JPH0643682B2 - Bridge floor slab removal method - Google Patents

Bridge floor slab removal method

Info

Publication number
JPH0643682B2
JPH0643682B2 JP1113274A JP11327489A JPH0643682B2 JP H0643682 B2 JPH0643682 B2 JP H0643682B2 JP 1113274 A JP1113274 A JP 1113274A JP 11327489 A JP11327489 A JP 11327489A JP H0643682 B2 JPH0643682 B2 JP H0643682B2
Authority
JP
Japan
Prior art keywords
floor slab
bridge girder
concrete
bridge
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1113274A
Other languages
Japanese (ja)
Other versions
JPH02292404A (en
Inventor
勝見 坂田
節夫 久保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHOOBONDO KENSETSU KK
Dymosha KK
Sho Bond Corp
Original Assignee
SHOOBONDO KENSETSU KK
Dymosha KK
Sho Bond Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHOOBONDO KENSETSU KK, Dymosha KK, Sho Bond Corp filed Critical SHOOBONDO KENSETSU KK
Priority to JP1113274A priority Critical patent/JPH0643682B2/en
Publication of JPH02292404A publication Critical patent/JPH02292404A/en
Publication of JPH0643682B2 publication Critical patent/JPH0643682B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/02Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing
    • B28D1/08Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with saw-blades of endless cutter-type, e.g. chain saws, i.e. saw chains, strap saws
    • B28D1/088Sawing in situ, e.g. stones from rocks, grooves in walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 〔発明の目的〕 (産業上の利用分野) 本発明は、老朽化等により改築の必要となった橋梁床版
を低公害、かつ、経済性を備えて撤去することのできる
橋梁床版の撤去工法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Purpose of the Invention] (Field of Industrial Use) The present invention is to remove a bridge floor slab that needs to be reconstructed due to deterioration and the like with low pollution and economical efficiency. Concerning the method of removing bridge deck slabs that can be used.

(従来の技術) 高架道路等における橋梁床版は、年月の経過により老朽
化したり、損傷したりし、改築の必要が生じ、改築の際
には、その橋梁床版を形成するコンクリート床版を撤去
する必要が生じる。
(Prior Art) Bridge slabs on elevated roads, etc. are deteriorated or damaged due to the passage of time and need to be reconstructed. At the time of renovation, concrete slabs that form the bridge slabs are required. Need to be removed.

通常行われている撤去の仕方は、第11図に示すように
コンクリート床版をコンクリートカッターを用いて橋桁
に沿ってその両側を上下方向に切断するとともに前か後
に長さ方向に適当な間隔をもって幅員方向も上下方向に
切断し、コンクリートブロックとし、第12図に示すよ
うに大型クレーン等を用いて切断したコンクリートブロ
ックを吊り込み撤去する。コンクリートブロック撤去後
は、第13図に示すように橋桁上の残コンクリートを
(a)人力ブレーカーや(b)大型油圧ブレーカーを用
いて破砕したり、(c)油圧圧砕機により圧砕する。そ
の後第14図に示すように床版定着アンカーをガス切断
器等により切断したり床版破砕屑をベルトコンベア等に
より回収する。
The usual method of removal is to cut the concrete slab vertically along the bridge girder using a concrete cutter, as shown in Fig. 11, and at appropriate intervals in the longitudinal direction either before or after. The width direction is also cut vertically to form a concrete block, and the cut concrete block is suspended and removed using a large crane or the like as shown in FIG. After removing the concrete block, as shown in FIG. 13, the residual concrete on the bridge girder is crushed using (a) a human breaker or (b) a large hydraulic breaker, or (c) crushed by a hydraulic crusher. Thereafter, as shown in FIG. 14, the floor slab fixing anchor is cut by a gas cutter or the like, and floor slabs are collected by a belt conveyor or the like.

(発明が解決しようとする課題) しかしながら、このような撤去工法は、種々の問題を生
じる。
(Problems to be Solved by the Invention) However, such a removal method causes various problems.

まず、コンクリート床版の橋梁幅員方向の切断は当然と
して橋桁方向の両側も上下方向に切断しなければなら
ず、切断そのものもかなりの時間を要する。そのうえ、
橋桁上の残コンクリートをブレーカーにより破砕したり
するため、騒音、振動、粉塵公害が著しく、市街地作業
に不適であるばかりでなく、橋桁の損傷をも招くことに
なる。しかも、コンクリート床版の撤去後も床版定着ア
ンカーの切断作業、コンクリート破砕屑の回収作業等2
次的な作業を余儀なくされる。
First, cutting the concrete slab in the width direction of the bridge must of course be done in the vertical direction on both sides in the bridge girder direction, and the cutting itself requires a considerable amount of time. Besides,
Since the residual concrete on the bridge girder is crushed by a breaker, noise, vibration, and dust pollution are significant, which is not suitable for urban work, but also causes damage to the bridge girder. Moreover, even after removing the concrete floor slab, the work of cutting the anchor for anchoring the floor slab, the work of collecting the crushed concrete, etc.
The next task is forced.

