JPH063875Y2 - Tremie tube - Google Patents

Tremie tube

Info

Publication number
JPH063875Y2
JPH063875Y2 JP2392288U JP2392288U JPH063875Y2 JP H063875 Y2 JPH063875 Y2 JP H063875Y2 JP 2392288 U JP2392288 U JP 2392288U JP 2392288 U JP2392288 U JP 2392288U JP H063875 Y2 JPH063875 Y2 JP H063875Y2
Authority
JP
Japan
Prior art keywords
length
pipe
tube
tremie
tremie pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2392288U
Other languages
Japanese (ja)
Other versions
JPH01136544U (en
Inventor
祐悦 菊地
Original Assignee
株式会社間組
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社間組 filed Critical 株式会社間組
Priority to JP2392288U priority Critical patent/JPH063875Y2/en
Publication of JPH01136544U publication Critical patent/JPH01136544U/ja
Application granted granted Critical
Publication of JPH063875Y2 publication Critical patent/JPH063875Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【考案の詳細な説明】 <産業上の利用分野> この考案は水中コンクリートに対する貫入深さを管理可
能にするトレミー管に関する。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a tremie pipe capable of controlling the penetration depth into underwater concrete.

<従来の技術> 水中コンクリートを施工する場合には、複数の管を連結
したトレミー管を通して水中コンクリートを打設してい
き、この打設中にトレミー管を引き抜きながら、上端よ
り上記各管を取り外すといった作業を繰り返し実施して
いる。この場合において、トレミー管の水中コンクリー
トへの貫入長を管理することは、水中コンクリートの分
離を防止する上で重要である。このため、従来はトレミ
ー管長からコンクリート天端検尺長さを差引いた長さを
トレミー管の貫入長として管理している。
<Conventional technology> When constructing underwater concrete, the underwater concrete is placed through a tremie pipe that connects multiple pipes, and while pulling out the tremie pipe during this placement, the above pipes are removed from the upper end. Such work is repeatedly carried out. In this case, it is important to control the penetration length of the tremie pipe into the underwater concrete in order to prevent the underwater concrete from separating. For this reason, conventionally, the length obtained by subtracting the measuring length of the concrete crown from the tremie pipe length is managed as the penetration length of the tremie pipe.

<考案が解決しようとする課題> しかしながら、かかる従来のトレミー管の貫入長の管理
方法では、これらのトレミー管長を、初期トレミー管長
から、引き抜いたトレミー管長を差引いて求めるため、
このトレミー管長や検尺長さを現場作業員の記憶に頼っ
て管理する必要があり、この結果場合によっては、上記
貫入長を誤って算出してしまい、高品質の水中コンクリ
ートを打設できなくなる場合があるなどの問題点があっ
た。
<Problems to be solved by the invention> However, in such a conventional method of controlling the penetration length of a tremie pipe, these tremie pipe lengths are obtained by subtracting the extracted tremie pipe length from the initial tremie pipe length.
It is necessary to manage this tremie pipe length and measuring length by relying on the memory of field workers, and in some cases, the above penetration length will be calculated incorrectly, and it will not be possible to place high-quality underwater concrete. There were problems such as cases.

この考案はかかる従来の問題点に着目してなされたもの
であり、トレミー管の水中コンクリートへの貫入長の管
理にあたって、現場作業員の各種計算値の記憶に頼る部
分を少なくして、水中コンクリートへの上記貫入長を確
実に、しかも簡単に管理できるトレミー管を得ることを
目的とする。
This invention was made by paying attention to such a conventional problem, and in managing the penetration length of the tremie pipe into the underwater concrete, the part which relies on the memory of various calculated values by the site worker is reduced, and the underwater concrete is reduced. An object of the present invention is to obtain a tremie tube that can reliably and easily manage the above penetration length into the tube.

<課題を解決するための手段> この考案にかかるトレミー管は、複数の管が分離可能に
連結され、各管の単位ごとに、最下部の管の下端からの
長さを実質的に表示する表示部を設けたものである。
<Means for Solving the Problems> In the tremey pipe according to the present invention, a plurality of pipes are separably connected and the length from the lower end of the lowermost pipe is substantially displayed for each unit of the pipe. A display unit is provided.

<作用> この考案における表示部は、各管の単位ごとに設けられ
ているため、初期トレミー管長から引抜いたトレミー管
長を差引いた値であるトレミー管長は、測定位置にある
管に設けた表示部の記入内容(寸法)を読むことで直ち
に確認できる。従って、この読み取ったトレミー管長か
らコンクリート天端検尺長さを差引く計算のみで、容易
にトレミー管の水中コンクリートに対する貫入長を求め
られるようにする。
<Operation> Since the display unit in the present invention is provided for each unit of the pipe, the tremie pipe length, which is a value obtained by subtracting the extracted tremie pipe length from the initial tremie pipe length, is displayed on the pipe at the measurement position. It can be confirmed immediately by reading the entry contents (dimensions). Therefore, the penetration length of the tremie pipe into the underwater concrete can be easily obtained only by the calculation of subtracting the concrete top end measuring length from the read tremie pipe length.

