JPH0641918A - Support structure of form device for molding bridge and bridge construction method using support structure - Google Patents

Support structure of form device for molding bridge and bridge construction method using support structure

Info

Publication number
JPH0641918A
JPH0641918A JP21323692A JP21323692A JPH0641918A JP H0641918 A JPH0641918 A JP H0641918A JP 21323692 A JP21323692 A JP 21323692A JP 21323692 A JP21323692 A JP 21323692A JP H0641918 A JPH0641918 A JP H0641918A
Authority
JP
Japan
Prior art keywords
bridge
suspension beam
beam member
pier
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21323692A
Other languages
Japanese (ja)
Other versions
JPH07116691B2 (en
Inventor
Kunio Oohi
邦夫 大樋
Kyukichi Moriya
久吉 森谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAWADA KENSETSU KK
Original Assignee
KAWADA KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAWADA KENSETSU KK filed Critical KAWADA KENSETSU KK
Priority to JP21323692A priority Critical patent/JPH07116691B2/en
Publication of JPH0641918A publication Critical patent/JPH0641918A/en
Publication of JPH07116691B2 publication Critical patent/JPH07116691B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To smoothly perform a molding work by disposing plural suspension beam members on a bridge leg along the bridge length direction, fixing both ends of thereof, and hanging a form centering of a form device for molding a bridge with suspension beam members. CONSTITUTION:Plural suspension beam members 18 are disposed along the bridge length direction X in positions corresponding to the space area of poids parts of a bridge 12 to be molded on a bridge pier 10 through support shoes 16 in such a manner that the lower surface 18a thereof is positioned above the lower surface 12a of the bridge 12. Subsequently, the upper ends of chemical anchor rods 20 fixed on the bridge pier 10 are inserted in both ends of the suspension beam member 18 and fixed through take-up devices 22. Subsequently, the form device 32 for molding a bridge is hung through form centerings 30 by hanging rods 24 disposed on the suspension beam member 18. Further, concrete is placed on the form device 32 to mold the bridge 12 with the suspension beam member 18 embedded.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、橋梁における橋体を
コンクリートで成型する際に使用する型枠装置の支持構
造およびこの支持構造を利用して橋体を構築する方法に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a support structure for a formwork apparatus used when molding a bridge body of a bridge with concrete, and a method for constructing a bridge body using this support structure.

【0002】[0002]

【従来技術および発明が解決すべき課題】従来より、橋
脚スパンが25m前後の橋梁においては、各橋脚間に予
め橋体成型用型枠装置を架設しておき、この型枠装置に
コンクリートを打設することにより上部工としての橋体
を構築している。
2. Description of the Related Art Conventionally, in a bridge having a pier span of about 25 m, a bridge forming mold device is previously installed between the piers, and concrete is poured into the mold device. The bridge is constructed as a superstructure by installing it.

【0003】ところで、この上部工としての橋体を構築
する際に使用する成型用型枠装置は、例えば、橋脚間の
地上から足場装置を組上げてこの足場装置上に枕梁およ
び型枠支持梁を井桁状に配置した型枠支保工を介して支
持するか、あるいは、下部工としての橋脚上部側面に支
持ブラケットを配置してこの支持ブラケットに枕梁およ
び型枠支持梁を井桁状に配置した型枠支保工を介して支
持している。
By the way, a molding frame device used when constructing a bridge body as the superstructure is constructed by, for example, assembling a scaffolding device from the ground between bridge piers, and forming a pillow beam and a formwork supporting beam on the scaffolding device. Are supported via formwork supports arranged in a cross girder, or a support bracket is arranged on the upper side of the pier as a substructure and pillow beams and formwork support beams are arranged in a cross girder on this support bracket. It is supported via formwork support.

【0004】しかるに、前者の足場装置方式では、足場
装置の組立てや撤去の日数などを含むコストが橋梁を架
設する地形等に大きく左右され、橋梁工事が遅滞するこ
とがある。
However, in the former scaffolding device system, the cost, including the number of days for assembling and removing the scaffolding device, is greatly influenced by the terrain on which the bridge is constructed, and the bridge construction may be delayed.

