JPH0624419Y2 - Concrete pile - Google Patents

Concrete pile

Info

Publication number
JPH0624419Y2
JPH0624419Y2 JP8172489U JP8172489U JPH0624419Y2 JP H0624419 Y2 JPH0624419 Y2 JP H0624419Y2 JP 8172489 U JP8172489 U JP 8172489U JP 8172489 U JP8172489 U JP 8172489U JP H0624419 Y2 JPH0624419 Y2 JP H0624419Y2
Authority
JP
Japan
Prior art keywords
pile
wall
hole
holes
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8172489U
Other languages
Japanese (ja)
Other versions
JPH0321441U (en
Inventor
好伸 木谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitani Sekisan Co Ltd
Original Assignee
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitani Sekisan Co Ltd filed Critical Mitani Sekisan Co Ltd
Priority to JP8172489U priority Critical patent/JPH0624419Y2/en
Publication of JPH0321441U publication Critical patent/JPH0321441U/ja
Application granted granted Critical
Publication of JPH0624419Y2 publication Critical patent/JPH0624419Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【考案の詳細な説明】 (産業上の利用分野) この考案は、側壁及び拡底部に透孔を設けたコンクリー
トくいに関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a concrete pile having a through hole in a side wall and a bottom.

(従来の技術) 従来知られているコンクリートくいには何れも透孔が無
かった。
(Prior Art) None of the conventionally known concrete piles has a through hole.

(考案により解決すべき課題) 従来知られているコンクリートくいには透孔が無かった
ので、くいの中空部とくい穴内壁とは連通関係になく、
くい穴内壁の安定液などは、くい穴底より押し上げる
か、くい穴上部から注入する以外に手段がなかった。そ
こで、中掘工法においては、くい外壁とくい穴内壁との
間にセメントミルクなどを充填する手段がなかったの
で、拡底くいは使用できなかった。また、くい穴内壁と
くい中空部との連繋がとれない為に、くい中空部へセメ
ントミルキなどを充填しても、これによってくい外壁の
補強はできなかった。
(Problems to be solved by the invention) Since there is no through hole in the conventionally known concrete pile, there is no communication between the hollow part of the pile and the inner wall of the pile hole.
There was no means other than pushing up the stabilizing liquid on the inner wall of the pit and pushing it from the bottom of the pit or injecting from the top of the pit. Therefore, in the medium excavation method, since there is no means for filling cement milk or the like between the outer wall of the pile and the inner wall of the pile hole, the bottom drilling pier cannot be used. Further, since the inner wall of the pile and the hollow portion of the pile cannot be connected, even if cement hollow was filled into the hollow portion of the pile, the outer wall of the pile could not be reinforced by this.

(課題を解決する為の手段) 然るにこの考案は、軸部の側壁に複数の横方向の透孔を
設け、拡底部の側壁に縦方向の透孔を設けたので、くい
をくい穴に埋設した際に、くいの内外を強固に連結し、
または、くい外壁と、くい穴内壁との間隙部へセメント
ミルクなどを洩れなく充填して、くいの支持力を一層増
強できるようにしたのである。
(Means for Solving the Problems) However, according to the present invention, since the lateral wall of the shaft portion is provided with a plurality of lateral through holes and the lateral wall of the expanded bottom portion is provided with a longitudinal through hole, the stake is buried in the pierced hole. When you do, firmly connect the inside and outside of the pile,
Alternatively, the gap between the outer wall of the pile and the inner wall of the pile hole can be filled with cement milk or the like without leakage so that the bearing capacity of the pile can be further enhanced.

即ちこの考案は、軸部と拡底部とからなる中空のくい本
体の該軸部の側壁に横方向の複数の透孔を設けると共
に、前記拡底部の側壁に縦方向の複数の透孔を設けたこ
とを特徴とするコンクリートくいである。
That is, according to this invention, a plurality of lateral through holes are provided in a side wall of the hollow piling body having a shaft portion and a bottom expanding portion, and a plurality of vertical through holes are provided in a side wall of the bottom expanding portion. It is a concrete pile that is characterized by that.