<考案の実施例> 以下に、この考案の一実施例を図について説明する。第
1図において、1は場所打ち杭や連続地中壁を構築する
ために設けられた掘削孔で、この掘削孔1には底部から
上部へ順次コンクリート2を打設しながら引抜きが行わ
れるトレミー管3が挿入されている。4は下端に重錘5
を取り付けた検尺テープで、これがコンクリート天端ま
での長さをコンクリート天端検尺長さとして測定するの
に用いられる。トレミー管3は分離可能な複数の3a
を、第2図に示すように連設したものからなり、各管3
aどうしが、これらの両端に有するフランジ6どうしを
複数組のボルト・ナット7により結合することにより、
一体化されている。
<Embodiment of the Invention> An embodiment of the invention will be described below with reference to the drawings. In FIG. 1, reference numeral 1 denotes a drill hole provided for constructing a cast-in-place pile or a continuous underground wall. In this drill hole 1, concrete 2 is sequentially poured from the bottom to the top, and tremie is performed. The tube 3 is inserted. 4 is a weight 5 at the lower end
It is a measuring tape with attached, which is used to measure the length to the concrete crown as the concrete crown measuring length. The tremie tube 3 is a plurality of separable 3a
2 are connected in series as shown in FIG.
By connecting the flanges 6 at both ends with a plurality of sets of bolts and nuts a,
It is integrated.

また、各管3aの外周には表示部8が設けられている。
この表示部8は、第2図と第3図にも示すように、例え
ば断面L字状の金具をコの字状に形成した枠部材8a
と、この枠部材8aの内外に着脱可能な管長明示プレー
ト8bとからなる。また、表示部8の全部をマグネット
製または一部のみをマグネット製のプレートとすること
で、装着状態を安定化することができる。さらに、上記
各管3aの表示部8によって表示すべき管長は、最下部
の管3aの下端からのものとする必要があるため、管長
明示プレート8bには、その下端から各管3a上端まで
の寸法をトレミー管3の長さとして、その値が記入され
る。また、各管3aの長さが全く等しい場合には、順序
番号のみとすることもできる。
Further, a display portion 8 is provided on the outer circumference of each tube 3a.
As shown in FIGS. 2 and 3, the display portion 8 has a frame member 8a in which, for example, a metal fitting having an L-shaped cross section is formed in a U-shape.
And a pipe length indicating plate 8b which can be attached / detached to / from the frame member 8a. Moreover, the mounting state can be stabilized by using a plate made of a magnet or only a part of the display 8 as a magnet. Further, since the pipe length to be displayed by the display portion 8 of each pipe 3a needs to be from the lower end of the lowermost pipe 3a, the pipe length explicit plate 8b has a length from its lower end to each pipe 3a upper end. The value is entered with the dimension as the length of the tremie tube 3. If the lengths of the tubes 3a are exactly the same, it is possible to use only the sequence number.

第4図は表示部8の他の実施例を示す。これは、各管3
aの外周に2本のピン8bを溶接などにより植設し、こ
れにマグネット製の管長明示プレート8bに穿った孔8
cを、第5図に示すように差し込んで取り付けられるよ
うにしたものである。なお、マグネツトの吸引力が強力
である場合には、上記枠部材8aやピン8dを必ずしも
必要としない。また、各管長明示プレート8bはオン/
オフ式のマグネットベースとすることもできる。さら
に、これらの管長明示プレート8bにおける管3a上の
位置も何ら限定する必要はない。
FIG. 4 shows another embodiment of the display unit 8. This is each tube 3
Two pins 8b are planted on the outer periphery of a by welding or the like, and a hole 8 is formed in the tube length explicit plate 8b made of magnet.
c is inserted and attached as shown in FIG. The frame member 8a and the pin 8d are not necessarily required when the magnet has a strong suction force. Also, each tube length explicit plate 8b is turned on /
It can also be an off-type magnet base. Further, it is not necessary to limit the positions of the tube length indicating plate 8b on the tube 3a.