【0005】また、この種の橋梁工事は一般的には下部
工と上部工の施工業者が異なるケースが多いため、後者
の支持ブラケット方式では上部工の施工とは関係のない
下部工施工業者が支持ブラケットの付設工事を設置する
ことになったり、あるいは上部工施工業者が橋体成型作
業前に支持ブラケットを設置する必要があるなど工事手
順が煩雑になり、構築作業が円滑に行えないなど種々の
解決すべき課題が指摘されていた。
Further, in this type of bridge construction, in general, there are many cases in which the substructure work and the superstructure work are different. Therefore, in the latter support bracket method, there is a substructure work contractor unrelated to the superstructure work. There are various things such as installation work of support brackets being installed, or superstructure contractors having to install support brackets prior to bridge molding work, which complicates the construction procedure and makes construction work not smooth. The problem to be solved was pointed out.

【0006】[0006]

【課題を解決するための手段】そこで、この発明では、
橋脚上に支持沓を介して吊梁部材を橋長方向に沿って複
数配置するとともにこの吊梁部材の下面が成型される橋
体下面より上方に位置するように設定し、一方前記吊梁
部材の両端側を転倒防止用アンカー手段を介して橋脚に
固定し、さらに橋体成形用型枠装置の型枠支保工を前記
吊梁部材で吊持する支持構造を採用することにより、橋
梁の架設地形などに左右されることなく、橋体成型作業
を円滑に行えるようにしたものである。
Therefore, according to the present invention,
A plurality of suspension beam members are arranged along the bridge length direction on the pier via a support shoe, and the lower surface of the suspension beam member is set to be located above the lower surface of the bridge body to be molded. Both ends of the bridge are fixed to the bridge pier via the fall prevention anchor means, and a bridge structure is constructed by adopting a support structure in which the formwork support of the formwork device for forming the bridge body is suspended by the suspension beam members. The bridge molding work can be performed smoothly regardless of the terrain.

【0007】この場合、転倒防止用アンカー手段として
は、橋脚上に固定したケミカルアンカーロッドを好適に
使用することができる。
In this case, a chemical anchor rod fixed on the pier can be preferably used as the fall prevention anchor means.

【0008】代案として、一端部を吊梁部材に固定する
とともに型枠支保工を吊持したロッド部材の他端部を橋
脚下部に付設した転倒防止ブラケットに固定することに
より転倒防止用アンカー手段を構成することもできる。
As an alternative, by fixing one end to the suspension beam member and fixing the other end of the rod member that suspends the formwork support to the fall prevention bracket attached to the lower part of the pier, the fall prevention anchor means is provided. It can also be configured.

【0009】また、橋体を具体的に構築するに際して
は、橋脚上に支持沓を介して吊梁部材を橋長方向に沿っ
て複数配置するとともにこの吊梁部材の下面が成型され
る橋体下面より上方になるように位置決めし、次にこの
吊梁部材の両端側を転倒防止用アンカー手段により橋脚
に固定し、前記吊梁部材に型枠支保工を介して橋体成形
用型枠装置を吊持した後、この橋体成形用型枠装置にコ
ンクリートを打設することにより吊梁部材を埋設した状
態で橋体を成型し、さらに橋体の硬化後緊張して吊梁部
材の支持沓と転倒防止用アンカー手段の不要部分を切除
すれば良い。
Further, in concretely constructing the bridge body, a plurality of suspension beam members are arranged on the bridge piers along the bridge length direction through the support trough, and the lower surface of the suspension beam member is molded. Positioning is performed so that it is above the lower surface, then both end sides of this suspension beam member are fixed to the bridge pier by means of anchors for preventing fall, and a frame device for forming a bridge body is formed on the suspension beam member via a frame support work. After suspending the bridge, the bridge body is molded by placing concrete in the bridge forming formwork device, and the bridge body is molded. It is only necessary to remove unnecessary parts of the shoe and the anchor means for preventing the fall.

【0010】[0010]

【作 用】この発明に係る枕梁支持構造によれば、橋脚
上に配置した吊梁部材によって型枠支保工を介して橋体
成形用型枠装置を吊持するので、橋梁の架設地形などに
左右されることなくしかも上部工施工業者が適宜設置で
きるので橋体の成型作業を円滑に行うことができるもの
である。
[Operation] According to the bolster support structure according to the present invention, since the bridge forming formwork device is suspended by the suspension beam members arranged on the bridge piers through the formwork support, bridge construction terrain, etc. The bridge construction work can be carried out smoothly because it can be installed appropriately by the superstructure contractor without being affected by the above.

