JPH033788B2 - - Google Patents

Info

Publication number
JPH033788B2
JPH033788B2 JP12818683A JP12818683A JPH033788B2 JP H033788 B2 JPH033788 B2 JP H033788B2 JP 12818683 A JP12818683 A JP 12818683A JP 12818683 A JP12818683 A JP 12818683A JP H033788 B2 JPH033788 B2 JP H033788B2
Authority
JP
Japan
Prior art keywords
formwork
steel
joist
suspended
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP12818683A
Other languages
Japanese (ja)
Other versions
JPS6019867A (en
Inventor
Kunio Yamada
Norio Noda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OKABE KK
Original Assignee
OKABE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OKABE KK filed Critical OKABE KK
Priority to JP12818683A priority Critical patent/JPS6019867A/en
Publication of JPS6019867A publication Critical patent/JPS6019867A/en
Publication of JPH033788B2 publication Critical patent/JPH033788B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 従来の鉄骨鉄筋コンクリート構築物における梁
の型枠の組立ては、鉄骨梁に直接吊り足場を取付
け、その吊り足場上にて作業者が鉄骨の本締めお
よび鉄筋の組立てを行つてその作業が完了すると
吊り足場を撤去し、その後、梁の型枠の組立てを
しているので、その梁の型枠組立てのために、再
度、床上から脚立足場等によつて足場を構築しな
ければならなく、足場が一貫した足場でないため
の無駄が多い上に、安全面においても、一般的に
は不安定な足場によつて施工が行われているの
で、安全性にも問題がある等の欠点があつた。
[Detailed Description of the Invention] In the conventional method of assembling formwork for beams in steel-framed reinforced concrete structures, a suspended scaffold is attached directly to the steel beam, and workers perform final tightening of the steel frame and assembly of reinforcing bars on the suspended scaffold. When the work is completed, the suspended scaffolding is removed and the beam formwork is being assembled, so in order to assemble the beam formwork, the scaffolding must be rebuilt from the floor using stepladder scaffolding, etc. Not only is there a lot of waste because the scaffolding is not consistent, but there are also safety issues as construction is generally done on unstable scaffolding. There were some shortcomings.

そこで、本発明は上記欠陥を解消するため、鉄
骨梁にセパレーター装置およびこれに装着する取
付けボルトにより梁型枠受けばたを着脱可能に連
結し、その梁型枠受けばたに吊り足場を着脱可能
に取付け、作業者が吊り足場上にて鉄骨の本締
め、鉄筋の組立て、梁型枠の組立て、スラブ型枠
の組立て等の作業をなし得る上に、コンクリート
の打設後、そのコンクリートの硬化を待つて型枠
の取外し作業まで一貫して作業して安全に作業す
ることができる。
Therefore, in order to eliminate the above-mentioned defects, the present invention removably connects a beam formwork receiver to a steel beam using a separator device and mounting bolts attached to the separator device, and attaches and detaches a suspended scaffold to the beam formwork receiver. This allows workers to perform work such as final tightening of steel frames, assembling reinforcing bars, assembling beam forms, and assembling slab formwork on a suspended scaffold. You can work safely by waiting for the mold to harden and removing the formwork.

更に、梁型枠受けばたの任意数の根太受け台を
それぞれくさびにより押上げて梁底型枠を組立
て、梁下支保工の存置期間よりも先行して適所の
根太受け台を下降させることにより、吊り足場の
安全性を維持した状態で容易に梁底型枠の根太を
取外して梁側型枠を解体することができ、資材を
効果的に運用して作業性が向上すると共に安全が
確保されるようにしたことを特徴とする鉄骨鉄筋
コンクリート構築物の型枠における吊り足場取付
け方法および吊り足場装置に係るものである。
Furthermore, the beam bottom formwork is assembled by pushing up an arbitrary number of joist supports of the beam formwork support with wedges, and the joist supports at appropriate locations are lowered in advance of the period in which the beam bottom support remains. This makes it possible to easily remove the joists of the beam bottom formwork and dismantle the beam side formwork while maintaining the safety of the suspended scaffolding, which improves work efficiency and safety by utilizing materials effectively. The present invention relates to a method for attaching a suspended scaffold in a formwork for a steel-framed reinforced concrete structure, and a suspended scaffolding device, which are characterized in that the suspended scaffolding is secured.

