JPH06173578A JP18389292A JP18389292A JPH06173578A JP H06173578 A JPH06173578 A JP H06173578A JP 18389292 A JP18389292 A JP 18389292A JP 18389292 A JP18389292 A JP 18389292A JP H06173578 A JPH06173578 A JP H06173578A
Authority
JP
Japan
Prior art keywords
steel pipe
ground
press
injection
outer periphery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18389292A
Other languages
Japanese (ja)
Inventor
Toshio Hayashi
敏夫 林
Teruhiko Suzuki
輝彦 鈴木
Tamiya Hirakawa
民也 平川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tekken Corp
Original Assignee
Tekken Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tekken Corp filed Critical Tekken Corp
Priority to JP18389292A priority Critical patent/JPH06173578A/en
Publication of JPH06173578A publication Critical patent/JPH06173578A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To make it possible to form a reinforced wall which continues to a ground by a method wherein a steel tube acts as a supporting and strengthening material can be easily injected and the injected reinforcing material is prevented from leaking out. CONSTITUTION:A drilling member provided with a bit on its end is releasably inserted into a steel tube wherein the opposite ends thereof are opened and a plurality of through holes 6 are provided on the outer periphery thereof and an external thread is formed on the rear end thereof, and the steel tube 4 is forced into a ground while the drilling member bores a hole through the ground, whereupon the drilling member is pulled out of the steel tube. By means of an injection pump 24 connected to the steel tube through an injection plug 23 which is engaged with the thread 5, strengthening material is forced into the steel tube to inject the material into the ground from the end opening of the tube and through holes 6, following which the plug 23 is removed from the tube and a washer is fitted into the tube in place of the plug and a cap nut is threadedly engaged with the thread 5 so that the gap between the outer periphery and the ground is sealed by the washer.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、トンネル等の地山の
強化工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for strengthening natural ground such as tunnels.

【0002】[0002]

【従来の技術】従来例えばトンネルの地山を強化する工
法として、トンネル掘削断面の外側地山にトンネルの輪
郭に沿って設けた支保工の上に、トンネルの掘削方向に
平行に配置した複数の鋼管を圧入し、この鋼管により掘
削面と相似な屋根を形成する工法は公知である。ところ
で前記のような従来の工法は、鋼管が支保工として作用
するだけであって、トンネル地山が強化されるものでは
なくて、地山の緩みや沈下を有効に防止することが困難
であり、また地山中に岩盤が存在するような場合、鋼管
の圧入が不可能となって同部の強化が不可能となるとい
うような問題がある。
2. Description of the Related Art Conventionally, for example, as a method of strengthening the ground of a tunnel, a plurality of supports arranged parallel to the tunnel excavation direction have been installed on the outer supports of the tunnel excavation cross section along the contour of the tunnel. A method of press-fitting a steel pipe and forming a roof similar to the excavated surface by the steel pipe is known. By the way, in the conventional construction method as described above, the steel pipe only acts as a supporting work, the tunnel ground is not strengthened, and it is difficult to effectively prevent loosening or subsidence of the ground. In addition, when there is bedrock in the ground, there is a problem that the steel pipe cannot be press-fitted to strengthen the same part.

【0003】[0003]

【発明が解決しようとする課題】そこでこのような問題
を解消することのできる方法として、この出願人はさき
に提案した特公平3-48314号公報に開示したような方法
があり、これはこの発明の図示した実施例と一部共通す
るところがあるので、これを参照して説明することとす
る。この方法は両端が開口して外周に複数の透孔6を有
し、内部に先端にビットが装着された穿孔手段8を挿脱
可能に配置した鋼管4を、穿孔手段8によって地山2に
穿孔しながら圧入し、所定長の穿孔圧入の終了後穿孔手
段8を鋼管4から抜出し、このようにして地山2内に圧
入された複数の同鋼管4内に強化材を圧入して、その先
端開口部及び外周の透孔6から地山2内に強化材を注入
し、連続した強化壁部3を形成するものであって、所期
の目的を達成できるものではある。しかしながらこのよ
うな方法においては、鋼管内に強化材を圧入する際、そ
の操作が厄介であって手際よく圧入することが困難であ
り、また圧入した強化材が地山と鋼管との間を通って外
部に漏洩するというような問題がある。
As a method for solving such a problem, there is a method disclosed in Japanese Patent Publication No. 3-48314 proposed by the applicant earlier, which is Since there is some commonality with the illustrated embodiment of the invention, description will be made with reference to this. According to this method, a steel pipe 4 having a plurality of through holes 6 opened at both ends and having a bit attached to the tip inside thereof is removably arranged in the ground 2 by the piercing means 8. After press-fitting while punching, the punching means 8 is withdrawn from the steel pipe 4 after completion of press-fitting for a predetermined length, and the reinforcing material is press-fitted into the plurality of steel pipes 4 thus press-fitted into the ground 2, The reinforcing material is injected into the ground 2 through the tip opening and the through hole 6 on the outer periphery to form the continuous reinforcing wall portion 3, and the intended purpose can be achieved. However, in such a method, when the reinforcing material is press-fitted into the steel pipe, the operation is troublesome, and it is difficult to press it in properly, and the reinforcing material that has been press-fitted passes between the ground and the steel pipe. There is a problem that it leaks to the outside.