本発明は、このような点に鑑み、以下に述べるところに
より、低公害で経済性を備えた橋梁床版の撤去工法を提
供しようとするものである。
In view of such a point, the present invention intends to provide a method for removing a bridge floor slab with low pollution and economy as described below.

〔発明の構成〕[Structure of Invention]

(問題点を解決するための手段) 基本的には、本発明は、コンクリート床版と橋桁との接
触部のハンチ部分及び床版定着アンカーを水平方向に切
断することにより解決し、幅員方向を上下方向に切断し
てコンクリートブロックを作り、この橋桁より切り離さ
れたコンクリートブロックを除去しやすいようにするも
のであり、吊り込み等して撤去することにより、上記問
題点を解決するものであり、また、好ましくはコンクリ
ート床版と橋桁との接触部のハンチ部分を床版定着アン
カーとともに水平方向に切断する具体的方法の一つとし
ては、ソーイングワイヤーをコンクリート床版の橋桁接
触部切断線方向に沿わせるとともにソーイングワイヤー
をエンドレスに形成し、該ソーイングワイヤーを回転さ
せながら移動させることにより行うものであり、具体的
には、このエンドレスになっているソーイングワイヤー
をハンチ部分両側切断線方向に沿わせ、かつ、途中に設
けられた方向転換用滑車を用いて空間方向に方向転換せ
しめ、その端部を移動レールを介して移動する駆動装置
の回転体に回転可能に巻き、回転体の回転により回転さ
せ、移動レールを介して駆動装置を移動することにより
このソーイングワイヤーによってハンチ部分を床版定着
アンカーとともに水平方向に切断して、コンクリートブ
ロックとして、このコンクリートブロックを撤去しよう
とするものであり、また必要により切断後のコンクリー
ト床版又はブロックを橋桁に仮接続をしておき、車両を
通行させることのできるものである。
(Means for Solving Problems) Basically, the present invention solves the problem by horizontally cutting the haunch portion of the contact portion between the concrete floor slab and the bridge girder and the floor slab fixing anchor, and It makes a concrete block by cutting in the vertical direction and makes it easy to remove the concrete block separated from this bridge girder, and it is to solve the above problems by removing it by hanging etc. Further, preferably, as one of the concrete methods of horizontally cutting the haunch part of the contact portion between the concrete floor slab and the bridge girder together with the floor slab fixing anchor, the sawing wire is cut in the bridge girder contact portion cutting line direction of the concrete floor slab. Along with running along with forming a sewing wire endlessly and moving it while rotating the sewing wire Specifically, this endless sewing wire is made to follow the cutting line on both sides of the haunch part, and the direction is changed to the spatial direction by using a direction changing pulley provided in the middle, and the end thereof is changed. Part is rotatably wound around the rotating body of the driving device that moves through the moving rail, and is rotated by the rotation of the rotating body, and the driving device is moved through the moving rail, so that the haunch part is fixed to the floor plate by the sawing wire. It is intended to remove this concrete block as a concrete block by cutting it horizontally with the anchor, and if necessary, temporarily connect the cut concrete floor slab or block to the bridge girder and let the vehicle pass through. It is possible.

(作用) 上記構成において、コンクリート床版はコンクリート床
版と橋桁との接触部のハンチ部分において、円盤状ブレ
ード、ソーイングワイヤー、ウォータージェット等によ
り、床版定着アンカーとともに水平方向切断され、又は
水平方向の切断とともに、幅員方向に上下方向に切断さ
れるので容易に撤去しやすい。
(Operation) In the above configuration, the concrete floor slab is horizontally cut together with the floor slab fixing anchor by the disc blade, the sawing wire, the water jet, or the horizontal direction at the haunch portion of the contact portion between the concrete slab and the bridge girder. It is easy to remove because it is cut in the vertical direction along with the width.

(実施例) つぎに、本発明の実施例を図面に基いて説明する。(Example) Next, the Example of this invention is described based on drawing.

第1図乃至第3図は、ソーイングワイヤーを用いた切断
方法を示す概略説明図で、それぞれ側面、平面、第1図
のA−A断面を示す。
1 to 3 are schematic explanatory views showing a cutting method using a sawing wire, showing a side surface, a plane, and a cross section taken along the line AA of FIG. 1, respectively.

