JPH06211319A - Packaging work indication system - Google Patents

Packaging work indication system

Info

Publication number
JPH06211319A
JPH06211319A JP753293A JP753293A JPH06211319A JP H06211319 A JPH06211319 A JP H06211319A JP 753293 A JP753293 A JP 753293A JP 753293 A JP753293 A JP 753293A JP H06211319 A JPH06211319 A JP H06211319A
Authority
JP
Japan
Prior art keywords
capacity
packing
inventory
inventory information
packaging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP753293A
Other languages
Japanese (ja)
Other versions
JP3150471B2 (en
Inventor
Toru Takahara
徹 高原
Yukihiko Harada
幸彦 原田
Shigeyoshi Yamanaka
茂好 山中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP753293A priority Critical patent/JP3150471B2/en
Publication of JPH06211319A publication Critical patent/JPH06211319A/en
Application granted granted Critical
Publication of JP3150471B2 publication Critical patent/JP3150471B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

PURPOSE:To improve loading efficiency of a distribution vehicle by outputting packaging indication so that loading capacity becomes the full loading capacity at the time when the distribution vehicle leaves for a destined physical distribution base. CONSTITUTION:After a daily work is finished, stock information sent from each physical distribution base is tabulated, and the information is stored in a stock information storage part 1 by attaching an order of precedence on a product the stock amount of which is small first in order for each of the physical distribution bases. Additionally, from a packaging actual data at the time of finishing the daily work and a loading capacity data of a following day's distribution vehicle arranged, residual loadable capacity is computed by a loadable capacity computing part 2. Thereafter, at a packaging indication output part 3, in accordance with the order of precedence of the stock information stored in the stock information storage part 1 firstly, within a range of the loadable capacity computed at the loadable capacity computing part 2, possible packaging capacity from the packaging starting time of the day of distribution to the departure time of the distribution vehicle is computed. Thereafter, only for this possible packaging capacity, in accordance with the order of precedence of the stock information, packaging indication of a prepared stock stored in a warehouse is output.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、生産工場において生産
された製品に仕掛在庫が発生した場合にはこれを倉庫に
保管し、物流拠点からの在庫情報に基づき、保管した仕
掛在庫から必要な数量を梱包して出荷場に搬送し、配送
車輌に積載して物流拠点に配送するといった一連の製品
配送ラインにおいて好適な梱包作業指示システムに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention stores a work-in-process inventory in a product produced in a production factory, stores the work-in-process inventory in a warehouse, and based on the inventory information from a distribution base, it is necessary to store the work-in-process inventory. The present invention relates to a packaging work instruction system suitable for a series of product delivery lines in which quantities are packed, transported to a shipping site, loaded on a delivery vehicle, and delivered to a distribution base.

【0002】[0002]

【従来の技術】押出成形等の生産工場においては、生産
効率の向上から成形機等の設備機器は24時間稼働とす
る一方、生産された製品を梱包する作業は人手による例
えば昼間7時間の作業となっている。そのため、梱包作
業が行われない間に生産された製品は、仕掛在庫として
一旦倉庫に保管しておく必要がある。
2. Description of the Related Art In a production factory such as extrusion molding, equipment such as a molding machine is operated for 24 hours in order to improve production efficiency, while packing of produced products is carried out manually by, for example, 7 hours in the daytime. Has become. Therefore, it is necessary to temporarily store the products produced before the packing work as a work-in-process inventory in the warehouse.

【0003】また、このような生産工場では、1日の業
務終了時の梱包実績データに基づいて翌日の配送計画を
立てている。そして、その配送計画に従い、前日に各物
流拠点から送られてきた在庫情報に基づいて各部所に梱
包指示及び出荷指示を与えるようになっている。
Further, in such a production factory, a delivery plan for the next day is made based on the actual packaging data at the end of the day of work. Then, according to the delivery plan, a packing instruction and a shipping instruction are given to each department based on the inventory information sent from each distribution base the day before.

