JPH0620651U JP6035892U JP6035892U JPH0620651U JP H0620651 U JPH0620651 U JP H0620651U JP 6035892 U JP6035892 U JP 6035892U JP 6035892 U JP6035892 U JP 6035892U JP H0620651 U JPH0620651 U JP H0620651U
Authority
JP
Japan
Prior art keywords
pair
movable mounting
mounting members
hanging bolt
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6035892U
Other languages
Japanese (ja)
Inventor
伸三 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP6035892U priority Critical patent/JPH0620651U/en
Publication of JPH0620651U publication Critical patent/JPH0620651U/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

(57)【要約】 【目的】 引き抜き強度等の問題がなく、位置調整可能
で、見栄えも良い。 【構成】 コンクリートに埋め込まれた箱体11と、箱
体11内に平行に架設された一対の支持レール12,1
3と、支持レール12,13間に支持レールの架設方向
位置調整可能に渡して上下から挾むように形成された一
対の可動取付材14,15と、可動取付材14,15に
位置調整可能に吊りボルト3が通るように形成された長
穴14h,15hと、可動取付材14,15を挾みつけ
るように吊りボルト3に螺着される一対のナット16,
17とを備えた。
(57) [Summary] [Purpose] There is no problem with pull-out strength, position adjustment is possible, and it looks good. [Constitution] Box 11 embedded in concrete, and a pair of support rails 12 and 1 installed in parallel in box 11
3 and the pair of movable mounting members 14 and 15 formed so as to sandwich the supporting rails 12 and 13 between the supporting rails 12 and 13 so that the position of the supporting rails can be adjusted in the installation direction, and the movable mounting members 14 and 15 are hung to be adjustable in position. Slotted holes 14h and 15h formed so that the bolt 3 can pass through, and a pair of nuts 16 screwed to the suspension bolt 3 so as to sandwich the movable mounting members 14 and 15,
17 and.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、ダクト等の被吊支物を吊支する吊りボルトをコンクリートなどの 構造物の天井等に取り付ける吊りボルト取付具に関するものである。 The present invention relates to a hanging bolt mounting tool for mounting a hanging bolt for suspending a suspended object such as a duct on a ceiling or the like of a structure such as concrete.

【0002】[0002]

【従来の技術】[Prior art]

図3は従来の吊りボルト取付具を示す。図3(A),(B),(C),(D) 及び(E)に示すものは、コンクリート型枠7に設定用枠6を取り付け、取付具 191を挿入し、コンクリートを打ち込み、コンクリート固化後、取付具191 に吊りボルト3を挿着する。図3(F)に示すものは、コンクリート構造物9に 孔9hを掘り、孔9hに取付具192を挿入して先端部を拡張させて取り付ける 。図3(G)及び(H)に示すものは、上記のようにしてコンクリート構造物に 取り付けられた取付具192に中間取付具193を取り付け、中間取付具193 の長穴に位置調整可能に吊りボルト3を取り付ける。 FIG. 3 shows a conventional hanging bolt fixture. 3 (A), (B), (C), (D), and (E), the setting frame 6 is attached to the concrete form 7, the fixture 191 is inserted, and the concrete is driven into the concrete. After solidification, the hanging bolt 3 is inserted into the fixture 191. In the structure shown in FIG. 3 (F), a hole 9h is dug in the concrete structure 9, and a mounting tool 192 is inserted into the hole 9h to expand the tip end of the concrete structure 9 for mounting. As shown in FIGS. 3 (G) and (H), the intermediate fixture 193 is attached to the fixture 192 attached to the concrete structure as described above, and the intermediate fixture 193 is hung so that its position can be adjusted. Install the bolt 3.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

従来の吊りボルト取付具は以上のようであるが、図3(A)乃至(E)に示す ものは、設定用枠6を取り付けるコンクリート型枠7が変位変形しやすいので、 設定位置が不正確で、取付後は位置調整が不可能である。図3(F)に示すもの も、穿孔位置ずれのため、設定位置が不正確で、取付具192と孔9hとの摩擦 に依存するため、施工の良否で引き抜き強度の信頼性の問題がある。図3(G) 及び(H)に示すものは、上記取付具192の引き抜き強度の問題の他、中間取 付具193が露出するので、見栄えが悪いというような課題があった。 Although the conventional hanging bolt fixtures are as described above, the ones shown in FIGS. 3 (A) to 3 (E) are inaccurate in setting position because the concrete formwork 7 to which the setting frame 6 is attached is easily deformed and deformed. Therefore, it is impossible to adjust the position after mounting. Also in FIG. 3 (F), since the set position is inaccurate due to the displacement of the drilling position and depends on the friction between the fitting 192 and the hole 9h, there is a problem of reliability of the pulling strength depending on the quality of the construction. . 3 (G) and 3 (H), there is a problem that the intermediate fitting 193 is exposed because the intermediate fitting 193 is exposed in addition to the problem of the pull-out strength of the fitting 192.

