JPH06322979A - Casting of concrete slab for building - Google Patents

Casting of concrete slab for building

Info

Publication number
JPH06322979A
JPH06322979A JP13954093A JP13954093A JPH06322979A JP H06322979 A JPH06322979 A JP H06322979A JP 13954093 A JP13954093 A JP 13954093A JP 13954093 A JP13954093 A JP 13954093A JP H06322979 A JPH06322979 A JP H06322979A
Authority
JP
Japan
Prior art keywords
jack
concrete slab
fitting
members
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13954093A
Other languages
Japanese (ja)
Inventor
Kunihito Kuramoto
久仁人 倉本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP13954093A priority Critical patent/JPH06322979A/en
Publication of JPH06322979A publication Critical patent/JPH06322979A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To make easy, correct and safe support possible for sleepers, rails and panels for concrete casting, and to save labor in removal of the sleepers, the rails and the panels for concrete casting after construction. CONSTITUTION:An H-steel, a piece of beam 3 or the like, is cut in specified length and divided into members including two L-shaped members 20a, two reinforcing rib members 20b and one bottom plate member 21a. Beam-clamps metal fittings 21 are made by welding L-steels to the bottom plate member 21a, and two sets of jack-jointing metal fittings 20 are made by welding the L-steels to the two L-shaped members 20a and the two reinforcing rib members 20b. Then, the jack-jointing metal fittings 20 are installed to a beam 3 with the beam-clamping metal fittings 21. And bases of jacks 23 are put into gaps of the jack-jointing metal fittings 20, and thereby the jacks 23 are installed to the beam 3. Sleepers 6, rails 8, panels 9 for concrete casting or the like are held with the jacks 23, and a concrete slab 11 is cast.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、鉄筋あるいは鉄骨の
建造物におけるフロアを形成するためのコンクリートス
ラブ打設方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete slab placing method for forming a floor in a reinforcing bar or steel frame structure.

【0002】[0002]

【従来の技術】鉄筋あるいは鉄骨の建造物において、2
階あるいは3階のフロアを形成するためのコンクリート
スラブを打設する方法としては、通常、大引き、桟材な
どを用いて打設用パネルを敷き、その上にコンクリート
スラブを打設する方法が用いられていた。この場合、大
引き、桟材、打設用パネルなどを保持する手段として、
下側のフロアからジャッキを用いた支柱で支える手段が
ある。この手段は、支柱の設置が簡単であり、また、コ
ンクリートスラブを打設後支柱を除去する作業も簡単で
あるが、下側のフロアに対するコンクリートスラブを打
設する場合には、支柱があるために他のフロアと同時に
施工できない。
2. Description of the Related Art In a structure of a reinforcing bar or a steel frame, 2
As a method of placing a concrete slab for forming the first floor or the third floor, a method of placing a placing panel using a large pull, a crosspiece, etc., and placing a concrete slab on it are usually used. Was used. In this case, as a means to hold the large pull, crosspiece, driving panel, etc.
There is a means to support from the lower floor with a prop using a jack. By this means, it is easy to install the pillars, and it is also easy to remove the pillars after placing the concrete slab, but when the concrete slab is placed on the lower floor, there are pillars. It cannot be installed at the same time as other floors.

【0003】従って、下側のフロアに対するコンクリー
トスラブを同時に打設する場合には図5に示すように、
仕切り壁の間に架設した梁材に木製の支柱を取付けて支
える手段が用いられていた。即ち、図5は従来の方法を
示すもので、(a)は正面図、(b)は図(a)のb−
b線から見た側面図である。図において、1は下側のフ
ロア、2は室間を仕切る仕切り壁、3は仕切り壁2の間
に架設した梁材であり、H形鋼を用いて構成されてい
る。このH形鋼は建造物の規模に適合したサイズのもの
が使用される。4は大引き支柱であり木材で形成されて
いる。この大引き支柱4は、H形鋼の梁材3の両側に適
当な間隔ごと設けられ、脱落しないようにそれぞれ水平
つなぎ用桟材5によりつないである。6は大引きであ
り、かすがい7を用いて大引き支柱4にとめてある。8
は大引き6により支持された桟材、9は桟材8により支
持された打設用パネル、10はくさびであり、打設用パ
ネル9が正しい平面になるように調節するものである。
11は打設したコンクリートスラブである。
Therefore, when concrete slabs are simultaneously placed on the lower floor, as shown in FIG.
A means for attaching and supporting wooden columns on beam members erected between partition walls has been used. That is, FIG. 5 shows a conventional method, in which (a) is a front view and (b) is b- in FIG.
It is the side view seen from the b line. In the figure, 1 is a lower floor, 2 is a partition wall for partitioning between rooms, and 3 is a beam material installed between the partition walls 2 and is made of H-shaped steel. This H-section steel is used in a size suitable for the scale of the building. 4 is a large-pulled column, which is made of wood. The large pulling columns 4 are provided on both sides of the H-shaped steel beam member 3 at appropriate intervals, and are connected by horizontal connecting bar members 5 so as not to fall off. 6 is a large pull, and it is fixed to the large pull strut 4 by using a clasp 7. 8
Is a crosspiece supported by the pulling bar 6, 9 is a placing panel supported by the crosspiece 8, and 10 is a wedge for adjusting the placing panel 9 to a correct plane.
Reference numeral 11 is a concrete slab that has been placed.