【0004】つまり、物流拠点からの在庫情報に基づい
て、在庫量の少ない順に順次梱包する梱包指示を梱包ラ
インに出力し、その梱包実績に基づく出荷指示を出荷場
に出力するようになっている。
That is, based on the inventory information from the distribution base, a packing instruction for sequentially packing in ascending order of the stock quantity is output to the packing line, and a shipping instruction based on the packing result is output to the shipping site. .

【0005】[0005]

【発明が解決しようとする課題】しかしながら、このよ
うな梱包指示及び出荷指示は、物流拠点から送られてき
た前日のデータに基づいて作成されているので、これら
の指示によって梱包され出荷場に搬送されてきた製品の
数が、手配した配送車輌の積載容量を超えている場合に
は、出荷場において梱包状態の製品在庫(積み残し)が
発生するといった問題があった。また、これとは逆に、
出荷場に搬送されてきた製品の数が、手配した配送車輌
の積載容量に満たない場合には、積載量に余裕を残した
ままで配送車輌が出発することとなり、積載効率が低下
するといった問題があった。
However, since such packing instructions and shipping instructions are created based on the previous day's data sent from the distribution base, they are packed according to these instructions and transported to the shipping site. If the number of products that have been shipped exceeds the load capacity of the delivery vehicle that has been arranged, there is a problem that a product inventory (unloading) in a packed state occurs at the shipping site. On the contrary,
If the number of products delivered to the shipping site is less than the arranged loading capacity of the delivery vehicle, the delivery vehicle will leave with a margin of the loading capacity, which reduces the loading efficiency. there were.

【0006】本発明はかかる実情に鑑みてなされたもの
で、その目的は、配送車輌の積載効率が100%になる
ような梱包指示を出力することにより、出荷場における
積み残しの発生、積載効率の低下、仕掛在庫の低減等を
可能とする梱包作業指示システムを提供することにあ
る。
The present invention has been made in view of the above circumstances, and an object thereof is to output a packing instruction so that the loading efficiency of a delivery vehicle is 100%, thereby causing unloaded and unloaded items at the shipping site. (EN) It is intended to provide a packing work instruction system capable of reducing the amount of work in progress and the stock of work in progress.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するた
め、本発明の梱包作業指示システムは、生産工場におい
て生産された製品に仕掛在庫が発生した場合にはこれを
倉庫に保管し、物流拠点からの在庫情報に基づき、保管
した仕掛在庫から必要な数量を梱包して出荷場に搬送
し、配送車輌に積載して物流拠点に配送するといった一
連の製品配送ラインに適用し、1日の業務終了後に物流
拠点から送られてくる在庫情報に基づき、在庫量の少な
い製品から順に優先順位を付して格納する在庫情報格納
部と、配送前日の梱包実績データと手配した配送車輌の
積載容量データとから残りの積載可能容量を算出する積
載可能容量算出部と、前記在庫情報格納部に格納された
在庫情報の優先順位に従い、前記積載可能容量算出部に
より算出された積載可能容量の範囲内において、配送当
日の梱包開始時刻から前記配送車輌の出発時刻までの梱
包可能容量を算出し、この算出した梱包可能容量分だ
け、前記在庫情報格納部に格納された在庫情報の優先順
位に従って前記仕掛在庫の梱包指示を出力する梱包指示
出力部とを備えた構成とする。
In order to solve the above-mentioned problems, the packing work instruction system of the present invention stores a work-in-process inventory in a product produced in a production factory, stores the work-in-process inventory in a warehouse, and stores it in a distribution base. Apply to a series of product delivery lines, such as packing required quantity from stored in-process inventory, transporting it to a shipping site, loading it on a delivery vehicle and delivering it to a logistics base based on the inventory information from After the end, based on the inventory information sent from the distribution base, the inventory information storage unit that stores the products in order of priority from the one with the smallest inventory, the packing result data on the day before delivery and the loading capacity data of the arranged delivery vehicle According to the priority of the stackable capacity calculation unit that calculates the remaining stackable capacity from the stackable capacity calculation unit and the stock information stored in the stock information storage unit, the stackable capacity calculated by the stackable capacity calculation unit Within the capacity range, the packable capacity from the packing start time on the day of delivery to the departure time of the delivery vehicle is calculated, and priority is given to the inventory information stored in the inventory information storage section by the calculated packable capacity. A packing instruction output unit for outputting the packing instruction for the in-process inventory according to the order.

