Apparatus for supporting oven-top brick during hot repair of brick work in coke oven chamber

Info

Publication number
JPH06212158A
JPH06212158A JP548693A JP548693A JPH06212158A JP H06212158 A JPH06212158 A JP H06212158A JP 548693 A JP548693 A JP 548693A JP 548693 A JP548693 A JP 548693A JP H06212158 A JPH06212158 A JP H06212158A
Authority
JP
Japan
Prior art keywords
brick
support
repair
supporting
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP548693A
Other languages
Japanese (ja)
Other versions
JP2596501B2 (en
Inventor
Yutaka Oda
豊 小田
Junichi Otsuka
純一 大塚
Akio Kikuchi
昭男 菊地
Kazuya Okanishi
和也 岡西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP548693A priority Critical patent/JP2596501B2/en
Publication of JPH06212158A publication Critical patent/JPH06212158A/en
Application granted granted Critical
Publication of JP2596501B2 publication Critical patent/JP2596501B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

PURPOSE:To prevent the bending of an oven-top brick structure due to the traveling load of a charging car. CONSTITUTION:The apparatus supports oven-top bricks 7 and comprises a stand 5 for supporting a rail of a charging car and independent supporting beams 2, 3. The apparatus enables traveling of a moving machine on a coke oven even when the brick work in a coke oven chamber is under hot repair, preventing production troubles due to the repair work, decreasing the slacking of supporting bricks or occurrence of joint crack, and improving tightness of sealing the chamber wall after the repair.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はコークス炉炭化室の熱間
補修における炉頂煉瓦支持装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rooftop brick support device for hot repair of a coke oven carbonization chamber.

【0002】[0002]

【従来の技術】従来のコークス炉炭化室の熱間補修工事
における炉頂煉瓦支持装置では、図5に示すように、補
修燃焼室をはさんで、非補修燃焼室の炉頂煉瓦(図示せ
ず)で支持されたクロスステー2を支持する。このクロ
スステー2に、補修燃焼室の炉頂煉瓦を支持する吊りボ
ルト6を装着する。炉上を走行する装入車の軌条が、ク
ロスステー2の設置範囲内にある場合、図6の(a)に
示すように装入車軌条と軌条台を外して、炉頂煉瓦を大
幅に掘削して、クロスステー2を設置するか、図6の
(b)に示すように、軌条台にクロスステー2を接合す
る必要があった。
2. Description of the Related Art In a conventional furnace top brick support device for hot repair work of a coke oven carbonization chamber, as shown in FIG. 5, a roof top brick (not shown) of a non-repair combustion chamber is sandwiched between repair combustion chambers. The cross stay 2 supported by (No.) is supported. A suspension bolt 6 for supporting the furnace top brick of the repair combustion chamber is attached to the cross stay 2. When the rail of the charging vehicle running on the furnace is within the setting range of the cross stay 2, remove the charging vehicle rail and the rail platform as shown in FIG. It was necessary to dig and install the cross stay 2 or to join the cross stay 2 to the rail base as shown in FIG.

【0003】[0003]

【発明が解決しようとする課題】上述のように、従来の
技術による炉頂煉瓦支持装置では、図6の(a)の場
合、炉頂煉瓦を大幅に掘削することにより炉頂煉瓦の構
造強度と安定性の低下、そして図6の(b)の場合、装
入車の移動荷重に伴う軌条台のたわみがクロスステー2
のたわみとなり、吊りボルト6が装入車通過のたびに上
下することによる炉頂煉瓦の構造劣化、強いては、補修
部の炉壁の目地のゆるみを生じる問題があった。
As described above, in the furnace top brick supporting device according to the prior art, in the case of FIG. 6 (a), the structural strength of the furnace top brick is increased by largely excavating the furnace top brick. In addition, in the case of FIG. 6 (b), the deflection of the rail base due to the moving load of the charging vehicle causes the cross stay 2
As a result, the hanging bolt 6 moves up and down every time the charging vehicle passes through, causing structural deterioration of the furnace top brick and, in the worst case, loosening of joints on the furnace wall of the repair section.