【0004】[0004]

【発明が解決しようとする課題】上記のように、大引き
支柱4により大引き6、桟材8、打設用パネル9を支持
してコンクリートスラブを打設すると、下側のフロアに
対するコンクリートスラブの打設が同時に施工できる。
しかし、梁材3に大引き支柱4を取付けるのに手数がか
かっていた。特に、水平つなぎ用桟材5により大引き支
柱4をつないだり、かすがい7を用いてとめる等の養生
を施すと、施工後大引き支柱4、大引き6、桟材8、打
設用パネル9を取外す作業に手数がかかる。この養生を
省略すると、一点鎖線で示すように大引き支柱4が倒れ
たり脱落するなど正確で安全な工事ができないなどの問
題があった。
As described above, when the concrete slab is placed by supporting the large pull 6, the crosspiece 8 and the placing panel 9 by the large pull column 4, when the concrete slab is placed on the floor below. Can be installed at the same time.
However, it took a lot of time to attach the pulling support column 4 to the beam member 3. In particular, when the horizontal pulling bars 5 are used to connect the large pulling supports 4 and / or the clasps 7 are used to stop them, after the construction, the large pulling supports 4, the large pulling 6, the cross members 8, and the panel for placing are placed. It takes time to remove 9 pieces. If this curing is omitted, there is a problem that accurate and safe construction cannot be performed, such as the pulling support column 4 falling over or falling off as shown by a chain line.

【0005】この発明はかかる問題点を解決するために
なされたものであり、大引き6、桟材8、打設用パネル
9の支持が容易で、施工後大引き6、桟材8、打設用パ
ネル9を取外す作業にも手数がかからないコンクリート
スラブ打設方法を提供することを目的としている。
The present invention has been made in order to solve such a problem, and it is easy to support the large pull 6, the crosspiece 8, and the panel 9 for placing, and after the construction, the large draw 6, the crosspiece 8, It is an object of the present invention to provide a concrete slab placing method that does not require much labor for removing the installation panel 9.

【0006】[0006]

【課題を解決するための手段】この発明に係るコンクリ
ートスラブ打設方法においては、梁材3の切れ端材また
は梁材3に使用したH形鋼と類似のH形鋼を所定長さに
切り、2個のL形部材と2個の補強リブ部材および1個
の底板部材に分割切断する。つぎに分割切断した部材の
内、底板部材にL形鋼を溶接して梁材挟持金具を、ま
た、2個のL形部材と2個の補強リブ部材にL形鋼を溶
接して2組のジャッキ嵌合金具を形成する。この場合、
ジャッキ嵌合金具にはジャッキの基台を嵌込むための空
隙を設ける。つぎに、梁材挟持金具によりジャッキ嵌合
金具を梁材に取付けする。ジャッキ嵌合金具の空隙にジ
ャッキの基台を嵌込むことによりジャッキを梁材に取付
ける。このジャッキにより大引き、桟材、打設用パネル
などを保持してコンクリートスラブを打設する。
In the concrete slab placing method according to the present invention, a scrap of the beam 3 or an H-section steel similar to the H-section steel used for the beam 3 is cut into a predetermined length, Divide into two L-shaped members, two reinforcing rib members and one bottom plate member. Next, of the members that have been divided and cut, the bottom plate member is welded with L-shaped steel to clamp the beam member, and the two L-shaped members and the two reinforcing rib members are welded with L-shaped steel to form two sets. Form the jack fitting. in this case,
The jack fitting is provided with a space to fit the base of the jack. Next, the jack fitting is attached to the beam member by the beam member sandwiching member. Attach the jack to the beam by inserting the jack base into the gap of the jack fitting. With this jack, a concrete slab is placed while holding a large pull, a crosspiece, a placing panel, and the like.

