JPH06212684A - Device for installing box culvert - Google Patents

Device for installing box culvert

Info

Publication number
JPH06212684A
JPH06212684A JP5007889A JP788993A JPH06212684A JP H06212684 A JPH06212684 A JP H06212684A JP 5007889 A JP5007889 A JP 5007889A JP 788993 A JP788993 A JP 788993A JP H06212684 A JPH06212684 A JP H06212684A
Authority
JP
Japan
Prior art keywords
side wall
top plate
box culvert
construction
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5007889A
Other languages
Japanese (ja)
Inventor
Yuichi Kijima
裕一 木島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumiken Concrete Kogyo KK
Original Assignee
Sumiken Concrete Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumiken Concrete Kogyo KK filed Critical Sumiken Concrete Kogyo KK
Priority to JP5007889A priority Critical patent/JPH06212684A/en
Publication of JPH06212684A publication Critical patent/JPH06212684A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B41/00After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
    • C04B41/45Coating or impregnating, e.g. injection in masonry, partial coating of green or fired ceramics, organic coating compositions for adhering together two concrete elements
    • C04B41/52Multiple coating or impregnating multiple coating or impregnating with the same composition or with compositions only differing in the concentration of the constituents, is classified as single coating or impregnation

Abstract

PURPOSE:To improve the safety and working efficiency by a method wherein, in a truck having a self-traveling means, a box culvert is divided into four sections, i.e., a bottom plate, side wall materials, and a top plate, the bottom plate is horizontally suspended, the side wall material are vertically suspended along the two sides of the truck, and the top plate is horizontally supported from below. CONSTITUTION:A box culvert 1 of square cross section is divided into four sections, a bottom plate 2, side wall materials 3 and 3, and a top plate 4. The bottom plate 2 is suspended from the end in the traveling direction of a truck having a self-traveling means, the side wall materials 3 are suspended from the two sides of thereof, and the top plate 4 is supported to the rear end thereof. Through traveling on a rail, the bottom plate 2 is conveyed to an installation place and lowered in a given place for installation. The side wall materials 3 are conveyed to an installation place and lowered after positioning and installed. Further, the top plate 4 is conveyed and installed in a given position to construct the box culvert 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は地下道等の地下構造物
を構成するボックスカルバートの据付装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a box culvert installation device that constitutes an underground structure such as an underground passage.

【0002】[0002]

【発明が解決しようとする課題】近年、ボックスカルバ
ートは大型化してきている。このために製造、運搬、架
設を容易にするために分割化が必要となってきている。
従来、ボックスカルバートを施工するには、レッカーに
よるものが一般的であった。ところで、ボックスカルバ
ートの施工は、施工地点が順次移動していくので、レッ
カーも移動し、部材の運搬車輌もそれに同伴しなければ
ならない。しかし、最近は施工現場の条件もいろいろな
制約が生じ、レッカーの設置場所を自由に選定すること
はむずかしくなってきている。また、レッカー施工の場
合は、部材を据付けるオペレーターは離れた場所からの
ブーム操作となり、機械を操作するのに高度の技術を必
要とする。
In recent years, box culverts have become larger. For this reason, division has become necessary to facilitate manufacturing, transportation, and installation.
Conventionally, a wicker was generally used to construct a box culvert. By the way, in the construction of the box culvert, since the construction points are sequentially moved, the wrecker must be moved and the vehicle for transporting the members must be accompanied with it. However, recently, there are various restrictions on the conditions of the construction site, and it has become difficult to freely select the installation location of the tow truck. Also, in the case of wrecker construction, the operator who installs the member operates the boom from a remote location, and requires a high level of skill to operate the machine.

【0003】この発明は上記問題点に着目しなされたも
のである。その目的は、作業条件、範囲等に制約がある
限られたスペースでの施工、特に多くの制約がある地下
での施工において、安全性および作業能率が優れ、施工
精度の向上を図ることができるボックスカルバートの据
付装置を提案するにある。
The present invention has been made in view of the above problems. The purpose is to improve the construction accuracy and the safety and work efficiency, and to improve the construction accuracy in the construction in a limited space where there are restrictions on the working conditions, range, etc., especially in the underground construction where there are many restrictions. To propose a box culvert installation device.

