquids are mixed, and the contents are different from the dilution adjustment of the processing oil as in the present invention.

【0016】そこで、本発明は、自動又は手動操作によ
って水溶性加工油を、適正な濃度に希釈し、精緻に調合
された調合加工油を、加工機貯油槽に供給することので
きる調合加工油の自動生成と、この調合加工油の補給装
置を得ることにある。
Therefore, according to the present invention, a water-soluble processing oil is diluted to an appropriate concentration by an automatic or manual operation, and a prepared processing oil precisely prepared is supplied to a processing machine oil storage tank. The automatic generation of and the replenishment device for this mixed processing oil.

【0017】[0017]

【課題を解決するための手段】本発明に係る加工油の自
動調合、補給装置を介して、極めて精緻な調合加工油を
生成するために、下記のような構成を採用した。
In order to generate an extremely precise blended working oil via the automatic blending and replenishing device for working oil according to the present invention, the following constitution is adopted.

【0018】即ち、本発明の加工油の自動調合、補給装
置は、加工油の原液を貯蔵する原液槽と、この原液槽と
配管を介して連通され、かつこの配管を介して供給され
た原液槽の原液を、レベル、体積、重量等検出手段を用
いて、一定量計量する計量槽と、この計量槽から配管を
介して供給された計量原液に対応する水が供給され、か
つ前記計量原液及び水を撹拌混合して、一定比率に希釈
して調合加工油を生成する調合槽と、前記原液槽に加工
油原液を供給する原液補給ポンプと、前記調合槽に水を
供給する手段と、前記調合槽内の調合加工油を、配管を
介して加工機貯油槽に補給する加工油補給ポンプと、で
構成してなり、前記加工油貯油槽からの指令により、自
動的に調合加工油を、当該加工機貯油槽に補給すること
を特徴とする。
That is, the automatic blending and replenishing device for processed oil of the present invention is connected to a stock solution tank for storing a stock solution of the processed oil via a pipe, and the stock solution supplied via this pipe. A metering tank for measuring a fixed amount of the stock solution in the tank using a means for detecting the level, volume, weight, etc., and water corresponding to the metering stock solution supplied from this measuring tank through a pipe, A mixing tank for stirring and mixing water and diluting it to a fixed ratio to produce a mixed processing oil; a stock solution replenishing pump for supplying a processing oil stock solution to the stock solution tank; and a means for supplying water to the preparation tank. The processing oil replenishing pump that replenishes the processing oil in the mixing tank to the processing machine oil storage tank via a pipe, and the processing oil is automatically supplied in response to a command from the processing oil storage tank. It is characterized by replenishing the oil storage tank of the processing machine.

【0019】また本発明に係る加工油の自動調合、補給
装置の構造の簡素化、及び調合のスピード化を図るため
に、下記の構成を採用した。
Further, in order to automatically blend the processing oil according to the present invention, simplify the structure of the replenishing device, and speed up the blending, the following constitution is adopted.

【0020】即ち、本発明の加工油の自動調合、補給装
置は、加工油の原液を貯蔵する原液槽と、この原液槽と
配管を介して連通され、かつこの配管を介して供給され
た原液槽の原液を、レベル、体積、重量等検出手段を用
いて、一定量計量した後、この計量原液に対応する水が
供給され、かつ前記計量原液及び水を撹拌混合して、一
定比率に希釈して調合加工油を生成する調合槽と、前記
原液槽に加工油原液を供給する原液補給ポンプと、前記
調合槽に前記水を供給する手段と、前記調合槽内の調合
加工油を、配管を介して加工機貯油槽に補給する加工油
補給ポンプと、で構成してなり、前記加工油貯油槽から
の指令により、自動的に調合加工油を、当該加工機貯油
槽に補給することを特徴とする。
That is, the automatic blending and replenishing device for processing oil according to the present invention is connected to a stock solution tank for storing the stock solution of the processing oil via a pipe, and the stock solution supplied via this pipe. After measuring a fixed amount of the stock solution in the tank using the level, volume, weight, etc. detection means, water corresponding to the measured stock solution is supplied, and the measured stock solution and water are stirred and mixed to dilute to a fixed ratio. A mixing tank for producing mixed processed oil, a stock solution replenishing pump for supplying a concentrated processing oil solution to the stock solution tank, a means for supplying the water to the mixing tank, and a mixing and processing oil in the mixing tank. A processing oil replenishment pump for replenishing the processing machine oil storage tank via the processing machine oil storage tank, and automatically supplying the prepared processing oil to the processing machine oil storage tank in response to a command from the processing oil storage tank. Characterize.

【0021】[0021]

【作用】次に、本発明の作用を説明する。Next, the operation of the present invention will be described.

【0022】各個運転の場合には、原液ポンプスイッチ
を押すことにより、原液がポンプにより原液槽に供給さ
れ、満杯になるとポンプが自動的に停止する。
In the case of individual operation, by pressing the stock solution pump switch, the stock solution is supplied to the stock solution tank by the pump, and when the stock solution is full, the pump is automatically stopped.