図面において、1はコンクリート床版、2は橋桁、3は
床版定着アンカー、4はソーイングワイヤー、5は方向
転換滑車、6は駆動装置、7は移動レール、8は挿通孔
である。
In the drawings, 1 is a concrete floor slab, 2 is a bridge girder, 3 is a floor slab anchoring anchor, 4 is a sawing wire, 5 is a direction changing pulley, 6 is a drive device, 7 is a moving rail, and 8 is an insertion hole.

コンクリート床版1は、橋桁2に載置されて床版定着ア
ンカー3によって定着されている。床版定着アンカー3
は、たとえば、第4図に示すように鋼板と鉄筋の組み合
せ(a)、スタットジベル(b)、鉄筋又は締鉄
(c)、角鋼と鉄筋(d)、鉄筋(e)のようなものが
あり、橋桁2のフランジ2aとコンクリート床版1のハ
ンチ部分1aとを強固に定着している。
The concrete floor slab 1 is placed on the bridge girder 2 and fixed by the floor slab fixing anchor 3. Floor slab anchor 3
For example, as shown in FIG. 4, a combination of a steel plate and a reinforcing bar (a), a stud dowel (b), a reinforcing bar or a tightening iron (c), a square steel and a reinforcing bar (d), a reinforcing bar (e), etc. Yes, the flange 2a of the bridge girder 2 and the haunch portion 1a of the concrete floor slab 1 are firmly fixed.

このようにしてなるコンクリート床版1にあって、橋桁
との接触部のハンチ部分1aを床版定着アンカー3とと
もに水平方向に切断し、またコンクリート床版1の幅員
方向を上下方向に切断しコンクリートブロックとし、コ
ンクリート床版1と橋桁2とを切り離す。水平方向の切
断と幅員方向の上下方向の切断とは前後してもよい。
In the concrete floor slab 1 thus formed, the haunch portion 1a at the contact portion with the bridge girder is horizontally cut together with the floor slab anchoring anchor 3, and the width direction of the concrete floor slab 1 is vertically cut. As a block, concrete floor slab 1 and bridge girder 2 are separated. The cutting in the horizontal direction and the cutting in the vertical direction in the width direction may be mixed.

水平方向の切断は、ソーイングワイヤー、円盤状ブレー
ド、ウォータージェット等を切断個所に当て、これらを
水平方向に移動して行う。
The cutting in the horizontal direction is performed by applying a sawing wire, a disk-shaped blade, a water jet, etc. to the cutting point and moving them in the horizontal direction.

一般に用いられているソーイングワイヤー4は第5図及
び第6図に示すように複数のダイヤモンドビーズ4aに
ワイヤー4bを通してエンドレスに形成されている。
A commonly used sewing wire 4 is endlessly formed by passing a wire 4b through a plurality of diamond beads 4a as shown in FIGS.

ソーイングワイヤー4はコンクリート床版1のハンチ部
分1aの橋桁2の直角方向に窄孔した挿通孔8に挿通し
て切断線方向に沿わせるとともに、ハンチ部分1aの両
側切断線方向に沿わせ、途中で空間方向に方向転換させ
る。ソーイングワイヤー4はハンチ部分1a端部、たと
えば伸縮継手位置では、挿通孔8を設けることなくその
端面に沿わせるとともに両側切断線方向に沿わせればよ
い。この実施例においては、切断線方向の両側に取り付
けられた方向転換滑車5を介して下方へ方向転換し、さ
らに下方の方向転換滑車5により水平方向に方向転換し
ている。この方向転換は、切断の進行に伴って、ソーイ
ングワイヤー4を切断方向に移動させるための移動空間
を保つことができる。下方には駆動装置6を移動させる
移動レール7が敷設され駆動装置6が位置している。方
向転換したソーイングワイヤー4は、下方に敷設した駆
動装置移動レール7を介して移動する駆動装置6の回転
体に回転体の回転により回転可能にエンドレス状にして
巻かれている。駆動装置6は回転体の回転により、ソー
イングワイヤー4を回転させ、ソーイングワイヤー4に
よりハンチ部分1aを切断し、切断の進行に伴い、移動
レールを介して駆動装置6が移動し、ソーイングワイヤ
ー4の張力を一定に保つようになっている。
The sewing wire 4 is inserted into the insertion hole 8 which is formed at a right angle to the bridge girder 2 of the haunch portion 1a of the concrete floor slab 1 so as to extend along the cutting line direction, and along the cutting line direction on both sides of the haunch portion 1a. Turn to the spatial direction with. At the end of the haunch part 1a, for example, at the expansion joint position, the sawing wire 4 may be along the end surface of the haunch portion 1a without providing the insertion hole 8 and along the both-side cutting line direction. In this embodiment, the direction is changed downward through the direction changing pulleys 5 attached to both sides in the cutting line direction, and further, the direction is changed horizontally by the lower direction changing pulleys 5. This direction change can maintain a moving space for moving the sawing wire 4 in the cutting direction as the cutting progresses. A moving rail 7 for moving the driving device 6 is laid below and the driving device 6 is located. The sawing wire 4 whose direction has been changed is wound endlessly around a rotating body of a drive device 6 that moves via a drive device moving rail 7 that is laid below so as to be rotatable by the rotation of the rotating body. The drive device 6 rotates the sawing wire 4 by the rotation of the rotating body, cuts the haunch portion 1a by the sawing wire 4, and the drive device 6 moves through the moving rail as the cutting progresses, and the sawing wire 4 moves. It is designed to keep the tension constant.