【0004】[0004]

【課題を解決するための手段】このような問題を解消す
べき、発明者らは鋭意開発を進めた結果、装入車軌条支
持台を設けると共に独立の支持桁を設けて炉頂煉瓦を支
持することにより装入車の移動荷重による炉頂煉瓦構造
の撓みを防止することを目的とするものである。その発
明の要旨とするところは、コークス炉炭化室の中繰り工
法による熱間補修において、装入車の移動荷重による炉
頂煉瓦構造の撓みを防止するための装入車軌条支持台を
設けると共に、独立の支持桁を設けて炉頂煉瓦を支持さ
せることを特徴とする炭化室熱間補修における炉頂煉瓦
支持装置にある。
[Means for Solving the Problems] As a result of intensive development, the inventors of the present invention should solve the above problems. As a result, a rail support for a charging vehicle and an independent support girder are provided to support a rooftop brick. By doing so, it is intended to prevent the bending of the furnace top brick structure due to the moving load of the charging vehicle. The gist of the invention is to provide a charging vehicle rail support for preventing the bending of the furnace top brick structure due to the moving load of the charging vehicle in hot repair by the boring method of the coke oven carbonization chamber. , A furnace top brick support device in a hot repair of a carbonization chamber, characterized in that an independent support girder is provided to support the furnace top brick.

【0005】[0005]

【作用】以下本発明について図面に従って詳細に説明す
る。図1は本発明に係る補修燃焼室での補強支持桁を設
けた断面図である。図1(a)に示すように、装入車軌
条1および軌条台5と独立して、炉頂煉瓦を支持するた
めの支持桁2および3を設置する。また、支持桁2およ
び3はクロスタイロッドAとも独立である。
The present invention will be described in detail below with reference to the drawings. FIG. 1 is a sectional view in which a reinforcing support girder is provided in a repair combustion chamber according to the present invention. As shown in FIG. 1 (a), support girders 2 and 3 for supporting the furnace top brick are installed independently of the charging vehicle rail 1 and the rail platform 5. The support girders 2 and 3 are also independent of the cross tie rod A.

【0006】上記のように、装入車軌条支持台及び独立
の補強支持桁を設けることによって、装入車の移動荷重
による炉頂煉瓦構造の撓みを防止するものである。符号
8は燃焼室、9は煉瓦支持金物である。図1(b)はク
ロスタイロッドA部分での拡大図であって、クロスタイ
ロッド18は、補修のために増設する仮設タイロッド1
0と接合されている。炉頂煉瓦高さが炉端部等補修しな
い部位と、補修のために掘削した部位とで異なることか
ら、クロスタイロッドの高さ方向において段差を生じる
ために設けられたタイロッドである。
As described above, by providing the charging vehicle rail support and the independent reinforcing support girder, the bending of the furnace top brick structure due to the moving load of the charging vehicle is prevented. Reference numeral 8 is a combustion chamber, and 9 is a brick support hardware. FIG. 1 (b) is an enlarged view of the cross tie rod A portion, and the cross tie rod 18 is a temporary tie rod 1 to be added for repair.
It is joined with 0. This is a tie rod that is provided to create a step in the height direction of the cross tie rod because the height of the furnace top brick differs between the portion that is not repaired, such as the furnace end, and the portion that is excavated for repairing.

【0007】図2は図1の本発明に係る支持構造の平面
図である。図2は2窯補修の支持構造例を示す図であ
る。装入車軌条および軌条台1と別個の支持桁2及び3
にそれぞれ吊りボルト支持梁11及び12を配設し、桁
支持台13にて固定される。符号14は石炭装入孔であ
る。図3は図1の本発明に係る支持構造の側面図であ
る。コークス炉全体を炉高方向に炉締するための吊りボ
ルト6によって補強支持桁3を吊り上げた構造になって
いる。符号15は炭化室である。図4は図2のB視から
の装入車軌条支持台の断面構造を示す図である。取替軌
条16及び装入車軌条支持台5の取替え範囲を示してい
る。すなわち、軌条取替え範囲及び装入車軌条支持台の
取替え範囲を示している。また、符号17は軌条取替え
のときの軌条接合部を示している。
FIG. 2 is a plan view of the support structure according to the present invention of FIG. FIG. 2 is a diagram showing an example of a supporting structure for repairing two kilns. Support girders 2 and 3 separate from the loading vehicle rail and rail platform 1
Suspending bolt support beams 11 and 12 are respectively disposed on the column and fixed by a girder support base 13. Reference numeral 14 is a coal charging hole. FIG. 3 is a side view of the support structure according to the present invention in FIG. It has a structure in which the reinforcing support girder 3 is hoisted by hoisting bolts 6 for tightening the entire coke oven in the furnace height direction. Reference numeral 15 is a carbonization chamber. FIG. 4 is a view showing a cross-sectional structure of the charging vehicle rail support from the view B of FIG. The replacement range of the replacement rail 16 and the charging vehicle rail support 5 is shown. That is, it shows the range of rail replacement and the range of replacement of the loaded vehicle rail support. Further, reference numeral 17 indicates a rail joint portion when the rail is replaced.