【0011】[0011]

【実施例】次に、本発明に係る橋体成型用型枠装置の支
持構造の好適な実施例につき添付図面を参照しながら以
下詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment of a support structure for a bridge forming mold device according to the present invention will be described in detail below with reference to the accompanying drawings.

【0012】図1および図2において、本発明に係る支
持構造は、橋脚10上において成型しようとする橋体1
2におけるボイド部14の離間部に対応する位置に、支
持沓16を介して吊梁部材18をその橋長方向Xに沿っ
て複数配置する。なお、支持沓16は橋脚10上に配設
した無収縮モルタル、支持プレートおよびH型鋼によっ
て構成されている。
1 and 2, the support structure according to the present invention has a bridge body 1 to be molded on a pier 10.
A plurality of suspension beam members 18 are arranged along the bridge length direction X via support troughs 16 at positions corresponding to the separated portions of the void portions 14 in 2. The support shoe 16 is composed of non-shrink mortar, support plate, and H-shaped steel arranged on the pier 10.

【0013】また、この場合、この吊梁部材18の下面
18aは成型される予定の橋体12の下面12aよりも
上方に位置するように設定する。
Further, in this case, the lower surface 18a of the suspension beam member 18 is set to be located above the lower surface 12a of the bridge body 12 to be molded.

【0014】一方、前記吊梁部材18の両端側は、橋脚
10上の所定箇所に立設固定したケミカルアンカーロッ
ド20の上端部を緊締具22を介して固定することによ
り、後述するコンクリート打設時などにおける転倒防止
ないしは危険防止を図るように構成する。
On the other hand, at both ends of the suspension beam member 18, the upper end of the chemical anchor rod 20 which is erected and fixed at a predetermined position on the bridge pier 10 is fixed by means of a tightening tool 22 so that concrete can be poured as described later. It is configured to prevent falls or danger in case of time.

【0015】そして、吊梁部材18の端部には、吊持ロ
ッド24により井桁状に配設した枕梁26および支持梁
28からなる型枠支保工30を介して橋体成形用型枠装
置32を吊持する。
At the end of the suspension beam member 18, a bridge body forming frame device is provided via a frame support 30 composed of pillow beams 26 and support beams 28 arranged in a cross beam shape by a suspension rod 24. Suspend 32.

【0016】なお、コンクリート打設時などにおける転
倒防止手段の代案としては、図3に示すように、一端部
を吊梁部材18に固定して型枠支保工30を吊持したロ
ッド部材34を使用することもでき、この場合は前記ロ
ッド部材34の他端部を橋脚10下部に付設した転倒防
止ブラケット36に固定すればよい。そしてこのロッド
部材34を使用する場合は、梃作用を利用することがで
きるので転倒防止ブラケット36を小型化することがで
きるので転倒防止手段を簡便に構成することができる。
As an alternative to the fall prevention means at the time of pouring concrete, as shown in FIG. 3, a rod member 34 having one end fixed to the suspension beam member 18 and the form support 30 is suspended. It can also be used, and in this case, the other end of the rod member 34 may be fixed to a fall prevention bracket 36 attached to the lower portion of the pier 10. When this rod member 34 is used, since the lever action can be utilized, the fall prevention bracket 36 can be downsized, and the fall prevention means can be simply configured.

【0017】このように構成した本発明に係る支持構造
によれば、橋梁を架設する地形などに左右されることな
くしかも上部工施工業者がその手順に従って橋体成形用
型枠装置の支持構造を簡便に構成することが可能となる
ものである。
According to the support structure of the present invention having the above-described structure, the superstructure contractor follows the procedure without depending on the terrain on which the bridge is erected, etc. It is possible to simply configure.

【0018】一方、このように構成される支持構造を使
用して橋体12を具体的に構築するに際しては、まず、
橋脚10上において成型しようとする橋体12における
ボイド部14の離間部と対応する位置に、支持沓16を
介して吊梁部材18をその橋長方向Xに沿って複数配置
する。この場合、この吊梁部材18の下面18aは成型
される予定の橋体12の下面12aよりも上方に位置す
るように設定しておく(図4a参照)。
On the other hand, in concretely constructing the bridge body 12 using the support structure thus constructed, first,
A plurality of suspension beam members 18 are arranged along the bridge length direction X via support troughs 16 at positions corresponding to the separated portions of the void portions 14 in the bridge body 12 to be molded on the pier 10. In this case, the lower surface 18a of the suspension beam member 18 is set so as to be located above the lower surface 12a of the bridge body 12 to be molded (see FIG. 4a).