【0008】[0008]

【作用】在庫情報格納部では、1日の業務終了後に各物
流拠点から送られてくる在庫情報を集計し、各物流拠点
毎に在庫量の少ない製品から順に優先順位を付して格納
する。
In the stock information storage unit, stock information sent from each distribution base after the end of the day's work is totaled, and the products are stored in each distribution base in order of priority from the product with the smallest stock.

【0009】積載可能容量算出部では、その日の業務終
了時点の梱包実績データと、手配した翌日の配送車輌の
積載容量データとから、残りの積載可能容量を算出す
る。
The loadable capacity calculation unit calculates the remaining loadable capacity from the actual packing data at the end of the work on that day and the loadable capacity data of the delivery vehicle on the next day of the arrangement.

【0010】梱包指示出力部では、まず在庫情報格納部
に格納された在庫情報の優先順位に従い、積載可能容量
算出部により算出された積載可能容量の範囲内におい
て、配送当日の梱包開始時刻から配送車輌の出発時刻ま
での梱包可能容量を算出する。そして、この算出した梱
包可能容量分だけ、在庫情報格納部に格納された在庫情
報の優先順位に従って、倉庫に保管された仕掛在庫の梱
包指示を出力する。
In the packing instruction output unit, first, according to the priority order of the inventory information stored in the inventory information storage unit, within the range of the loadable capacity calculated by the loadable capacity calculation unit, delivery is performed from the packing start time on the day of delivery. Calculate the packable capacity by the time the vehicle departs. Then, according to the calculated packable capacity, according to the priority order of the inventory information stored in the inventory information storage unit, a packing instruction for the in-process inventory stored in the warehouse is output.

【0011】これにより、配送車輌が目的の物流拠点に
向けて出発するときには、ほぼ100%の積載量とな
り、積載効率が向上するものである。
As a result, when the delivery vehicle departs for the intended physical distribution base, the loading capacity is almost 100%, and the loading efficiency is improved.

【0012】[0012]

【実施例】以下、本発明の一実施例を図面を参照して説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0013】図2は、本発明の梱包作業指示システムが
適用された製品配送ラインの全体構成を示している。
FIG. 2 shows the overall structure of a product delivery line to which the packing work instruction system of the present invention is applied.

【0014】すなわち、生産工場に設置された例えば成
形機11により成形された製品に、仕掛在庫が発生した
場合には、これらの仕掛在庫は倉庫12に保管される。
つまり、押出成形等を行う生産工場においては、生産効
率の向上から成形機11等の設備機器は24時間稼働と
する一方、生産された製品を梱包する作業は人手による
例えば昼間7時間の作業となっている。そのため、梱包
作業が行われない間に生産された製品は、仕掛在庫とし
て一旦倉庫12に保管される。
That is, when in-process inventory occurs in products molded by, for example, the molding machine 11 installed in the production factory, these in-process inventory is stored in the warehouse 12.
In other words, in a production factory where extrusion molding or the like is performed, the equipment such as the molding machine 11 is operated for 24 hours in order to improve the production efficiency, while the work of packing the produced products is performed manually by, for example, 7 hours in the daytime. Has become. Therefore, the products produced while the packing work is not performed are temporarily stored in the warehouse 12 as in-process inventory.

【0015】また、このような生産工場では、1日の業
務終了時の梱包実績データに基づいて翌日の配送車輌の
手配を行う。そして、その配送計画に従い、前日に各物
流拠点から送られてきた在庫情報に基づいて各部所に梱
包指示及び出荷指示を与えるようになっている。
Further, in such a production factory, a delivery vehicle for the next day is arranged on the basis of the packing result data at the end of the day of business. Then, according to the delivery plan, a packing instruction and a shipping instruction are given to each department based on the inventory information sent from each distribution base the day before.

