JPH06341121A - Structure of guard fence and execution method of said guard fence - Google Patents

Structure of guard fence and execution method of said guard fence

Info

Publication number
JPH06341121A
JPH06341121A JP15259193A JP15259193A JPH06341121A JP H06341121 A JPH06341121 A JP H06341121A JP 15259193 A JP15259193 A JP 15259193A JP 15259193 A JP15259193 A JP 15259193A JP H06341121 A JPH06341121 A JP H06341121A
Authority
JP
Japan
Prior art keywords
guard fence
concrete
guard
gutter
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15259193A
Other languages
Japanese (ja)
Inventor
Kunio Murakami
国夫 村上
Shiyunichi Karasuda
俊一 烏田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KEIHAN CONCRETE KOGYO KK
Original Assignee
KEIHAN CONCRETE KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEIHAN CONCRETE KOGYO KK filed Critical KEIHAN CONCRETE KOGYO KK
Priority to JP15259193A priority Critical patent/JPH06341121A/en
Publication of JPH06341121A publication Critical patent/JPH06341121A/en
Pending legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

PURPOSE:To shorten the term of work by installing a concrete block, in which a cable is housed, on an excavated ground surface in a road and mounting a guard fence onto the block. CONSTITUTION:A road 11 is excavated and levelled concrete 12 is installed, and a gutter 13 made of precast concrete is mounted onto the level led concrete 12. A catchment inlet 15 is set up to the connecting section of mutual gutters 13 and the gutters 13 are connected, and a guard fence 14 is installed onto the gutters 13. The position of a catchment opening 14A formed to the guard fence 14 is adjusted so as to be positioned at the place of the catchment inlet 15, and a cover 17 is fixed to the guard fence 14 and the peripheries of the gutters 13 and the catchment inlet 15 are buried with soil. Accordingly, the gutters, etc., are mounted under the guard fence, thus increasing the effective width of the road.

Description

【発明の詳細な説明】Detailed Description of the Invention

【産業上の利用分野】本発明は、道路の中央分離帯や道
路の端部に設置されるガードフエンスの改良に関し、更
に詳しくは該ガードフエンスの基礎コンクリートと用水
溝、排水溝、ケーブル通し溝を構成するコンクリート構
造物とを兼用したガードフエンスの構造及び該ガートフ
エンスの施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to improvement of a guard fence installed in a median strip of a road or an end portion of a road, and more specifically, to a concrete concrete of the guard fence and a water groove, a drain groove, a cable passage groove. The present invention relates to a structure of a guard fence which is also used as a concrete structure constituting the above and a construction method of the gart fence.

【0002】[0002]

【従来の技術】道路の中央分離帯や端部には車両通行の
安全を保障するためにガードフエンスを設置している。
ガードフエンスには、金属帯体を張設する形式のもの
と、コンクリート製の壁体を設置する形式のものとに区
別される。このコンクリート製の壁体からなるガードフ
エンスは、通常の場合、現場で鉄筋を組んでコンクリー
ト打設して形成するが、場合によっては予め工場で製造
したプレキャスト製品のガードフエンスブロックを現場
で設置する場合もある。
2. Description of the Related Art A guard fence is installed at a median strip or an end portion of a road in order to ensure the safety of vehicle traffic.
The guard fence is classified into a type in which a metal strip is stretched and a type in which a concrete wall is installed. Normally, the guard fence made of this concrete wall body is formed by placing reinforcing bars at the site and placing it in concrete, but in some cases, a guard fence block of precast product manufactured in advance at the factory is installed at the site. In some cases.

【0003】上記従来公知のコンクリート製のガードフ
エンスの一例を図9で説明すると、通常、以下の手順で
施工される。先ず、所定深さまで道路1を掘削する。そ
して、該掘削部分の表面に直線や水平面を出すための均
しコンクリート2を打設する。次に、該均しコンクリー
ト2の上に基礎コンクリート3を打設する。この基礎コ
ンクリート3を打設する際に、鉄筋4が基礎コンクリー
ト3から上方に突出するように予め設置して置く。この
基礎コンクリート3に設置された鉄筋4を取り囲むよう
に型枠(図示しない)を設置し、該型枠内に図示しない
装置によってコンクリートを打設してガードフエンス5
を形成する。
An example of the above-mentioned conventionally known concrete guard fence will be explained with reference to FIG. First, the road 1 is excavated to a predetermined depth. Then, the leveling concrete 2 for placing a straight line or a horizontal surface is placed on the surface of the excavated portion. Next, the foundation concrete 3 is poured on the leveling concrete 2. When the foundation concrete 3 is poured, it is installed and placed in advance so that the reinforcing bars 4 project upward from the foundation concrete 3. A form (not shown) is installed so as to surround the reinforcing bars 4 installed on the basic concrete 3, and concrete is poured into the form by a device (not shown) to form the guard fence 5
To form.