【0019】つぎに、橋脚10上の所定箇所に立設固定
したケミカルアンカーロッド20の上端部を前記吊梁部
材18の両端側に挿入して緊締具22を介して固定する
(図4b参照)。
Next, the upper ends of the chemical anchor rods 20 which are erected and fixed at predetermined positions on the bridge pier 10 are inserted into both ends of the suspension beam member 18 and fixed through the tightening tool 22 (see FIG. 4b). .

【0020】次いで、吊梁部材18に配設した吊持ロッ
ド24により型枠支保工30を介して橋体成形用型枠装
置32を前記吊梁部材18によって吊持する(図4c図
参照)。
Next, the bridge body forming frame device 32 is suspended by the suspension beam member 18 via the frame support work 30 by the suspension rod 24 arranged on the suspension beam member 18 (see FIG. 4c). .

【0021】そして、この橋体成形用型枠装置32にコ
ンクリートを打設して前記吊梁部材18を埋設した状態
で橋体12を成型する。なお、このようにして成型した
橋体12が硬化したら、支承周りの型枠を外して緊張
業を行い、残りの型枠装置を取り外した後、吊梁部材1
8の支持沓16と転倒防止用アンカー手段としてのケミ
カルロッド20の露出部分を切断除去すればよい(図4
d参照)。
Then, concrete is cast into the bridge forming mold device 32 to form the bridge 12 with the suspension beam member 18 embedded therein. When the bridge body 12 molded in this way hardens, the formwork around the bearing is removed to perform a tensioning operation, and the remaining formwork device is removed, and then the suspension beam member 1 is removed.
It is only necessary to cut and remove the exposed portion of the support shaft 16 of 8 and the chemical rod 20 as an anchor means for preventing fall (FIG. 4).
d)).

【0022】[0022]

【発明の効果】先に述べたように、本発明に係る橋体成
型用型枠装置の支持構造によれば、橋梁の架設地形など
に左右されることもなく、支持構造を定格コストにより
構成することができる。
As described above, according to the support structure for the bridge forming formwork device of the present invention, the support structure is constructed at the rated cost without being affected by the terrain of the bridge. can do.

【0023】また、橋脚上に設置した吊梁部材によって
型枠支保工を吊持するので、上部工施工業者がその手順
に従って極めて容易に支持構造を構成できるので橋体の
成型作業を円滑に行うことができる等種々の利点を有す
るものである。
Further, since the formwork support work is suspended by the suspension beam member installed on the bridge pier, the superstructure contractor can construct the support structure very easily according to the procedure, so that the bridge work can be smoothly performed. It has various advantages such as being possible.

【0024】以上、本発明に係る橋体成型用型枠装置の
支持構造およびこの支持構造を使用する橋体の構築方法
の好適な実施例につき説明したが、本発明はこの実施例
に限定されるものではなく、例えば、図5に示すよう
に、橋脚10上にスペーサとしてのH型鋼38を介して
吊梁部材18を配置し、このH型鋼38に添設配置した
ケミカルロッド20で転倒防止手段を形成し、さらに吊
梁部材18の端部に型枠支保工30を介して吊持ロッド
24により橋体成形用型枠装置32を吊持して、橋体1
2の成型後に吊梁部材18を撤去するように構成する
等、本発明の精神を逸脱しない範囲内において種々の変
更をなし得ることは勿論である。
The preferred embodiment of the support structure for the bridge forming mold device and the method for constructing a bridge using this support structure according to the present invention has been described above, but the present invention is not limited to this embodiment. For example, as shown in FIG. 5, the suspension beam member 18 is arranged on the pier 10 via the H-shaped steel 38 as a spacer, and the chemical rod 20 attached to the H-shaped steel 38 prevents falling. Means, and the bridge body forming frame device 32 is suspended by the suspension rod 24 at the end of the suspension beam member 18 via the frame support 30.
It goes without saying that various modifications can be made without departing from the spirit of the present invention, such as by removing the suspension beam member 18 after the molding of FIG.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る橋体成型用型枠装置の支持構造の
好適な実施例を示す橋長方向の側面説明図である。
FIG. 1 is a side view in the bridge length direction showing a preferred embodiment of a support structure for a bridge forming formwork apparatus according to the present invention.