しかして、ソーイングワイヤー4をハンチ部分1aの切
断線方向に沿わせ、方向転換を行い、駆動装置6の回転
体にエンドレス状に巻いた状態で、駆動装置6の回転体
を駆動するとエンドレス状になったソーイングワイヤー
4は張力のある状態で回転し、挿通孔8の内面を切断す
る。そして、切断の進行に伴い、駆動装置6を移動レー
ル7に沿って移動するとソーイングワイヤー4は張力が
保たれ、さらに水平方向に切断を進行させ、コンクリー
ト床版1を床版定着アンカー3とともに橋桁2より切り
離す。
Then, the sewing wire 4 is moved along the cutting line direction of the haunch portion 1a, the direction is changed, and the rotating body of the drive device 6 is driven endlessly when the rotating body of the drive device 6 is endlessly wound. The sawing wire 4 thus rotated rotates under tension and cuts the inner surface of the insertion hole 8. When the driving device 6 is moved along the moving rail 7 as the cutting progresses, the tension of the sawing wire 4 is maintained and the cutting is further advanced in the horizontal direction, so that the concrete floor slab 1 together with the floor slab anchoring anchor 3 are bridge girders. Separate from 2.

しかるのち、適当な間隔で幅員方向に上下方向の切断を
行ってコンクリートブロックとする。なお、幅員方向に
上下方向の切断は水平方向の切断より先に行ってもよ
く、この場合切断部をソーイングワイヤーの挿通孔8と
してもよい。
After that, the concrete blocks are cut at appropriate intervals in the width direction in the vertical direction. The cutting in the vertical direction in the width direction may be performed before the cutting in the horizontal direction. In this case, the cutting portion may be the insertion hole 8 of the sawing wire.

つぎに、橋桁2との接触部のハンチ部分1aと定着アン
カーとの水平方向の切断を円盤状ブレードを用いて行う
一例を第7図に示す。
Next, FIG. 7 shows an example in which a disc blade is used to horizontally cut the haunch portion 1a at the contact portion with the bridge girder 2 and the fixing anchor.

円盤状ブレード14は、橋桁2の側面にアンカー17a
により取り付けられた駆動装置移動レール17に保持さ
れる保持部15に接続する駆動装置16に取り付けられ
ている。駆動装置16はモーターの駆動により円盤状ブ
レード14を回転させて、円盤状ブレード14により橋
桁2との接触部のハンチ部分1a及び定着アンカーを切
断せしめ、切断の進行に従って、駆動装置移動レール1
7に沿って保持部15を移動せしめて移動する。
The disk-shaped blade 14 has an anchor 17a on the side surface of the bridge girder 2.
It is attached to the drive device 16 connected to the holding portion 15 held by the drive device moving rail 17 attached by. The driving device 16 rotates the disk-shaped blade 14 by driving the motor, and cuts the haunch part 1a at the contact portion with the bridge girder 2 and the fixing anchor by the disk-shaped blade 14, and as the cutting progresses, the driving device moving rail 1
The holding part 15 is moved along 7 and moved.

水平方向の切断は、円盤状ブレード14をハンチ部分1
aに当て行う。水平方向切断後はソーイングワイヤーの
切断の場合と同様に適当な個所の幅員方向に上下方向の
切断を行ってコンクリートブロックを形成する。
For cutting in the horizontal direction, the disc-shaped blade 14 is used for the haunch portion 1.
Apply to a. After the horizontal cutting, as in the case of sawing wire cutting, vertical cutting is performed in the width direction at appropriate places to form concrete blocks.

ここで、切断されたコンクリート床版1を橋桁2に仮接
続しておくことにより、撤去前でも交通開放を行うこと
ができる。
By temporarily connecting the cut concrete slab 1 to the bridge girder 2, the traffic can be opened even before the removal.