【0023】そして、原液バルブスイッチを押すことに
よって、原液槽からの原液が、配管及びバルブを介して
計量槽に供給され、所定レベルまで供給されるとレベ
ル、体積、重量検出手段等(以下、レベル検出手段とす
る。)の検出手段の検出によって原液の供給が停止され
る。
Then, by pressing the stock solution valve switch, the stock solution from the stock solution tank is supplied to the measuring tank through the pipe and the valve, and when the stock solution is supplied to a predetermined level, level, volume, weight detection means, etc. The supply of the stock solution is stopped by the detection of the level detection means).

【0024】以上の操作を介して、一定量の原液が計量
槽に入り、計量バルブスイッチを押すことにより計量槽
内の一定量の計量原液が、配管を介して調合槽内に入
る。
Through the above operation, a fixed amount of the stock solution enters the metering tank, and by pressing the metering valve switch, a fixed amount of the stock solution in the metering tank enters the mixing tank through the pipe.

【0025】一方、工水バルブスイッチを押すことによ
り、調合槽内に満杯になるまで水(工水)が供給され
る。
On the other hand, by pressing the industrial water valve switch, water (industrial water) is supplied until the mixing tank is full.

【0026】この供給された計量原液と水とを、撹拌機
によって撹拌、混合することによって、ここに所定の濃
度に希釈された加工油(以下、単に調合加工油とす
る。)が調合される。
By stirring and mixing the supplied undiluted measurement solution and water with a stirrer, a processing oil diluted to a predetermined concentration (hereinafter, simply referred to as a compounding processing oil) is prepared. .

【0027】この状態において、例えば、加工機貯蔵槽
からの指令に基づいて、補給指令信号が発せられた場合
は、補給ポンプスイッチを押すことにより、調合槽内の
調合加工油が、配管及び補給ポンプを介して加工機貯油
槽に補給され、所定レベルに達する迄、原則として自動
的に補給され、当該所定レベルに達した段階で、前記調
合加工油の供給が停止される。
In this state, for example, when a replenishment command signal is issued based on a command from the processing machine storage tank, the replenishment pump switch is pressed to cause the mixed processing oil in the preparation tank to replenish the piping and replenishment. As a general rule, the oil is supplied to the oil storage tank of the processing machine via a pump and automatically supplied until a predetermined level is reached, and when the predetermined level is reached, the supply of the mixed processing oil is stopped.

【0028】自動運転の場合には、上記の作用は自動的
に行われ、加工機貯油槽からの補給指令により計量槽内
での原液の計量、調合槽内での計量原液と水の調合、加
工機貯油槽への調合加工油の補給が自動的に行われる。
In the case of automatic operation, the above operation is automatically performed, and the stock solution is measured in the measuring tank by the replenishment command from the oil storage tank of the processing machine, and the stock solution and water are mixed in the mixing tank. The processing oil is automatically supplied to the processing machine oil storage tank.

【0029】[0029]

【実施例】以下、本発明の実施例を図面を参照して説明
する。
Embodiments of the present invention will be described below with reference to the drawings.

【0030】図1〜図3は、本発明の一実施例を示し、
図1は加工油の自動調合、補給装置の正面図、図2は概
略構成を示す模式図、図3は動作を説明するためのフロ
ーシートである。
1 to 3 show an embodiment of the present invention,
FIG. 1 is a front view of an automatic mixing and replenishing device for processing oil, FIG. 2 is a schematic diagram showing a schematic configuration, and FIG. 3 is a flow sheet for explaining the operation.

【0031】図において、1は加工油の原液を収容する
原液槽、2は前記原液槽1からの原液を所定レベルまで
計量して供給する計量槽、3は前記計量槽2からの一定
量の計量原液と、この計量原液に対応する水が供給さ
れ、この計量原液及び水とを撹拌かつ混合して、規定濃
度に希釈した加工油を調合し、ここで生成された調合加
工油を加工機貯油槽に供給する調合槽、4は前記原液槽
1に原液を補給する原液ポンプ、5は加工機貯油槽に加
工油を補給する補給ポンプ、6は前記調合槽3内の加工
油を撹拌、混合する撹拌機、6aはその翼である。
In the figure, 1 is a stock solution tank for containing a stock solution of processing oil, 2 is a metering tank for measuring and supplying the stock solution from the stock solution tank 1 to a predetermined level, and 3 is a fixed amount from the meter tank 2. A metering stock solution and water corresponding to this metering stock solution are supplied, the metering stock solution and water are stirred and mixed to prepare a processing oil diluted to a specified concentration, and the prepared processing oil produced here is processed by a processing machine. Mixing tank for supplying to the oil storage tank, 4 is a stock solution pump for supplying the stock solution to the stock solution tank 1, 5 is a supply pump for supplying the processing machine oil tank with the processing oil, 6 is agitating the processing oil in the preparation tank 3, The agitator 6a for mixing is its blade.

【0032】そして、前記原液槽1、計量槽2、調合槽
3、原液ポンプ4等は、図示の如く、ケーシングA内に
設けられている(配置及び寸法は、限定されず。)。
The stock solution tank 1, the metering tank 2, the mixing tank 3, the stock solution pump 4 and the like are provided in a casing A as shown in the drawing (the arrangement and dimensions are not limited).

【0033】図中7〜12は、それぞれ配管を示す。Reference numerals 7 to 12 in the figure respectively denote pipes.

