Method for constructing underground continuous wall

Info

Publication number
JPH06158650A
JPH06158650A JP17535893A JP17535893A JPH06158650A JP H06158650 A JPH06158650 A JP H06158650A JP 17535893 A JP17535893 A JP 17535893A JP 17535893 A JP17535893 A JP 17535893A JP H06158650 A JPH06158650 A JP H06158650A
Authority
JP
Japan
Prior art keywords
horizontal
panel
bar
horizontal bars
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17535893A
Other languages
Japanese (ja)
Other versions
JPH0756134B2 (en
Inventor
Fumio Kodaira
文夫 小平
Shinichi Yamanobe
慎一 山野辺
Teru Akiyama
暉 秋山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP17535893A priority Critical patent/JPH0756134B2/en
Publication of JPH06158650A publication Critical patent/JPH06158650A/en
Publication of JPH0756134B2 publication Critical patent/JPH0756134B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To enhance the withstanding strength and toughness of a joint so as to enhance reliability and to freely adjust the holding force of the horizontal bars of a panel that follows and to prevent the horizontal bars from holding in excess by building a reinforcing cage for the following panel, and widening narrow end horizontal bars, and laying the bars on top of the horizontal bars of the preceding panels without gaps. CONSTITUTION:Channeled guide rails 10 are provided to the vertical insides of the ends of the horizontal bars 5 of a panel that follows. Hooks 9a, 9a formed at both ends of a plate 9 narrower than the width between the unbound horizontal bars 5, 5 are inserted into the guide rails 10 and the horizontal bars 5 are narrowed to such a degree that they can be forcibly restored. The horizontal bars 5 are constructed between the horizontal bars of the ends of the preceding panel and then the plate 9 is extracted from above the ground to return the space between the horizontal bars 5, 5 to initial width.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、土留、止水壁、基礎構
造物等を構成する地中連続壁の施工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a continuous underground wall which constitutes a retaining soil, a water stop wall, a foundation structure and the like.

【0002】[0002]

【従来の技術】地中連続壁の施工法は、一般に長孔を掘
削し、その中に鉄筋籠を押入してコンクリート打設して
形成する各パネル毎に分割施工し、後行パネルを先行パ
ネルに順次連設して施工していくものである。そして、
各パネル間の接続部が十分な連結強度を保つように、隣
り合うパネル同士の鉄筋を互いにラップさせることが必
要となる。
2. Description of the Related Art Generally, a continuous underground wall is constructed by excavating a long hole, inserting a reinforcing bar cage into it, and concrete-placing it to divide it into individual panels. The panels will be installed one after another in sequence. And
It is necessary to wrap the reinforcing bars of adjacent panels so that the connecting portions between the panels maintain sufficient connection strength.

【0003】図7は、その一例を示すもので、図中1は
先行パネル、2はその内部の鉄筋籠で、先行パネル1の
端からラップ用の横筋3を突設し、一方、後行パネル用
鉄筋籠4の後端の横筋5,5はその先端部相互の巾を前
記先行パネルの横筋3,3間の巾よりも狭く形成してい
る。
FIG. 7 shows an example thereof. In the figure, 1 is a front panel, 2 is a reinforcing bar cage inside thereof, and a horizontal bar 3 for wrap is projected from an end of the front panel 1, while a trailing line is provided. The horizontal widths 5 and 5 at the rear end of the panel reinforcing bar cage 4 are formed such that the widths between their front end portions are smaller than the width between the horizontal widths 3 and 3 of the preceding panel.

【0004】このようにして、横筋3,3間に横筋5,
5を差入れることによりラップ長を確保するものである
が、地上で予め組まれる鉄筋籠4の建込みの容易性を考
慮した場合横筋3と横筋5との間はある程度の間隔aを
存していた。
In this way, the horizontal stripes 5, 3 are located between the horizontal stripes 3, 3.
The length of the lap is secured by inserting 5 in this case, but in consideration of the ease of erection of the reinforcing bar cage 4 preassembled on the ground, there is a certain distance a between the horizontal bar 3 and the horizontal bar 5. Was there.

【0005】[0005]

【発明が解決しようとする課題】このような従来の地中
連続壁では、前記のごとく継手部の横筋3,5間が間隔
aの分だけ離れているため、図8に示すようにその間を
縫うような割裂ひび割れが発生し、継手部がぜい性的に
破壊するおそれがある。
In such a conventional underground continuous wall as described above, since the horizontal bars 3, 5 of the joint portion are separated by the distance a, as shown in FIG. Sewing cracks may occur and the joint may be brittlely broken.