【0016】つまり、始業時には、倉庫12に保管した
仕掛在庫から、梱包ライン13において必要な数量を梱
包し、出荷場14に搬送する。そして、手配した配送車
輌15に積載して、目的の物流拠点16に配送するよう
になっている。
That is, at the beginning of work, the necessary quantity is packed in the packing line 13 from the in-process inventory stored in the warehouse 12 and is transported to the shipping site 14. Then, it is loaded on the arranged delivery vehicle 15 and delivered to the intended distribution base 16.

【0017】図1は、上記した製品配送ラインに適用さ
れる本発明の梱包作業指示システムの電気的構成を示す
ブロック図である。
FIG. 1 is a block diagram showing an electrical configuration of a packing work instruction system of the present invention applied to the product delivery line described above.

【0018】同図において、1日の業務終了後に各物流
拠点16,16・・・から送られてくる在庫情報は、在
庫情報格納部1に与えられる。在庫情報格納部1では、
この在庫情報を分析し、在庫量の少ない製品から順に優
先順位を付して格納するとともに、必要に応じてその格
納した在庫情報を梱包指示出力部3に出力する。
In the figure, the inventory information sent from each physical distribution base 16, 16 ... After the end of the day's work is given to the inventory information storage unit 1. In the inventory information storage unit 1,
This inventory information is analyzed and stored in order of priority from the product with the smallest inventory quantity, and the stored inventory information is output to the packing instruction output unit 3 as necessary.

【0019】一方、積載可能容量算出部2には、その日
の梱包ライン13での梱包実績データと、手配した翌日
の配送車輌の積載容量データとが与えられている。積載
可能容量算出部2は、梱包実績データと積載容量データ
とから、手配した配送車輌への残りの積載可能容量を算
出するとともに、必要に応じてその算出した積載可能容
量のデータを梱包指示出力部3に出力する。
On the other hand, the loadable capacity calculating section 2 is provided with the actual packing data on the packing line 13 on that day and the loading capacity data of the delivery vehicle on the next day of the arrangement. The loadable capacity calculation unit 2 calculates the remaining loadable capacity of the arranged delivery vehicle from the actual packing data and the loadable capacity data, and outputs the calculated loadable capacity data as a packing instruction if necessary. Output to the part 3.

【0020】梱包指示出力部3では、在庫情報格納部1
から与えられた在庫情報の優先順位に従い、積載可能容
量算出部2により算出された積載可能容量の範囲内にお
いて、配送当日の梱包開始時刻から配送車輌の出発時刻
までの梱包可能容量を算出する。そして、この算出した
梱包可能容量分だけ、在庫情報格納部から与えられた在
庫情報の優先順位に従って、仕掛在庫の梱包指示を梱包
ライン13に出力するようになっている。
In the packing instruction output unit 3, the stock information storage unit 1
In accordance with the priority order of the inventory information given from the above, within the range of the loadable capacity calculated by the loadable capacity calculation unit 2, the packable capacity from the packing start time of the delivery day to the departure time of the delivery vehicle is calculated. Then, the packing instruction for the in-process inventory is output to the packing line 13 in accordance with the priority of the inventory information given from the inventory information storage unit by the calculated packable capacity.

【0021】上記構成において、在庫情報格納部1、積
載可能容量算出部2及び梱包指示出力部3は、それぞれ
がコンピュータ上で動作するソフトウエアを含む構成と
なっており、本実施例の場合には、工場ホストコンピュ
ータにより処理される構成となっている。
In the above configuration, the inventory information storage unit 1, the loadable capacity calculation unit 2, and the packing instruction output unit 3 are each configured to include software that operates on a computer, and in the case of this embodiment. Are processed by the factory host computer.

【0022】次に、上記構成の梱包作業指示システムの
処理動作について説明する。
Next, the processing operation of the packing work instruction system having the above configuration will be described.