【0004】そこでこの発明の目的は、前記のような従
来の工法のもつ問題を解消し、鋼管が支保工として作用
するのに加えて、地山に連続した強化壁部を形成するこ
とができ、しかもその形成の際の強化材の圧入に当り、
そのための操作が容易であって、手際よく圧入すること
ができ、また圧入した強化材が地山と鋼管との間を通っ
て外部に漏洩するようなことのない地山の強化工法を提
供するにある。
Therefore, an object of the present invention is to solve the above-mentioned problems of the conventional construction method, to allow the steel pipe to act as a supporting work, and to form a continuous reinforcing wall portion in the ground. In addition, when press-fitting the reinforcing material during its formation,
It provides a method for strengthening natural rock that is easy to operate for that purpose, can be press-fitted in an efficient manner, and that the strengthened material that has been press-fitted does not leak to the outside through between the rock and the steel pipe. It is in.

【0005】[0005]

【課題を解決するための手段】この発明は前記のような
目的を達成するために、請求項1の発明は、両端が開口
して外周に複数の透孔を有し、後端外周におすねじ部を
有する鋼管の内部に、先端にビットが装着された穿孔手
段を挿脱可能に挿入し、前記穿孔手段によって地山に穿
孔しながら該地山に前記鋼管を圧入し、所定長圧入した
ところで前記穿孔手段を鋼管から抜出し、このようにし
て地山内に圧入された複数の同鋼管の後端おすねじ部に
注入プラグを螺着し、この注入プラグを介して鋼管に接
続された注入ポンプによって鋼管内に強化材を圧入し、
鋼管の先端開口部及び外周の透孔から地山内に強化材を
注入し、このようにして強化材を注入終了後鋼管から注
入プラグを取外し、その代わりに鋼管に座金を嵌合して
鋼管のおすねじ部に袋ナットを螺着して外周と地山との
間の間隙を座金で密封し、地山内に連続した強化壁部を
形成することを特徴とするものであり、請求項2の発明
は、請求項1の発明において、鋼管の前端内部に前記お
すねじ部に螺合可能なめすねじ部が設けられていて、必
要に応じて両ねじ部を螺合して複数の鋼管を連結して長
尺加工をする。
In order to achieve the above-mentioned object, the invention of claim 1 has a plurality of through holes on the outer circumference with both ends opened, and the outer circumference of the rear end. A drilling means having a bit attached to the tip is removably inserted into a steel pipe having a female thread, and the steel pipe is press-fitted into the ground while punching the ground by the drilling means, and a predetermined length of press-fitting is performed. Then, the perforating means was pulled out from the steel pipe, and injection plugs were screwed to the male threads of the rear ends of the plurality of steel pipes press-fitted into the ground in this way, and the injection pipes were connected to the steel pipe. The injection pump pumps the reinforcement into the steel pipe,
The reinforcing material is injected into the ground through the opening at the tip of the steel pipe and the through hole on the outer periphery, and the injection plug is removed from the steel pipe after finishing the injection of the reinforcing material in this way. 3. A cap nut is screwed to the male threaded portion to seal a gap between the outer circumference and the ground with a washer, thereby forming a continuous reinforcing wall portion in the ground. In the invention of claim 1, in the invention of claim 1, a female screw portion that can be screwed into the male screw portion is provided inside the front end of the steel pipe, and if necessary, both screw portions are screwed together to form a plurality of steel pipes. Connect and perform long processing.