【0034】原液槽1にはその側壁に近接スイッチ等の
スイッチ(以下、スイッチとする。)PLS0、PLS
1及びPLS2が設けられ、それぞれ液面レベルの上限
値、中位置及び下限値を検知する。
A switch such as a proximity switch (hereinafter referred to as a switch) PLS0, PLS is provided on the side wall of the stock solution tank 1.
1 and PLS2 are provided to detect the upper limit value, middle position and lower limit value of the liquid level, respectively.

【0035】計量槽2には、その側壁にスイッチPLS
3が及びPLS4が設けられ、それぞれ液面レベルの上
限値及び下限値を検知する。
The measuring tank 2 has a switch PLS on its side wall.
3 and PLS 4 are provided to detect the upper limit value and the lower limit value of the liquid level, respectively.

【0036】また調合槽3には、その側壁にスイッチP
LS7及びPLS8が設けられ、それぞれ液面レベルの
上限値及び下限値を検知する。
Further, the mixing tank 3 has a switch P on its side wall.
LS7 and PLS8 are provided to detect the upper limit value and the lower limit value of the liquid level, respectively.

【0037】前記原液槽1と計量槽2の間に設けた配管
8には、電磁弁SOL1及びボール弁V1が設けられ、
原液の供給を制御する。
A solenoid valve SOL1 and a ball valve V1 are provided in a pipe 8 provided between the stock solution tank 1 and the measuring tank 2.
Control the supply of stock solution.

【0038】他に、原液槽1の下部に設けたドレン用の
配管(番号付さず)には、ボール弁V2が設けられる。
In addition, a ball valve V2 is provided in the drain pipe (not numbered) provided in the lower portion of the stock solution tank 1.

【0039】尚計量槽2と調合槽3の間に設けた配管9
には、ボール弁V3及びロータリー弁SOL2が設けら
れ、原液の供給を制御する。
A pipe 9 provided between the measuring tank 2 and the mixing tank 3
Is provided with a ball valve V3 and a rotary valve SOL2 to control the supply of the stock solution.

【0040】他に計量槽2の下部に設けたドレン用の配
管(番号付さず)には、ボール弁V4が設けられる。
Besides, a ball valve V4 is provided in the drain pipe (not numbered) provided in the lower portion of the measuring tank 2.

【0041】尚前記配管7に設けたゲートV6は、原液
ポンプ(P1)4による原液の原液槽1への供給を制御
する。
The gate V6 provided in the pipe 7 controls the supply of the stock solution to the stock solution tank 1 by the stock solution pump (P1) 4.

【0042】また配管10に設けたゲート弁V9及び電
磁弁SOL8は、調合槽3への水の供給を制御する。一
方調合槽3で生成された調合加工油は、配管12に設け
たロータリー弁SOL9は、補給ポンプ(P2)5を介
して、複数の加工機貯油槽13に自動又は手動制御によ
り補給される。
A gate valve V9 and a solenoid valve SOL8 provided in the pipe 10 control the supply of water to the mixing tank 3. On the other hand, the mixed processing oil generated in the mixing tank 3 is replenished to the plurality of processing machine oil storage tanks 13 automatically or manually by the rotary valve SOL9 provided in the pipe 12 via the replenishment pump (P2) 5.

【0043】また調合槽3の下部に設けたドレン用の配
管(番号付さず)には、ボール弁V5が設けられる。
A ball valve V5 is provided in the drain pipe (not numbered) provided in the lower portion of the mixing tank 3.

【0044】複数の加工機貯油槽13には、スイッチF
L4〜FL8、弁V10〜V14、電磁弁SOL3〜S
OL7が、それぞれ設けられている。
A switch F is provided in the plurality of processing machine oil storage tanks 13.
L4 to FL8, valves V10 to V14, solenoid valves SOL3 to S
OL7 is provided respectively.

【0045】次にこの実施例による作用を説明する。Next, the operation of this embodiment will be described.

【0046】運転に先立って、図示しない原液ポンプス
イッチを押すことにより、原液ポンプ(P1)4が作動
する。
Prior to operation, the stock solution pump (P1) 4 is activated by pressing a stock solution pump switch (not shown).

【0047】この原液ポンプ(P1)4を介して、前記
原液は、配管7及びゲート弁V6を通って原液槽1に補
給される。
The stock solution is supplied to the stock solution tank 1 through the stock solution pump (P1) 4 through the pipe 7 and the gate valve V6.

【0048】そして、原液槽1に供給された原液の液面
が、上限を示すスイッチPLS0(スイッチPLS0の
位置は、限定されず。)のレベルまで達すると、自動的
に原液の補給が停止される。
When the liquid level of the stock solution supplied to the stock solution tank 1 reaches the level of the switch PLS0 (the position of the switch PLS0 is not limited) indicating the upper limit, the stock solution replenishment is automatically stopped. It

【0049】また運転中に前記原液の液面が、スイッチ
PLS1(スイッチPLS1の位置は、限定されず。)
のレベルまで減少した場合は、同様に図示しないスイッ
チを押すことにより、前述と同様に原液が、補給され
る。
During operation, the liquid level of the stock solution is switch PLS1 (the position of switch PLS1 is not limited).
When the level has decreased to the level of, the stock solution is replenished in the same manner as described above by pressing a switch (not shown).