【0007】[0007]

【作用】上記のように構成されたコンクリートスラブの
打設方法は、梁材用のH形鋼の切れ端材などを用いて梁
材挟持金具およびジャッキ嵌合金具を製作し、この梁材
挟持金具およびジャッキ嵌合金具を梁材に着脱自在に装
着し、この装着したジャッキ嵌合金具にジャッキの基台
を嵌込むことによりジャッキを上記梁材に取付けし、こ
のジャッキにより大引き、桟材、打設用パネルなどを保
持してコンクリートスラブを打設する。
According to the method of placing a concrete slab constructed as described above, a beam material holding metal fitting and a jack fitting metal fitting are manufactured by using an H-shaped steel scrap for a beam material. And, the jack fitting is detachably attached to the beam, and the jack base is fitted into the attached jack fitting to attach the jack to the beam. The concrete slab is placed while holding the panel for placing.

【0008】[0008]

【実施例】【Example】

実施例1.図1ないし図4はこの発明の一実施例を示す
ものである。図において、3は梁材、6は大引き、8は
桟材、9は打設用パネルであり、これらは図5に示す従
来のものと同一のものである。なお、梁材3はH形鋼を
用いて構成され仕切り壁2(図示せず)の間に架設され
ている構成も同一である。20はジャッキ嵌合金具、2
1は梁材挟持金具であり、図3および図4に示すように
形成されている。先ず、梁材3の切れ端材または梁材3
に使用したH形鋼と類似のH形鋼を約12.5cmの長さ
に切り、これを例えば図4において一点鎖線で示すよう
な寸法(cm)に分割切断する。即ち、2個のL形部材2
0aと2個の補強リブ部材20bおよび1個の底板部材
21aに分割切断する。つぎに図3に示すように、分割
切断した部材の内、底板部材21aにL形鋼21bを溶
接して梁材挟持金具21を、また、2個のL形部材20
aと2個の補強リブ部材20bにL形鋼20cを溶接し
て2組のジャッキ嵌合金具20を形成する。この場合、
ジャッキ嵌合金具20にはジャッキの基台を嵌込むため
の空隙20dを設ける。なお、補強リブ部材20bはジ
ャッキ嵌合金具20を梁材3に装着するための補強用と
H形鋼の内側のR部分のにがしのために設けたものであ
る。また、20eはジャッキ23の脱落防止用のロック
穴である。
Example 1. 1 to 4 show an embodiment of the present invention. In the figure, 3 is a beam, 6 is a large drawing, 8 is a crosspiece, and 9 is a driving panel, which are the same as the conventional one shown in FIG. The beam member 3 is made of H-shaped steel and is installed between the partition walls 2 (not shown) in the same manner. 20 is a jack fitting, 2
Reference numeral 1 denotes a beam member holding metal fitting, which is formed as shown in FIGS. 3 and 4. First, the scrap material of the beam 3 or the beam 3
An H-section steel similar to the H-section steel used in Example 1 is cut into a length of about 12.5 cm, which is cut into pieces (cm), for example, as indicated by a chain line in FIG. That is, two L-shaped members 2
It is divided into 0a, two reinforcing rib members 20b and one bottom plate member 21a. Next, as shown in FIG. 3, among the divided members, the L-shaped steel 21b is welded to the bottom plate member 21a to form the beam member holding metal fitting 21 and the two L-shaped members 20.
L-shaped steel 20c is welded to a and two reinforcing rib members 20b to form two sets of jack fittings 20. in this case,
The jack fitting 20 is provided with a space 20d for fitting the base of the jack. The reinforcing rib member 20b is provided for reinforcement for mounting the jack fitting 20 on the beam member 3 and for peeling off the R portion inside the H-section steel. Also, 20e is a lock hole for preventing the jack 23 from falling off.

【0009】つぎに、図1および図2に示すように梁材
挟持金具21によりジャッキ嵌合金具20を上記梁材3
に取付けする。22は装着のためのボルトである。23
はジャッキであり、ジャッキ嵌合金具20の空隙20d
に基台を嵌込むことにより梁材3に取付けられている。
このジャッキ23により大引き6、桟材8、打設用パネ
ル9などを保持してコンクリートスラブ11を打設す
る。なお、ジャッキ23は建造物の規模に対応して複数
箇所に取付けられるものである。また、コンクリートス
ラブ11はアスファルトスラブにする場合もある。
Next, as shown in FIGS. 1 and 2, the jack fitting 20 is fixed to the beam member 3 by the beam member clamping member 21.
Install on. 22 is a bolt for mounting. 23
Is a jack, and the space 20d of the jack fitting 20 is
It is attached to the beam 3 by fitting the base into the.
The jack 23 holds the large pull 6, the crosspiece 8, the driving panel 9 and the like, and drives the concrete slab 11 into it. The jacks 23 are attached to a plurality of places according to the scale of the building. Further, the concrete slab 11 may be an asphalt slab.