【0006】この破壊は、鉄筋比が比較的小さい時には
当該横筋が降伏した後に、鉄筋比が比較的大きい時には
当該横筋が降伏する前に生じる。
This destruction occurs after the transverse bar yields when the reinforcing bar ratio is relatively small, and before the transverse bar yields when the reinforcing bar ratio is relatively large.

【0007】これに対し、特開昭57-21621号公報に示す
ように建込むべき鉄筋籠のラップ部分の鉄筋の縦方向鉄
筋を横方向鉄筋に枢着し、かつこの縦方向鉄筋にスター
ラップ鉄筋を予め溶接しておいて建込んでから前記縦方
向鉄筋を回動してスターラップ鉄筋を掛け渡すことが提
示されている。
On the other hand, as shown in JP-A-57-21621, the longitudinal reinforcing bars of the reinforcing bars of the reinforcing bar cage to be built are pivotally attached to the transverse reinforcing bars, and the longitudinal reinforcing bars are star-wrapped. It is proposed that the reinforcing bars are welded in advance and installed, and then the longitudinal reinforcing bars are rotated to span the stirrup reinforcing bars.

【0008】しかし、かかる方法では、ラップ部での縦
方向鉄筋の枢着構造が面倒なものであり、また縦方向鉄
筋と横方向鉄筋との結合が弱くなり強度上の低下もまぬ
がれない。
However, in such a method, the structure of pivotally attaching the vertical rebars in the wrap portion is troublesome, and the connection between the vertical rebars and the horizontal rebars is weakened, so that a decrease in strength cannot be avoided.

【0009】また、特開昭57-21621号公報に示すように
地中連続壁の施工法において、先行パネル用鉄筋籠の横
筋端縁から突出した弾性突出部を内方に縮めて交差させ
てその中心に鉄筋による介在部材を差し込んで係止し、
後行パネル内に建込んだ後にこの介在部材を外して弾性
突出部をその弾性により外方に開かせて、該弾性突出部
先端の折曲部を先行パネルにからみ合わせる工法があ
る。
Further, as disclosed in Japanese Patent Laid-Open No. 21621/1982, in the method of constructing an underground continuous wall, elastic protrusions protruding from the lateral edge of the reinforcing bar basket for the preceding panel are contracted inward and crossed. Insert an intervening member made of rebar in the center and lock it,
There is a construction method in which the interposing member is removed after being installed in the trailing panel to open the elastic protrusion outward due to its elasticity, and the bent portion at the tip of the elastic protrusion is entangled with the preceding panel.

【0010】しかしかかる工法では、弾性突出部は撓ま
せ過ぎになりもとの形にもどらないおそれがある。
However, in such a construction method, there is a possibility that the elastic protrusion is excessively bent and does not return to its original shape.

【0011】本発明の目的は前記従来例の不都合を解消
し、後行パネル用鉄筋籠を建込んでから、それまで巾狭
であった端部横筋を広げて先行パネル側の横筋に隙間な
く重ね、その結果として継手部の耐力及びじん性を向上
させることができて信頼性の高いものとすることがで
き、しかも、後行パネル側の横筋の撓み具合を任意的に
調節することができ、撓み過ぎを防止できる地中連続壁
の施工法を提供することにある。
The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional example, and after constructing a reinforcing bar basket for a trailing panel, widen the end lateral bar that was narrow until then without leaving a gap in the lateral bar on the preceding panel side. Overlap, as a result, it is possible to improve the proof stress and toughness of the joint portion and to make it highly reliable, and moreover, it is possible to arbitrarily adjust the degree of flexion of the transverse stripes on the trailing panel side. , It is to provide a construction method of a continuous underground wall that can prevent excessive bending.

【0012】[0012]