【0050】そして、原液槽1から計量槽2に原液を供
給する場合は、図示しない原液供給スイッチを押すこと
により、電磁弁SOL1が開き、原液槽1内の原液が、
配管8を介して、計量槽2に供給され、原液の液面が上
限を示すスイッチPLS3(スイッチPLS3の位置
は、限定されず。)のレベルまで達すると、自動的に電
磁弁SOL1が閉じて、原液の供給が停止され、計量槽
2内に所定量の計量原液が貯蔵される。
When the stock solution is supplied from the stock solution tank 1 to the measuring tank 2, a solenoid valve SOL1 is opened by pressing a stock solution supply switch (not shown), and the stock solution in the stock solution tank 1 is
When the liquid level of the stock solution supplied to the measuring tank 2 through the pipe 8 reaches the level of the switch PLS3 (the position of the switch PLS3 is not limited) indicating the upper limit, the solenoid valve SOL1 is automatically closed. The supply of the stock solution is stopped, and a predetermined amount of the stock solution is stored in the measuring tank 2.

【0051】尚諸条件に応じた濃度の希釈を可能にする
ために、前記スイッチPLS3の位置は可変とすること
は、前述の通りであります(各スイッチ類も同様であ
る。)。
As described above, the position of the switch PLS3 is variable to enable dilution of the concentration according to various conditions (the same applies to each switch).

【0052】前記のように計量槽2内に計量原液が供給
され、つづいて(時間的限定なし、)図示しない計量バ
ルブスイッチを押すことにより、ロータリー弁SOL2
が開き、計量槽2内の計量原液が、配管9を介して調合
槽3に供給され、かつ計量槽2の原液の液面が下がり、
下限を示すスイッチPLS4(スイッチPLS4の位置
は、限定されず。)のレベルまで減少すると、自動的に
ロータリー弁SOL2が閉じ、調合槽3への計量原液の
供給が停止される。
As described above, the metering stock solution is supplied into the metering tank 2, and then (not limited in time) by pressing a metering valve switch (not shown), the rotary valve SOL2
Opens, the undiluted solution in the measuring tank 2 is supplied to the mixing tank 3 through the pipe 9, and the liquid level of the undiluted solution in the measuring tank 2 drops.
When the level of the switch PLS4 indicating the lower limit (the position of the switch PLS4 is not limited) is reduced, the rotary valve SOL2 is automatically closed and the supply of the stock solution for metering to the mixing tank 3 is stopped.

【0053】そこで、つづいて図示しない、工水バルブ
スイッチを押すことにより、電磁弁SOL8が開き、配
管10を介して水が、調合槽3に供給され、液面の上限
を示すスイッチPLS7(スイッチPLS7の位置は、
限定されず。)のレベルまで達すると、自動的に電磁弁
SOL8が閉じて、水の供給が停止される。
Then, by subsequently pressing an industrial water valve switch (not shown), the solenoid valve SOL8 is opened, water is supplied to the mixing tank 3 through the pipe 10, and the switch PLS7 (switch The position of PLS7 is
Not limited. ), The solenoid valve SOL8 is automatically closed and the water supply is stopped.

【0054】このようにして、調合槽3に充填(供給)
された計量原液及び水は、撹拌機6の翼6aを介して撹
拌、混合されて、希釈化された調合加工油が得られる。
In this way, the mixing tank 3 is filled (supplied).
The measured undiluted solution and water are agitated and mixed through the blade 6a of the agitator 6 to obtain a diluted compounded processing oil.

【0055】この状態、複数の加工機貯油槽13のうち
の一つにおいて、加工油が減少してスイッチFL4〜F
L8のうちの一つが、低レベルLを示した場合には、補
給指令信号が発せられる。
In this state, in one of the plurality of processing machine oil storage tanks 13, the processing oil is reduced and the switches FL4 to FL
If one of L8 indicates a low level L, a replenishment command signal is issued.

【0056】この補給指令信号が発せられると、同時
に、補給指令ランプが点灯させられ、図示しない補給ポ
ンプスイッチを押すことにより、ロータリー弁SOL9
が開き、配管11、配管12及び補給ポンプ(P2)5
を介して、調合槽3内の調合加工油が、前記一つの加工
機貯油槽13にのみ補給され、所定の高レベルHに達し
たときに補給は完了する。
When this replenishment command signal is issued, at the same time, the replenishment command lamp is turned on and a replenishment pump switch (not shown) is pressed to turn the rotary valve SOL9.
Opens, and piping 11, piping 12 and replenishment pump (P2) 5
Via the above, the mixed processing oil in the mixing tank 3 is supplied only to the one processing machine oil storage tank 13, and the supply is completed when a predetermined high level H is reached.

【0057】自動運転の場合には、個別のスイッチ操作
を要することなく、原液が原液槽1から、配管8及び電
磁弁SOL1並びにボール弁V1を通って計量槽2に供
給され、計量槽2内で所定レベルに計量された計量原液
が、配管9及びボール弁V3並びにロータリー弁SOL
2を通って調合槽3に供給される。
In the case of the automatic operation, the stock solution is supplied from the stock solution tank 1 to the measuring tank 2 through the pipe 8, the solenoid valve SOL1 and the ball valve V1 without the need for individual switch operation. The undiluted solution measured to a predetermined level in the pipe 9 and the ball valve V3 and the rotary valve SOL.
It is supplied to the mixing tank 3 through 2.