次に、上記構成になるトレミー管3を使用して、これの
貫入長を管理しながら水中コンクリート2を打設する場
合について説明する。いま、掘削孔1に水中コンクリー
ト2を打設するに当って、各管3aをボルト・ナット7
により必要個数だけ連結し、その各管3aの上記枠部材
8aに、最下部の管3aの下端からの長さ(必要に応じ
上記順序番号)を記入した管長明示プレート8bを上記
のように装着する。従って、最上部の管3aの管長明示
プレート8bには、初期トレミー管長が記入されること
になる。
Next, a case will be described in which the underwater concrete 2 is placed while controlling the penetration length of the tremie pipe 3 having the above structure. Now, when placing the underwater concrete 2 in the excavation hole 1, connect each pipe 3a to the bolt / nut 7
By connecting the required number of pipes 3a to the frame member 8a of each pipe 3a, and mounting the pipe length indicating plate 8b in which the length from the lower end of the lowermost pipe 3a (the sequence number if necessary) is entered as described above. To do. Therefore, the initial tremie pipe length is written on the pipe length explicit plate 8b of the uppermost pipe 3a.

次に、このように連結されたトレミー管3を掘削孔1に
挿入して、その下端が底につかない状態にて、このトレ
ミー管3を通じて水中コンクリート2を掘削孔1内に充
填していく。この場合に、水中コンクリートの品質管理
等のために、トレミー管3の水中コンクリート2におけ
る管入長を管理する必要があり、従って、この管入長を
守るため、トレミー管3は順次上方へ引抜かれ、必要に
応じ上記ボルト・ナット7を外して、最上部のものから
順次取り除かれる。
Next, the tremie pipe 3 thus connected is inserted into the excavation hole 1, and the underwater concrete 2 is filled into the excavation hole 1 through the tremie pipe 3 with the lower end thereof not touching the bottom. In this case, in order to control the quality of the underwater concrete, it is necessary to control the pipe entry length of the tremie pipe 3 in the underwater concrete 2. Therefore, in order to protect this pipe entry length, the tremie pipe 3 is sequentially drawn upward. The bolts and nuts 7 are removed and, if necessary, the bolts and nuts 7 are removed, and the uppermost ones are sequentially removed.

この結果、水中コンクリート2の増加およびこれに伴う
トレミー管3の引抜きによって、地上の測定位置におけ
るトレミー管長が順次短かくなっていき、その値は上記
管長明示プレート8b上の記録内容から、記憶に頼るこ
となく、直に確認できる。一方、コンクリート天端検尺
長は、重錘5を取り付けた検尺テープ4によって計測で
きる。従って、作業員は上記管長明示プレート8bから
得られたトレミー管長から、検尺テープ4によるコンク
リート天端検尺長を差し引いた残りをトレミー管3の貫
入長として、迅速かつ正確に求めることができることに
なる。そして、かかる貫入長を管理された所定値に保ち
ながら、水中コンクリート2の打設およびトレミー管3
の引抜きをさらに続けて行うことによって、水中コンク
リートの打設を地上付近まで最適に実施し、水中コンク
リートの品質を最適に維持できることとなる。
As a result, due to the increase in the underwater concrete 2 and the accompanying pulling out of the tremie pipe 3, the tremie pipe length at the measurement position on the ground gradually becomes shorter, and the value is memorized from the recorded contents on the pipe length explicit plate 8b. You can check directly without relying on it. On the other hand, the concrete crown measuring length can be measured by the measuring tape 4 to which the weight 5 is attached. Therefore, the operator can quickly and accurately obtain the remainder obtained by subtracting the concrete top end measuring length by the measuring tape 4 from the tremie pipe length obtained from the pipe length indicating plate 8b as the penetration length of the tremie pipe 3. become. Then, while maintaining such a penetration length at a controlled predetermined value, pouring of underwater concrete 2 and tremie pipe 3
By further pulling out the concrete, it is possible to optimally place the underwater concrete near the ground and maintain the optimal quality of the underwater concrete.

なお、上記実施例において、管長明示プレート8bに順
次番号を記入した場合には、これからトレミー管長を暗
算により直ちに求められるので、上記同様の結果が得ら
れる。
In addition, in the above embodiment, when numbers are sequentially written on the tube length indicating plate 8b, the tremie tube length can be immediately obtained by mental calculation, and the same result as above can be obtained.