【0006】[0006]

【作用】前記のような請求項1の発明において、鋼管内
に穿孔手段の一部を挿脱可能に配置し、穿孔手段を作動
させることによりその先端のビットによって地山に穿孔
しながら該地山に前記鋼管を圧入し、所定長圧入したと
ころで前記穿孔手段を鋼管から抜出し、このようにして
地山内に圧入された複数の同鋼管の後端おすねじ部に注
入プラグを螺着し、この注入プラグを介して鋼管に接続
された注入ポンプによって鋼管内に強化材を圧入し、鋼
管の先端開口部及び外周の透孔から地山内に強化材を注
入し、このようにして強化材を注入終了後鋼管から注入
プラグを取外し、その代わりに鋼管に座金を嵌合して鋼
管のおすねじ部に袋ナットを螺着して外周と地山との間
の間隙を座金で密封し、地山内に連続した強化壁部を形
成する。つぎに請求項2の発明においては、長尺加工が
必要な場合には、先行鋼管の後端おすねじ部に後行鋼管
の先端のめすねじ部を螺合して、複数の鋼管を連結する
こととなる。
In the invention of claim 1 as described above, a part of the piercing means is removably disposed in the steel pipe, and the piercing means is operated to pierce the ground by the bit at the tip of the piercing means. The steel pipe is press-fitted into the mountain, and the punching means is pulled out from the steel pipe when press-fitted for a predetermined length, and the injection plug is screwed to the rear end male screw portion of the plurality of steel pipes thus press-fitted into the ground, The reinforcement is pressed into the steel pipe by the injection pump connected to the steel pipe through this injection plug, and the reinforcement is injected into the ground through the tip opening of the steel pipe and the through hole in the outer periphery. After the injection is completed, remove the injection plug from the steel pipe, replace the steel pipe with a washer, screw a cap nut to the male thread of the steel pipe, and seal the gap between the outer circumference and the ground with a washer. A continuous strengthening wall is formed in the ground. Next, in the invention of claim 2, when a long process is required, a plurality of steel pipes are connected by screwing a female screw portion of the leading end of the trailing steel pipe into a male screw portion of the trailing end of the preceding steel pipe. Will be done.

【0007】[0007]

【実施例】図面に示すこの発明の実施例において、図1
にはこの発明の工法によって、強化されたトンネル1の
地山2における強化壁部3の断面が示されており、4は
鋼管を示す。図2〜4にはこの工法に使用される穿孔手
段8が示されており、鋼管4は両端が開口して外周に複
数の透孔6を有し、前端にめすねじ部9が、また後端に
めすねじ部9に螺合可能なおすねじ部5が設けられてい
る。穿孔手段8は前記従来のものと同様に構成され、先
端に設けたビット本体7の先端に固定第1ビット18と、
開閉可能な第2ビット19とを有していて、さく岩機11に
取付けたシャンクロッド12にカップリングスリーブ13を
介して接合される穿孔ロッド14の先端に取付けられ、カ
ップリングスリーブ13の前側にはホルダキャップ16を介
してパイプホルダ17が装着され、該パイプホルダ17に鋼
管4が嵌合されている。
1 is a block diagram of an embodiment of the present invention shown in the drawings.
Shows a cross section of the strengthening wall portion 3 in the ground 2 of the tunnel 1 strengthened by the construction method of the present invention, and 4 represents a steel pipe. 2 to 4 show a piercing means 8 used in this construction method. The steel pipe 4 has a plurality of through holes 6 opened at both ends and a female thread portion 9 at the front end and a rear portion. A male screw portion 5 that can be screwed into the female screw portion 9 is provided at the end. The piercing means 8 is constructed in the same manner as the conventional one, and the first bit 18 fixed to the tip of the bit body 7 provided at the tip,
A second bit 19 that can be opened and closed, and is attached to the tip of a drilling rod 14 that is joined to a shank rod 12 attached to a rock drilling machine 11 via a coupling sleeve 13, and the front side of the coupling sleeve 13 A pipe holder 17 is attached via a holder cap 16 to which the steel pipe 4 is fitted.