【0004】ガードフエンス5が設置された道路1の側
部も掘削され、その表面に均しコンクリート6が設置さ
れる。そして、均しコンクリート6の上に側溝7が埋設
される。側溝7は道路1上の雨水、塵埃等を集めて排出
するものであり、道路1に沿って連続して設置され、途
中に集水桝(図示しない)を設置して下水として排出し
ている。側溝7としては、近年、予め工場で製造された
プレキャストコンクリートブロックが使用されることが
多いが、現場でコンクリート打設して側溝7を形成する
場合もある。
The side portion of the road 1 on which the guard fence 5 is installed is also excavated, and the leveling concrete 6 is installed on the surface thereof. Then, the gutter 7 is embedded on the leveling concrete 6. The gutter 7 collects and discharges rainwater, dust, and the like on the road 1, is continuously installed along the road 1, and a collecting basin (not shown) is installed on the way to discharge it as sewage. . As the gutter 7, a precast concrete block manufactured in advance in a factory is often used in recent years, but the gutter 7 may be formed by pouring concrete on site.

【0005】ガードフエンス5及び側溝7は、前述のよ
うに、プレキャストコンクリートブッロクであっても良
いし、現場でコンクリートを打設して形成する現場打ち
コンクリートであっても良いが、均しコンクリート2及
び基礎コンクリート3は現場でコンクリート打設して形
成しているのが実状である。
As described above, the guard fence 5 and the side groove 7 may be precast concrete blocks or cast-in-place concrete formed by pouring concrete on site. In addition, the basic concrete 3 is actually formed by pouring concrete on site.

【0006】尚、上記公知のガードフエンスでは、側溝
7はガードフエンス5の一方側にのみ設置されている
が、ガードフエンス5が中央分離帯として設置される場
合には該ガードフエンス5の両側に側溝7を設置する場
合もある。
Incidentally, in the above-mentioned known guard fence, the side groove 7 is installed only on one side of the guard fence 5, but when the guard fence 5 is installed as a median strip, it is located on both sides of the guard fence 5. The gutter 7 may be installed in some cases.

【0007】又、高速道路ではガードフエンスに沿って
通信用のケーブルを埋設している場合がある。通常、こ
のケーブルは通し溝を有するコンクリートブロックや金
属管からなる配管の中に配置され、該コンクリートブロ
ックあるいは配管を地中に埋設している。このようなケ
ーブル埋設用のコンクリートブロックも前記図9に示す
ような側溝7と同様な構造あるいは施工方法となってい
る。
[0007] Further, there are cases in which communication cables are buried along the guard fence on highways. Usually, this cable is arranged in a concrete block having a through groove or a pipe made of a metal pipe, and the concrete block or the pipe is buried in the ground. Such a concrete block for burying a cable also has the same structure or construction method as the side groove 7 as shown in FIG.

【0008】[0008]

【発明が解決しようとする課題】上記に示すような従来
公知のガードフエンスによると、以下のように問題点が
あった。先ず、施工の工程上、基礎コンクリート3を打
設しなければならない分だけ工程が多くなり、かつ基礎
コンクリート3の打設工程の分さらには該基礎コンクリ
ート3の養生期間だけ工期が長くなってしまう。又、基
礎コンクリートの打設工程に基づく作業費及び材料費が
かさんでコスト高となってしまう。
The conventionally known guard fence as described above has the following problems. First, in the construction process, the number of steps is increased by the amount that the basic concrete 3 must be cast, and the construction period is increased by the amount of the step of placing the basic concrete 3 and the curing period of the basic concrete 3. . Further, the work cost and the material cost based on the placing process of the basic concrete are expensive and the cost becomes high.