仮接続の一例を第8図に示す。An example of temporary connection is shown in FIG.

橋桁2より切り離されたコンクリート床版又はブロック
の下面ハンチ部分両側にセットしたアンカーボルト21
をセットし、橋桁2とハンチ部分1aとを板ばね22で
連結し、ボルトを締め付け固定する。切断によるすき間
は硬質物によるクサビ23等を挿入する。撤去の際は仮
接続を解除する。
Anchor bolts 21 set on both sides of the bottom haunch part of the concrete floor slab or block separated from the bridge girder 2.
Is set, the bridge girder 2 and the haunch portion 1a are connected by a leaf spring 22, and the bolt is tightened and fixed. A wedge 23 or the like made of a hard material is inserted into the gap formed by cutting. When removing it, the temporary connection is released.

切断されたコンクリートブロックは公知の方法、たとえ
ば、第9図及び第10図に示すように大型クレーン等を
使用して吊り込み撤去される。
The cut concrete block is suspended and removed by a known method, for example, using a large crane as shown in FIGS. 9 and 10.

〔発明の効果〕〔The invention's effect〕

本発明は、上述のようにしてなるので、つぎの効果を有
する。
Since the present invention is configured as described above, it has the following effects.

請求項において、コンクリート床版と橋桁との接
触部のハンチ部分及び床版定着アンカーを水平方向に切
断するので従来のようにコンクリート床版を橋桁に沿う
両側の上下方向を切断することなく、コンクリート床版
と橋桁とが切り離され、又、請求項において、幅員方
向の上下方向を適宜の間隔で切断するだけで、橋桁より
切り離されコンクリートブロックが形成される。
In the claim, since the haunch portion of the contact portion between the concrete floor slab and the bridge girder and the floor slab fixing anchor are horizontally cut, the concrete floor slab is not vertically cut on both sides along the bridge girder as in the conventional case, The floor slab and the bridge girder are separated from each other, and in the claims, a concrete block is separated from the bridge girder by cutting the width direction in the vertical direction at appropriate intervals.

したがって、コンクリート床版の切断個所が少くて済
み、そのうえ、ハンチ部分を床版アンカーとともに切断
し、コンクリート床版を橋桁より切り離すので橋桁上の
残コンクリートの破砕作業、床版定着アンカーのガス切
断作業、コンクリート屑の回収作業を省略できることに
より、全体の作業時間を短縮することができる、橋桁
上の残コンクリートの破砕作業を要せず、ブレーカー、
油圧圧砕機等を使用しないので、騒音、振動、粉塵の発
生がきわめて少く、また、橋桁への損傷の影響が少い、
床版定着アンカーのガス溶断を伴わないので熱影響に
よる橋桁の逆そり等悪影響が避けられる、コンクリー
ト床版と橋桁との接触部のハンチ部分の切断は水平方向
に対するものであるので交通を止めることなく行うこと
ができる、全体として時間短縮ができるので、一般交
通への影響を少くすることができる等の利点を有する。
Therefore, the number of cutting points on the concrete floor slab is small, and the haunch part is cut together with the floor slab anchor to separate the concrete floor slab from the bridge girder. Since the work of collecting concrete scraps can be omitted, the overall work time can be shortened, the work of crushing the residual concrete on the bridge girder is not required, and the breaker,
Since no hydraulic crusher is used, noise, vibration and dust are extremely small, and the damage to the bridge girder is minimal.
Because the anchorage of the slab anchorage is not melted by gas, adverse effects such as reverse warping of the bridge girder due to heat can be avoided.The cutting of the haunch part at the contact part between the concrete slab and bridge girder is for the horizontal direction, so stop the traffic. Since it can be carried out without any time and the time can be shortened as a whole, it has advantages such as being able to reduce the influence on general traffic.

請求項において、切断具としてソーイングワイヤーを
用いたので、コンクリート床版と橋桁とを結合している
定着アンカーも比較的容易に切断することができる。
In the claims, since the sewing wire is used as the cutting tool, the fixing anchor connecting the concrete floor slab and the bridge girder can be cut relatively easily.

請求項において、請求項第1項、第2項及び第3項の
効果を有することはもちろん特有の効果として、駆動装
置の作動によりコンクリート及び床版定着アンカーを切
断し、駆動装置移動レールを設けたことにより、切断の
進行に伴い駆動装置を移動させながら切断を続けること
ができ、かつ、滑車によるソーイングワイヤーの方向転
換を行うことができるので、床版下面の有効利用が図れ
る。
In the claims, as a matter of course having the effects of claim 1, claim 2 and claim 3, the concrete and floor slab fixing anchors are cut by the operation of the drive device, and the drive device moving rail is provided. As a result, the cutting can be continued while moving the driving device as the cutting progresses, and the direction of the sawing wire can be changed by the pulley, so that the lower surface of the floor slab can be effectively used.