図面に示す本発明の1実施態様についてその構
造を説明すれば、Aは鉄骨鉄筋コンクリート構築
物のスラブを示し、1はそのスラブ堰板、2は根
太、3はビームである。
To explain the structure of one embodiment of the present invention shown in the drawings, A indicates a slab of a steel reinforced concrete structure, 1 is a weir plate of the slab, 2 is a joist, and 3 is a beam.

Bは梁を示し、4,5はその梁側堰板および梁
底堰板、6は工形の鉄骨梁で、その両側面の中間
部にはプロジエクシヨンナツト7を、下面には連
結金8で連繋した左右のナツト9をそれぞれ鉄骨
梁6の長手方向に沿つて適当間隔に並設する。1
0は梁Bの組立鉄筋、11は横ばた、12,13
は上部および下部の型枠締付金具、14は根太で
ある。
B shows a beam, 4 and 5 are the beam side weir plate and the beam bottom weir plate, and 6 is a steel beam in the form of a construction, with projection nuts 7 on the middle part of both sides, and connecting metal on the bottom surface. Left and right nuts 9 connected by 8 are respectively arranged in parallel at appropriate intervals along the longitudinal direction of the steel beam 6. 1
0 is the assembled reinforcing bar of beam B, 11 is horizontal, 12, 13
are upper and lower formwork clamping fittings, and 14 is a joist.

15は梁Bの角筒状の梁型枠受けばたで、その
両側端部にストツパー16をそれぞれ着脱可能で
前後へ突出させて装設し、中央部下方には吊り足
場取付金17を突設する。18,19は中央部お
よび両側の根太受け台で、の中央根太受け台18
は状に形成して梁型枠受けばた15に嵌合する
と共に、両縦片の縦長孔20と梁型枠受けばた1
5の通孔とにボルト21を挿着して梁型枠受けば
た15に上下動可能に嵌着し、両側の根太受け台
19は角筒状に形成して梁型枠受けばた15に左
右動および上下動可能に嵌合する。一方、それら
の根太受け台18,19の上方中央部にくさび孔
を装設し、上片の両側縁には立上りを設ける。2
2は根太受け台18および19のくさび孔に打込
む2段階型くさびで、チエン23より根太受け台
18または19に連繋する。
Reference numeral 15 denotes a rectangular cylindrical beam formwork receiving flap for the beam B. Stoppers 16 are attached to both ends of the beam and are removable and protrude forward and backward, and a hanging scaffold mounting bracket 17 is attached to the lower part of the center. Set up 18 and 19 are the joist holders in the center and on both sides, and the center joist holder 18 is
It is formed into a square shape and fits into the beam formwork receiving flap 15, and the vertical holes 20 of both vertical pieces and the beam formwork receiving flap 1 are connected to each other.
The bolts 21 are inserted into the through holes 5 and fit into the beam formwork receiving flaps 15 so as to be movable up and down. It is fitted in such a way that it can move horizontally and vertically. On the other hand, a wedge hole is provided in the upper center of the joist holders 18 and 19, and rising edges are provided on both side edges of the upper piece. 2
A two-stage wedge 2 is driven into the wedge holes of the joist holders 18 and 19, and is connected to the joist holders 18 or 19 through a chain 23.

aはセパレーター装置を示し、24はセパレー
タ装置aの両端部にねじを装設した両側のセパレ
ーターで、その1端ねじに端子25の中心ねじ孔
の1半部を螺着する。26は両端部にねじを設け
た取付けボルト、27は取付けボルト26の1端
ねじに螺合するナツトである。
A indicates a separator device, and 24 is a separator on both sides having screws installed at both ends of the separator device a, and one half of the center screw hole of the terminal 25 is screwed into one end of the separator. 26 is a mounting bolt provided with threads at both ends, and 27 is a nut screwed into the thread at one end of the mounting bolt 26.

bは吊り足場の吊り足場枠を示し、28は吊り
足場枠bの足場板支承用横杆で、その両側端部上
に手摺支持柱29を、両側部上に受杆30をそれ
ぞれ立設してその両側受杆30に両側の吊り材3
1の下端部をそれぞれボルト32により取付け
る。33は足場板、34は手摺杆、35は吊り足
場取付け用ボルトである。
b shows a hanging scaffold frame of the hanging scaffold, 28 is a horizontal rod for supporting the scaffold plate of the hanging scaffold frame b, and handrail support columns 29 are erected on both sides of the frame, and support rods 30 are erected on both sides. Attach the hanging members 3 on both sides to the support rods 30 on both sides.
Attach the lower ends of 1 with bolts 32, respectively. 33 is a scaffold board, 34 is a handrail lever, and 35 is a bolt for attaching a hanging scaffold.