【0009】更に、ガードフエンスの側部に側溝等が設
置されているので、その分だけ道路の有効幅が低減さ
れ、車両通行帯の幅が狭くなってしまう。
Further, since the side wall of the guard fence is provided with a gutter or the like, the effective width of the road is reduced by that amount and the width of the vehicle lane is narrowed.

【0010】そこで、本発明の目的は前記欠点を改善
し、側溝等を基礎コンクリートと兼用することにより工
期の短縮、コスト低減を図ると同時に、道路の有効幅を
大きくしたガードフエンスの構造及び施工方法を提供す
るにある。
Therefore, the object of the present invention is to improve the above-mentioned drawbacks and to shorten the construction period and cost by using gutters and the like as basic concrete, while at the same time constructing and constructing a guard fence with a wide effective road. There is a way to provide.

【0011】[0011]

【課題を解決するための手段】本発明の特徴とするとこ
ろは、以下の点にある。先ず、地中に埋設された側溝
と、該側溝の上に設置されたガードフエンスと、該ガー
ドフエンスに形成された集水開口とからなることを特徴
とするガードフエンスの構造。
The features of the present invention are as follows. First, a structure of a guard fence, which comprises a gutter buried in the ground, a guard fence installed on the gutter, and a water collecting opening formed in the guard fence.

【0012】次に、地中に埋設されたケーブル収容のコ
ンクリートブロックと、該コンクリートブロックの上に
設置されたガードフエンスとからなることを特徴とする
ガードフエンスの構造。
[0012] Next, a structure of a guard fence, which comprises a concrete block for burying a cable buried in the ground and a guard fence installed on the concrete block.

【0013】更に、道路を掘削し、該掘削した地面上に
側溝を設置し、該側溝の上に集水開口を有するガードフ
エンスを設置し、側溝の周囲に土を埋めてなることを特
徴とするガードフエンスの施工方法。
Further, a road is excavated, a ditch is installed on the excavated ground, a guard fence having a water collecting opening is installed on the ditch, and soil is buried around the ditch. How to install guard fence.

【0014】更に又、道路を掘削し、該掘削した地面上
にケーブル収容のコンクリートブロックを設置し、該コ
ンクリートブロックの上にガードフエンスを設置し、コ
ンクリートブロックの周囲に土を埋めてなることを特徴
とするガードフエンスの施工方法。
Furthermore, a road is excavated, a concrete block containing a cable is installed on the excavated ground, a guard fence is installed on the concrete block, and soil is buried around the concrete block. The construction method of the characteristic guard fence.

【0015】[0015]

【実施例】以下、図によって本発明の一実施例について
説明する。図1は本発明の一実施例になるガードフエン
スの構造を示す正面図、図2は図1のAーA断面図、図
3は図1のBーB断面図、図4は図1のCーC断面図で
ある。
An embodiment of the present invention will be described below with reference to the drawings. 1 is a front view showing the structure of a guard fence according to an embodiment of the present invention, FIG. 2 is a sectional view taken along the line AA of FIG. 1, FIG. 3 is a sectional view taken along the line BB of FIG. 1, and FIG. It is CC sectional drawing.