【0008】このように、従来の支持構造体とは独立し
た補強桁を設けるとにより、操業中での外乱荷重の影響
による撓みによる煉瓦目地切れの亀裂発生を抑制すると
とが出来、操業を継続しながらも定常時に炉頂煉瓦を安
定して支持を図ることが出来るものである。
As described above, by providing the reinforcing girder independent of the conventional support structure, it is possible to suppress the occurrence of cracks in the brick joint breakage due to the bending due to the influence of the disturbance load during the operation, and the operation is continued. However, it is possible to stably support the rooftop bricks in a steady state.

【0009】[0009]

【発明の効果】以上述べたように、本発明によって熱間
補修工事中においても炉上移動機械の走行運転が可能と
なり、工事による生産障害を回避することが出来、しか
も補修工事中の支持煉瓦の緩み、目地亀裂の発生が低下
され、また補修後の面壁シール性を向上出来る極めて優
れた効果を奏するものである。
As described above, according to the present invention, the traveling machine of the furnace moving machine can be operated even during the hot repair work, the production trouble due to the work can be avoided, and the supporting bricks during the repair work are also prevented. And the occurrence of joint cracks are reduced, and the surface wall sealing property after repair is improved, which is an extremely excellent effect.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る補修燃焼室での補強支持桁を設け
た断面図
FIG. 1 is a cross-sectional view showing a reinforcing support girder in a repair combustion chamber according to the present invention.

【図2】図1の本発明に係る支持構造の平面図FIG. 2 is a plan view of the support structure according to the present invention in FIG.

【図3】図1の本発明に係る支持構造の側面図FIG. 3 is a side view of the support structure according to the present invention in FIG.

【図4】図2のB視からの装入車軌条支持台の断面構造
を示す図
FIG. 4 is a view showing a cross-sectional structure of the charging vehicle rail support from the view B of FIG.

【図5】従来のコークス炉端部補修のための炉頂支持構
造を示す図である。
FIG. 5 is a diagram showing a furnace top support structure for repairing a conventional coke furnace end portion.

【図6】従来のコークス炉補修における装入車軌条およ
び軌条台と吊りボルト支持梁との関係を示す図である。
FIG. 6 is a view showing a relationship between a charging vehicle rail and a rail base and a suspension bolt support beam in conventional coke oven repair.

【符号の説明】[Explanation of symbols]

1 装入車軌条 2、3 支持桁 4 炉頂煉瓦吊りボルト 5 装入車軌条支持台 6 吊りボルト 7 補修窯炭化室上部煉瓦 8 燃焼室 9 煉瓦支持金物 10 仮設タイロッド 11、12 吊りボルト支持ボルト梁 13 桁支持台 14 石炭装入孔 15 炭化室 16 取替軌条 17 軌条取替えのときの軌条接合部 18 クロスタイロッド 1 Charging vehicle rail 2, 3 Support girder 4 Furnace top brick hanging bolt 5 Charging vehicle rail support stand 6 Hanging bolt 7 Repair kiln carbonization chamber upper brick 8 Combustion chamber 9 Brick support metal 10 Temporary tie rod 11, 12 Hanging bolt support bolt Beam 13 Girder support 14 Coal charging hole 15 Carbonization chamber 16 Replacement rail 17 Rail joint at the time of rail replacement 18 Cross tie rod

───────────────────────────────────────────────────── フロントページの続き (72)発明者 岡西 和也 兵庫県姫路市広畑区富士町1番地 新日本 製鐵株式会社広畑製鐵所内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kazuya Okani 1 Fuji-machi, Hirohata-ku, Himeji-shi, Hyogo Shin Nippon Steel Co., Ltd. Hirohata Works

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 コークス炉炭化室の熱間補修において、
装入車の移動荷重による炉頂煉瓦構造の撓みを防止する
ための装入車軌条支持台を設けると共に、独立の補強支
持桁を設けて炉頂煉瓦を支持させることを特徴とする炭
化室熱間補修における炉頂煉瓦支持装置。
1. A hot repair of a coke oven carbonization chamber,
Charging chamber heat, characterized in that a charging vehicle rail support is provided to prevent bending of the furnace top brick structure due to the moving load of the charging car, and an independent reinforcing support girder is provided to support the furnace top brick. Brick support device for rooftops during repair work.
JP548693A 1993-01-18 1993-01-18 Furnace brick support equipment in hot repair of carbonization room. Expired - Fee Related JP2596501B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP548693A JP2596501B2 (en) 1993-01-18 1993-01-18 Furnace brick support equipment in hot repair of carbonization room.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP548693A JP2596501B2 (en) 1993-01-18 1993-01-18 Furnace brick support equipment in hot repair of carbonization room.