【0008】前記のような鋼管4内に穿孔手段8の一部
を挿脱可能に配置したものにより穿孔するに際しては、
さく岩機11を作動させることにより、穿孔ロッド14に推
力を付与しながら該穿孔ロッド14を回転し、それに伴っ
て回転するビット本体7の第1ビット18によって先掘り
したうえ、第2ビット19によって鋼管4の外径以上の孔
21を掘削する。この孔21の掘削と同時にパイプホルダ17
を介して鋼管4にも推力が付与されて鋼管4が孔21内に
貫入され、このようにして鋼管4を所定深さまで貫入し
たら、さく岩機11の作動を停止してパイプホルダ17を鋼
管4から取外し、図3に示すように穿孔ロッド14を穿孔
部材10とともに鋼管4から引き抜く。この引抜時に第2
ビット19がビット本体7内に収納される。
When drilling with the above-mentioned steel pipe 4 in which a part of the drilling means 8 is removably arranged,
The drilling machine 11 is operated to rotate the drilling rod 14 while applying thrust to the drilling rod 14, and the first bit 18 of the bit main body 7 which rotates in association with the drilling is used to excavate the second drilling bit 14. Depending on the diameter of the steel pipe 4
Drill 21. At the same time as drilling this hole 21, the pipe holder 17
A thrust is also applied to the steel pipe 4 through the steel pipe 4 so that the steel pipe 4 penetrates into the hole 21, and when the steel pipe 4 is penetrated to a predetermined depth in this way, the operation of the rock drill 11 is stopped and the pipe holder 17 is moved to the steel pipe 4. 4 and pull out the piercing rod 14 together with the piercing member 10 from the steel pipe 4 as shown in FIG. The second when this is pulled out
The bit 19 is stored in the bit body 7.

【0009】このようにして図1に示すように地山2内
に圧入された複数の鋼管4の後端おすねじ部5に、図4
に示すように注入プラグ23を螺着し、この注入プラグ23
を介して鋼管に接続された注入ポンプ24によって鋼管4
内に強化材を圧入し、鋼管4の先端開口部及び外周の透
孔6から地山2内に強化材を注入し、このようにして強
化材の注入終了後鋼管4から注入プラグ23を取外し、図
5に示すようにその代わりに鋼管4に座金25を嵌合して
鋼管4のおすねじ部5に袋ナット26を螺着して、鋼管4
の外周と地山2との間の間隙を座金25で密封し、地山2
内に連続した強化壁部3を形成する。そして地山2の状
態等により、長尺加工をしたい場合には、先行鋼管4の
後端おすねじ部5に後行鋼管4のめすねじ部9を螺合し
て、複数の鋼管4を連結することとなる。
In this way, as shown in FIG. 1, the male screw portions 5 at the rear ends of the plurality of steel pipes 4 which are press-fitted into the ground 2 are connected to the male screw portion 5 shown in FIG.
Screw the injection plug 23 as shown in
Steel pipe 4 by infusion pump 24 connected to the steel pipe via
The reinforcing material is press-fitted in the inside, and the reinforcing material is injected into the ground 2 through the tip opening of the steel pipe 4 and the through hole 6 on the outer periphery. Thus, after the injection of the reinforcing material is completed, the injection plug 23 is removed from the steel pipe 4. Instead, as shown in FIG. 5, a washer 25 is fitted to the steel pipe 4 and a cap nut 26 is screwed to the male thread portion 5 of the steel pipe 4 to form the steel pipe 4.
The gap between the outer periphery of the ground and the ground 2 is sealed with a washer 25, and the ground 2
A continuous reinforcing wall portion 3 is formed inside. When it is desired to perform long processing due to the state of the ground 2, etc., the female screw portion 9 of the trailing steel pipe 4 is screwed into the rear male screw portion 5 of the preceding steel pipe 4 to form a plurality of steel pipes 4. Will be connected.

【0010】[0010]