【0016】先ず、図1ないし図4を参照して本発明の
一実施例になるガードフエンスの構造を説明すると、道
路11に均しコンクリート12を設置し、該均しコンク
リート12の上に側溝13を設置する。そして、該側溝
13の上にガードフエンス14を設置する。側溝13は
この実施例ではプレキャスト製品となっているが、現場
打ちの鉄筋コンクリート製であっても良い。側溝13の
つなぎ部分には集水桝15が設けられ、該集水桝15に
は道路11上の雨水が直接流入され、更には道路11上
の雨水が一旦側溝13に流入された後、該側溝13の通
水溝13Aを流れて流入される。道路11上の雨水が直
接集水桝15内へ流入できるように、ガードフエンス1
4の基端部分に集水開口14Aが形成されている。集水
開口14Aの設置位置は、集水桝15の設置位置と同一
位置となっている。更に、道路13上の雨水が側溝13
に形成された通水溝13A内へ流入されるように、ガー
ドフエンス14の基端部分には集水開口14Bが形成さ
れている。集水開口14Bの設置位置はガードフエンス
14の前記集水開口14Aの中間部分であり、一つのブ
ロックからなるガードフエンス14に対して1個あるい
は複数個形成されるものである。側溝13の通水溝13
Aに流入した雨水は集水桝15に流入し、直接集水桝1
5に流入した雨水と一緒に排水開口15Aを介して下水
として排水される。側溝13の通水溝13Aには雨水が
通過するスリットを有する蓋部材16が被せられてい
る。又、集水開口14Aを覆うカバー17がガードフエ
ンス14に固定されている。
First, referring to FIGS. 1 to 4, the structure of a guard fence according to an embodiment of the present invention will be described. A leveling concrete 12 is installed on a road 11 and a gutter is placed on the leveling concrete 12. Install 13. Then, the guard fence 14 is installed on the side groove 13. The gutters 13 are precast products in this embodiment, but may be made of cast-in-place reinforced concrete. A water collecting basin 15 is provided at a connecting portion of the gutter 13, rainwater on the road 11 directly flows into the water collecting basin 15, and further, rainwater on the road 11 once flows into the ditch 13 and then It flows in through the water passage groove 13A of the side groove 13 and flows in. In order to allow rainwater on the road 11 to flow directly into the catchment basin 15, guard fence 1
A water collecting opening 14A is formed at the base end portion of No. 4. The installation position of the water collecting opening 14A is the same as the installation position of the water collecting basin 15. Furthermore, the rainwater on the road 13 is drained by the gutter 13.
A water collecting opening 14B is formed at the base end portion of the guard fence 14 so that the water can flow into the water passage 13A formed in the above. The installation position of the water collecting opening 14B is an intermediate portion of the water collecting opening 14A of the guard fence 14, and one or a plurality of water collecting openings 14B are formed with respect to the guard fence 14 formed of one block. Water passage groove 13 of the side groove 13
The rainwater flowing into A flows into the collecting basin 15 and directly collects into the collecting basin 1.
It is drained as sewage through the drainage opening 15A together with the rainwater that has flowed into the tank 5. A lid member 16 having a slit through which rainwater passes is covered on the water passage 13A of the side groove 13. A cover 17 that covers the water collecting opening 14A is fixed to the guard fence 14.

【0017】以上のように構成された本発明のガードフ
エンスの施工方法について、以下説明する。先ず、道路
11を掘削してその上に均しコンクリート12を設置
し、直線及び水平面が出るようにする。次に、該均しコ
ンクリート12の上に側溝13を設置する。この実施例
では側溝13はプレキャストコンクリート製品となって
いる。そして、側溝13どうしのつなぎ部分に集水桝1
5を設置し、側溝13どうしを連結する。続いて、側溝
13の上にガードフエンス14を設置する。この場合、
ガードフエンス14に形成されている集水開口14Aが
集水桝15の位置となるように位置調整する。そして、
側溝13とガードフエンス14とを締め具18(この実
施例ではボルト)によって結合する。その後、カバー1
7をガードフエンス14に固定し、側溝13及び集水桝
15の周囲を土で埋める。
A method for constructing the guard fence of the present invention having the above-described structure will be described below. First, the road 11 is excavated, and the leveling concrete 12 is installed on the road 11 so that a straight line and a horizontal plane are formed. Next, a gutter 13 is installed on the leveling concrete 12. In this example, the gutter 13 is a precast concrete product. Then, the water collecting basin 1 is provided at the connecting portion between the gutters 13.
5 is installed and the gutters 13 are connected to each other. Then, the guard fence 14 is installed on the side groove 13. in this case,
The position of the water collecting opening 14A formed in the guard fence 14 is adjusted to the position of the water collecting basin 15. And
The side groove 13 and the guard fence 14 are connected by a fastener 18 (a bolt in this embodiment). Then cover 1
7 is fixed to the guard fence 14, and the surroundings of the gutter 13 and the water collecting basin 15 are filled with soil.

【0018】本発明の側溝13を有するガードフエンス
14では、道路11上の雨水は、一方では集水開口14
Aを介して直接集水桝15へ流入し、他方では集水開口
14Bを介して一旦側溝13の通水溝13Aに流入さ
れ、これが通水溝13Aを流れて集水桝15に流入さ
れ、それが下水等として排出されるものとなっいる。
In the guard fence 14 with the gutters 13 of the present invention, rainwater on the road 11 is, on the one hand, a collection opening 14
It directly flows into the water collecting basin 15 through A, and on the other hand, once flows into the water collecting groove 13A of the side groove 13 through the water collecting opening 14B, which flows through the water flowing groove 13A and flows into the water collecting basin 15. It is discharged as sewage.