【0010】コンクリートスラブ11を打設した後、大
引き6、桟材8、打設用パネル9などを取り除くが、こ
の場合、ジャッキ23を取り外すことにより簡単に取り
除くことができる。ジャッキ23を取り外した後ジャッ
キ嵌合金具20および梁材挟持金具21を取外して作業
を完了する。
After the concrete slab 11 has been cast, the large pull 6, the crosspiece 8, the driving panel 9 and the like are removed. In this case, the jack 23 can be easily removed. After removing the jack 23, the jack fitting metal fitting 20 and the beam material holding metal fitting 21 are removed to complete the work.

【0011】[0011]

【発明の効果】以上のように、この発明によれば分割切
断したH形鋼とL形鋼を組み合わせてジャッキ嵌合金具
と梁材挟持金具を製作し、これを梁材に取り付けてジャ
ッキを取り付けて大引き、桟材、打設用パネルなどを保
持してコンクリートスラブを打設するようにしたので、
大引き6、桟材8、打設用パネル9の支持が容易で、正
確で安全な工事になる。また、施工後大引き6、桟材
8、打設用パネル9を取外す作業にも手数がかからない
など実用性の高いコンクリートスラブ打設方法が得られ
る。
As described above, according to the present invention, a jack fitting metal fitting and a beam member holding metal fitting are manufactured by combining the H-shaped steel and the L-shaped steel which are divided and cut, and are attached to the beam material to mount the jack. I installed it and held a large pull, a crosspiece, a panel for placing, etc. so that I could place a concrete slab,
The large pull 6, the crosspiece 8, and the panel 9 for placing are easily supported, and the construction is accurate and safe. Further, a concrete slab placing method having high practicality can be obtained such that the work of removing the pulling bar 6, the crosspieces 8 and the placing panel 9 after the construction is not troublesome.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例を一部分断面して示す側面図
である。
FIG. 1 is a side view showing a partial cross section of an embodiment of the present invention.

【図2】この発明の実施例を示す正面図である。FIG. 2 is a front view showing an embodiment of the present invention.

【図3】この発明の実施例のジャッキ嵌合金具と梁材挟
持金具を示す斜視図である。
FIG. 3 is a perspective view showing a jack fitting fitting and a beam member holding fitting according to an embodiment of the present invention.

【図4】この発明の実施例のジャッキ嵌合金具と梁材挟
持金具を製作するためのH形鋼の加工図である。
FIG. 4 is a working diagram of an H-shaped steel for manufacturing the jack fitting and the beam holding fixture according to the embodiment of the present invention.

【図5】従来の方法を示すもので、(a)は正面図、
(b)は図(a)のb−b線から見た側面図である。
FIG. 5 shows a conventional method, (a) is a front view,
(B) is a side view seen from the line bb of FIG.

【符号の説明】[Explanation of symbols]

3 梁材 6 大引き 8 桟材 9 打設用パネル 11 コンクリートスラブ 20 ジャッキ嵌合金具 20a L形部材 20b 補強リブ部材 21 梁材挟持金具 21a 底板部材 23 ジャッキ 3 Beam material 6 Large pulling 8 Bar material 9 Placing panel 11 Concrete slab 20 Jack fitting metal fitting 20a L-shaped member 20b Reinforcing rib member 21 Beam material holding metal fitting 21a Bottom plate member 23 Jack

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 対向する仕切り壁の間にH形鋼で形成し
た梁材を架設し、この梁材により、大引き、桟材、打設
用パネルなどを保持してコンクリートスラブを打設する
ものにおいて、所定長さのH形鋼を、2個のL形部材と
2個の補強リブ部材および1個の底板部材に分割切断し
て、上記2個のL形部材と2個の補強リブ部材にL形鋼
を組合わせて2組のジャッキ嵌合金具を形成し、1個の
底板部材にL形鋼を組合わせて梁材挟持金具を形成し、
上記梁材挟持金具によりジャッキ嵌合金具を上記梁材に
装着し、上記装着したジャッキ嵌合金具にジャッキの基
台を嵌込むことによりジャッキを上記梁材に取付けし、
このジャッキにより大引き、桟材、打設用パネルなどを
保持してコンクリートスラブを打設するようにした建造
物のコンクリートスラブ打設方法。
1. A beam material made of H-shaped steel is erected between opposing partition walls, and a concrete slab is driven by the beam material while holding a large pull, a crosspiece, a driving panel, and the like. In this case, an H-shaped steel having a predetermined length is cut into two L-shaped members, two reinforcing rib members and one bottom plate member, and the two L-shaped members and two reinforcing ribs are cut. L-shaped steel is combined with the member to form two sets of jack fittings, and one bottom plate member is combined with the L-shaped steel to form the beam-holding bracket.
The jack fitting is attached to the beam by the beam holding metal fitting, and the jack is attached to the beam by fitting the base of the jack into the fitted jack fitting.
A concrete slab pouring method for a structure in which the jack is used to hold a large pull, a crosspiece, a pouring panel, and the like for pouring a concrete slab.
JP13954093A 1993-05-17 1993-05-17 Casting of concrete slab for building Pending JPH06322979A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13954093A JPH06322979A (en) 1993-05-17 1993-05-17 Casting of concrete slab for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13954093A JPH06322979A (en) 1993-05-17 1993-05-17 Casting of concrete slab for building