次にその作用を説明する。 Next, its effect will be explained.

鉄骨先組みの場合は、鉄骨梁6の組立てが完了
すれば、 (1) 両側において、端子25付きセパレーター2
4の他端ねじをナツト9に螺合する。
In the case of pre-assembled steel frames, once the assembly of the steel beams 6 is completed, (1) Separators 2 with terminals 25 are installed on both sides.
4 into the nut 9.

(2) 梁底堰板5を端子25の位置まで持上げた
後、取付けボルト26の他端ねじを梁底堰板5
の通孔に挿通して端子25の中心ねじ孔の他半
部に螺合する。
(2) After lifting the beam bottom weir plate 5 to the position of the terminal 25, tighten the other end screw of the mounting bolt 26 onto the beam bottom weir plate 5.
the other half of the center screw hole of the terminal 25.

(3) くさび22を打込んで根太受け台18,19
を上昇させた状態において、梁型枠受けばた1
5の両側通孔を両側の取付けボルト26に嵌合
し、その取付けボルト26の1端ねじにナツト
27を適宜に螺合して梁型枠受けばた15を仮
りに取付ける。
(3) Drive in the wedge 22 and attach the joist supports 18 and 19.
In the raised state, the beam formwork catcher 1
5 are fitted into the mounting bolts 26 on both sides, and a nut 27 is suitably screwed into the screw at one end of the mounting bolt 26 to temporarily install the beam form receiving flap 15.

(4) 梁底堰板5と根太受け台18および19との
間に根太14を挿入した後、ナツト27をねじ
込み梁底堰板5の根太14および根太受け台1
8,19付き梁型枠受けばた15を一体的に上
昇させてその梁底堰板5を端子25に当て、セ
パレーター装置aにより鉄骨梁6の梁底堰板5
の間にコンクリート被覆厚さの間隔を形成させ
て鉄骨梁6に梁底型枠の最終的な固定をする。
(4) After inserting the joists 14 between the beam bottom dam plate 5 and the joist holders 18 and 19, screw the nuts 27 to secure the joists 14 and joist holders 1 of the beam bottom dam plate 5.
The beam formwork receiving flaps 15 with 8 and 19 are raised integrally and the beam bottom weir plate 5 is applied to the terminal 25, and the beam bottom weir plate 5 of the steel beam 6 is removed by the separator device a.
The beam bottom formwork is finally fixed to the steel beam 6 by forming an interval equal to the thickness of the concrete covering between them.

(5) 取付金17に足場枠bの両側吊り材31の上
端部をボルト35により取付け、その後、その
足場枠bの横杆28上にわたして足場板33を
載置し、支持柱29にわたし手摺杆34を取付
けて吊り足場を構成する。
(5) Attach the upper ends of the hanging members 31 on both sides of the scaffolding frame b to the mounting brackets 17 with the bolts 35, then place the scaffolding board 33 across the horizontal beams 28 of the scaffolding frame b, and attach them to the support columns 29. A hanging scaffold is constructed by attaching the handrail rods 34.

また、鉄骨先組みでない場合には、上記の法に
代え、鉄骨梁6の組込む前に、床上において鉄骨
梁6の両側の脚立上に掛けわたし、該鉄骨梁6に
上記と同様に操作してセパレーター装置a、梁底
堰板5、根太14、根太受け台18,19付き梁
型枠受けばた15、吊り足場等を一体として取付
け、その組立物の鉄骨梁6を吊上げ装置等により
引上げて鉄骨を組んでもよい。
In addition, if the steel beam is not pre-assembled, instead of the above method, before installing the steel beam 6, hang it on a stepladder on both sides of the steel beam 6 on the floor and operate the steel beam 6 in the same manner as above. The separator device a, the beam bottom weir plate 5, the joist 14, the beam formwork support 15 with joist supports 18 and 19, the hanging scaffolding, etc. are installed as one unit, and the assembled steel beam 6 is lifted up by a lifting device etc. You can also build a steel frame.

そこで、作業者が足場板33上にて、順次従来
と同様の鉄骨梁6の本締め、鉄筋10の組立て、
梁側堰板4、横ばた11、締付金具12,13等
による梁Bの型枠組立て、スラブAのビーム3、
根太2、堰板1の取付けによる型枠組立て等の作
業を行つて構築物の型枠組立てを完了する。
Therefore, on the scaffolding board 33, the worker sequentially tightens the steel beams 6, assembles the reinforcing bars 10, and
Formwork assembly for beam B using beam side weir plate 4, side beam 11, fastening fittings 12, 13, etc., beam 3 for slab A,
Work such as assembling the formwork by attaching the joists 2 and the weir plate 1 is performed to complete the formwork assembly of the structure.