請求項において、切り離されたコンクリート床版又
はコンクリートブロックと橋桁とを仮接続したので安全
な交通開放が可能である。
In the claims, since the separated concrete floor slab or concrete block and the bridge girder are temporarily connected, safe traffic opening is possible.

【図面の簡単な説明】[Brief description of drawings]

第1図乃至第3図は、コンクリート床版の切断における
実施例を示す概略図で、第1図は側面図、第2図は平面
図、第3図は第1図のA−A断面図、第4図は床版定着
アンカーを例示した概略斜視図、第5図及び第6図は、
ソーイングワイヤーの一実施例を示す概略図で、第5図
は平面図、第6図は断面図、第7図は、円盤状ブレード
を用いた切断における実施例を示す概略図、第8図は、
切断された後の仮接続の実施例を示す概略図、第9図及
び第10図は、コンクリート床版の撤去手順の実施例を
示す概略図で、第9図は幅員方向の概略図、第10図は
長手方向の概略図、第11図乃至第14図は、従来例を
示す概略図である。 図面において、1はコンクリート床版、1aはハンチ部
分、2は橋桁、3は床版定着アンカー、4はソーイング
ワイヤー、5は方向転換滑車、6は駆動装置、7は駆動
装置移動レール、8は挿通孔、14は円盤状ブレード、
16は駆動装置、17は駆動装置移動レールである。
1 to 3 are schematic views showing an embodiment in cutting a concrete floor slab, FIG. 1 is a side view, FIG. 2 is a plan view, and FIG. 3 is a sectional view taken along line AA of FIG. , FIG. 4 is a schematic perspective view illustrating a floor slab fixing anchor, and FIGS. 5 and 6 are
FIG. 5 is a schematic view showing an embodiment of a sewing wire, FIG. 5 is a plan view, FIG. 6 is a cross-sectional view, FIG. 7 is a schematic view showing an embodiment in cutting using a disc blade, and FIG. ,
Schematic diagrams showing an example of temporary connection after cutting, FIGS. 9 and 10 are schematic diagrams showing an example of a procedure for removing a concrete floor slab, and FIG. 9 is a schematic diagram in the width direction, FIG. 10 is a schematic view in the longitudinal direction, and FIGS. 11 to 14 are schematic views showing a conventional example. In the drawings, 1 is a concrete floor slab, 1a is a haunch part, 2 is a bridge girder, 3 is a floor slab fixing anchor, 4 is a sewing wire, 5 is a direction changing pulley, 6 is a driving device, 7 is a driving device moving rail, and 8 is Insertion hole, 14 is a disk-shaped blade,
Reference numeral 16 is a drive device, and 17 is a drive device moving rail.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭62−45804(JP,A) 特開 昭62−55306(JP,A) 特開 昭63−151791(JP,A) 特開 昭60−162602(JP,A) ─────────────────────────────────────────────────── --Continued from the front page (56) References JP-A-62-45804 (JP, A) JP-A-62-55306 (JP, A) JP-A-63-151791 (JP, A) JP-A-60- 162602 (JP, A)