【0019】以上に説明したガードフエンスの構造及び
その施工方法は本発明の一実施例であって、本発明は上
記実施例に限定されるものではない。例えば、ガードフ
エンス及び側溝は、現場でコンクリート打設によって形
成しても良い。
The structure of the guard fence and the construction method thereof described above are only one embodiment of the present invention, and the present invention is not limited to the above embodiment. For example, the guard fence and gutters may be formed in-situ by concrete pouring.

【0020】更に、スリットを有する蓋部材は必ずしも
必要な構成ではなく、省略可能である。又、蓋部材とし
て、雨水が流入する部分以外の部分において、スリット
のない蓋部材を設け、雨水の流入する部分にはスリット
を有する蓋部材を設けるかあるいは蓋部材を設けない構
造とすることもできる。又、通水溝の形状はU形に限定
されるものではなく、円形であっても良い。又、集水桝
は必ずしも必要な構成ではなく、省略可能である。この
場合には、雨水は集水開口14Bから直接側溝の通水溝
内へ流入し、適宜の位置で通水溝13A外部へ排出され
る構造となる。更に又、集水開口をガードフエンスの両
側に開口させ、ガードフエンスの両側から雨水を流入さ
せるようにすることもできる。この構造は、ガードフエ
ンスが中央分離帯として設置され、該ガードフエンスの
両側に道路が形成されている場合に有効なものである。
Further, the lid member having the slit is not always necessary and can be omitted. Further, as the lid member, a lid member without a slit may be provided in a portion other than the portion where the rainwater flows in, and a lid member having a slit may be provided in the portion where the rainwater flows in, or the lid member may not be provided. it can. Further, the shape of the water passage is not limited to the U shape, and may be circular. Further, the water collecting basin is not always necessary and can be omitted. In this case, the rainwater directly flows into the water passage of the side groove from the water collecting opening 14B and is discharged to the outside of the water passage 13A at an appropriate position. Furthermore, the water collecting openings may be opened on both sides of the guard fence so that rainwater can flow in from both sides of the guard fence. This structure is effective when the guard fence is installed as a median strip and roads are formed on both sides of the guard fence.

【0021】本発明は上記実施例の他、次のような構造
の実施例も含むものである。即ち、図5は、本発明の他
の実施例になるガードフエンスの構造を示す断面図であ
り、この実施例においては図1ないし図4における側溝
の代わりにケーブル等の通し用溝を有するコンクリート
ブロックとなっている。即ち、ケーブル21が配置され
る溝形のコンクリートブロック22の上にガードフエン
ス23が配置される構造となっている。この場合には、
溝形のコンクリートブロック22内へは集水しないので
ガードフエンス23には集水開口を形成していない。
In addition to the above embodiments, the present invention includes embodiments having the following structures. That is, FIG. 5 is a cross-sectional view showing a structure of a guard fence according to another embodiment of the present invention. In this embodiment, concrete having through grooves for cables or the like instead of the side grooves in FIGS. 1 to 4 is used. It is a block. That is, the guard fence 23 is arranged on the groove-shaped concrete block 22 on which the cable 21 is arranged. In this case,
Since no water is collected into the channel-shaped concrete block 22, no water collecting opening is formed in the guard fence 23.

【0022】ケーブル21設置のコンクリートブロック
22を設置する場合、ケーブル21のメンテナンスが必
要となる場合がある。そこで、図6及び図7に示すよう
なメンテナンス用の取付け、取外し自在の壁部材24を
設置する。即ち、隣接するガードフエンス23の間に間
隔を設け、該間隔部分にガードフエンス23と略同一形
状をした金属板からなる壁部材24をボルト25によっ
て取付け、取外し自在に設置する。更に、隣接するコン
クリートブロック22にも間隙を設け、該間隙部分に作
業用の桝26を設置するものである。ケーブル21のメ
ンテナンスが必要となると、ボルト25を外して壁部材
24を取外し、作業員が作業用の桝26の中に入ってメ
ンテナンス作業を行うようにする。
When installing the concrete block 22 on which the cable 21 is installed, maintenance of the cable 21 may be required in some cases. Therefore, as shown in FIGS. 6 and 7, an attachment / detachment wall member 24 for maintenance is installed. That is, a space is provided between the adjacent guard fences 23, and a wall member 24 made of a metal plate having substantially the same shape as the guard fence 23 is attached to the space between the guard fences 23 with a bolt 25 so as to be detachably installed. Further, a gap is provided also between the adjacent concrete blocks 22, and a work basin 26 is installed in the gap portion. When the maintenance of the cable 21 is required, the bolt 25 is removed and the wall member 24 is removed, so that the worker can enter the work rod 26 to perform the maintenance work.