而して、コンクリートを打設してそのコンクリ
ートが硬化した後は、作業者が足場板33上にて (1) スラブAのビーム3を下降操作して根太2を
取外し、その後、ビーム3を除去する。
After the concrete has been poured and the concrete has hardened, the worker (1) lowers the beam 3 of slab A on the scaffolding board 33 to remove the joists 2, and then lowers the beam 3. Remove.

(2) 両側の梁側堰板4の直下の根太受け台19の
くさび22を操作し該くさび22の先端低部を
根太受け台19に対向させて根太受け台19を
下降し、梁側堰板4、横ばた11等を取外して
梁側型枠を解体する。
(2) Operate the wedges 22 of the joist holders 19 directly below the beam side weir plates 4 on both sides, and lower the joist holders 19 with the lower end of the wedge 22 facing the joist holders 19, and lower the joist holders 19 to the beam side dam plates 4. Remove the board 4, side beam 11, etc. and dismantle the beam side formwork.

(3) スラブAの堰板1を除去する。(3) Remove weir plate 1 of slab A.

(4) 足場板33および足場枠bを取除く。(4) Remove scaffolding board 33 and scaffolding frame b.

(5) 中央部の根太受け台18のくさび22を上記
と同様に操作してその根太受け台18を下降
し、根太14を除去する。
(5) Operate the wedge 22 of the central joist holder 18 in the same manner as above to lower the joist holder 18 and remove the joist 14.

(6) ナツト27を取除いて根太受け台18,19
付き梁型枠受けばた15を取外し、その後、順
次取付けボルト26、梁底堰板5を除去する
と、足場および型枠を解体することができる。
(6) Remove the nut 27 and install the joist supports 18 and 19.
The scaffolding and the formwork can be dismantled by removing the attached beam formwork receiving flap 15 and then sequentially removing the mounting bolts 26 and the beam bottom weir plate 5.

なお、セパレータ装置は、上記セパレータ装置
aの構造に限定されるものでなく、そのセパレー
タ装置に、従来の鉄骨梁6に嵌合する形ボルト
等を用いた他の適当な構成のものを使用しても上
記と同様に作用する。
Note that the separator device is not limited to the structure of the separator device a described above, and other suitable structures using conventional bolts that fit into the steel beams 6 may be used for the separator device. works in the same way as above.

また吊り足場枠bの両側吊り材31は、H形、
形、x形等に組合わせた構成にしてもよい。
In addition, the hanging members 31 on both sides of the hanging scaffold frame b are H-shaped,
It is also possible to have a configuration in which they are combined into a shape, an x-shape, or the like.

本発明は鉄骨鉄筋コンクリート構築物の型枠に
おける吊り足場を上記のように設けたから、コン
クリート構築物の鉄骨の組立てが完了すると同時
に、その鉄骨梁にセパレータ装置および取付けボ
ルトを介して梁型枠受けばたおよび吊り足場を取
付け、作業者が上記吊り足場上にて鉄骨の本締
め、鉄筋の組立て、梁型枠の組立て、スラブ型枠
の組立て等の作業をなし得る。また、そのままコ
ンクリートを打設し、その後そのコンクリートの
硬化を待つて型枠の取外し作業まで一貫して作業
することができ、コンクリート構築の工期を短縮
し得る上に、時間と労力を節減して経済的であ
り、且つ梁型枠受けばたおよび吊り足場はセパレ
ータ装置および取付けボルトより鉄骨に取付けら
れてその支持が確実堅固であるから、作業者は吊
り足場上にて安心して安全に作業することができ
る。
Since the present invention provides a suspended scaffold in the formwork of a steel-framed reinforced concrete structure as described above, at the same time as the assembly of the steel frame of the concrete structure is completed, the beam formwork receiver and A suspended scaffold is installed, and workers can perform tasks such as final tightening of steel frames, assembling reinforcing bars, assembling beam forms, and assembling slab forms on the suspended scaffold. In addition, it is possible to pour concrete as it is, wait for the concrete to harden, and then remove the formwork, which not only shortens the construction period of concrete, but also saves time and labor. It is economical, and since the beam formwork support and suspended scaffolding are attached to the steel frame using separator devices and mounting bolts, their support is reliable and solid, so workers can work safely and securely on the suspended scaffolding. be able to.