くい本体に設ける透孔は、例えばくい長1m毎に4〜1
0箇所、直径2cm〜10cm位で、千鳥状に設ける。この
透孔は、コンクリートくいの遠心成形時に、型枠内の適
所へ、所定直径の合成樹脂管又は金属管を配設しておく
ことにより、所定の場所へ所定数、正確に穿設すること
ができる。
Through holes provided in the pile body are, for example, 4 to 1 for each 1m of pile length.
Staggered at 0 places and a diameter of 2 cm to 10 cm. This through-hole should be accurately drilled in a specified number of places by placing a synthetic resin pipe or metal pipe of a specified diameter in an appropriate place in the mold during centrifugal molding of concrete piles. You can

このようなくいを使用すれば、くいの中空部へセメント
ミルクを圧入することによって、各透孔から外側へセメ
ントミルクが放出され、すき間を洩れなく充填する。然
して内外一体化して強度が大きくなる。
When such a piling is used, by pressing the cement milk into the hollow portion of the plow, the cement milk is discharged to the outside from each through hole, and the gap is filled without leakage. However, the strength is increased by integrating the inside and outside.

(作用) 即ちこの考案は、くい壁に透孔を設けたので、くい内中
空部と、くい外壁のくい穴との間隙部を連通させ、セメ
ントミルクその他流体の流動ができる。また、セメント
ミルクが硬化すると、内外を一体化することができる。
(Operation) That is, in this invention, since the through hole is provided in the pile wall, the hollow portion inside the pile and the gap portion between the hole in the outer wall of the pile are communicated with each other to allow the flow of cement milk or other fluid. Further, when the cement milk hardens, the inside and outside can be integrated.

(実施例) 図面に基づき、この考案の実施例を説明する。(Example) The Example of this invention is described based on drawing.

軸部1の下部に拡底部5を連設すると共に、上下全長に
亘る中空部2を有するくい本体3において、該くい本体
3の軸部1側壁へ透孔6、6を半径方向で放射状に、軸
方向で一定間隔かつ千鳥状に設ける(第1図、第2
図)。
In a pile body 3 having a hollow portion 2 extending over the entire vertical length, a bottom portion 5 is continuously provided below the shaft portion 1, and through holes 6, 6 are radially formed in the sidewall of the shaft portion 1 of the pile body 3 in the radial direction. , Staggered in the axial direction (Figs. 1 and 2)
Figure).

また、くい本体3の下部の拡底部5にも縦方向(軸方
向)の透孔7、7を設ける(第1図、第3図)。以上の
ようにして、コンクリートくい4を構成する(第1
図)。
Further, through holes 7, 7 in the vertical direction (axial direction) are also provided in the expanded bottom portion 5 at the bottom of the pile body 3 (FIGS. 1 and 3). The concrete pile 4 is configured as described above (first
Figure).

図中8、9は合成樹脂管又は鉄管からなる管体で、何れ
の透孔6、7も管体8、9によって形成されている。前
記透孔6、7を設けるには、くいの遠心成形時に、所定
長さ(肉厚と同一)の管体8及び所定長さの管体9を型
枠内へ支持すればよいことになる。尤もこの場合には、
管体8、9の両端部に栓をして、セメントミルクなどの
流入を防ぐことが好ましい。
In the figure, 8 and 9 are tube bodies made of synthetic resin tubes or iron tubes, and any of the through holes 6 and 7 are formed by the tube bodies 8 and 9. In order to provide the through holes 6 and 7, it is sufficient to support the tubular body 8 of a predetermined length (same as the wall thickness) and the tubular body 9 of a predetermined length in the mold during centrifugal molding of the pile. . But in this case,
It is preferable to plug both ends of the pipes 8 and 9 to prevent the inflow of cement milk or the like.

前記コンクリートくい4をくい穴10内へ挿入した際
に、コンクリートくい4の外壁4aと、くい穴10の内
壁との間隙11には、透孔6、7が連結開口されている
ので、くい穴底とくいの中空部とは、前記間隙部11と
連通することになる。そこで、中空部4bにセメントミ
ルクを加圧充填すれば、セメントミルクは間隙部11へ
流入し、中空部4bと間隙部11は一体化して、強固な
複合くいができる。
When the concrete pile 4 is inserted into the pile hole 10, since the through holes 6 and 7 are connected and opened in the gap 11 between the outer wall 4a of the concrete pile 4 and the inner wall of the pile hole 10, the pile hole is formed. The bottom and the hollow part of the pile communicate with the gap 11. Therefore, if the hollow portion 4b is pressure-filled with cement milk, the cement milk flows into the gap portion 11, and the hollow portion 4b and the gap portion 11 are integrated to form a strong composite pile.