【0023】又、図8は本発明の他の実施例を示す断面
図であり、この実施例では側溝が円形水路31となって
おり、その上面に形成された雨水の流入スリット32を
覆うことなくガードフエンス33が一方側に寄せて設置
されているものである。
FIG. 8 is a sectional view showing another embodiment of the present invention. In this embodiment, the side groove is a circular water channel 31, and the rainwater inflow slit 32 formed on the upper surface thereof is covered. Instead, the guard fence 33 is installed close to one side.

【0024】上記図5及び図8に示す実施例の施工工程
は、図1ないし図4に示す実施例の施工工程と略同様で
あるから説明を省略する。
Since the construction steps of the embodiment shown in FIGS. 5 and 8 are substantially the same as the construction steps of the embodiment shown in FIGS. 1 to 4, the description thereof will be omitted.

【0025】[0025]

【発明の効果】以上に説明したように本発明による以下
のような効果がある。先ず、施工の工程上、基礎コンク
リートが省略されているので、その分だけ工程が簡単化
され、更に基礎コンクリートの打設工程及び該基礎コン
クリートの養生期間がなくなって工期が短縮される。
又、基礎コンクリートの打設工程がない分だけ作業費及
び材料費が低減され、低コストが得られる。
As described above, the following effects are provided by the present invention. First, since the basic concrete is omitted in the construction process, the process is simplified accordingly, and the construction process of the basic concrete and the curing period of the basic concrete are eliminated, and the construction period is shortened.
Further, the work cost and the material cost are reduced by the amount of the step of placing the basic concrete, and the low cost can be obtained.

【0026】更に、ガードフエンスの下に側溝等が設置
されているので、その分だけ道路の有効幅が増大し、車
両通行帯の幅が広がる。
Further, since a gutter or the like is installed under the guard fence, the effective width of the road is increased and the width of the vehicle lane is widened accordingly.

【0027】取付け、取外し自在の壁部材を隣接するガ
ードフエンスの間に設置した構造のケーブル埋設用のガ
ードフエンス構造によると、ケーブルのメンテナンスを
簡単に行うことができるものとなる。
According to the guard fence structure for burying a cable in which a wall member that can be attached and detached is installed between adjacent guard fences, the cable can be easily maintained.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明の一実施例になるガードフエン
スの構造を示す正面図である。
FIG. 1 is a front view showing a structure of a guard fence according to an embodiment of the present invention.

【図2】図2は、図1のAーA断面図である。FIG. 2 is a sectional view taken along the line AA of FIG.

【図3】図3は、図1のBーB断面図である。FIG. 3 is a sectional view taken along line BB in FIG.

【図4】図4は図1のCーC断面図である。FIG. 4 is a sectional view taken along line CC of FIG.

【図5】図5は、本発明の他の実施例を示す断面図であ
る。
FIG. 5 is a cross-sectional view showing another embodiment of the present invention.

【図6】図6は、図5の実施例において、メンテナンス
機構を設けた実施例を示す断面図である。
FIG. 6 is a sectional view showing an embodiment in which a maintenance mechanism is provided in the embodiment of FIG.

【図7】図7は、図6のDーD断面図である。7 is a cross-sectional view taken along line DD of FIG.

【図8】図8は、本発明の他の実施例を示す断面図であ
る。
FIG. 8 is a sectional view showing another embodiment of the present invention.

【図9】図9は、公知のガートフエンスの構造及び施工
方法を説明するための断面図である。
FIG. 9 is a cross-sectional view for explaining a structure and a construction method of a known gart fence.