【0058】一方、水は配管10及びゲート弁V9並び
に電磁弁SOL8を通って調合槽3のスイッチPLS7
のレベルまで供給され、撹拌機6の翼6aで撹拌、混合
することにより、希釈化された調合加工油が得られる。
On the other hand, the water passes through the pipe 10, the gate valve V9 and the solenoid valve SOL8, and the switch PLS7 of the mixing tank 3 is supplied.
Is supplied to the level of, and is mixed and stirred by the blade 6a of the stirrer 6, to obtain a diluted compounded processing oil.

【0059】この待機状態で(限定されず)、複数の加
工機貯油槽13のうちの一つにおいて、加工油が減少し
てスイッチFL4〜FL8のうちの一つが低レベルLに
なると、低レベルLの信号が発せられる。
In this standby state (not limited), when one of the plurality of processing machine oil storage tanks 13 decreases in processing oil and one of the switches FL4 to FL8 becomes a low level L, a low level. The L signal is emitted.

【0060】この低レベルLの補給指令信号が発せられ
ると、補給指令ランプが点灯され、前記調合槽3内の調
合加工油は、自動的に開く、ロータリー弁SOL9、並
びに配管11、配管12及び補給ポンプ(P2)5を介
して、当該加工機貯油槽13にのみ補給され、所定の高
レベルHに達したときに補給は完了する。
When this low level L replenishment command signal is issued, the replenishment command lamp is turned on, and the mixed processing oil in the mixing tank 3 is automatically opened. The rotary valve SOL9, the pipe 11, the pipe 12 and It is replenished only to the processing machine oil storage tank 13 via the replenishment pump (P2) 5, and the replenishment is completed when a predetermined high level H is reached.

【0061】図4は加工油自動補給装置の他の実施例の
概略構成を示す。
FIG. 4 shows a schematic construction of another embodiment of the automatic processing oil supply device.

【0062】この実施例は第1実施例における計量槽2
の使用を省略し、その機能を調合槽3に兼用させるもの
である。
This embodiment is the measuring tank 2 of the first embodiment.
Is omitted, and the function is shared by the mixing tank 3.

【0063】第2実施例において原液を原液槽1に補給
する作用は、第1実施例におけるものと同様である。
The operation of replenishing the stock solution to the stock solution tank 1 in the second embodiment is similar to that in the first embodiment.

【0064】そして、原液槽1から調合槽3に、所定量
の原液を供給する場合は、図示しない原液供給スイッチ
を押すことにより、電磁弁SOL1が開き、原液槽1内
の原液が、配管8を介して、所定量調合槽3に供給さ
れ、調合槽3の原液の液面が、原液供給限のレベルを示
すスイッチPLS4(スイッチPLS4の位置は、限定
されず。)のレベルまで達すると、自動的に電磁弁SO
L1が閉じて、原液の供給が停止され、ここで原液の計
量が完了する。
When a predetermined amount of the stock solution is supplied from the stock solution tank 1 to the mixing tank 3, the solenoid valve SOL1 is opened by pressing a stock solution supply switch (not shown), and the stock solution in the stock solution tank 1 is connected to the pipe 8 When a predetermined amount is supplied to the mixing tank 3 via the, and the liquid level of the stock solution in the mixing tank 3 reaches the level of the switch PLS4 (the position of the switch PLS4 is not limited) indicating the level of the stock solution supply limit, Solenoid valve SO automatically
L1 is closed and the supply of the stock solution is stopped, whereupon the measurement of the stock solution is completed.

【0065】一方、工水バルブスイッチを押すことによ
り、電磁弁SOL8が開き、水が配管10を介して、調
合槽3に供給され水の水面が、水液供給限のレベルを示
すスイッチPLS7(スイッチPLS7の位置は、限定
されず。)のレベルまで達すると、前記調合槽3に供給
された計量原液に対応する水が供給されたことになるの
で、自動的に電磁弁SOL8が閉じて、水の供給が停止
される。
On the other hand, when the engineering water valve switch is pressed, the solenoid valve SOL8 is opened, water is supplied to the mixing tank 3 through the pipe 10, and the water surface of the switch indicates the level of the water liquid supply limit PLS7 ( The position of the switch PLS7 is not limited.) When it reaches the level of (), it means that the water corresponding to the undiluted metering solution supplied to the mixing tank 3 has been supplied, so the solenoid valve SOL8 is automatically closed, Water supply is stopped.

【0066】そこで、続いて、調合槽3内に充填された
計量原液及び水は、ここに配備する撹拌機6の翼6aを
用いて撹拌、混合され、希釈化された調合加工油が得ら
れる。
Then, subsequently, the metered stock solution and water filled in the mixing tank 3 are stirred and mixed by using the blades 6a of the stirrer 6 provided here, and diluted processing oil is obtained. .

【0067】この待機状態で、複数の加工機貯油槽13
のうちの一つにおいて、加工油が減少し、スイッチFL
4〜FL8のうちの一つが、低レベルLを示す補給指令
信号を発したら、図示しない補給ポンプスイッチを押
す。
In this standby state, a plurality of processing machine oil storage tanks 13
In one of the
When one of 4-FL8 issues a replenishment command signal indicating a low level L, a replenishment pump switch (not shown) is pushed.