(考案の効果) この考案は、コンクリートくいの軸部では横方向の透
孔、拡底部には縦方向の透孔を設けたので、くい中空部
又はくい底部とくい外壁とを連通させる効果がある。従
って、中空部にセメントミルクを加圧充填すれば、くい
外壁の間隙にも容易に回り込み、洩れなくセメントミル
クを充填することができ、くい穴の内壁とコンクリート
くいの外壁との間の間隙部、コンクリートくいの中空
部、くい穴底、及びコンクリートくいとを一体とした複
合くいを構築できるので、くいの支持力を増加させるこ
とができる効果がある。
(Effect of the device) This device has a horizontal through hole in the concrete pile shaft and a vertical through hole in the expanded bottom, so that it has the effect of communicating the hollow hollow part or the pile bottom with the outer wall of the pile. is there. Therefore, if the hollow part is pressurized and filled with cement milk, it can easily flow into the gap between the outer wall of the pile and the cement milk can be filled without leaking, and the gap between the inner wall of the pile hole and the outer wall of the concrete pile can be filled. Since it is possible to construct a composite pile that integrates the hollow part of the concrete pile, the bottom of the pile, and the concrete pile, it is possible to increase the bearing capacity of the pile.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの考案の一部を切断した正面図、第2図は同
じく第1図中A−A断面図、第3図は同じく第1図中B
−B断面図である。 1……軸部、2……透孔 3……くい本体、4……コンクリートくい 5……拡底部、6、7……透孔 8、9……管体
FIG. 1 is a partially cutaway front view of the present invention, FIG. 2 is a sectional view taken along line AA in FIG. 1, and FIG.
It is a -B sectional view. 1 ... Shaft part, 2 ... Through hole 3 ... Pile body, 4 ... Concrete pile 5 ... Expanded bottom part, 6, 7 ... Through hole 8, 9 ... Tube body

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】軸部と拡底部とからなる中空のくい本体の
該軸部の側壁に横方向の複数の透孔を設けると共に、前
記拡底部の側壁に縦方向の複数の透孔を設けたことを特
徴とするコンクリートくい
1. A hollow pile main body including a shaft portion and an expanded bottom portion is provided with a plurality of lateral through holes on a side wall of the shaft portion, and a plurality of vertical through holes is provided on a sidewall of the expanded bottom portion. Concrete pilings characterized by
【請求項2】軸部の透孔は、くい本体の側壁に放射状に
設けた請求項1記載のコンクリートくい
2. The concrete pile according to claim 1, wherein the through holes of the shaft portion are provided radially on the side wall of the pile body.
【請求項3】透孔は、くい壁に埋設したパイプにより形
成した請求項1記載のコンクリートくい
3. The concrete pile according to claim 1, wherein the through hole is formed by a pipe embedded in the pile wall.
JP8172489U 1989-07-12 1989-07-12 Concrete pile Expired - Lifetime JPH0624419Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8172489U JPH0624419Y2 (en) 1989-07-12 1989-07-12 Concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8172489U JPH0624419Y2 (en) 1989-07-12 1989-07-12 Concrete pile

Publications (2)

Publication Number Publication Date
JPH0321441U JPH0321441U (en) 1991-03-04
JPH0624419Y2 true JPH0624419Y2 (en) 1994-06-29

Family

ID=31627914

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8172489U Expired - Lifetime JPH0624419Y2 (en) 1989-07-12 1989-07-12 Concrete pile

Country Status (1)

Country Link
JP (1) JPH0624419Y2 (en)

Also Published As

Publication number Publication date
JPH0321441U (en) 1991-03-04

Similar Documents

Publication Publication Date Title
CN104452749B (en) The constructional method of a kind of reinforced concrete cast-in-situ pile tube
KR101571359B1 (en) Connectong structure of steel tube and foundation pile
US3751931A (en) Piling
US3913337A (en) Piling
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN206721875U (en) A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod
CN100366829C (en) Method for construction of large head expanding combined pile
JPH0624419Y2 (en) Concrete pile
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN110700278A (en) Inner support structure, foundation pit support system and construction method thereof
KR20040090679A (en) Micropile type packer and method for constructing micropile of pressure type using the micropile type packer
JP2533853B2 (en) Pile construction method
US4199277A (en) Piling
CN211285628U (en) Inner support structure and foundation pit support system
CN209975507U (en) Upper-section drainage and lower-section non-drainage combined prefabricated pipe pile
CN219240525U (en) Maintenance and stability system for bored pile construction
CN211773804U (en) Prefabricated precipitation tubular pile structure in subway station foundation ditch
CN108547284A (en) A kind of bottom-expanding sinking-pipe pilework and construction method
CN207846399U (en) A kind of compound reinforced stake for basement process
JP3304323B2 (en) Underground fixing method of concrete pile
JPH01102125A (en) Placement of concrete pile at site
CN207727585U (en) implanted prefabricated pile grouting device
JP2589672B2 (en) Construction method of ready-made pile
KR200336229Y1 (en) Steel pipe pile of closing structure
JPH10252064A (en) Method for constructing cast-in-site pile

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term