【0004】 この考案は上記のような課題を解消するためになされたもので、引き抜き強度 の問題がなく、取付後も位置調整が可能で、見栄えも良い吊りボルト取付具を得 ることを目的とする。The present invention has been made to solve the above problems, and an object thereof is to obtain a hanging bolt fixture that does not have a problem of pull-out strength, can be adjusted in position even after attachment, and has a good appearance. And

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

この考案に係る吊りボルト取付具は、開放面を表面として構造物に埋め込まれ た箱体と、この箱体の対向側板間に平行に架設された一対の支持レールと、この 一対の支持レール間にこの支持レールの架設方向位置調整可能に渡して上下から 挾むように形成された上下一対の可動取付材と、この一対の可動取付材に長手方 向位置調整可能に吊りボルトが通るように形成された長穴と、前記一対の可動取 付材を上下から挾みつけるように前記吊りボルトに螺着される一対のナットとを 備えたものである。 The hanging bolt fixture according to the present invention has a box body having an open surface as a surface embedded in a structure, a pair of support rails installed in parallel between opposite side plates of the box body, and a space between the pair of support rails. A pair of upper and lower movable mounting members formed so as to sandwich the support rail in the erection direction so as to be sandwiched from above and below, and a suspension bolt is formed through the pair of movable mounting members so that the longitudinal position can be adjusted. And a pair of nuts screwed to the hanging bolt so that the pair of movable mounting members can be clamped from above and below.

【0006】[0006]

【作用】[Action]

この考案における吊りボルト取付具の一対の支持レール間に渡した一対の可動 取付材の長穴に吊りボルトを通して挾みつけるように一対のナットを螺着すれば 、前記可動取付材は前記支持レールを挾みつけ、構造物に埋め込まれた箱体は、 引き抜き強度の問題なく、前記支持レール,前記可動取付材及び前記ナットを介 して吊りボルトを吊支する。前記ナットによる前記可動取付材の螺着にあたり、 前記可動取付材は前記支持レールの架設方向位置調整可能であり、前記吊りボル トは前記可動取付材の長穴に長手方向位置調整可能に螺着することができるので 、この両方向の位置を調整して螺着すれば、この両方向の位置調整範囲内の平面 内で任意の位置に吊りボルトを固定することができる。 In this invention, a pair of nuts are screwed into the oblong holes of the pair of movable mounting members that are passed between the pair of support rails of the hanging bolt mounting member so that the hanging bolts can be caught. The box body that is sandwiched and embedded in the structure suspends the suspension bolt through the support rail, the movable mounting member, and the nut without any problem of pulling strength. When the movable mounting member is screwed by the nut, the movable mounting member is positionally adjustable in the erection direction of the support rail, and the suspension bolt is screwed in the elongated hole of the movable mounting member so as to be longitudinally positionally adjustable. Therefore, by adjusting and screwing the positions in both directions, the suspension bolt can be fixed at an arbitrary position within a plane within the position adjustment range in both directions.

【0007】[0007]