【0068】これにより、ロータリー弁SOL9が開
き、配管11、配管12及び補給ポンプ(P2)5を介
して、前記調合槽3内の調合加工油が、加工機貯油槽1
3に補給され、所定の高レベルHに達したときに補給は
完了する。
As a result, the rotary valve SOL9 is opened, and the mixed and processed oil in the mixing tank 3 passes through the pipe 11, the pipe 12 and the replenishment pump (P2) 5 and the processing machine oil storage tank 1
3 is supplied, and the supply is completed when a predetermined high level H is reached.

【0069】尚、原則として、調合槽3が空になると、
次の調合完了まで、調合加工油の補給を一時的に停止
し、調合加工油が生成されると、自動的に補給を再開す
る。
As a general rule, when the mixing tank 3 becomes empty,
Replenishment of the blended processed oil is temporarily stopped until the next blending is completed, and when the blended processed oil is generated, the replenishment is automatically restarted.

【0070】自動運転の場合には、個別のスイッチ操作
を要することなく、原液が原液槽1から、配管8及び電
磁弁SOL1、ボール弁V1並びにボール弁V5を通っ
て調合槽3に供給され、原液の液面が、原液供給限のレ
ベルを示すスイッチPLS4のレベルまで達した段階で
停止され、もって所定量の原液が供給される。
In the case of automatic operation, the stock solution is supplied from the stock solution tank 1 to the blending tank 3 through the pipe 8, the solenoid valve SOL1, the ball valve V1 and the ball valve V5 without requiring individual switch operation. The liquid level of the stock solution is stopped when the level of the switch PLS4 indicating the level of the stock solution supply limit is reached, and a predetermined amount of the stock solution is supplied.

【0071】一方、水は、配管10及びゲート弁V9並
びに電磁弁SOL8を通って調合槽3に供給され、水の
水面が、水液供給限のレベルを示すスイッチPLS7の
レベルまで達した段階で、計量原液に対応する水の供給
が済むとともに、水の供給が停止される。
On the other hand, water is supplied to the mixing tank 3 through the pipe 10, the gate valve V9 and the solenoid valve SOL8, and when the water surface reaches the level of the switch PLS7 indicating the level of the water liquid supply limit. The supply of water corresponding to the undiluted solution is completed and the supply of water is stopped.

【0072】前記調合槽3に充填された計量原液及び水
は、撹拌機6の翼6aで撹拌、混合され、希釈化された
調合加工油が生成される。
The stock solution for metering and water filled in the blending tank 3 are agitated and mixed by the blades 6a of the agitator 6 to produce a diluted blended processing oil.

【0073】この待機状態において、複数の加工機貯油
槽13の内の一つにおいて、加工油が減少してスイッチ
FL4〜FL8のうちの一つが低レベルLになると、補
給指令信号にしたがって、前記調合槽3内の調合加工油
は、自動的に開く、ロータリー弁SOL9、並びに配管
11、配管12及び補給ポンプ(P2)5を介して、当
該加工機貯油槽13にのみ補給され、所定の高レベルH
に達したときに補給は完了する。
In this standby state, when the working oil decreases in one of the plurality of processing machine oil storage tanks 13 and one of the switches FL4 to FL8 becomes the low level L, the above-mentioned operation is performed in accordance with the replenishment command signal. The blended processing oil in the blending tank 3 is automatically replenished and is replenished only to the processing machine oil storage tank 13 via the rotary valve SOL9, the pipe 11, the pipe 12 and the replenishment pump (P2) 5, and a predetermined level is reached. Level H
Replenishment is complete when is reached.

【0074】尚、原則として、調合槽3が空になると、
次の調合完了まで、調合加工油の補給を一時的に停止
し、調合加工油が生成されると、自動的に補給を再開す
る。
In principle, when the mixing tank 3 becomes empty,
Replenishment of the blended processed oil is temporarily stopped until the next blending is completed, and when the blended processed oil is generated, the replenishment is automatically restarted.

【0075】[0075]

【発明の効果】以上のように、本発明の加工油の自動調
合、補給装置により、調合加工油の濃度を、ほぼ均一化
することができること、また加工機貯油槽の調合加工油
を、必要最小限度となし得ること、また水溶性加工油の
腐敗を防止し得、もって貯留環境条件の向上、並びに維
持、管理の容易化をが図れること、等の効果を有する。
As described above, the automatic blending and replenishing device of the working oil of the present invention can make the concentration of the blended working oil substantially uniform, and requires the blended working oil in the processing machine oil storage tank. The effects are that it can be minimized, that the water-soluble processing oil can be prevented from spoiling, and that storage environment conditions can be improved, and maintenance and management can be facilitated.

【0076】また以上で説明した、前記調合濃度の均一
化及び水溶性加工油の貯留環境条件の向上を介して、工
作機械の加工精度の向上、及び品質の向上等が、大いに
期待できる。
Further, through the homogenization of the blending concentration and the improvement of the environmental conditions for storing the water-soluble processing oil described above, the processing accuracy of the machine tool and the quality can be greatly expected.

【0077】更に無人化による調合加工油の生成、及び
補給が可能になる等の効果が得られる。
Further, it is possible to obtain effects such as generation and replenishment of blended processed oil by unmanned operation.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の加工油自動補給装置の正面
図である。
FIG. 1 is a front view of an automatic processing oil supply device according to an embodiment of the present invention.