Publications (1)

Publication Number Publication Date
JPH06322979A true JPH06322979A (en) 1994-11-22

Family

ID=15247651

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13954093A Pending JPH06322979A (en) 1993-05-17 1993-05-17 Casting of concrete slab for building

Country Status (1)

Country Link
JP (1) JPH06322979A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116084A (en) * 2010-12-10 2011-07-06 陈永生 Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
KR101157588B1 (en) * 2010-07-07 2012-06-18 삼광선재 주식회사 Slab form bracket and method for constructing slab of an iron architect using thereof
CN103835434A (en) * 2014-03-27 2014-06-04 莱芜钢铁集团有限公司 H-shaped steel with rib and concrete structure of H-shaped steel with rib
CN106065713A (en) * 2016-07-28 2016-11-02 中国五冶集团有限公司 The template frame without scaffold cast-in-place concrete can be realized
CN106088585A (en) * 2016-07-28 2016-11-09 中国五冶集团有限公司 A kind of template main beam stand apparatus of alternative scaffold

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101157588B1 (en) * 2010-07-07 2012-06-18 삼광선재 주식회사 Slab form bracket and method for constructing slab of an iron architect using thereof
CN102116084A (en) * 2010-12-10 2011-07-06 陈永生 Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
CN103835434A (en) * 2014-03-27 2014-06-04 莱芜钢铁集团有限公司 H-shaped steel with rib and concrete structure of H-shaped steel with rib
CN103835434B (en) * 2014-03-27 2016-06-29 莱芜钢铁集团有限公司 H profile steel with ribbing and H profile steel xoncrete structure with ribbing
CN106065713A (en) * 2016-07-28 2016-11-02 中国五冶集团有限公司 The template frame without scaffold cast-in-place concrete can be realized
CN106088585A (en) * 2016-07-28 2016-11-09 中国五冶集团有限公司 A kind of template main beam stand apparatus of alternative scaffold
CN106088585B (en) * 2016-07-28 2018-04-24 中国五冶集团有限公司 A kind of template main beam stand apparatus of alternative scaffold

Similar Documents

Publication Publication Date Title
RU2087648C1 (en) Shuttering panel
JP2719124B2 (en) Panels and panel structures
GB2319274A (en) Framework for use in concrete walls for supporting wall shuttering
WO2002066757A9 (en) A load bearing building panel
JPH06322979A (en) Casting of concrete slab for building
JPH0941666A (en) Concrete formwork construction method
JP2000234410A (en) Driven form and slab construction method making use thereof
JPH0420050B2 (en)
JP7365518B1 (en) Panel support material and formwork structure using it
KR200351989Y1 (en) Concrete slab sheeting apparatus For P.C beam girder bridge
JP3029324B2 (en) Temporary enclosures and foundations for temporary enclosures
JP2999958B2 (en) Temporary stage
JP2004124485A (en) Formation method of floor surface and beam material or the like for building structure making use of form concrete block
JPH0754427A (en) Construction method of wall and device thereof
JPS6046219B2 (en) Construction method of concrete retaining wall
JPH033788B2 (en)
KR930005582Y1 (en) Bracket for supporting forms
JPS63206569A (en) Mold frame timbering of slab concrete and timbering construction method
JPH0623651Y2 (en) Sash assembly device for curtain wall
JP2002364139A (en) Steel stair mounting hardware, mounting device and mounting method
JP2989337B2 (en) Pre-assembly method of beam in steel reinforced concrete structure
JPH05287761A (en) Building construction member and construction method of structure using the same
AU2002234421B2 (en) A load bearing building panel
JPH0539643A (en) Wooden prefabricated building
JPH0650022B2 (en) Formwork