【0004】[0004]

【課題を解決するための手段】このボックスカルバート
の据付装置は、自走手段を備えた台車に、ボックスカル
バートを底版材、側壁材、側壁材および頂版材に4分割
した底版材を昇降可能に水平に吊下げる手段、側壁材を
台車の両側面に沿い横方向移動および昇降可能に垂直に
吊下げる手段、および頂版材を昇降可能に水平に下方か
ら支持する手段を設けてなることを特徴とする。
[Means for Solving the Problems] This box culvert installation device is capable of raising and lowering a bottom slab obtained by dividing a box culvert into a bottom slab, a side wall, a side wall and a top slab on a trolley equipped with self-propelled means. Means for suspending horizontally, means for vertically suspending the side wall material along both sides of the bogie so that it can be laterally moved and lifted, and means for horizontally supporting the top plate material from below so that it can be lifted. Characterize.

【0005】[0005]

【実施例】この据付装置は、図1に示す断面方形のボッ
クスカルバート1を底版材2、側壁材3、側壁材3およ
び頂版材4に4分割した部材を搬送して組立、据付ける
ものである。
EXAMPLE This installation apparatus is one in which a box culvert 1 having a rectangular cross section shown in FIG. 1 is conveyed to a bottom plate material 2, a side wall material 3, a side wall material 3 and a top plate material 4 and assembled and installed. Is.

【0006】実施例の据付装置5は図2に示すように、
自走用モーター6、車輪7からなる自走手段を備えた台
車8に、その前進方向先端に底版材吊下げ手段9、その
両側面に側壁材吊下げ手段10、およびその後端に頂版
材支持手段11を設けてなっている。
As shown in FIG. 2, the installation device 5 of the embodiment is as follows.
A trolley 8 having a self-propelled motor 6 and a self-propelled means including wheels 7, a bottom plate material suspending means 9 at the forward end, a side wall material suspending means 10 at both side surfaces thereof, and a top plate material at the rear end thereof. Supporting means 11 is provided.

【0007】底版材吊下げ手段9は、台車8の前進方向
に直交する梁材12の両端部に取付けた2のジャッキ1
3−1と、その先端から垂下した吊りフック14からな
り、底版材2の両端をフック14で係止して昇降可能に
水平に吊下げできる。
The bottom plate material suspension means 9 has two jacks 1 attached to both ends of a beam material 12 which is orthogonal to the forward direction of the carriage 8.
3-1 and a hanging hook 14 hanging down from the tip thereof, both ends of the bottom plate material 2 are locked by the hooks 14 and can be hung horizontally so as to be able to move up and down.

【0008】側板材吊下げ手段10は、台車8の上中央
部の梁材12の両端部に取付けた2のジャッキ13−2
とその先端から垂下した吊りフック14からなり、それ
ぞれの吊りフック14に側壁材3の一端を係止して、台
車の両側面に沿い側壁材3を横方向移動および昇降可能
に垂直に吊下げできる。
The side plate material suspension means 10 has two jacks 13-2 attached to both ends of the beam material 12 at the upper center of the carriage 8.
And hanging hooks 14 hanging from the tip thereof, one end of the side wall material 3 is locked to each of the hanging hooks 14, and the side wall material 3 is vertically hung vertically along the both side surfaces of the truck so that the side wall material 3 can be moved and moved up and down. it can.

【0009】頂版材支持手段11は、台車8後端の、梁
材12の両端上面に取付けた上方に伸縮する2のジャッ
キ13−3とその上部に取付けた受台15からなり、頂
版材4を2の受台15で昇降可能に水平に支持できる。
The top plate material support means 11 is composed of two jacks 13-3, which are attached to the upper surfaces of both ends of the beam member 12 at the rear end of the carriage 8, and which extend and contract upward, and a pedestal 15, which is attached to the top thereof. The material 4 can be horizontally supported by the pedestal 15 of 2 so that it can be raised and lowered.

【0010】この装置を用い4分割した部材を据付けボ
ックスカルバートを施工する例を以下に記述する。
An example of installing a box culvert by using this device to install a member divided into four parts will be described below.

【0011】この施工例は、所定のボックスカルバート
組立長さを施工単位とし、底版部施工、側壁部施工、頂
版部施工の工程順に時期をずらせ施工するものである。
In this construction example, a predetermined box culvert assembly length is used as a construction unit, and construction is carried out at different timings in the order of bottom slab construction, side wall construction, and top slab construction.