また、梁底型枠に使用する根太の形状や寸法が
変つても、取付けボルトは取替えを要することな
く使用し得て作業上便利である。
Further, even if the shape and dimensions of the joists used in the beam bottom form change, the mounting bolts can be used without having to be replaced, which is convenient for work.

更に、梁型枠受けばたに嵌合した任意数の根太
受け台をそれぞれくさびにより押上げて梁底型枠
を組立てるから、コンクリートへの型枠存置期間
後、根太受け台を下降させることにより、梁型枠
受けばたの取付けボルトのナツトを緩めたりする
ことなく、吊り足場の安定性を維持した状態で容
易に梁底型枠の根太を取外して型枠を解体するこ
とができる。従つて、作業性が向上すると共に、
安全が確保される。
Furthermore, since the beam bottom formwork is assembled by pushing up an arbitrary number of joist supports that fit into the beam formwork receivers using wedges, the joist supports can be lowered after the formwork remains in the concrete for a period of time. To easily remove the joists of the beam bottom formwork and dismantle the formwork while maintaining the stability of the suspended scaffold without loosening the nuts of the mounting bolts of the beam formwork support. Therefore, workability is improved, and
Safety is ensured.

また、梁側型枠やスラブ支保工を解体する際、
梁側型枠直下の根太受け台のみを下降させること
によつて簡易に梁側型枠およびスラブ型枠を解体
し得るので、梁下支保工の存置期間よりも先行し
て梁側型枠およびスラブ型枠を解体し、その資材
を次の施工に転用して資材の効果的運用を計るこ
とができる。
In addition, when dismantling beam side formwork or slab support,
The beam side formwork and slab formwork can be easily dismantled by lowering only the joist support directly below the beam side formwork. The slab formwork can be dismantled and the materials can be used for the next construction, allowing for effective use of materials.

その上、梁型枠受けばたへの根太受け台の取付
け数は、必要によつて増減し得る上に、その根太
受け台は、異なる長さの根太を1通り複数本で使
用した際、根太の端部の重複する箇所も受けて支
持することができ、且つ根太受け台が梁型枠受け
ばたに沿つて自由に滑動するので、梁幅に適応し
た根太の位置を設定してその根太を根太受け台で
確実に支持し得る。
Furthermore, the number of joist supports installed on a beam formwork support can be increased or decreased as needed, and the number of joist supports installed in a beam formwork receiver can be increased or decreased depending on the need. It is possible to receive and support the overlapping parts of the ends of the joists, and the joist supports slide freely along the beam formwork supports, so you can set the position of the joists to suit the beam width. To reliably support a joist with a joist holder.

しかも、構造が簡単で容易安価に製作でき、簡
易に着脱してその固定は堅固なる等の効果があ
る。
Moreover, it has a simple structure, can be manufactured easily and inexpensively, can be easily attached and detached, and is firmly fixed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の1実施態様を示す鉄骨鉄筋コ
ンクリート構築物の梁の型枠の正断面図、第2図
はその中央部の根太受け部の拡大側断面図、第3
図は側方の根太受け部の拡大側断面図である。 5……梁底堰板、6……鉄骨梁、15……梁型
枠受けばた、18,19……根太受け台、22…
…くさび、a……セパレーター装置、26……取
付けボルト、b……吊り足場枠、31……吊り
材、33……足場板。
Fig. 1 is a front sectional view of a beam formwork of a steel-framed reinforced concrete structure showing one embodiment of the present invention, Fig. 2 is an enlarged side sectional view of the joist receiving part at the center thereof,
The figure is an enlarged side sectional view of the side joist receiver. 5... Beam bottom weir plate, 6... Steel beam, 15... Beam formwork support, 18, 19... Joist support, 22...
... Wedge, a... Separator device, 26... Mounting bolt, b... Hanging scaffolding frame, 31... Hanging material, 33... Scaffolding board.