【発明の効果】この発明は前記のようであって、請求項
1の発明は、両端が開口して外周に複数の透孔を有し、
後端外周におすねじ部を有する鋼管の内部に、先端にビ
ットが装着された穿孔部材を挿脱可能に挿入し、穿孔部
材によって地山に穿孔しながら該地山に鋼管を圧入した
ところで穿孔部材を鋼管から抜出し、このようにして地
山内に圧入された複数の同鋼管の後端おすねじ部に螺着
した注入プラグを介して、鋼管に接続された注入ポンプ
によって鋼管内に強化材を圧入し、鋼管の先端開口部及
び外周の透孔から地山内に強化材を注入し、この強化材
の注入終了後鋼管から注入プラグを取外し、その代わり
に鋼管に座金を嵌合して鋼管のおすねじ部に袋ナットを
螺着して、外周と地山との間の間隙を座金で密封するよ
うになっているので、鋼管が支保工として作用するのに
加えて、地山に連続した強化壁部を形成することがで
き、しかもその形成の際の強化材の注入操作が容易であ
って手際よく注入することができ、また注入した強化材
が地山と鋼管との間を通って外部に漏洩するようなこと
がないという効果がある。また請求項2の発明は、請求
項1の発明において、鋼管の前端内部に前記おすねじ部
に螺合可能なめすねじ部が設けられていて、必要に応じ
て両ねじ部を螺合して複数の鋼管を連結し、長尺加工を
するようになっているので、請求項1の発明と同様な効
果をもつのに加えて、地山の状態等によって長尺加工を
したい場合には、先行鋼管の後端おすねじ部に後行鋼管
のめすねじ部を螺合して、複数の鋼管を連結するという
簡単な操作によって容易にそれを実施することができる
という効果がある。
The present invention is as described above, and the invention according to claim 1 has a plurality of through holes on the outer periphery with both ends opened.
Inside the steel pipe having a threaded portion on the outer periphery of the rear end, a perforating member having a bit attached to the tip is removably inserted, and while the steel pipe is press-fit into the natural rock while perforating the natural rock by the perforating member. The piercing member is pulled out of the steel pipe, and is strengthened in the steel pipe by the injection pump connected to the steel pipe through the injection plugs screwed to the male threads of the rear ends of the steel pipes that are thus press-fitted into the ground. Material is press-fitted, the reinforcement is injected into the ground through the opening at the tip of the steel pipe and the through hole on the outer periphery, and after the injection of this reinforcement is completed, the injection plug is removed from the steel pipe, and instead a washer is fitted to the steel pipe. A cap nut is screwed onto the male thread of the steel pipe to seal the gap between the outer periphery and the ground with a washer, so in addition to the steel pipe acting as a support work, It is possible to form a continuous strengthening wall on the A simple injection operation reinforcement can be injected neat when, also injected reinforcement there is an effect that is not as leaks to the outside through between the natural ground and the steel pipe. According to a second aspect of the present invention, in the first aspect of the present invention, a female threaded portion that can be screwed into the male threaded portion is provided inside the front end of the steel pipe, and both threaded portions are screwed as necessary. Since a plurality of steel pipes are connected to perform long processing, in addition to having the same effect as that of the invention of claim 1, when it is desired to perform long processing depending on the state of natural ground, There is an effect that it can be easily carried out by a simple operation of screwing the female thread portion of the trailing steel pipe to the male thread portion of the trailing steel pipe and connecting a plurality of steel pipes.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明によって構築された地山の強化壁部を
示す正面図である。
FIG. 1 is a front view showing a reinforced wall portion of a natural ground constructed according to the present invention.

【図2】この発明の穿孔工程を示す縦断正面図である。FIG. 2 is a vertical sectional front view showing a perforating step of the present invention.

【図3】同上の穿孔手段の引抜工程を示す縦断正面図で
ある。
FIG. 3 is a vertical cross-sectional front view showing a pulling-out process of the punching means of the above.

【図4】同上の強化材の注入工程を示す縦断正面図であ
る。
FIG. 4 is a vertical cross-sectional front view showing the step of injecting the reinforcing material of the above.

【図5】同上の全工程終了時の縦断正面図である。FIG. 5 is a vertical sectional front view at the end of all the steps of the above.

【符号の説明】[Explanation of symbols]

1 トンネル 2 地山 3 強化壁部 4 鋼管 5 おすねじ部 6 透孔 7 ビット本体 8 穿孔手段 9 めすねじ部 10 穿孔部材 21 孔 23 注入プラグ 24 注入ポンプ 25 座金 26 袋ナット 1 tunnel 2 ground 3 strengthening wall 4 steel pipe 5 male screw 6 through hole 7 bit body 8 drilling means 9 female screw 10 drilling member 21 hole 23 injection plug 24 injection pump 25 washer 26 cap nut