【図2】加工油自動補給装置の系統図である。FIG. 2 is a system diagram of an automatic processing oil supply device.

【図3】同装置の動作を示すフローシートである。FIG. 3 is a flow sheet showing the operation of the apparatus.

【図4】本発明の他の実施例の自動補給装置の系統図で
ある。
FIG. 4 is a system diagram of an automatic supply device according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 原液槽 2 計量槽 3 調合槽 4 原液ポンプ 5 補給ポンプ立上枠体 6 撹拌機 7 配管 8 配管 9 配管 10 配管 11 配管 12 配管 13 加工油貯油槽 A ケーシング PLS0 スイッチ PLS1 スイッチ PLS2 スイッチ PLS3 スイッチ PLS4 スイッチ PLS5 スイッチ PLS6 スイッチ PLS7 スイッチ PLS8 スイッチ 1 stock solution tank 2 measuring tank 3 blending tank 4 stock solution pump 5 replenishing pump rising frame 6 stirrer 7 piping 8 piping 9 piping 10 piping 11 piping 12 piping 13 processing oil storage tank A casing PLS0 switch PLS1 switch PLS3 switch PLS4 Switch PLS5 Switch PLS6 Switch PLS7 Switch PLS8 Switch

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 加工油の原液を貯蔵する原液槽と、 この原液槽と配管を介して連通され、かつこの配管を介
して供給された原液槽の原液を、レベル、体積、重量等
検出手段を用いて、一定量計量する計量槽と、 この計量槽と配管を介して連通され、かつこの配管を介
して供給された計量原液に対応する水が供給され、かつ
前記計量原液及び水を撹拌混合して、一定比率に希釈し
て調合加工油を生成する調合槽と、 前記原液槽に加工油原液を供給する原液補給ポンプと、 前記調合槽に水を供給する手段と、 前記調合槽内の調合加工油を、配管を介して加工機貯油
槽に補給する加工油補給ポンプと、 で構成してなる加工油の自動調合、補給装置。
1. An undiluted solution tank for storing undiluted solution of processing oil, and means for detecting the undiluted solution in the undiluted solution tank, which is communicated with this undiluted solution tank through a pipe and is supplied through this pipe, such as level, volume, and weight. A metering tank for metering a fixed amount of water is supplied with the metering tank, and water corresponding to the metering stock solution supplied through the piping is connected to the metering tank and the metering stock solution and water are stirred. A mixing tank for mixing and diluting to a fixed ratio to produce a mixed processing oil, a stock solution replenishing pump for supplying a stock solution of the processing oil to the stock solution tank, a means for supplying water to the mixing tank, and the inside of the mixing tank An automatic processing oil mixing and replenishing device consisting of a processing oil replenishment pump that replenishes the processing oil in the processing machine oil storage tank via a pipe.
【請求項2】 加工油の原液を貯蔵する原液槽と、 この原液槽と配管を介して連通され、かつこの配管を介
して供給された原液槽の原液を、レベル、体積、重量等
検出手段を用いて、一定量計量した後、この計量原液に
対応する水が供給され、かつ前記計量原液及び水を撹拌
混合して、一定比率に希釈して調合加工油を生成する調
合槽と、 前記原液槽に加工油原液を供給する原液補給ポンプと、 前記調合槽に前記水を供給する手段と、 前記調合槽内の調合加工油を、配管を介して加工機貯油
槽に補給する加工油補給ポンプと、 で構成してなる加工油の自動調合、補給装置。
2. An undiluted solution tank for storing undiluted solution of processing oil, and means for detecting the undiluted solution in the undiluted solution tank, which is communicated with this undiluted solution tank through a pipe and is supplied through this pipe, such as a level, a volume and a weight. After measuring a fixed amount using, the corresponding water is supplied to the measuring stock solution, and the mixing stock solution and water are stirred and mixed, and a mixing tank for producing a mixed processing oil by diluting to a fixed ratio, A stock solution replenishment pump for supplying a stock solution stock solution to the stock solution tank, a means for supplying the water to the preparation tank, and a processing oil supply for supplying the prepared processing oil in the preparation tank to a processing machine oil storage tank through a pipe. Automatic blending and replenishing device for processing oil consisting of a pump.
【請求項3】 請求項1、及び請求項2の調合槽に撹拌
機を設けた構成の請求項又は請求項2の加工油の自動調
合、補給装置。
3. The automatic mixing and replenishing device for processing oil according to claim 2 or claim 3, wherein the mixing tank according to claim 1 and claim 2 is provided with an agitator.
JP159292A 1992-01-06 1992-01-06 Processing oil automatic blender Expired - Lifetime JPH07121496B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP159292A JPH07121496B2 (en) 1992-01-06 1992-01-06 Processing oil automatic blender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP159292A JPH07121496B2 (en) 1992-01-06 1992-01-06 Processing oil automatic blender

Publications (2)

Publication Number Publication Date
JPH0647649A true JPH0647649A (en) 1994-02-22
JPH07121496B2 JPH07121496B2 (en) 1995-12-25

Family

ID=11505786

Family Applications (1)

Application Number Title Priority Date Filing Date
JP159292A Expired - Lifetime JPH07121496B2 (en) 1992-01-06 1992-01-06 Processing oil automatic blender

Country Status (1)