【0023】ただし、この処理動作の前提として、配送
車輌15は、1回の配送で1箇所の物流拠点16のみに
配送を行うものとし、配送車輌15の手配は出荷の前日
までに梱包実績をもとに台数、行き先、トン数を指定す
るものとし、生産工場での生産は24時間生産ラインと
し、梱包作業は昼間7時間の作業とする。
However, as a premise of this processing operation, it is assumed that the delivery vehicle 15 delivers only to one distribution base 16 at one delivery, and the delivery vehicle 15 can be arranged by the packing record by the day before shipping. Based on the number of units, the destination, and the number of tons, the production plant will use a 24-hour production line and the packing work will be a 7-hour daytime operation.

【0024】在庫情報格納部1には、1日の業務終了後
に各物流拠点16,16・・・から在庫情報が送られて
くる。在庫情報格納部1では、この在庫情報を集計し、
各物流拠点16,16・・・毎に在庫量の少ない製品か
ら順に優先順位を付して格納する。
Inventory information is sent to the inventory information storage unit 1 from each of the physical distribution sites 16, 16 ... The inventory information storage unit 1 aggregates this inventory information,
For each of the distribution bases 16, 16 ...

【0025】図3に示す表は、ある物流拠点16から送
られてきたその日の在庫情報の一例を示している。この
表では、品番WWWWの在庫が最も少なく、在庫月数
0.2月となっている。また、品番ZZZZの在庫が最
も多く、在庫月数1.0となっている。在庫情報格納部
1では、この在庫月数の少ない順に優先順位を付して格
納する。
The table shown in FIG. 3 shows an example of inventory information of the day sent from a certain distribution base 16. In this table, the stock of the product number WWWWW is the smallest and the stock month is 0.2 months. In addition, the product number ZZZZ is the most in stock, with a monthly inventory of 1.0. In the stock information storage unit 1, the stock information is stored in order of priority from the smallest stock month.

【0026】一方、積載可能容量算出部2には、その日
の業務終了時点(例えば、PM5:00)の梱包実績デ
ータが与えられており、この梱包実績データから、翌日
の配送車輌の手配を行う。
On the other hand, the loadable capacity calculation unit 2 is provided with the packing actual result data at the end of the work day (for example, PM 5:00), and the delivery vehicle for the next day is arranged from this packing actual result data. .

【0027】図4に示す表は、梱包実績データの一例を
示している。この表では、品番AAAAから品番EEE
Eまでの梱包実績の合計が1500(才数)となってい
る。そのため、翌日に手配する配送車輌は、少なくとも
この1500(才数)分を積載できる容量のある車輌を
選ぶ必要がある。ここに、才数とは、・・・(才数の意
味を記載して下さい)・・・を意味する。
The table shown in FIG. 4 shows an example of the actual packaging data. In this table, product number AAAA to product number EEE
The total packaging results up to E is 1500 (age). Therefore, it is necessary to select a delivery vehicle to be arranged the next day that has a capacity capable of loading at least 1500 (ages). Here, the term "talent" means ... (please describe the meaning of the talent).

【0028】一方、図5は、手配する先の車輌会社の配
送車輌の手持ち台数と積載容量(積数)とを示す一覧表
である。この表より、1500(才数)分を積載可能な
車輌は、2000(才数)分の積載が可能な車輌dのみ
であるので、この場合には車輌dを手配することにな
る。
On the other hand, FIG. 5 is a list showing the number of delivery vehicles on hand and the loading capacity (number of vehicles) of the vehicle company to which the order is made. From this table, the vehicle that can load 1500 (age) is only the vehicle d that can load 2000 (age), so in this case, the vehicle d will be arranged.

【0029】積載可能容量算出部2では、これらのデー
タ〔すなわち、梱包実績データとして1500(才
数)、配送車輌の積載容量データとして2000(才
数)〕に基づいて、あと幾ら積載可能かの計算を行う。
すなわち、この場合には、2000から1500を引い
た500(才数)が積載可能容量となる。
In the loadable capacity calculation unit 2, how much more can be loaded based on these data [that is, 1500 (age) as the actual packing data and 2000 (age) as the load capacity data of the delivery vehicle]. Calculate.
That is, in this case, 500 (age) obtained by subtracting 1500 from 2000 is the loadable capacity.