【実施例】【Example】

以下、この考案の一実施例を図について説明する。図1はこの考案の一実施例 による吊りボルト取付具を示し、(A)は吊支状態の全体正面図、(B)は下面 図、(C)は側面断面図である。図1において、3は吊りボルトであり、図1( A)に示すように、この吊りボルト取付具1は、コンクリート構造物9の天井等 に埋め込まれて取り付けられ、吊りボルト取付具1に取り付けられた吊りボルト 3は、支持部材4を介してダクト5等の被吊支物を吊支するものである。この吊 りボルト取付具1は、図1(B)及び(C)に示すように、鋼板などで製作され た1面は開放で他の5面は閉囲した箱体11と、箱体11の裏面に溶接などで取 り付けられた鋼棒などのアンカー18と、箱体11の内部に箱体11の対向する 側板間にその両側板に溶接などで取り付けて渡して平行に設けられた2本の支持 レール12,13と、この支持レール12,13に渡してこの支持レール12, 13を上下から挾むように形成された上下2枚の可動取付材14,15と、この 可動取付材14,15に長手方向に形成された吊りボルト3が通る長穴14h, 15hと、吊りボルト3に螺着されるナット16,17とを備えている。 An embodiment of the present invention will be described below with reference to the drawings. 1A and 1B show a suspension bolt attachment according to an embodiment of the present invention. FIG. 1A is an overall front view of a suspended state, FIG. 1B is a bottom view, and FIG. 1C is a side sectional view. In FIG. 1, 3 is a suspension bolt, and as shown in FIG. 1 (A), this suspension bolt fixture 1 is embedded in a ceiling or the like of a concrete structure 9 and attached to the suspension bolt fixture 1. The hanging bolt 3 is used to suspend a suspended object such as the duct 5 via the support member 4. As shown in FIGS. 1 (B) and 1 (C), this hanging bolt attachment 1 is a box body 11 made of steel plate and the like, one side of which is open and the other five sides are closed, and a box body 11 Anchors 18 such as steel rods are attached to the back of the box by welding, etc., and are installed in parallel inside the box 11 between the opposite side plates of the box 11 by welding etc. on both side plates. Two support rails 12 and 13, two upper and lower movable mounting members 14 and 15 formed so as to sandwich the support rails 12 and 13 from above and below by passing over the support rails 12 and 13, and this movable mounting member 14 , 15 are provided with elongated holes 14h and 15h formed in the longitudinal direction through which the hanging bolt 3 passes, and nuts 16 and 17 screwed to the hanging bolt 3.

【0008】 この吊りボルト取付具1をコンクリート構造物9に埋め込んで取り付ける要領 は、先ず、図2(A)に示すように、コンクリート型枠7の内面の吊りボルト取 付具1の埋設箇所に設定用枠6を釘などで打ちつけて取り付ける。次に、図2( B)に示すように、設定用枠6に吊りボルト取付具1を嵌めて設置する。次に、 図2(C)に示すように、コンクリートを打設する。コンクリートが固化した後 に、図2(D)に示すように、コンクリート型枠7及び設定用枠6を取り外す。 コンクリートが固化すれば、アンカー18等にコンクリートが付着して吊りボル ト取付具1は強固に埋設され、引き抜き強度等の問題は全くない。コンクリート が固化した後、後述のように、この吊りボルト取付具1に吊りボルト3を取り付 ける。なお、取付ビス21で化粧パネル2を取り付けて内部が見えないようにす ればさらに良い見栄えが得られる。As shown in FIG. 2 (A), first, as shown in FIG. 2 (A), the method of embedding the hanging bolt fixture 1 in the concrete structure 9 is as follows. Attach the setting frame 6 by hitting it with a nail or the like. Next, as shown in FIG. 2 (B), the hanging bolt fixture 1 is fitted into the setting frame 6 and installed. Next, as shown in FIG. 2 (C), concrete is poured. After the concrete is solidified, the concrete form 7 and the setting frame 6 are removed as shown in FIG. 2 (D). When the concrete is solidified, the concrete is attached to the anchors 18 and the like, and the suspension bolt fixture 1 is firmly embedded, so that there is no problem such as pull-out strength. After the concrete has solidified, the hanging bolt 3 can be attached to the hanging bolt fixture 1 as described later. If the decorative panel 2 is attached with the attaching screw 21 so that the inside cannot be seen, a better appearance can be obtained.