【0012】図3に底版部施工の工程を示す。図(a) に
おいて底版材2をレッカーを用い据付け、ベース16を
施工する。(b) において、ベース16上にレール17を
布設し、前記の据付装置5をレール17上に組立てる。
なお、レール17は底版の施工に追従して延長してい
く。この据付装置5を用い、図3(c) 、図4に示すごと
く、ベース16で底版材2の両端をフック14で係止し
て吊下げ、レール17上を走行して据付場所まで搬送
し、所定の位置に降し据付け、所定長さにわたり底版部
を施工する。
FIG. 3 shows a process of constructing the bottom slab. In Fig. (A), the bottom slab 2 is installed using a wrecker, and the base 16 is installed. In (b), the rail 17 is laid on the base 16 and the installation device 5 is assembled on the rail 17.
The rail 17 is extended following the construction of the bottom slab. As shown in FIG. 3 (c) and FIG. 4, using this installation device 5, both ends of the bottom plate material 2 are suspended by hooks 14 with a base 16 and hung, and traveled on a rail 17 to be transported to an installation place. , Install it at the specified position, and install the bottom slab over the specified length.

【0013】図5、図6に側壁部施工の工程を示す。ベ
ース16において、側壁材3を据付装置5の両側面にフ
ック14で係止して垂直に吊下げ、レール17上を走行
して据付場所まで搬送し、車輪18にのった、ジャッキ
13を梁材12上を外側に移動させ、位置決めして側壁
材を降し、据付ける。側壁材3はPC鋼材で緊結した
り、モルタル充填継手等により、セット固定される。こ
れを繰返し所定長さの側壁部を施工する。ベース16の
側壁の施工は作業性を考慮して最後に行ない、同時に頂
版も据付ける。なお、側壁材3下端と台車8との間に折
曲して伸縮する支持装置19を取付けて横ゆれを防止し
てある。
FIG. 5 and FIG. 6 show steps for constructing the side wall portion. In the base 16, the side wall material 3 is hooked on both side surfaces of the installation device 5 with hooks 14 and hung vertically, and the rails 17 travel on rails 17 to be transported to the installation location. The beam member 12 is moved to the outside, positioned, and the side wall member is lowered and installed. The side wall material 3 is tightly bonded with a PC steel material, or is set and fixed by a mortar filling joint or the like. By repeating this, the side wall portion having a predetermined length is constructed. The side wall of the base 16 is constructed lastly in consideration of workability, and at the same time, the top plate is installed. A supporting device 19 which is bent and expands and contracts is attached between the lower end of the side wall member 3 and the dolly 8 to prevent lateral shaking.

【0014】図7、図8に頂版部施工の工程を示す。頂
版材4をベース16から設置場所まで、頂版上を走行す
るミニ台車20に載せて搬送し、ミニ台車20から据付
装置の受台15上に積かえ、受台15を所定の頂版位置
まで下げて据付け所定長さの頂版部を施工し、ボックス
カルバートの施工が完了する。
FIG. 7 and FIG. 8 show the steps of construction of the top plate. The top plate material 4 is carried from the base 16 to the installation place on a mini carriage 20 traveling on the top plate, and is transferred from the mini carriage 20 onto a receiving stand 15 of the installation device, and the receiving stand 15 is set to a predetermined top plate. The box culvert is completed by lowering it to the position and installing the top plate of the specified length.

【0015】頂版材4をミニ台車20から受台に積かえ
るには、例えば図9(a)のように、頂版材4の両側端
をミニ台車20’,20’にのせ搬送し、頂版材を取付
ける両側の既設側壁材3上に、頂版受材21を仮設し、
既設頂版と同一平面の搬送面をつくり、2つの受材21
間で受台に積かえる。
In order to load the top plate material 4 from the mini-carriage 20 onto the pedestal, for example, as shown in FIG. 9 (a), both side ends of the top plate material 4 are placed on the mini-bogies 20 ', 20' and conveyed. Temporarily installing the top plate receiving material 21 on the existing side wall materials 3 on both sides to which the top plate material is attached,
Creates a transport surface that is flush with the existing top plate, and supports two receiving materials 21.
Transfer to the cradle in between.

【0016】また、図9(b)のように、頂版材4をミ
ニ台車20の張出したアーム22で吊下げ支持し、受台
に積かえることもできる。
Further, as shown in FIG. 9 (b), the top plate material 4 can be suspended and supported by the overhanging arm 22 of the mini-carriage 20 and can be stacked on the pedestal.

【0017】[0017]

【作用】この発明は以上の構成からなる。このボックス
カルバートの据付装置は、走行台車に底版材、頂版材を
水平に、側壁材を台車側面に沿い横および垂直に、それ
ぞれ移動および昇降可能に支持、あるいは吊下げるもの
であるので、各部材を据付位置に接近する処まで搬送
ができる。据付位置に据付装置を近づけて現場状況を
確認して直接操作でき、施工精度、施工能率および安全
性が向上する。
The present invention is constructed as described above. This box culvert installation device supports or hangs the bottom plate material and the top plate material horizontally on the traveling carriage, and the side wall materials horizontally and vertically along the side surface of the carriage so that they can be moved and lifted. The parts can be transported to the place where they approach the installation position. The installation equipment can be brought close to the installation position to check the site situation and directly operate, improving the construction accuracy, construction efficiency and safety.