【0030】梱包指示出力部3では、在庫情報格納部1
に格納された図2に示す在庫情報の優先順位に従い、積
載可能容量算出部2により算出された積載可能容量の範
囲内〔500(才数)〕において、配送当日の梱包開始
時刻(例えば、AM.8:00)から配送車輌の出発時
刻(例えば、PM3:00)までの梱包可能容量を算出
する。ここで、本実施例では、算出した梱包可能容量が
積載可能容量と同じ500(才数)になったとすると、
図3より品番WWWWの在庫月数が最も少なく800
(才数)であるので、この品番WWWWを500(才
数)分梱包する指示を梱包ライン13に出力する。
In the packing instruction output unit 3, the stock information storage unit 1
In the range of the loadable capacity calculated by the loadable capacity calculating unit 2 [500 (age)] according to the priority order of the inventory information shown in FIG. . 8:00) to the departure time of the delivery vehicle (for example, PM 3:00) is calculated. Here, in the present embodiment, if the calculated packable capacity is 500 (age), which is the same as the stackable capacity,
From Figure 3, the product month WWWW has the smallest number of inventory months 800
Since it is (age), an instruction to pack the product number WWWW for 500 (age) is output to the packing line 13.

【0031】梱包ライン13では、当日の業務開始時
(AM.8:00)から品番WWWWの仕掛在庫を倉庫
12から搬出し、梱包ライン13において順次梱包し
て、出荷場14に搬送する。
In the packing line 13, the in-process inventory of the product number WWW is carried out from the warehouse 12 from the start of the work on the day (AM. 8:00), sequentially packed in the packing line 13 and transported to the shipping site 14.

【0032】出荷場14では、前日に梱包した1500
(才数)分の製品を積み込んだ後、現在梱包ライン13
で梱包中の500(才数)分の製品の積み込みを行う。
これにより、配送車輌15の出発時刻であるPM3:0
0には、積載率100%で出発できることになる。つま
り、従来では75%(1500÷2000×100)の
積載率で出発していたのが、この場合には100%の積
載率となり、積載効率が向上するものである。
At the shipping site 14, 1500 packed the day before
After loading (talent) products, the current packaging line 13
The product for 500 (ages) in the package is loaded at.
As a result, the delivery time of the delivery vehicle 15, PM 3: 0
By 0, it will be possible to start at a loading rate of 100%. In other words, conventionally, the starting rate was 75% (1500 ÷ 2000 × 100), but in this case, the loading rate is 100%, and the loading efficiency is improved.

【0033】なお、上記実施例では、算出した梱包可能
容量が積載可能容量と同じ500(才数)になったと仮
定して説明しているが、配送車輌15の出発時刻によっ
ては、梱包ライン13の梱包能力の関係より梱包可能数
量が積載可能容量を下回ることがある。この場合には、
配送車輌15の積載率が100%にはならないが、少な
くとも従来の75%よりは高くなる。また、このような
梱包指示とすることにより、必要な製品を必要な量だけ
梱包するので、積み残しが発生せず、最小限の仕掛在庫
となる。
In the above embodiment, the calculated packing capacity is assumed to be 500 (age), which is the same as the loading capacity. However, depending on the departure time of the delivery vehicle 15, the packing line 13 may be used. Due to the packaging capacity of the above, the packable quantity may fall below the loadable capacity. In this case,
Although the loading rate of the delivery vehicle 15 does not reach 100%, it is at least higher than the conventional 75%. Further, by using such a packing instruction, a necessary product is packed in a necessary amount, so that there is no leftover and a minimum in-process inventory is obtained.