【課題を解決するための手段】本発明は前記目的を達成
するため、先行パネル端から突出する横筋に後行パネル
用鉄筋籠端の横筋をラップさせて接続する地中連続壁の
施工法において、後行パネルの横筋の先端には内側上下
方向にチャンネル状のガイドレールを設けておき、該ガ
イドレール内に、拘束しない状態の横筋間の巾よりも巾
の狭いプレートの両端に形成したフックを挿入してこの
後行パネル用鉄筋籠の横筋を強制的に復位可能な巾狭と
し、これを先行パネル端の横筋間に建込んだ後に地上か
ら前記プレートを引き抜いて横筋間をもとの巾に戻すこ
と、および、先行パネル用鉄筋籠の横筋に着く縦筋は外
側に、また後行パネル用鉄筋籠の横筋に着く縦筋は内側
に配設しておき、先行パネル側と後行パネル側の縦筋が
ともに横筋の外側に位置するように横筋同士を上下方向
において同一平面上で重畳させること、さらに、プレー
トを引き抜き後、先端がすぼまった押し出し具の両端を
このガイドレール内に差入れて強制的に横筋を押広げる
ことを要旨とするものである。
Means for Solving the Problems In order to achieve the above object, the present invention provides a method for constructing an underground continuous wall in which a horizontal bar projecting from an end of a preceding panel is connected with a horizontal bar of a cage end of a trailing panel by wrapping the horizontal bar. , A channel-shaped guide rail is provided in the vertical direction of the inside at the tip of the horizontal stripe of the trailing panel, and hooks formed at both ends of the plate having a width narrower than the width between the horizontal stripes in an unrestrained state in the guide rail. Inserting this to make the horizontal bar of the cage for this trailing panel narrow enough to be able to reposition, and after installing this between the horizontal bars at the end of the preceding panel, pull out the plate from the ground Return the width to the width, and arrange the vertical bar that reaches the horizontal bar of the reinforcing bar for the leading panel on the outside and the vertical bar that reaches the horizontal bar of the reinforcing bar for the trailing panel on the inside. The vertical stripes on the panel side are both outside the horizontal stripes Place the horizontal stripes on the same plane in the vertical direction so that they are positioned.Further, after pulling out the plate, insert both ends of the push-out tool with a narrowed tip into this guide rail to forcefully spread the horizontal stripes. This is the summary.

【0013】[0013]

【作用】請求項1記載の本発明によれば、チャンネル状
のガイドレールに沿って該プレート両端のフックを挿入
すると、端部横筋は強制的にプレートの巾と同一巾とな
るように弓なりに曲がるので、先行パネル側の横筋間に
容易に差し込むことができ、差し込み後に、プレートを
外すと、この端部横筋は鉄筋の弾性により復位して先行
パネル側と後行パネル側の横筋同士が自動的に一体化す
る。したがって、このプレートの巾を適宜なものに選定
すれば、後行パネル側の横筋の曲がる度合いを調節でき
てその弾性を失わせることがない。
According to the first aspect of the present invention, when the hooks at both ends of the plate are inserted along the channel-shaped guide rails, the end lateral stripes are forcibly bent to have the same width as the plate. Since it bends, it can be easily inserted between the horizontal bars on the front panel side, and when the plate is removed after insertion, this end horizontal bar is restored by the elasticity of the reinforcing bar and the horizontal bars on the front panel side and the rear panel side automatically Unify. Therefore, if the width of this plate is appropriately selected, the degree of bending of the horizontal stripes on the trailing panel side can be adjusted without losing its elasticity.

【0014】請求項2記載の本発明によれば、端部横筋
が復位すると、先行パネル側と後行パネル側の横筋同士
が上下方向において同一平面上で重畳するので、鉄筋間
の間隔は狭ばまって継手部が密となり、この継手部の強
度が高まる。
According to the second aspect of the present invention, when the end lateral bar is repositioned, the lateral bars on the leading panel side and the trailing panel side overlap each other on the same plane in the vertical direction, so that the distance between the reinforcing bars is narrow. The joints become dense and the joints become dense, and the strength of the joints increases.

【0015】請求項3記載の本発明によれば、仮にしぼ
り方が強過ぎたために、拘束部材を撤去しても横筋が弾
性力を失い十分に復位しない場合には、チャンネル状の
ガイドレール内に押し出し具の両端を差入れて強制的に
横筋を押広げてやればよい。なお、この押し出し具は、
横筋が安定した形を保つため埋め殺しとし、パネルの継
手部の強度向上にも役立つ。
According to the third aspect of the present invention, when the lateral stirrup loses its elastic force and does not fully return to its original position even if the restraining member is removed because the squeezing method is too strong, the inside of the channel-shaped guide rail is You can insert both ends of the pusher into it and forcefully spread the lateral streaks. In addition, this pusher is
The horizontal streaks are buried to maintain a stable shape, which also helps improve the strength of the panel joints.