Publications (2)

Publication Number Publication Date
JPH06212158A true JPH06212158A (en) 1994-08-02
JP2596501B2 JP2596501B2 (en) 1997-04-02

Family

ID=11612580

Family Applications (1)

Application Number Title Priority Date Filing Date
JP548693A Expired - Fee Related JP2596501B2 (en) 1993-01-18 1993-01-18 Furnace brick support equipment in hot repair of carbonization room.

Country Status (1)

Country Link
JP (1) JP2596501B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006066379A (en) * 2004-07-30 2006-03-09 Sanyo Electric Co Ltd Organic electroluminescence element and organic electroluminescence display device
JP2006210845A (en) * 2005-01-31 2006-08-10 Sanyo Electric Co Ltd Organic electroluminescent element and organic electroluminescent display
JP2007002189A (en) * 2005-06-27 2007-01-11 Jfe Refractories Corp Method and apparatus for supporting ceiling brick of combustion chamber in coke oven
JP2007149605A (en) * 2005-11-30 2007-06-14 Sanyo Electric Co Ltd Organic electroluminescent element, and organic electroluminescent display device
JP2015003936A (en) * 2013-06-19 2015-01-08 Jfeスチール株式会社 Larry car rail cradle and renewal method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006066379A (en) * 2004-07-30 2006-03-09 Sanyo Electric Co Ltd Organic electroluminescence element and organic electroluminescence display device
JP2006210845A (en) * 2005-01-31 2006-08-10 Sanyo Electric Co Ltd Organic electroluminescent element and organic electroluminescent display
JP2007002189A (en) * 2005-06-27 2007-01-11 Jfe Refractories Corp Method and apparatus for supporting ceiling brick of combustion chamber in coke oven
JP2007149605A (en) * 2005-11-30 2007-06-14 Sanyo Electric Co Ltd Organic electroluminescent element, and organic electroluminescent display device
JP2015003936A (en) * 2013-06-19 2015-01-08 Jfeスチール株式会社 Larry car rail cradle and renewal method thereof

Also Published As

Publication number Publication date
JP2596501B2 (en) 1997-04-02

Similar Documents

Publication Publication Date Title
KR100541024B1 (en) Method of repairing a coke oven buckstay and a moving device for use in such method
US6260270B1 (en) Method and apparatus for short-term relining or construction of blast furnace
CA1052080A (en) Method for constructing a blast furnace
CN101804501B (en) Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney
CN110440272B (en) Incinerator installation method
CN110984637B (en) Steel structure modular installation method for steelmaking oxygen lance valve station
JPH06212158A (en) Apparatus for supporting oven-top brick during hot repair of brick work in coke oven chamber
CN110159057B (en) Mounting and construction method for smoke pipe of technically improved factory building
JPH02180720A (en) Conduit for glass
JPH05222420A (en) Method for intermediate reconstruction of blast furnace
JP2017019885A (en) Construction method of coke oven
US3375795A (en) Panelized furnace roof
CN111485045A (en) Method for building bottom bricks in blast furnace maintenance
CN116005555A (en) Large-tonnage curved surface steel box girder diagonal manufacturing and installation construction process thereof
US4162891A (en) Scrap preheater modular roof assembly
US4053278A (en) Tunnel kiln
JP4592860B2 (en) Blast furnace component installation method
JP3110683B2 (en) How to attach a steel reinforcing member to a blast furnace furnace block
JP3512960B2 (en) Lance device
JP2001091164A (en) Method for executing panel of refractory
CN216005095U (en) Rail clamping type hydraulic crawler with automatic leveling device
CN216890791U (en) Coke oven overhauls uses protection greenhouse
JP2937993B1 (en) Furnace support device
JPH01168803A (en) Method and device for repairing blast furnace
JPH1046216A (en) Method for laying furnace bottom brick in blast furnace

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19961015

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090109

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100109

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110109

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120109

Year of fee payment: 15

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130109

Year of fee payment: 16

LAPS Cancellation because of no payment of annual fees