【符号の説明】[Explanation of symbols]

11 道路 12 均しコンクリート 13 側溝 14 ガードフエンス 14A 集水開口 14B 集水開口 15 集水桝 16 蓋部材 17 カバー 18 止め具 11 Road 12 Leveling Concrete 13 Gutter 14 Guard Fence 14A Water Collection Opening 14B Water Collection Opening 15 Water Collection Mouth 16 Lid Member 17 Cover 18 Stopper

Claims (12)

【特許請求の範囲】[Claims] 【請求項1】地中に埋設された側溝と、該側溝の上に設
置されたガードフエンスと、該ガードフエンスに形成さ
れた集水開口とからなることを特徴とするガードフエン
スの構造。
1. A structure of a guard fence, comprising a gutter embedded in the ground, a guard fence installed on the gutter, and a water collecting opening formed in the guard fence.
【請求項2】地中に埋設されたケーブル収容のコンクリ
ートブロックと、該コンクリートブロックの上に設置さ
れたガードフエンスとからなることを特徴とするガード
フエンスの構造。
2. A structure of a guard fence, comprising a concrete block for burying a cable buried in the ground and a guard fence installed on the concrete block.
【請求項3】側溝あるいはケーブル収容のコンクリート
ブロックとガードフエンスの内、どちらか一方がプレキ
ャストコンクリート製品であり、他方が現場打ちコンク
リートであることを特徴とする請求項1又は請求項2記
載のガードフエンスの構造。
3. A guard according to claim 1 or 2, wherein one of the concrete block and the guard fence of the gutter or cable is a precast concrete product, and the other is cast-in-place concrete. Fuence structure.
【請求項4】側溝あるいはケーブル収容のコンクリート
ブロックとガードフエンスの両方がプレキャストコンク
リート製品であることを特徴とする請求項1又は請求項
2記載のガードフエンスの構造。
4. The guard fence structure according to claim 1 or 2, wherein both the gutter or cable containing concrete block and the guard fence are precast concrete products.
【請求項5】側溝あるいはケーブル収容のコンクリート
ブロックとガードフエンスの両方が現場打ちコンクリー
トであることを特徴とする請求項1又は請求項2記載の
ガードフエンスの構造。
5. The guard fence structure according to claim 1 or 2, wherein both the gutter or cable-containing concrete block and the guard fence are cast concrete.
【請求項6】隣接するガードフエンスの間隙に取付け、
取外し自在に略ガードフエンスブロックと同一形状の壁
部材を設けてなることを特徴とする請求項2記載のガー
ドフエンスの構造。
6. Attaching to a gap between adjacent guard fences,
The guard fence structure according to claim 2, wherein a wall member having substantially the same shape as that of the guard fence block is provided so as to be removable.
【請求項7】道路を掘削し、該掘削した地面上に側溝を
設置し、該側溝の上に集水開口を有するガードフエンス
を設置し、側溝の周囲に土を埋めてなることを特徴とす
るガードフエンスの施工方法。
7. A method of excavating a road, installing a gutter on the excavated ground, installing a guard fence having a water collecting opening on the gutter, and burying soil around the gutter. How to install guard fence.
【請求項8】道路を掘削し、該掘削した地面上にケーブ
ル収容のコンクリートブロックを設置し、該コンクリー
トブロックの上にガードフエンスを設置し、コンクリー
トブロックの周囲に土を埋めてなることを特徴とするガ
ードフエンスの施工方法。
8. A method of excavating a road, installing a cable-containing concrete block on the excavated ground, installing a guard fence on the concrete block, and burying soil around the concrete block. How to construct the guard fence.
【請求項9】側溝あるいはケーブル収容のコンクリート
ブロックとガードフエンスの内、どちらか一方がプレキ
ャストコンクリート製品であり、他方が現場打ちコンク
リートであることを特徴とする請求項6又は請求項7記
載のガードフエンスの施工方法。
9. The guard according to claim 6 or 7, wherein one of the concrete block and the guard fence of the gutter or cable is a precast concrete product, and the other is cast-in-place concrete. Fence construction method.
【請求項10】側溝あるいはケーブル収容のコンクリー
トブロックとガードフエンスの両方がプレキャストコン
クリート製品であることを特徴とする請求項6又は請求
項7記載のガードフエンスの施工方法。
10. A method of constructing a guard fence according to claim 6 or 7, wherein both the gutter or cable containing concrete block and the guard fence are precast concrete products.
【請求項11】側溝あるいはケーブル収容のコンクリー
トブロックとガードフエンスの両方が現場打ちコンクリ
ートであることを特徴とする請求項6又は請求項7記載
のガードフエンスの施工方法。
11. The method of constructing a guard fence according to claim 6 or 7, wherein both the concrete block for housing the gutter or the cable and the guard fence are cast concrete.
【請求項12】隣接するガードフエンスの間隙を覆う様
に略ガードフエンスと同一形状の壁部材をガードフエン
スに止め手段によって取付け、取外し自在に設け、該壁
部材を取り外してケーブルのメンテナンスを可能とした
請求項7記載のガードフエンスの施工方法。 【0001】
12. A wall member having substantially the same shape as that of the guard fence is attached to the guard fence by a fastening means so as to cover a gap between adjacent guard fences and is detachably provided. The wall member can be detached for maintenance of a cable. The method for constructing a guard fence according to claim 7, [0001]
JP15259193A 1993-06-01 1993-06-01 Structure of guard fence and execution method of said guard fence Pending JPH06341121A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15259193A JPH06341121A (en) 1993-06-01 1993-06-01 Structure of guard fence and execution method of said guard fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15259193A JPH06341121A (en) 1993-06-01 1993-06-01 Structure of guard fence and execution method of said guard fence