【0016】[0016]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1〜図3は本発明の地中連続壁の施工法の
各工程を示す平面図で、前記従来例を示す図7,図8と
同一構成要素には同一参照番号を付したものである。
Embodiments of the present invention will now be described in detail with reference to the drawings. 1 to 3 are plan views showing respective steps of the method for constructing a continuous underground wall of the present invention, in which the same constituent elements as those in FIGS. 7 and 8 showing the conventional example are designated by the same reference numerals. .

【0017】まず、図1に示すように先行パネルは完成
されており、その端部から横筋3と縦筋7の組合せ格子
体が2列平行に鉄筋籠2の延長をなすように後行パネル
側に突設している。
First, as shown in FIG. 1, the preceding panel has been completed, and the trailing panel is formed so that the combined lattice of horizontal bars 3 and vertical bars 7 extends from the end of the reinforcing bar cage 2 in two rows. It is protruding to the side.

【0018】次いで、図2に示すように削孔後後行パネ
ル用の鉄筋籠4を組込むが、この鉄筋籠4は地上で予め
拘束部材として、両端にフック9a付きのプレート9を
使用し、一方、横筋5側には内側上下方向にチャンネル
状のガイドレール10を設け、このガイドレール10内に前
記フック9aを差入れることによりプレート9を介して
しぼりをかけるようにした。
Next, as shown in FIG. 2, the rebar cage 4 for the trailing panel after drilling is assembled, and the rebar cage 4 is preliminarily used as a restraining member on the ground by using the plate 9 with hooks 9a at both ends. On the other hand, a channel-shaped guide rail 10 is provided on the lateral streak 5 side in the vertical direction of the inside, and the hook 9a is inserted into the guide rail 10 to squeeze through the plate 9.

【0019】このように端部が線鋼材6でしぼめられた
鉄筋籠4を、そのしぼり部分が前記先行パネル1の横筋
3,3の間に入り込むように所定の深さまで建込む。
The rebar cage 4 whose ends are squeezed with the wire steel material 6 in this manner is built up to a predetermined depth so that the squeezed portion can enter between the horizontal bars 3 of the preceding panel 1.

【0020】そして、建込みが完了した時点で前記拘束
部材としてのプレート9を前記ガイドレール10の上端か
ら引く抜くことにより、地上から簡単に撤去できる。プ
レート9を引き抜くと、横筋5は弾性で復位し、横筋3
と上下方向において同一平面で重畳する。
When the construction is completed, the plate 9 as the restraint member is pulled out from the upper end of the guide rail 10 so that it can be easily removed from the ground. When the plate 9 is pulled out, the horizontal muscle 5 is elastically restored to the horizontal muscle 3
And overlap in the same plane in the vertical direction.

【0021】このとき、横筋3に着く縦筋7は外側に、
また横筋5に着く縦筋8は内側に配設したもので、図4
に示すようにこれら縦筋7,8はともに横筋3,5の重
畳部の外側に位置し、邪魔になることはない。
At this time, the vertical stripes 7 reaching the horizontal stripes 3 are outward,
In addition, the vertical streak 8 that reaches the horizontal streak 5 is arranged on the inner side.
As shown in FIG. 5, these vertical streaks 7 and 8 are both located outside the overlapping portion of the horizontal streaks 3 and 5, and do not interfere.

【0022】ところで、しぼり方が強過ぎた場合などで
拘束部材を撤去しても横筋5が弾性力を失い十分に復位
せず直線状にならないこともある。そのような場合は、
図6に示すように、前記のごときチャンネル状のガイド
レール10を横筋5端に取付けておき、図5に示すような
先端がすぼまったトラス形の押し出し具11の両端をこの
ガイドレール10内に差入れて強制的に横筋5を押広げて
やればよい。
By the way, even if the squeezing method is too strong, even if the restraining member is removed, the lateral streak 5 loses its elastic force and may not be sufficiently restored to form a straight line. In such cases,
As shown in FIG. 6, the channel-shaped guide rail 10 as described above is attached to the end of the horizontal bar 5, and the both ends of the truss-shaped push-out tool 11 having the recessed tip as shown in FIG. It is only necessary to insert it inside and forcefully spread the lateral streaks 5.

【0023】この押し出し具11は、横筋5が安定した形
を保つため埋め殺しとし、パネルの継手部の強度向上に
も役立つ。
The push-out tool 11 is buried in order to keep the horizontal streaks 5 in a stable shape, and also helps to improve the strength of the joint portion of the panel.