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】コンクリート床版と橋桁との接触部のハン
チ部分及び床版定着アンカーを水平方向に切断してコン
クリート床版を橋桁より切り離すことを特徴とする橋梁
床版の撤去工法。
1. A method for removing a bridge slab, which comprises cutting a concrete floor slab from a bridge girder by horizontally cutting a haunch part at a contact portion between the concrete slab and the bridge girder and a floor slab fixing anchor.
【請求項2】コンクリート床版と橋桁との接触部のハン
チ部分及び床版定着アンカーを水平方向に切断してコン
クリート床版を橋桁より切り離し、切り離されたコンク
リート床版を撤去することを特徴とする橋梁床版の撤去
工法。
2. The concrete floor slab is separated from the bridge girder by horizontally cutting the haunch portion at the contact portion between the concrete floor slab and the bridge girder and the floor plate anchor, and the separated concrete slab is removed. Bridge bridge slab removal method.
【請求項3】コンクリート床版と橋桁との接触部のハン
チ部分及び床版定着アンカーを水平方向に切断するとと
もに幅員方向を上下方向に切断し、コンクリートブロッ
クとし、橋桁より切り離されたコンクリートブロックを
橋桁より撤去することを特徴とする橋梁床版の撤去工
法。
3. A concrete block separated from the bridge girder is obtained by horizontally cutting the haunch part at the contact portion between the concrete floor slab and the bridge girder and the floor slab fixing anchor and cutting the width direction up and down. A method of removing bridge decks, characterized by removing from the bridge girder.
【請求項4】コンクリート床版と橋桁との接触部のハン
チ部分及び床版定着アンカーをソーイングワイヤーを用
いて水平方向に切断する請求項第1項、第2項又は第3
項記載の橋梁床版の撤去工法。
4. A haunch portion at a contact portion between a concrete floor slab and a bridge girder and a floor slab fixing anchor are horizontally cut using a sawing wire.
Method of removing bridge deck slab as described in paragraph.
【請求項5】コンクリート床版と橋桁との接触部のハン
チ部分及び床版定着アンカーを円盤状ブレードを用いて
水平方向に切断する請求項第1項、第2項又は第3項に
記載の橋梁床版の撤去工法。
5. The method according to claim 1, 2 or 3, wherein the haunch portion of the contact portion between the concrete floor slab and the bridge girder and the floor slab fixing anchor are horizontally cut using a disc blade. Bridge floor slab removal method.
【請求項6】ソーイングワイヤーをハンチ部分と橋桁と
の切断線方向に沿わせ、かつ、ハンチ部分の両側の切断
線方向の途中に設けられた方向転換用滑車を用いて方向
転換せしめ、駆動装置移動レールを介して移動する駆動
装置の回転体にエンドレス状にして回転可能に案内し、
このソーイングワイヤーを回転体の回転により回転さ
せ、駆動装置移動レールを介して駆動装置を移動させる
ことにより、ソーイングワイヤーによってハンチ部分及
び床版定着アンカーを水平方向に切断するとともに幅員
方向を上下方向に切断し、コンクリートブロックとし、
橋桁より切り離されたコンクリートブロックを橋桁より
撤去することを特徴とする橋梁床版の撤去工法。
6. A drive device in which a sewing wire is arranged along a cutting line direction between a haunch part and a bridge girder, and direction change is performed by using direction changing pulleys provided on the both sides of the haunch part in the cutting line direction. It guides rotatably in the endless form to the rotating body of the drive device that moves via the moving rail,
This sawing wire is rotated by the rotation of the rotating body, and the driving device is moved through the driving device moving rail, whereby the haunch part and the floor slab fixing anchor are cut horizontally by the sewing wire and the width direction is changed vertically. Cut into concrete blocks,
A method for removing a bridge deck characterized by removing a concrete block separated from the bridge girder from the bridge girder.
【請求項7】コンクリート床版と橋桁との接触部のハン
チ部分及び床版定着アンカーを水平方向に切断し、コン
クリート床版を橋桁より切り離し、切り離されたコンク
リート床版と橋桁とを一時仮接続をし、仮接続を解除し
たのちにコンクリート床版を橋桁より撤去することを特
徴とする橋梁床版の撤去工法。
7. The haunch part at the contact portion between the concrete floor slab and the bridge girder and the floor slab fixing anchor are horizontally cut, the concrete floor slab is separated from the bridge girder, and the separated concrete floor slab and bridge girder are temporarily provisionally connected. After removing the temporary connection, the concrete floor slab is removed from the bridge girder.
【請求項8】コンクリート床版と橋桁との接触部のハン
チ部分及び床版定着アンカーを水平方向に切断するとと
もに切断されたコンクリート床版と橋桁とを一時仮接続
し、その後幅員方向を上下方向に切断し、コンクリート
ブロックとし、仮接続を解除したのちにコンクリートブ
ロックを橋桁より撤去することを特徴とする橋梁床版の
撤去工法。
8. A horizontal cutting of the haunch part of the contact portion between the concrete floor slab and the bridge girder and the floor anchoring anchor is performed, and the cut concrete floor slab and the bridge girder are temporarily connected, and then the width direction is changed vertically. A method for removing a bridge deck, which is characterized in that the concrete block is cut off into a concrete block, the temporary connection is released, and then the concrete block is removed from the bridge girder.
【請求項9】切断されたコンクリート床版又はコンクリ
ートブロックと橋桁との仮接続は、板ばねをアンカーボ
ルトで連結、固定する支持金物で行う請求項第7項又は
第8項に記載の橋梁床版の撤去工法。
9. The bridge floor according to claim 7 or 8, wherein the temporary connection between the cut concrete floor slab or concrete block and the bridge girder is performed by a support metal member for connecting and fixing leaf springs with anchor bolts. Plate removal method.
【請求項10】橋桁より切り離されたコンクリート床版
又はコンクリートブロックの撤去は、吊り込み搬出して
行う請求項第1項、第2項、第3項、第6項、第7項又
は第8項に記載の橋梁床版の撤去工法。
10. A concrete floor slab or a concrete block separated from a bridge girder is removed by being carried out by a hanging method, claim 1, claim 2, claim 3, claim 6, claim 7, or claim 8. The method for removing the bridge slab described in paragraph.
JP1113274A 1989-05-02 1989-05-02 Bridge floor slab removal method Expired - Lifetime JPH0643682B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1113274A JPH0643682B2 (en) 1989-05-02 1989-05-02 Bridge floor slab removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1113274A JPH0643682B2 (en) 1989-05-02 1989-05-02 Bridge floor slab removal method