Claims (1)

【特許請求の範囲】 1 鉄骨梁に梁型枠受けばたを、セパレーター装
置および該セパレーター装置に着脱可能に装着す
る取付けボルトにより着脱可能に連結し、その梁
型枠受けばたに嵌合した任意数の根太受け台をそ
れぞれくさびにより押上げて梁底型枠を組立て、
上記梁型枠受けばたに吊り足場を着脱可能に取付
けることを特徴とする鉄骨鉄筋コンクリート構築
物の型枠における吊り足場取付け方法。 2 鉄骨梁とその下方に配置する梁型枠受けばた
とを、セパレーター装置および該セパレーター装
置に着脱可能に装着する取付けボルトにより着脱
可能に連結し、上記梁型枠受けばたに任意数の根
太受け台を左右動および上下動可能に嵌合してそ
の梁型枠受けばたと根太受け台の上部との間にく
さびを抜き差し可能に打込み、梁型枠受けばたに
吊り足場枠の吊り材を着脱可能に取付け、その吊
り足場枠上に足場板を載置したことを特徴とする
鉄骨鉄筋コンクリート構築物の型枠における吊り
足場装置。
[Scope of Claims] 1. A beam formwork catch plate is removably connected to a steel beam by a separator device and a mounting bolt that is detachably attached to the separator device, and the beam formwork catch plate is fitted into the beam form catch plate. Push up any number of joist supports with wedges to assemble the beam bottom form,
A method for attaching a suspended scaffold in a formwork for a steel-framed reinforced concrete structure, comprising removably attaching the suspended scaffold to the beam formwork receiving area. 2. A steel beam and a beam formwork receiver located below are removably connected by a separator device and a mounting bolt that is removably attached to the separator device, and any number of joists are attached to the beam formwork receiver. Fit the support so that it can move laterally and vertically, drive a wedge between the beam formwork support and the top of the joist support so that it can be inserted and removed, and attach the hanging material of the suspended scaffolding frame to the beam formwork support. A suspended scaffolding device for a formwork of a steel-framed reinforced concrete structure, characterized in that a scaffolding board is mounted on the suspended scaffolding frame in a detachable manner, and a scaffolding board is placed on the suspended scaffolding frame.
JP12818683A 1983-07-14 1983-07-14 Method for attaching hanging scaffold in mold frame of reinforced concrete construction and hanging scaffold apparatus Granted JPS6019867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12818683A JPS6019867A (en) 1983-07-14 1983-07-14 Method for attaching hanging scaffold in mold frame of reinforced concrete construction and hanging scaffold apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12818683A JPS6019867A (en) 1983-07-14 1983-07-14 Method for attaching hanging scaffold in mold frame of reinforced concrete construction and hanging scaffold apparatus

Publications (2)

Publication Number Publication Date
JPS6019867A JPS6019867A (en) 1985-02-01
JPH033788B2 true JPH033788B2 (en) 1991-01-21

Family

ID=14978563

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12818683A Granted JPS6019867A (en) 1983-07-14 1983-07-14 Method for attaching hanging scaffold in mold frame of reinforced concrete construction and hanging scaffold apparatus

Country Status (1)

Country Link
JP (1) JPS6019867A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102384586A (en) * 2010-08-28 2012-03-21 陈则韶 Parallel-connection type mutually-helped defrosting water heater of air source heat pump

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110552501A (en) * 2019-08-30 2019-12-10 中国一冶集团有限公司 High-space large-span steel reinforced concrete structure beam hanging formwork construction reinforcing structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102384586A (en) * 2010-08-28 2012-03-21 陈则韶 Parallel-connection type mutually-helped defrosting water heater of air source heat pump

Also Published As

Publication number Publication date
JPS6019867A (en) 1985-02-01

Similar Documents

Publication Publication Date Title
KR100809886B1 (en) Coping form system and method for constructing bridge pier using thereof
JPH10325173A (en) Construction method of beam, beam formwork device, and cap for side plate
KR100946192B1 (en) Apparatus for removing and coupling forms
JPH033788B2 (en)
CN210289158U (en) Temporary support device for connecting laminated plate with beam or wall
KR200213539Y1 (en) Frame of safety workbench
JPS58185856A (en) Support for use with working scaffold for constructing src structural beam
JPH06322979A (en) Casting of concrete slab for building
JPS6322269Y2 (en)
JP3072294B1 (en) Formwork equipment for manufacturing hollow PCa members
JPH1030333A (en) Construction method of temporary scaffold in steel encased reinforced concrete structure and beam scaffold device
JPS6137426B2 (en)
JPH037471Y2 (en)
JP2611882B2 (en) Construction method of stairs
JPH0115799Y2 (en)
JPS6046219B2 (en) Construction method of concrete retaining wall
JPH0254065A (en) Construction of slab with rib and spacer for rib reinforcement
JPS6133173Y2 (en)
JPH0371546B2 (en)
JPH0524758Y2 (en)
JPH0740029Y2 (en) Work scaffold mounting jig to steel column
JPH06229113A (en) One side scaffold
JPS6133172Y2 (en)
JPS638260B2 (en)
JPS6133174Y2 (en)