【0024】[0024]

【発明の効果】以上述べたように本発明の地中連続壁の
施工法は、先行パネル端から突出する横筋に後行パネル
用鉄筋籠端の横筋をラップさせて接続する地中連続壁の
施工法において、ラップする横筋同士は上下に重畳して
水平方向には離間せず、その結果継手部の耐力、じん性
を向上させることができるものである。さらに、従来の
鉄筋籠の構成を変えることなく、地上からの作業で安全
かつ簡単に施工できる。
As described above, the method for constructing an underground continuous wall of the present invention is a method for constructing an underground continuous wall in which a horizontal bar protruding from the end of the preceding panel is connected to the horizontal bar of the cage end of the trailing panel by wrapping it. In the construction method, the lateral stripes to be wrapped are vertically overlapped with each other and are not separated in the horizontal direction, and as a result, the yield strength and toughness of the joint portion can be improved. Furthermore, it can be safely and easily installed from the ground without changing the structure of the conventional rebar cage.

【0025】しかも、後行パネル側の横筋の曲げ具合を
任意的に調節することができて、この横筋のたわみ過ぎ
を防止してその弾性を失わせることがなく、しかも、そ
の操作もプレートのフックをガイドレールに出し入れす
るだけの簡単なものである。
Moreover, the bending condition of the lateral stripes on the trailing panel side can be arbitrarily adjusted, the excessive flexure of the lateral stripes is prevented, and the elasticity thereof is not lost. It's as simple as putting the hook in and out of the guide rail.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の地中連続壁の施工法の第1工程を示す
平面図である。
FIG. 1 is a plan view showing a first step of a method for constructing an underground continuous wall of the present invention.

【図2】本発明の地中連続壁の施工法の後行パネル用鉄
筋籠を示す平面図である。
FIG. 2 is a plan view showing a reinforcing bar cage for a trailing panel of the method for constructing an underground continuous wall according to the present invention.

【図3】本発明の地中連続壁の施工法の第2工程を示す
平面図である。
FIG. 3 is a plan view showing a second step of the method for constructing an underground continuous wall of the present invention.

【図4】A−A断面図である。FIG. 4 is a sectional view taken along line AA.

【図5】本発明の地中連続壁の施工法で用いる押し出し
具の正面図である。
FIG. 5 is a front view of an extrusion tool used in the method for constructing an underground continuous wall of the present invention.

【図6】本発明の地中連続壁の施工法の使用状態を示す
平面図である。
FIG. 6 is a plan view showing a usage state of the method for constructing an underground continuous wall of the present invention.

【図7】従来の地中連続壁の施工法を示す平面図であ
る。
FIG. 7 is a plan view showing a conventional method of constructing a continuous underground wall.

【図8】従来の地中連続壁の施工法におけるひび割れ発
生状態を示す平面図である。
FIG. 8 is a plan view showing a crack generation state in a conventional underground wall construction method.

【符号の説明】[Explanation of symbols]

1…先行パネル 2…鉄筋籠 3…横筋 4…後行パネル用鉄筋
籠 5…横筋 6…線鋼材 7,8…縦筋 9…プレート 9a…フック 10…ガイドレール 11…押し出し具 12…巾止め筋
1 ... Leading panel 2 ... Reinforcing bar basket 3 ... Horizontal bar 4 ... Rear panel reinforcing bar basket 5 ... Horizontal bar 6 ... Wire steel 7,8 ... Vertical bar 9 ... Plate 9a ... Hook 10 ... Guide rail 11 ... Extruder 12 ... Width stopper muscle