【0009】 次に、吊りボルト3の取付要領と作用について説明する。図2について上記説 明のように、この吊りボルト取付具1の箱体11をコンクリート構造物9の所定 位置に埋設する。しかし、コンクリート打設工事であるので、箱体11の位置を 正確に設定することは不可能である。コンクリートが固化した後に、図1(B) ,(C)に示すように、支持レール12,13の上に可動取付材14を渡し、下 から可動取付材15を可動取付材14に重ねて支持レール12,13を挾むよう に渡し、ナット17を螺着してある吊りボルト3を可動取付材15,14の長穴 15h,14hを通して差し込み、吊りボルト3の先端にナット16を螺入する 。ナット16と17で可動取付材14,15を強く締付ける以前に、可動取付材 14,15を支持レール12,13の架設方向(図1(B)で上下方向)に移動 させて位置を決め、吊りボルト3を可動取付材14,15の長穴14h,15h の中で図1(B),(C)で左右方向に移動させて位置を決めることにより、可 動取付材14,15の可動範囲と長穴14h,15hの中の吊りボルト3の可動 範囲とで限定される範囲の平面内で自由に吊りボルト3の位置を調整して決める ことができる。吊りボルト3の位置を調整設定した後、ナット16,17で可動 取付材14,15を締付ければ、可動取付材14,15は支持レール12,13 を挾みつけることになり、可動取付材14,15の位置が固定し、吊りボルト3 の可動取付材14,15に対する位置も固定するので、吊りボルト3の位置が前 記調整設定位置に固定される。Next, the mounting procedure and function of the suspension bolt 3 will be described. As described above with reference to FIG. 2, the box body 11 of the hanging bolt fixture 1 is embedded at a predetermined position in the concrete structure 9. However, since it is concrete pouring work, it is impossible to set the position of the box body 11 accurately. After the concrete has solidified, as shown in FIGS. 1 (B) and 1 (C), the movable mounting member 14 is passed over the support rails 12 and 13, and the movable mounting member 15 is superposed and supported from below. The rails 12 and 13 are sandwiched, and the hanging bolt 3 to which the nut 17 is screwed is inserted through the elongated holes 15h and 14h of the movable mounting members 15 and 14, and the nut 16 is screwed into the tip of the hanging bolt 3. Before strongly tightening the movable mounting members 14 and 15 with the nuts 16 and 17, move the movable mounting members 14 and 15 in the installation direction of the support rails 12 and 13 (vertical direction in FIG. 1B) to determine the position, By moving the suspension bolt 3 in the elongated holes 14h and 15h of the movable mounting members 14 and 15 in the horizontal direction in FIGS. 1B and 1C to determine the position, the movable mounting members 14 and 15 can be moved. The position of the hanging bolt 3 can be freely adjusted and determined within a plane limited by the range and the movable range of the hanging bolt 3 in the elongated holes 14h and 15h. If the movable mounting members 14 and 15 are tightened with the nuts 16 and 17 after the position of the suspension bolt 3 is adjusted and set, the movable mounting members 14 and 15 pinch the support rails 12 and 13, and the movable mounting members 14 and 15 are clamped. , 15 and the position of the suspension bolt 3 with respect to the movable mounting members 14, 15 are also fixed, so that the position of the suspension bolt 3 is fixed at the adjustment setting position.

【0010】 なお、この吊りボルト取付具1は吊りボルト3の位置調整範囲が広いので、こ の吊りボルト取付具1をコンクリート構造物9に埋設するにあたり、図2に示す 設定用枠6は必ずしも必要でなく、直接、箱体11をコンクリート型枠7に鉄筋 8等を利用して抑えて設置することもできる。なお、この吊りボルト取付具1は コンクリート構造物9の表面から突出する部分はないので、外観も良いが、図2 (D)に示すように、化粧パネル2を取り付ければさらに見栄えを良くすること ができる。Since the hanging bolt fixture 1 has a wide range of position adjustment of the hanging bolt 3, when the hanging bolt fixture 1 is embedded in the concrete structure 9, the setting frame 6 shown in FIG. It is not necessary to install the box body 11 directly on the concrete formwork 7 while restraining it by using the reinforcing bar 8 or the like. Since the hanging bolt fixture 1 has no portion projecting from the surface of the concrete structure 9, it has a good appearance, but as shown in FIG. 2 (D), if the decorative panel 2 is attached, the appearance will be further improved. You can

【0011】[0011]

【考案の効果】[Effect of device]

以上のように、この考案によれば、吊りボルト取付具を引き抜き強度等の問題 なく強固に構造物に埋設することができ、支持レールと可動取付材と長穴とによ り吊りボルトの位置を広い範囲で調整することができる効果がある。 As described above, according to the present invention, the suspension bolt fixture can be firmly embedded in the structure without problems such as pull-out strength, and the position of the suspension bolt can be determined by the support rail, the movable attachment material, and the elongated hole. The effect is that it can be adjusted in a wide range.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の一実施例による吊りボルト取付具を
示し、(A)は吊支状態の全体正面図、(B)は下面
図、(C)は側面断面図である。
1A and 1B show a hanging bolt attachment according to an embodiment of the present invention, FIG. 1A is an overall front view of a hanging state, FIG. 1B is a bottom view, and FIG. 1C is a side sectional view.

【図2】この考案の一実施例による吊りボルト取付具の
埋設要領を示し、(A)は設定用枠の取付要領図、
(B)は吊りボルト取付具の取付要領図、(C)はコン
クリート打設後の側面断面図、(D)は完成状態の側面
断面図である。
FIG. 2 shows an embedding procedure of a hanging bolt mounting tool according to an embodiment of the present invention, (A) is a mounting procedure diagram of a setting frame,
(B) is a mounting procedure diagram of a hanging bolt mounting tool, (C) is a side sectional view after concrete placing, and (D) is a side sectional view in a completed state.