【0018】実施例の装置は底版材、側壁材を吊下げる
ジャッキおよび頂版材を支持するジャッキはいずれも梁
材の両端部に取付けてあるが、ジャッキ取付位置を調節
したり、あるいはジャッキを取付ける梁材、柱材を伸縮
可能のものとすることにより、多様な形状のボックスカ
ルバートに対応が可能となる。
In the apparatus of the embodiment, the bottom slab material, the jack for hanging the side wall material and the jack for supporting the top stencil material are attached to both ends of the beam material. By making the beams and columns to be attached expandable and contractable, it is possible to accommodate box culverts of various shapes.

【0019】この据付装置は、前記実施例のボックスカ
ルバートの施工のように、底版部施工、側壁部施工、頂
版部施工の工程順に時期をずらせ行なう工法に用いて一
層その機能を有効に発揮できる。すなわち、施工した底
版上を底版材および側壁材を据付位置まで搬送し、上下
に昇降させて位置決めして据付けができる。また、頂版
材を施工した頂版上をミニ台車で搬送し、施工位置にお
いて据付装置の受台に積かえ、所定の頂版高さまで受台
を下げて据付けができる。従って狭い地下におけるボッ
クスカルバートの施工もこの装置を用い作業能率よく実
施できる。
This installation device is used more effectively when used in a construction method in which the steps of bottom slab construction, side wall construction, and top slab construction are carried out in the same order as in the case of the box culvert construction of the above-mentioned embodiment. it can. That is, the bottom slab material and the side wall material can be conveyed to the installation position on the constructed bottom slab, and moved up and down to be positioned and installed. Further, the top plate on which the top plate material has been applied can be conveyed by a mini-carriage, and can be loaded onto the support of the installation device at the installation position, and the support can be lowered to a predetermined top plate height for installation. Therefore, box culverts can be constructed in a narrow underground with this device with good work efficiency.

【0020】[0020]

【発明の効果】この発明は以上の通りでありこの装置を
用いることにより、4分割した部材を用い、高い安全
性、施工能率を保ち精度の高いボックスカルバートを施
工できる。
The present invention is as described above, and by using this device, a box culvert can be constructed with high accuracy while maintaining high safety and construction efficiency by using members divided into four parts.

【図面の簡単な説明】[Brief description of drawings]

【図1】底版材、側壁材、側壁材、頂版材からなるボッ
クスカルバートの正面図である。
FIG. 1 is a front view of a box culvert composed of a bottom plate material, a side wall material, a side wall material, and a top plate material.

【図2】実施例のボックスカルバートの据付装置の斜視
図である。
FIG. 2 is a perspective view of a box culvert installation device of the embodiment.

【図3】(a),(b),(c) 底版施工工程を順に示す説明図で
ある。
FIG. 3 (a), (b), (c) is an explanatory view sequentially showing the bottom slab construction process.

【図4】(a),(b) 底版材を吊下げた据付装置の正面図お
よび側面図である。
4 (a) and 4 (b) are a front view and a side view of an installation device in which a bottom slab is suspended.

【図5】(a),(b) 側壁施工工程順に示す説明図である。5 (a) and 5 (b) are explanatory views showing the side wall construction step order.

【図6】(a),(b) 側壁材を吊下げた据付装置の正面図お
よび側面図である。
6 (a) and 6 (b) are a front view and a side view of an installation device in which side wall materials are suspended.

【図7】(a),(b) 頂版施工工程を順に示す説明図であ
る。
7 (a) and 7 (b) are explanatory views sequentially showing the top plate construction process.

【図8】(a),(b) 頂版材を支持した据付装置の正面図お
よび側面図である。
8 (a) and 8 (b) are a front view and a side view of an installation device supporting a top plate material.

【図9】(a),(b) 頂版材をミニ台車から据付装置に積か
える態様例を示す説明図である。
9 (a) and 9 (b) are explanatory views showing an example of a mode in which the top plate material is loaded from the mini truck onto the installation device.