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 先行パネル端から突出する横筋に後行パ
ネル用鉄筋籠端の横筋をラップさせて接続する地中連続
壁の施工法において、後行パネルの横筋の先端には内側
上下方向にチャンネル状のガイドレールを設けておき、
該ガイドレール内に、拘束しない状態の横筋間の巾より
も巾の狭いプレートの両端に形成したフックを挿入して
この後行パネル用鉄筋籠の横筋を強制的に復位可能な巾
狭とし、これを先行パネル端の横筋間に建込んだ後に地
上から前記プレートを引き抜いて横筋間をもとの巾に戻
すことを特徴とした地中連続壁の施工法。
1. A method for constructing a continuous underground wall in which a horizontal bar projecting from the end of the preceding panel is connected to the horizontal bar of the reinforcing bar for the trailing panel by wrapping the horizontal bar, and the tip of the horizontal bar of the trailing panel is vertically inward. Provide a channel-shaped guide rail,
Into the guide rail, hooks formed at both ends of a plate having a width narrower than the width between the horizontal bars in the unrestrained state are inserted to make the horizontal bars of the reinforcing rod cage for the trailing panel into a narrow width capable of forcibly returning. A construction method for a continuous underground wall, characterized in that the plate is pulled out from the ground and restored to the original width after being installed between the horizontal stripes at the end of the preceding panel.
【請求項2】 先行パネル用鉄筋籠の横筋に着く縦筋は
外側に、また後行パネル用鉄筋籠の横筋に着く縦筋は内
側に配設しておき、先行パネル側と後行パネル側の縦筋
がともに横筋の外側に位置するように横筋同士を上下方
向において同一平面上で重畳させる請求項1記載の地中
連続壁の施工法。
2. A longitudinal bar that reaches the horizontal bar of the reinforcing bar basket for the preceding panel is arranged outside, and a vertical bar that reaches the lateral bar of the reinforcing bar basket for the trailing panel is arranged inside, and the front panel side and the rear panel side are arranged. The method for constructing a continuous underground wall according to claim 1, wherein the horizontal streaks are superposed on the same plane in the vertical direction so that the vertical streaks are both outside the horizontal streaks.
【請求項3】 プレートを引き抜き後、先端がすぼまっ
た押し出し具の両端をこのガイドレール内に差入れて強
制的に横筋を押広げる請求項1および請求項2記載の地
中連続壁の施工法。
3. Construction of a continuous underground wall according to claim 1 or 2, wherein after pulling out the plate, both ends of an extruding tool having a recessed tip are inserted into the guide rails to forcibly expand the lateral streaks. Law.
JP17535893A 1993-07-15 1993-07-15 Construction method for underground wall Expired - Lifetime JPH0756134B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17535893A JPH0756134B2 (en) 1993-07-15 1993-07-15 Construction method for underground wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17535893A JPH0756134B2 (en) 1993-07-15 1993-07-15 Construction method for underground wall

Publications (2)

Publication Number Publication Date
JPH06158650A true JPH06158650A (en) 1994-06-07
JPH0756134B2 JPH0756134B2 (en) 1995-06-14

Family

ID=15994685

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17535893A Expired - Lifetime JPH0756134B2 (en) 1993-07-15 1993-07-15 Construction method for underground wall

Country Status (1)

Country Link
JP (1) JPH0756134B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622546A (en) * 2022-03-17 2022-06-14 中交第三航务工程局有限公司 Space truss supporting platform, system and method for ultra-deep underground continuous wall
CN115217092A (en) * 2022-07-25 2022-10-21 上海市基础工程集团有限公司 Reinforcement cage structure for treating leakage of joint or wall body and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622546A (en) * 2022-03-17 2022-06-14 中交第三航务工程局有限公司 Space truss supporting platform, system and method for ultra-deep underground continuous wall
CN115217092A (en) * 2022-07-25 2022-10-21 上海市基础工程集团有限公司 Reinforcement cage structure for treating leakage of joint or wall body and construction method

Also Published As

Publication number Publication date
JPH0756134B2 (en) 1995-06-14

Similar Documents

Publication Publication Date Title
KR100730882B1 (en) High-strength concrete wall formwork
US10392772B2 (en) Construction method for band type fiber reinforcing material for reinforced-soil retaining-wall
US4856939A (en) Method and apparatus for constructing geogrid earthen retaining walls
US5044833A (en) Reinforced soil retaining wall and connector therefor
JPH06158650A (en) Method for constructing underground continuous wall
JPS62280414A (en) Construction work of underground continuous wall
JP2000008378A (en) Slope face structure and construction method thereof
JP3014616B2 (en) Formwork for construction of legal framework
JPS6146606B2 (en)
CN219568951U (en) Retaining wall skeleton
KR102523001B1 (en) Connection structure of pc wall
KR20230142117A (en) Connection structure of pc wall using loop bar and lacer bar
CN217734371U (en) Perforation anchoring lap joint combined section steel concrete wall beam joint
JP2516509B2 (en) Joint structure of underground wall
JP2545310B2 (en) Connection structure of underground continuous wall
JP2545319B2 (en) Joint structure of underground wall
JP3498068B2 (en) Connection structure of reinforcing body and method of manufacturing connection member
US2080876A (en) Supporting and anchoring means for wire lathing
JP2004332445A (en) Coupling device for reinforced banking
JPH0421871Y2 (en)
JPS6132450B2 (en)
JP3863322B2 (en) Steel reinforced concrete column base structure
JP4380156B2 (en) Wall structure with wall material
JPH0360973B2 (en)
JPH07107266B2 (en) Method of joining underground continuous walls