【図3】従来の吊りボルト取付具を示し、(A)はある
取付具の斜視図、(B)はその埋設準備作業の前段階を
示す図、(C)はその埋設準備作業の後段階を示す図、
(D)はその埋設後の側面断面図、(E)はその完成状
態の側面断面図、(F)は他の取付具の埋め込み要領を
示す図、(G)はさらに他の取付具の斜視図、(H)は
その取付要領を示す図である。
3A and 3B show a conventional hanging bolt fixture, FIG. 3A is a perspective view of a fixture, FIG. 3B is a diagram showing a pre-stage of the preparatory work for embedding, and FIG. Showing the figure,
(D) is a side sectional view after the embedding, (E) is a side sectional view of the completed state, (F) is a view showing how to embed another fixture, and (G) is a perspective view of yet another fixture. FIG. 1H is a view showing the mounting procedure.

【符号の説明】[Explanation of symbols]

1:吊りボルト取付具、11:箱体、12,13:支持
レール、14,15:可動取付材、 14h,15h:
長穴、16,17:ナット、18:アンカー、2:化粧
パネル、3:吊りボルト、6:設定用枠、7:コンクリ
ート型枠、9:コンクリート構造物。
1: Hanging bolt fixture, 11: Box body, 12, 13: Support rails, 14, 15: Movable mounting material, 14h, 15h:
Long holes, 16 and 17: nuts, 18: anchors, 2: decorative panels, 3: hanging bolts, 6: setting frame, 7: concrete formwork, 9: concrete structure.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 開放面を表面として構造物に埋め込まれ
た箱体と、この箱体の対向側板間に平行に架設された一
対の支持レールと、この一対の支持レール間にこの支持
レールの架設方向位置調整可能に渡して上下から挾むよ
うに形成された上下一対の可動取付材と、この一対の可
動取付材に長手方向位置調整可能に吊りボルトが通るよ
うに形成された長穴と、前記一対の可動取付材を上下か
ら挾みつけるように前記吊りボルトに螺着される一対の
ナットとを備えたことを特徴とする吊りボルト取付具。
1. A box body having an open surface as a surface embedded in a structure, a pair of support rails installed in parallel between opposite side plates of the box body, and a space between the pair of support rails of the support rail. A pair of upper and lower movable mounting members formed so as to be sandwiched from above and below so that the position in the erection direction can be adjusted, and an elongated hole formed in the pair of movable mounting members so that the suspension bolt can be adjusted in the longitudinal direction, and A suspension bolt mounting tool, comprising: a pair of nuts screwed to the suspension bolt so as to sandwich the pair of movable mounting members from above and below.
JP6035892U 1992-08-27 1992-08-27 Hanging bolt fixture Pending JPH0620651U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6035892U JPH0620651U (en) 1992-08-27 1992-08-27 Hanging bolt fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6035892U JPH0620651U (en) 1992-08-27 1992-08-27 Hanging bolt fixture

Publications (1)

Publication Number Publication Date
JPH0620651U true JPH0620651U (en) 1994-03-18

Family

ID=13139856

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6035892U Pending JPH0620651U (en) 1992-08-27 1992-08-27 Hanging bolt fixture

Country Status (1)

Country Link
JP (1) JPH0620651U (en)

Similar Documents

Publication Publication Date Title
JPH0620651U (en) Hanging bolt fixture
JP2005029304A (en) Suspending device for construction
JPH1061090A (en) Construction mechanism of ceiling member in building
JPH0319820Y2 (en)
JPH0711655U (en) Floor panel temporary placement jig
JP3740232B2 (en) Anchor bolt mounting bracket
JPH0323466Y2 (en)
JPH053498U (en) External wall panel mounting jig
JPS5938524Y2 (en) Anchor bolt support for concrete foundation
JPH0722461Y2 (en) A hanging connector to build another room in the building
JPS59142342U (en) Jigs for burying sheath pipes, etc.
JPS6114501Y2 (en)
JPH0728310Y2 (en) Receiving metal fitting for PC steel wire
JPH0615066Y2 (en) Suspended support bracket
JPS585022Y2 (en) Temporary fastener for sash frame
JPH0427991Y2 (en)
JPH0671702U (en) Wall panel mounting structure
JPH0732687Y2 (en) Curtain wall panel
JPS623449Y2 (en)
JPH069217Y2 (en) Building ceramic plate mounting structure
US3198471A (en) Suspended-ceiling hanger for drapery traverse rods
JP3003623U (en) Hanging bracket for space truss
JPS6242055Y2 (en)
JPH0722462Y2 (en) Kamoi mounting structure to build another room in the building
JPS6215374Y2 (en)