Country Link
JP (1) JPH07121496B2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08243920A (en) * 1994-11-21 1996-09-24 Shin Etsu Handotai Co Ltd Slurry viscosity adjusting device
JPH1029132A (en) * 1996-07-11 1998-02-03 Kayaba Ind Co Ltd System for supplying water soluble cutting fluid
JPH10175166A (en) * 1996-12-13 1998-06-30 Ebara Corp Abrasive liquid feeding device and abrasive liquid feeding method
JP2007090484A (en) * 2005-09-28 2007-04-12 Fuji Heavy Ind Ltd Machining system
JP2007203395A (en) * 2006-01-31 2007-08-16 Miya Seimitsu:Kk Coolant solution producing device and coolant solution supply system
JP2014136298A (en) * 2013-01-18 2014-07-28 Cem Co Ltd Cutting liquid supply device
JP2014176942A (en) * 2013-03-15 2014-09-25 Fanuc Ltd Cutting liquid control device for machine tool
JP2019181579A (en) * 2018-04-02 2019-10-24 株式会社小林産業 Coolant supply system
CN112497074A (en) * 2020-12-03 2021-03-16 汤文杰 Cutting fluid spraying flow control mechanism for precisely manufacturing aluminum wheel hub for automobile
CN116494018A (en) * 2023-06-26 2023-07-28 四川仨川航空科技股份有限公司 Automatic cutting fluid supplementing device and control method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08243920A (en) * 1994-11-21 1996-09-24 Shin Etsu Handotai Co Ltd Slurry viscosity adjusting device
JPH1029132A (en) * 1996-07-11 1998-02-03 Kayaba Ind Co Ltd System for supplying water soluble cutting fluid
JPH10175166A (en) * 1996-12-13 1998-06-30 Ebara Corp Abrasive liquid feeding device and abrasive liquid feeding method
JP2007090484A (en) * 2005-09-28 2007-04-12 Fuji Heavy Ind Ltd Machining system
JP2007203395A (en) * 2006-01-31 2007-08-16 Miya Seimitsu:Kk Coolant solution producing device and coolant solution supply system
JP2014136298A (en) * 2013-01-18 2014-07-28 Cem Co Ltd Cutting liquid supply device
JP2014176942A (en) * 2013-03-15 2014-09-25 Fanuc Ltd Cutting liquid control device for machine tool
US9399273B2 (en) 2013-03-15 2016-07-26 Fanuc Corporation Cutting fluid control device for machine tool
DE102014103326B4 (en) * 2013-03-15 2017-02-02 Fanuc Corporation Cutting fluid control device for machine tools
JP2019181579A (en) * 2018-04-02 2019-10-24 株式会社小林産業 Coolant supply system
CN112497074A (en) * 2020-12-03 2021-03-16 汤文杰 Cutting fluid spraying flow control mechanism for precisely manufacturing aluminum wheel hub for automobile
CN112497074B (en) * 2020-12-03 2021-12-17 潍坊奥润德新材料科技有限公司 Cutting fluid spraying flow control mechanism for precisely manufacturing aluminum wheel hub for automobile
CN116494018A (en) * 2023-06-26 2023-07-28 四川仨川航空科技股份有限公司 Automatic cutting fluid supplementing device and control method
CN116494018B (en) * 2023-06-26 2023-09-01 四川仨川航空科技股份有限公司 Automatic cutting fluid supplementing device and control method

Also Published As

Publication number Publication date
JPH07121496B2 (en) 1995-12-25

Similar Documents

Publication Publication Date Title
US5389546A (en) Method for determining and monitoring constituent concentration of an aqueous metalworking fluid
US4315421A (en) Method of controlling the concentration and stability of an emulsion
US4202193A (en) Apparatus for controlling the concentration and stability of an emulsion
JPH0647649A (en) Automatic mix and supply device for cutting oil
DE69409712T2 (en) Differential dosing scale with measurement of bulk density by level determination
EP3899529B1 (en) Method and device for monitoring a cooling and lubricating emulsion
US5780754A (en) Analysis method and analysis apparatus
KR20030046301A (en) Chemical solution feeding apparatus and method for preparing slurry
JPH0376173B2 (en)
DE2740712A1 (en) METHOD AND DEVICE FOR PRODUCING SILVER HALOGENIDE EMULSIONS
KR20030061312A (en) Method and apparatus for preparing slurry for cmp apparatus
CN108261976B (en) Control method and control system for mixing effect of intensive mixer
CN206812227U (en) The online adding set of plasterboard liquid water reducer
US3980435A (en) Method for controllng boric acid concentration in an aqueous stream
DE69327749T2 (en) Process for adjusting the concentration of a developer
CN1200176A (en) Determination of aqueous fluid surfactant concentration
JPH09290368A (en) Slurry supply device
CN205868160U (en) Automatic addition system of emulsion
CA1142626A (en) Method of and apparatus for controlling the concentration and stability of an emulsion
CN106442408A (en) Chemical-mechanical polishing liquid automatic preparation control system
CN106227146A (en) The control device of powder automatic blending and control method
CN220759043U (en) Standard solution preparation workstation for experiments
CN211612531U (en) Spinning emulsion modulating system
CN216677817U (en) Automatic sizing agent preparation device
CN214187895U (en) Water using system of diamond wire slicing device