【図2】図1に示す支持構造と橋体との横断方向におけ
る説明図である。
FIG. 2 is an explanatory diagram in a transverse direction between the support structure and the bridge shown in FIG.

【図3】図1に示す支持構造における転倒防止アンカー
手段の別の実施例を示す橋長方向の側面説明図である。
FIG. 3 is a side view in the bridge length direction showing another embodiment of the fall prevention anchor means in the support structure shown in FIG.

【図4】本発明に係る橋体成型用型枠装置の支持構造を
使用した橋体の構築手順を示す工程説明図であって、a
は橋脚上に吊梁部材を配置した状態、bは吊梁部材に転
倒防止手段を付設した状態、cは吊梁部材に橋体成形用
型枠装置を吊持した状態、dは橋体が成型された状態を
夫々示すものである。
FIG. 4 is a process explanatory view showing a procedure for constructing a bridge using the support structure of the bridge forming mold device according to the present invention, wherein
Is a state in which the suspension beam member is arranged on the pier, b is a state in which the suspension beam member is provided with a fall prevention means, c is a state in which the bridge forming formwork device is suspended on the suspension beam member, and d is a bridge body. It shows the molded state, respectively.

【図5】本発明に係る橋体成型用型枠装置の支持構造の
別の実施例を示す橋長方向の側面説明図である。
FIG. 5 is a side view in the bridge length direction showing another embodiment of the support structure for the bridge forming mold device according to the present invention.

【符号の説明】[Explanation of symbols]

10 橋脚、 12 橋体、 14
ボイド部、16 支持沓、 18 吊梁部材、
20 アンカーロッド、22 緊締具、
24 吊持ロッド、 26 枕梁、28 支持梁、
30 型枠支保工、 34 ロッド部材、32
橋体成形用型枠装置、 36 転倒防止ブラケット、
10 bridge piers, 12 bridge bodies, 14
Void part, 16 support shoe, 18 hanging beam member,
20 anchor rods, 22 tightening tools,
24 suspension rods, 26 pillow beams, 28 support beams,
30 Form support, 34 Rod member, 32
Forming device for bridge formation, 36 Fall prevention bracket,

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 橋脚上に支持沓を介して吊梁部材を橋長
方向に沿って複数配置するとともにこの吊梁部材の下面
が成型される橋体下面より上方に位置するように設定
し、一方前記吊梁部材の両端側を転倒防止用アンカー手
段を介して橋脚に固定し、さらに橋体成形用型枠装置の
型枠支保工を前記吊梁部材で吊持することを特徴とする
橋体成形用型枠装置の支持構造。
1. A plurality of suspension beam members are arranged on a pier along a bridge length direction through a support shoe, and a lower surface of the suspension beam member is set to be located above a lower surface of a bridge body to be molded, On the other hand, both ends of the suspension beam member are fixed to a bridge pier via fall prevention anchor means, and further the frame support of the bridge body forming frame device is suspended by the suspension beam member. Supporting structure for body forming mold device.
【請求項2】 転倒防止用アンカー手段として、橋脚上
に固定したケミカルアンカーロッドを使用することから
なる請求項1に記載の橋体成形用型枠装置の支持構造。
2. The support structure for a bridge forming formwork apparatus according to claim 1, wherein a chemical anchor rod fixed on the pier is used as the fall preventing anchor means.
【請求項3】 転倒防止用アンカー手段は、一端部を吊
梁部材に固定するとともに型枠支保工を吊持したロッド
部材の他端部を橋脚下部に付設した転倒防止ブラケット
に固定することにより構成することからなる請求項1に
記載の橋体構築方法。
3. The fall prevention anchor means has one end portion fixed to a suspension beam member and the other end portion of a rod member suspending a form supporting work is fixed to a fall prevention bracket attached to a lower portion of a pier. The method for constructing a bridge body according to claim 1, which is configured.
【請求項4】 橋脚上に支持沓を介して吊梁部材を橋長
方向に沿って複数配置するとともにこの吊梁部材の下面
が成型される橋体下面より上方になるように位置決め
し、次にこの吊梁部材の両端側を転倒防止用アンカー手
段により橋脚に固定し、前記吊梁部材に型枠支保工を介
して橋体成形用型枠装置を吊持した後、この橋体成形用
型枠装置にコンクリートを打設することにより吊梁部材
を埋設した状態で橋体を成型し、さらに橋体の硬化後緊
張して吊梁部材の支持沓と転倒防止用アンカー手段を切
除することを特徴とする橋体構築方法。
4. A plurality of suspension beam members are arranged on the pier along a bridge length direction through a support trough, and the lower surface of the suspension beam member is positioned so as to be above the lower surface of the bridge body to be molded. After fixing both end sides of this suspension beam member to the bridge pier by the anchor means for tipping prevention and suspending the bridge forming formwork device on the suspension beam member through the form support, Forming a bridge with the suspended beam member buried by placing concrete in the formwork device, and then tensioning after curing the bridge body to remove the support shoe of the suspended beam member and the anchoring means for fall prevention. Bridge construction method characterized by.
JP21323692A 1992-07-20 1992-07-20 Support structure for frame forming mold device and bridge construction method using the support structure Expired - Fee Related JPH07116691B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21323692A JPH07116691B2 (en) 1992-07-20 1992-07-20 Support structure for frame forming mold device and bridge construction method using the support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21323692A JPH07116691B2 (en) 1992-07-20 1992-07-20 Support structure for frame forming mold device and bridge construction method using the support structure