<考案の結果> 以上のように、この考案によればトレミー管を構成する
複数の管の各単位ごとに、最下部の管の下端からの長さ
を実質的に表示する表示部を設けたので、水中コンクリ
ートの打設に応じて引抜かれるトレミー管の長さを記憶
に頼らず容易に確認でき、従って、トレミー管の水中コ
ンクリートへの貫入長を誤りなく、正確に管理および計
測できる。かくして、打設される水中コンクリートの品
質をも最適に保つことができるという効果が得られる。
<Result of Invention> As described above, according to this invention, the display unit for substantially displaying the length from the lower end of the lowermost tube is provided for each unit of the plurality of tubes forming the tremie tube. Therefore, the length of the tremie pipe that is pulled out according to the pouring of the underwater concrete can be easily checked without depending on the memory, and therefore the penetration length of the tremie pipe into the underwater concrete can be accurately managed and measured without error. Thus, the effect that the quality of the poured underwater concrete can be maintained optimally can be obtained.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの考案にかかるトレミー管の使用例を示す説
明図、第2図は管どうしの結合構造を示す要部の正面
図、第3図は第2図における表示部の断面図、第4図は
管どうしの結合構造の他の実施例を示す要部の正面図、
第5図は第4図における表示部の断面図である。 2……水中コンクリート、3……トレミー管、3a……
管、8……表示部。
FIG. 1 is an explanatory view showing an example of use of a tremie tube according to the present invention, FIG. 2 is a front view of an essential part showing a connecting structure of tubes, and FIG. 3 is a sectional view of a display part in FIG. FIG. 4 is a front view of a main part showing another embodiment of the connecting structure of pipes,
FIG. 5 is a sectional view of the display section in FIG. 2 ... Underwater concrete, 3 ... Tremy tube, 3a ...
Tube, 8 ... Display.

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】複数の管が分離可能に連結された水中コン
クリート打設用のトレミー管において、上記管の各単位
ごとに、最下部の管の下端からの長さを実質的に表示す
る表示部を設けたトレミー管。
1. A tremie pipe for pouring underwater concrete in which a plurality of pipes are separably connected to each other, and a display for substantially displaying the length from the lower end of the lowermost pipe for each unit of the pipe. Tremy tube with a section.
【請求項2】表示部が管の外周に設けた枠部材と管長明
示プレートとからなる請求項1記載のトレミー管。
2. The tremie tube according to claim 1, wherein the display portion comprises a frame member provided on the outer circumference of the tube and a tube length indicating plate.
【請求項3】表示部が管の外周に設けたマグネット製の
プレートとした請求項1記載のトレミー管。
3. The tremie tube according to claim 1, wherein the display portion is a magnet plate provided on the outer circumference of the tube.
JP2392288U 1988-02-26 1988-02-26 Tremie tube Expired - Lifetime JPH063875Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2392288U JPH063875Y2 (en) 1988-02-26 1988-02-26 Tremie tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2392288U JPH063875Y2 (en) 1988-02-26 1988-02-26 Tremie tube

Publications (2)

Publication Number Publication Date
JPH01136544U JPH01136544U (en) 1989-09-19
JPH063875Y2 true JPH063875Y2 (en) 1994-02-02

Family

ID=31243325

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2392288U Expired - Lifetime JPH063875Y2 (en) 1988-02-26 1988-02-26 Tremie tube

Country Status (1)

Country Link
JP (1) JPH063875Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5898468B2 (en) * 2011-11-14 2016-04-06 株式会社フジタ Underwater concrete placing method and apparatus

Also Published As

Publication number Publication date
JPH01136544U (en) 1989-09-19

Similar Documents

Publication Publication Date Title
CN207248186U (en) Casing construction centralising device
JPH063875Y2 (en) Tremie tube
CN102587386B (en) Basement top-down method steel pipe column HPE hydraulic construction method
CN110485424A (en) Deep basal pit underground structure contrary sequence method steel pipe column positioning device and positioning construction method
CN110172977A (en) Foundation pit support steel column grout pile top concrete prevents superfilled construction method and structure
KR20040108384A (en) The universal instrumentation apparatus for the measure sinking value of the soft ground
JP2001064954A (en) Method and apparatus for conducting loading test at front end of cast-in-place pile
CN217174960U (en) Embedded measuring device for monitoring horizontal displacement at different depths
JP2006348592A (en) Pile core control tool, and pile core control method using pile core control tool
JP2869604B2 (en) Top measuring device for cast concrete
JP2620748B2 (en) Pipe burial position measurement device in excavation trench
JPH03295931A (en) Construction method for frame straight pillar
JP3510444B2 (en) Lift gauge in boom working machine
CN210343333U (en) Bored pile depth measurement structure
CN112212989A (en) Concrete temperature measuring device
JP2591281B2 (en) Top management system for cast concrete
CN213658102U (en) Concrete temperature measuring mechanism with recyclable device
JPH06128958A (en) Measuring equipment for top end of placed concrete
JPH0452808B2 (en)
JPH0573157U (en) Top display
JPS5922027B2 (en) Automatic centralized tensioning method and device for prestressed concrete structures
JP2876263B2 (en) Drilling rig for underground continuous wall method
CN220206669U (en) Remote convergence monitoring device for tunnel
JPH06128956A (en) Measuring equipment for top end of placed concrete
JPH0447727B2 (en)