【符号の説明】[Explanation of symbols]

1…ボックスカルバート、2…底版材、3…側壁材、4
…頂版材、5…ボックスカルバート据付装置、6…自走
用モーター、7…車輪、8…台車、9…底版材吊下げ手
段、10…側壁材吊下げ手段、11…頂版材支持手段、
12…梁材、13…ジャッキ、14…吊りフック、15
…受台、16…ベース、17…レール、18…車輪、1
9…支持装置、20…ミニ台車、21…頂版受材、22
…アーム。
1 ... box culvert, 2 ... bottom plate material, 3 ... side wall material, 4
... Top plate material, 5 ... Box culvert installation device, 6 ... Self-propelled motor, 7 ... Wheels, 8 ... Cart, 9 ... Bottom plate material hanging means, 10 ... Side wall material hanging means, 11 ... Top plate material supporting means ,
12 ... Beam material, 13 ... Jack, 14 ... Hanging hook, 15
... cradle, 16 ... base, 17 ... rail, 18 ... wheel, 1
9 ... Supporting device, 20 ... Mini cart, 21 ... Top plate receiving material, 22
…arm.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 自走手段を備えた台車に、ボックスカル
バートを底版材、側壁材、側壁材および頂版材に4分割
した底版材を昇降可能に水平に吊下げる手段、側壁材を
台車の両側面に沿い横方向移動および昇降可能に垂直に
吊下げる手段、および頂版材を昇降可能に水平に下方か
ら支持する手段を設けてなることを特徴とするボックス
カルバートの据付装置。
1. A trolley equipped with a self-propelled means, a box culvert being divided into a bottom slab material, a side wall material, and a side wall material and a top slab material. An installation device for a box culvert, which is provided with means for vertically suspending it so that it can be moved laterally along both sides and lifted up and down, and means for horizontally supporting the top plate material from below so that it can be lifted up and down.
JP5007889A 1993-01-20 1993-01-20 Device for installing box culvert Pending JPH06212684A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5007889A JPH06212684A (en) 1993-01-20 1993-01-20 Device for installing box culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5007889A JPH06212684A (en) 1993-01-20 1993-01-20 Device for installing box culvert

Publications (1)

Publication Number Publication Date
JPH06212684A true JPH06212684A (en) 1994-08-02

Family

ID=11678159

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5007889A Pending JPH06212684A (en) 1993-01-20 1993-01-20 Device for installing box culvert

Country Status (1)

Country Link
JP (1) JPH06212684A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006225950A (en) * 2005-02-17 2006-08-31 Chiba Yohgyoh Co Ltd Cylindrical concrete structure
JP2010196439A (en) * 2009-02-27 2010-09-09 Taisei Corp Device and method of conveying precast culvert

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006225950A (en) * 2005-02-17 2006-08-31 Chiba Yohgyoh Co Ltd Cylindrical concrete structure
JP2010196439A (en) * 2009-02-27 2010-09-09 Taisei Corp Device and method of conveying precast culvert

Similar Documents

Publication Publication Date Title
JP5051591B2 (en) Precast PC plate erection device for floor slab and its erection method
JP5769961B2 (en) Construction method and removal method of structure
JP5698474B2 (en) Installation method of overhead crane
JP2001248161A (en) Method for installing concrete block on face of slope and truck and device for installing it
JPH06212684A (en) Device for installing box culvert
JP2000282116A (en) Method and device for constructing furnace body of blast furnace
JP2709091B2 (en) Manufacturing and stocking method of unit floor
JP2018123608A (en) Hanging-down removal device of tunnel ceiling part concrete matter
JP3892196B2 (en) Slope-equipment carrying work device and construction method of this device
JP3217773B2 (en) How to carry heavy objects into the building and how to carry heavy objects outside the building
WO2004065727A1 (en) Skate, beam and transporter device and system for transferring and aligning houses
JP6682332B2 (en) Bridge removal method
JP4250282B2 (en) Side panel panel erection device and erection method
JPH10292790A (en) Method for tunnel lining construction
JP4552102B2 (en) Work cart
JP3980772B2 (en) Removal and installation of heavy structures
JP2881524B2 (en) Monorail track girder erection machine
JP4961268B2 (en) Precast floor slab transport method and transport mechanism
JP4804676B2 (en) Piping installation method and apparatus in tunnel
JP6718392B2 (en) How to suspend and remove concrete slabs
JPS6323519Y2 (en)
JP2983092B2 (en) Undercarriage transportation trolley, descent device and transportation installation method using the same
JP3565123B2 (en) Foundation reinforcement method and foundation reinforcement structure for blast furnace ring block suspension device in blast furnace furnace ring block method
JP2004068477A (en) Workpiece carrier
JP3380788B2 (en) Mobile trolley used for box culvert transfer