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 両端が開口して外周に複数の透孔を有
し、後端外周におすねじ部を有する鋼管の内部に、先端
にビットが装着された穿孔手段を挿脱可能に挿入し、前
記穿孔手段によって地山に穿孔しながら該地山に前記鋼
管を圧入し、所定長圧入したところで前記穿孔手段を鋼
管から抜出し、このようにして地山内に圧入された複数
の同鋼管の後端おすねじ部に注入プラグを螺着し、この
注入プラグを介して鋼管に接続された注入ポンプによっ
て鋼管内に強化材を圧入し、鋼管の先端開口部及び外周
の透孔から地山内に強化材を注入し、このようにして強
化材を注入終了後鋼管から注入プラグを取外し、その代
わりに鋼管に座金を嵌合して鋼管のおすねじ部に袋ナッ
トを螺着して外周と地山との間の間隙を座金で密封し、
地山内に連続した強化壁部を形成することを特徴とする
地山の強化工法。
1. A perforation means having a bit attached to a tip thereof is removably inserted into a steel pipe having both ends open and a plurality of through holes on an outer periphery and a threaded portion on an outer periphery of a rear end. Then, the steel pipe is press-fitted into the ground while piercing the ground by the piercing means, and the piercing means is extracted from the steel pipe when press-fitting for a predetermined length, and thus the plurality of steel pipes press-fitted into the ground An injection plug is screwed onto the male thread on the rear end, and a reinforcement is pressed into the steel pipe by an injection pump connected to the steel pipe through this injection plug. After injecting the reinforcing material in this way, remove the injection plug from the steel pipe after completing the injection of the reinforcing material, and instead fit a washer on the steel pipe and screw a cap nut to the male thread part of the steel pipe to attach the outer periphery. The gap between the ground and the ground is sealed with a washer,
A method for strengthening natural rocks, characterized by forming continuous strengthening walls inside the natural rocks.
【請求項2】 鋼管の前端内部に前記おすねじ部に螺合
可能なめすねじ部が設けられていて、必要に応じて両ね
じ部を螺合して複数の鋼管を連結し、長尺加工をする請
求項1の地山の強化工法。
2. A steel pipe is provided with a female screw portion capable of being screwed into the male screw portion inside a front end of the steel pipe. The method of strengthening the natural ground according to claim 1.
JP18389292A 1992-07-10 1992-07-10 Method for strengthening ground Pending JPH06173578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18389292A JPH06173578A (en) 1992-07-10 1992-07-10 Method for strengthening ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18389292A JPH06173578A (en) 1992-07-10 1992-07-10 Method for strengthening ground

Publications (1)

Publication Number Publication Date
JPH06173578A true JPH06173578A (en) 1994-06-21

Family

ID=16143644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18389292A Pending JPH06173578A (en) 1992-07-10 1992-07-10 Method for strengthening ground

Country Status (1)

Country Link
JP (1) JPH06173578A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57920A (en) * 1980-06-02 1982-01-06 Shin Meiwa Ind Co Ltd Hinge operating device for three-side tipping dump truck
JPS5927830A (en) * 1982-08-09 1984-02-14 Cosmo Co Ltd Antitumor glycoproteinic substance
JPH0348314A (en) * 1989-07-17 1991-03-01 Nippon Telegr & Teleph Corp <Ntt> Optical neural network circuit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57920A (en) * 1980-06-02 1982-01-06 Shin Meiwa Ind Co Ltd Hinge operating device for three-side tipping dump truck
JPS5927830A (en) * 1982-08-09 1984-02-14 Cosmo Co Ltd Antitumor glycoproteinic substance
JPH0348314A (en) * 1989-07-17 1991-03-01 Nippon Telegr & Teleph Corp <Ntt> Optical neural network circuit

Similar Documents

Publication Publication Date Title
JP4288331B2 (en) Rock bolt and supporting method using the same
TW200533821A (en) Expandable injection bolt and grouting method using same
JP2735650B2 (en) Ground reinforcement method and equipment
CN105134127A (en) Anti-collapse grouting consolidation device and using method thereof
JP3493014B2 (en) Tunnel widening method
CN105201447A (en) Quick-setting slurry grouting consolidation system and application method thereof
KR101825039B1 (en) Ground reinforcement method of messer shield tunnel
JP5439320B2 (en) Construction method of two-way pressurized injection short rock bolt
JPH06173578A (en) Method for strengthening ground
US4278363A (en) Rock bolt and installation system
JP3017941U (en) Support device for tunnel ground
JP3851590B2 (en) Preceding ground mountain consolidation method using self-drilling bolt and FRP bolt
CN112664250A (en) Vertical shaft well soil body reinforcing anchor rod and construction method thereof
JP2549062B2 (en) Pipe rod construction method
JPH11315533A (en) Soil improvement method
JP2022180263A (en) Rock bolt structural body and natural ground reinforcement structure
JP2022164110A (en) Rock bolt structure and rock mass reinforcement structure
JP2566522B2 (en) Ground improvement method for tunnel excavation and its surroundings
JPH0216300A (en) Grouting in self-drilling lock bolt
KR20220010262A (en) Double tube packer capable of complex grouting
JP3328817B2 (en) Ground reinforcement method
JPH02272112A (en) Method of chemical grouting construction to peripheral ground of tunnel
JPH08333999A (en) Adapter for driving rock bolt
JPS6249408B2 (en)
JP2014015723A (en) Unwidened long-sized steel pipe forepoling method and injection structure for injection material of terminal pipe used for the method

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02