【0034】[0034]

【発明の効果】本発明の梱包作業指示システムは、1日
の業務終了後に物流拠点から送られてくる在庫情報に基
づき、在庫量の少ない製品から順に優先順位を付して格
納する在庫情報格納部と、配送前日の梱包実績データと
手配した配送車輌の積載容量データとから残りの積載可
能容量を算出する積載可能容量算出部と、在庫情報格納
部に格納された在庫情報の優先順位に従い、積載可能容
量算出部により算出された積載可能容量の範囲内におい
て、配送当日の梱包開始時刻から前記配送車輌の出発時
刻までの梱包可能容量を算出し、この算出した梱包可能
容量分だけ、在庫情報格納部に格納された在庫情報の優
先順位に従って仕掛在庫の梱包指示を出力する梱包指示
出力部とを備えた構成としたので、配送車輌の積載効率
を向上することができる。また、出荷場における製品の
積み残しの発生が防止できるとともに、仕掛在庫を低減
することもできるといった効果を奏する。
According to the packing work instruction system of the present invention, based on the stock information sent from the physical distribution base after the end of the day's work, the stock information storage stores the products in order of decreasing stock quantity in order of priority. According to the priority of the inventory information stored in the inventory information storage unit, and the loadable capacity calculation unit that calculates the remaining loadable capacity from the unit, the packing performance data of the day before delivery, and the loaded capacity data of the arranged delivery vehicle. Within the range of the loadable capacity calculated by the loadable capacity calculation unit, the packable capacity from the packing start time on the day of delivery to the departure time of the delivery vehicle is calculated, and the calculated packable capacity corresponds to the inventory information. The packing instruction output unit that outputs the packing instruction of the in-process inventory according to the priority order of the inventory information stored in the storage unit is configured, so that the loading efficiency of the delivery vehicle can be improved. Kill. In addition, it is possible to prevent the product from being left unloaded at the shipping site, and it is possible to reduce the in-process inventory.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の梱包作業指示システムの電気的構成を
示すブロック図である。
FIG. 1 is a block diagram showing an electrical configuration of a packing work instruction system of the present invention.

【図2】本発明の梱包作業指示システムが適用される製
品配送ラインの全体構成を示す図である。
FIG. 2 is a diagram showing an overall configuration of a product delivery line to which the packing work instruction system of the present invention is applied.

【図3】ある物流拠点から送られてきたその日の在庫情
報の一例を示す表である。
FIG. 3 is a table showing an example of inventory information of the day sent from a distribution base.

【図4】梱包実績データの一例を示す表である。FIG. 4 is a table showing an example of actual packaging data.

【図5】手配する先の車輌会社の配送車輌の手持ち台数
と積載容量(積数)とを示す一覧表である。
FIG. 5 is a table showing the number of delivery vehicles on hand and the loading capacity (number of vehicles) of the delivery destination vehicle company.

【符号の説明】[Explanation of symbols]

1 在庫情報格納部 2 積載可能容量算出部 3 梱包指示出力部 1 inventory information storage 2 loadable capacity calculation 3 packing instruction output

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 生産工場において生産された製品に仕掛
在庫が発生した場合にはこれを倉庫に保管し、物流拠点
からの在庫情報に基づき、保管した仕掛在庫から必要な
数量を梱包して出荷場に搬送し、配送車輌に積載して物
流拠点に配送するといった一連の製品配送ラインにおい
て、 1日の業務終了後に物流拠点から送られてくる在庫情報
に基づき、在庫量の少ない製品から順に優先順位を付し
て格納する在庫情報格納部と、 配送前日の梱包実績データと手配した配送車輌の積載容
量データとから残りの積載可能容量を算出する積載可能
容量算出部と、 前記在庫情報格納部に格納された在庫情報の優先順位に
従い、前記積載可能容量算出部により算出された積載可
能容量の範囲内において、配送当日の梱包開始時刻から
前記配送車輌の出発時刻までの梱包可能容量を算出し、
この算出した梱包可能容量分だけ、前記在庫情報格納部
に格納された在庫情報の優先順位に従って前記仕掛在庫
の梱包指示を出力する梱包指示出力部とを備えたことを
特徴とする梱包作業指示システム。
1. When an in-process inventory occurs in a product produced in a production factory, the in-process inventory is stored in a warehouse, and a required quantity is packed from the in-process inventory stored based on inventory information from a distribution base and shipped. In a series of product delivery lines, such as transporting products to the site, loading them on delivery vehicles, and delivering them to distribution bases, based on the inventory information sent from the distribution bases after the day's operations, products with the lowest inventory quantity are given priority in order. An inventory information storage unit that stores the data in order, a loadable capacity calculation unit that calculates the remaining loadable capacity from the packing performance data of the day before delivery and the load capacity data of the arranged delivery vehicle, and the inventory information storage unit Within the range of the loadable capacity calculated by the loadable capacity calculation unit according to the priority order of the inventory information stored in, the start time of the delivery vehicle from the packing start time on the day of delivery Calculate the packable capacity up to
A packing work instruction system including a packing instruction output unit that outputs a packing instruction for the in-process inventory according to the priority order of the inventory information stored in the inventory information storage unit by the calculated packable capacity. .
JP753293A 1993-01-20 1993-01-20 Packing work instruction system Expired - Fee Related JP3150471B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP753293A JP3150471B2 (en) 1993-01-20 1993-01-20 Packing work instruction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP753293A JP3150471B2 (en) 1993-01-20 1993-01-20 Packing work instruction system