Publications (2)

Publication Number Publication Date
JPH0641918A true JPH0641918A (en) 1994-02-15
JPH07116691B2 JPH07116691B2 (en) 1995-12-13

Family

ID=16635781

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21323692A Expired - Fee Related JPH07116691B2 (en) 1992-07-20 1992-07-20 Support structure for frame forming mold device and bridge construction method using the support structure

Country Status (1)

Country Link
JP (1) JPH07116691B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643047A (en) * 2018-05-18 2018-10-12 中铁十六局集团第四工程有限公司 A kind of lower support built-in fitting of large bridge bracket
CN112779852A (en) * 2021-03-19 2021-05-11 上海市城市建设设计研究总院(集团)有限公司 Hollow continuous beam bridge V-shaped stay segment and construction method adapting to soft soil foundation area
CN114657882A (en) * 2022-03-25 2022-06-24 南通大学 Super-huge type 0# block cast-in-place box girder bracket structure and mounting method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643047A (en) * 2018-05-18 2018-10-12 中铁十六局集团第四工程有限公司 A kind of lower support built-in fitting of large bridge bracket
CN112779852A (en) * 2021-03-19 2021-05-11 上海市城市建设设计研究总院(集团)有限公司 Hollow continuous beam bridge V-shaped stay segment and construction method adapting to soft soil foundation area
CN114657882A (en) * 2022-03-25 2022-06-24 南通大学 Super-huge type 0# block cast-in-place box girder bracket structure and mounting method thereof

Also Published As

Publication number Publication date
JPH07116691B2 (en) 1995-12-13

Similar Documents

Publication Publication Date Title
JP2994222B2 (en) Construction method of cast-in-place slab of precast concrete girder and its formwork
JPH0641918A (en) Support structure of form device for molding bridge and bridge construction method using support structure
JPH1060913A (en) Installation method for machine equipment
JP2980567B2 (en) How to replace the bearing device
JP2000257264A (en) Cast-in-place construction method for pc structure
JPH10292668A (en) Construction method for fitting base isolation device
KR910007276Y1 (en) Device for adjusting the precast form on the bridge
JP2938386B2 (en) Construction method of formwork for residential foundation
JP2006052573A (en) Method of overhangingly erecting bridge, and diagonal member anchoring structure for use therein
JP2649205B2 (en) Anchor bolt burying method
JPH0921172A (en) Drain gutter installation method and grating support metal fitting
JP3368360B2 (en) How to install a packer plate for equipment installation
JPH05321229A (en) Method for constructing top overhung part of concrete dam
JPH0649982A (en) Formwork unit and its construction
JPS648145B2 (en)
JPH0765297B2 (en) How to erection a cane ramen bridge
KR960010534B1 (en) Supporting structure and supporting method for beam-shutterings
JP2001241047A (en) Method of installing anchor bolt for fixing large-sized equipment
JP2744956B2 (en) Reinforcement structure and reinforcement method of hinge part of gel bar bridge
JP2560598B2 (en) RC reverse construction method
JP2002212957A (en) Precast foundation constructing method and constructing jig
JPH0240823B2 (en) KATAMOCHISURABUNIOKERUTESURITORITSUKEBUZAINOSETSUCHIHOHO
JP2004176299A (en) Floor slab structure with step
JPH0615632A (en) Building method of precast beam
JP2021105272A (en) Precast floor slab construction method