Publications (2)

Publication Number Publication Date
JPH02292404A JPH02292404A (en) 1990-12-03
JPH0643682B2 true JPH0643682B2 (en) 1994-06-08

Family

ID=14608022

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1113274A Expired - Lifetime JPH0643682B2 (en) 1989-05-02 1989-05-02 Bridge floor slab removal method

Country Status (1)

Country Link
JP (1) JPH0643682B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019105031A (en) * 2017-12-08 2019-06-27 飛島建設株式会社 Method for removing floor slab of composite girder bridge and reinforcement member used for the same

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4606941B2 (en) * 2005-05-23 2011-01-05 オリエンタル白石株式会社 Floor slab peeling machine and floor slab peeling method
JP4875775B1 (en) * 2011-03-29 2012-02-15 黒沢建設株式会社 Removal method of bridge deck
JP6949614B2 (en) * 2017-08-09 2021-10-13 清水建設株式会社 Bridge deck dismantling equipment and bridge deck dismantling method
JP7020978B2 (en) * 2018-03-29 2022-02-16 株式会社Ihiインフラシステム How to remove the floor slab of synthetic girders
JP7113452B2 (en) * 2018-07-17 2022-08-05 佐藤鉄工株式会社 Floor slab removal method and rail fixture
JP7255803B2 (en) * 2019-07-26 2023-04-11 株式会社大林組 Cutting device and method for cutting and separating concrete floor slab and main girder
JP7309509B2 (en) * 2019-08-05 2023-07-18 株式会社大林組 Synthetic Structure of Main Girder and Concrete Slab, and Re-synthesis Method of Main Girder and Concrete Slab
JP7012062B2 (en) * 2019-12-05 2022-01-27 テクノス株式会社 How to handle the floor slab separated from the girder
CN113756171B (en) * 2021-08-30 2023-05-16 中铁第五勘察设计院集团有限公司 Combined bridge reverse swivel device and bridge

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63151790A (en) * 1986-12-15 1988-06-24 ハイリーエンタープライズジャパン株式会社 Method of wire sewing construction of reinforced concrete building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019105031A (en) * 2017-12-08 2019-06-27 飛島建設株式会社 Method for removing floor slab of composite girder bridge and reinforcement member used for the same

Also Published As

Publication number Publication date
JPH02292404A (en) 1990-12-03

Similar Documents

Publication Publication Date Title
JPH0643685B2 (en) Horizontal cutting method of bridge deck
JPH0643682B2 (en) Bridge floor slab removal method
JP4875775B1 (en) Removal method of bridge deck
JP6885434B2 (en) Cutting device for existing concrete floor slabs
JPH0643684B2 (en) Horizontal cutting method of bridge deck
JP3829073B2 (en) Partial cutting device and partial cutting method for existing expansion joint
JP6393556B2 (en) Method for repairing drain gutter and cover block for repair
JP7113452B2 (en) Floor slab removal method and rail fixture
JPH0643683B2 (en) Horizontal cutting method of bridge deck
JP2003193418A (en) Method for cutting and removing joint for bridge and oblique cutting device
JP2949165B2 (en) Cutting equipment for reinforced concrete structures such as bridges
JP2001081731A (en) Method and device for demolishing floor slab
JP7383847B1 (en) How to cut and remove concrete slabs
JP2007046291A (en) Method of cutting and removing part of surface of structure
JP7020978B2 (en) How to remove the floor slab of synthetic girders
JP7309509B2 (en) Synthetic Structure of Main Girder and Concrete Slab, and Re-synthesis Method of Main Girder and Concrete Slab
JP2558999B2 (en) Wire saw method
AU2022215262B2 (en) Expansion joint element and system
JP4030378B2 (en) How to cut and remove bridge joints
JP7012062B2 (en) How to handle the floor slab separated from the girder
CN116377904A (en) Hollow slab bridge dismantling construction method for preserving hollow slab
JPH01256602A (en) Method for paving road joint section
JP2006299676A (en) Expansion joint removing method
JPH04353168A (en) Method for cutting concrete slab
SU1504296A1 (en) Device for securing rail to crane-supporting girder