Publications (1)

Publication Number Publication Date
JPH06341121A true JPH06341121A (en) 1994-12-13

Family

ID=15543792

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15259193A Pending JPH06341121A (en) 1993-06-01 1993-06-01 Structure of guard fence and execution method of said guard fence

Country Status (1)

Country Link
JP (1) JPH06341121A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997006939A1 (en) * 1995-08-21 1997-02-27 G.O.R. Applicazioni Speciali S.P.A. Thermoforming mold with trimming movable side blades
JP2010174587A (en) * 2009-02-02 2010-08-12 Ito Yogyo Co Ltd Road facility
JP2013221380A (en) * 2012-04-19 2013-10-28 Kcon Kk Multifunctional guardfence having built in drain channel
JP2021521367A (en) * 2018-05-03 2021-08-26 上海▲シャン▼搶環境技術有限公司 Drainage ditch with dust collection function for roads

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997006939A1 (en) * 1995-08-21 1997-02-27 G.O.R. Applicazioni Speciali S.P.A. Thermoforming mold with trimming movable side blades
JP2010174587A (en) * 2009-02-02 2010-08-12 Ito Yogyo Co Ltd Road facility
JP2013221380A (en) * 2012-04-19 2013-10-28 Kcon Kk Multifunctional guardfence having built in drain channel
JP2021521367A (en) * 2018-05-03 2021-08-26 上海▲シャン▼搶環境技術有限公司 Drainage ditch with dust collection function for roads

Similar Documents

Publication Publication Date Title
KR102348396B1 (en) The point drainge appartus with linear drainge function
JPH06341121A (en) Structure of guard fence and execution method of said guard fence
JP3519378B2 (en) Retaining wall structure and members for retaining wall construction in the observer passage in the tunnel
KR101895753B1 (en) Boundary stone carrying cables
JP6532256B2 (en) Gutter cover and road surface structure provided with the gutter cover
JP4528743B2 (en) Side gutter drainage and side gutter construction method
JP3022195U (en) Drainage tractor pedestrian border block
JP6153187B1 (en) Road bridge cover widening unit
JP2000328641A (en) Side drain with lid slab having curb
JPH0718723A (en) Adjustable-slope road side ditch
JP3721526B2 (en) Precast concrete culvert side gutter
KR102571397B1 (en) Catch Basin for Height-Adjustable and Constructing Method Using The Same
JPH05339978A (en) Composite function type gutter
KR101491405B1 (en) extended drain installation structure of high-level road or step by step foundation construction
KR102678778B1 (en) Manhole block
KR100647210B1 (en) Gutter with boundary stones
JP2559319Y2 (en) Road side gutter block body
JP2000045212A (en) Boundary block
JP2005002710A (en) Concrete block for constructing sidewalk-roadway boundary body
CN209468655U (en) A kind of protection road shoulder of the combined based on highway road two sides
JPS6141826Y2 (en)
JP3066226U (en) Drain block
JPH0711701A (en) Free gradient two-piece underdrain block
JP3245259B2 (en) Foundation construction method
JP2006233429A (en) Drainage block