Publications (2)

Publication Number Publication Date
JPH06211319A true JPH06211319A (en) 1994-08-02
JP3150471B2 JP3150471B2 (en) 2001-03-26

Family

ID=11668400

Family Applications (1)

Application Number Title Priority Date Filing Date
JP753293A Expired - Fee Related JP3150471B2 (en) 1993-01-20 1993-01-20 Packing work instruction system

Country Status (1)

Country Link
JP (1) JP3150471B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001031207A (en) * 1999-07-21 2001-02-06 Shisutemakku:Kk Incoming warehouse system of inserting leaflet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49124295A (en) * 1973-04-03 1974-11-28
JPS6359877A (en) * 1986-08-30 1988-03-15 Yayoi Eng:Kk Aerated mechanical malt-preparation apparatus
JPS6348500U (en) * 1987-07-30 1988-04-01
JPH0216967A (en) * 1988-07-05 1990-01-19 Yayoi Eng:Kk Malt-preparation process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49124295A (en) * 1973-04-03 1974-11-28
JPS6359877A (en) * 1986-08-30 1988-03-15 Yayoi Eng:Kk Aerated mechanical malt-preparation apparatus
JPS6348500U (en) * 1987-07-30 1988-04-01
JPH0216967A (en) * 1988-07-05 1990-01-19 Yayoi Eng:Kk Malt-preparation process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001031207A (en) * 1999-07-21 2001-02-06 Shisutemakku:Kk Incoming warehouse system of inserting leaflet

Also Published As

Publication number Publication date
JP3150471B2 (en) 2001-03-26

Similar Documents

Publication Publication Date Title
JP2002140110A (en) System and method for production control
US20050289022A1 (en) Part ordering amount calculation device
CA2499700A1 (en) Part inventory management system
JPH06211319A (en) Packaging work indication system
EP1768055A1 (en) Method and system for rounding with availability check
JP2004352384A (en) Product stock control system
JPH01135452A (en) Production instruction system
JPH11188579A (en) Matrix type production equipment
JPH07334797A (en) Route and timetable determining device for load carrying vehicle
JPH04101929A (en) Palletizer
JP2504008B2 (en) Production control method
JP3578034B2 (en) Parts delivery instruction device and parts delivery instruction method
JP7045955B2 (en) Destination judgment support device, destination judgment support method and program
JPS5895002A (en) Picking method of automatic storehouse
US20050043981A1 (en) Demand dispatch system and method
JPS605301A (en) Controlling system of truck conveyance
JP3161330B2 (en) Inbound and outbound processing instructions
JP2003252447A (en) Method for loading baggage
JP3042452B2 (en) Reel parts management system
JPH07117851B2 (en) Carrier allocation method
JPH092620A (en) System of making packing work plan
JP2004106951A (en) Inventory management system
JPH0493157A (en) Forming line process controlling system
CN115345693A (en) Bin matching method, electronic device, storage medium and computer program product
JP2023128143A (en) Warehouse facility setting method and warehouse facility setting device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees