JPH06129190A - Gable frame structure - Google Patents

Gable frame structure

Info

Publication number
JPH06129190A
JPH06129190A JP4300659A JP30065992A JPH06129190A JP H06129190 A JPH06129190 A JP H06129190A JP 4300659 A JP4300659 A JP 4300659A JP 30065992 A JP30065992 A JP 30065992A JP H06129190 A JPH06129190 A JP H06129190A
Authority
JP
Japan
Prior art keywords
concrete
metal fitting
rubber tube
tube
gable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4300659A
Other languages
Japanese (ja)
Inventor
Katsuya Sogino
勝也 枌野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP4300659A priority Critical patent/JPH06129190A/en
Publication of JPH06129190A publication Critical patent/JPH06129190A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To enhance workability by closing the front side of concrete with a rubber tube and supporting the concrete with a presser hardware and holding a concrete casting form side of the rubber tube with an adjustable metal fitting. CONSTITUTION:An inner form B is installed between primary lining segments C by way of a specified concrete placing space. Then, after a rubber tube 1 is installed, an angle-shaped presser metal fitting 2 and a circular-shaped adjustable metal fitting 3 are mounted to an end face on the gable side of the form B. Then, air or the like is filled up in the tube 1 so as to expand the tube and pressure weld the tube with a bottom plate 32 of the metal fitting 3. Concrete is placed between the form B and primary lining C, thereby constructing secondary concrete A. During that time, the metal fitting 3 is moved in the direction of concrete placement under control, thereby closing the gable side of the secondary lining A without any clearance. It is, therefore, possible to close the gable side in conformity with the thickness of concrete placing.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、コンクリ−トの妻側を
閉塞する妻枠の構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gable frame structure for closing the gable side of a concrete.

【0002】[0002]

【従来技術の問題点】従来、打設したコンクリ−トの妻
側を閉塞する妻枠には、板状の妻枠とそれを押える金具
が使用されていた。しかし、板状の妻枠は重量が大き
く、設置作業や運搬作業に問題があった。また、このよ
うに重量の重い妻枠を固定する金具も大掛かりなものと
なるため、設置作業に手間と時間を要した。
2. Description of the Related Art Conventionally, a plate-shaped end frame and a metal fitting for pressing it have been used for the end frame for closing the end of the cast concrete. However, the plate-shaped gable frame has a large weight, which causes a problem in installation work and transportation work. Further, since the metal fitting for fixing the heavy gable frame is also large in size, the installation work requires time and effort.

【0003】[0003]

【課題を解決するための手段】本発明は、上記のような
問題点を解決するためになされたもので、軽量で設置作
業及び運搬作業を容易に行える妻枠の構造を提供するこ
とを目的とする。即ち、本発明は、コンクリ−トの妻側
を閉塞する妻枠の構造において、コンクリ−トの妻側を
閉塞して設置したゴムチュ−ブと、このゴムチュ−ブを
支持する押え金具と、コンクリ−ト打設用型枠と前記押
え金具に連結し、かつ前記ゴムチュ−ブのコンクリ−ト
打設用型枠側を押える調節金具とよりなることを特徴と
した、妻枠の構造である。また、調節金具は、コンクリ
−トの打設厚さ方向の位置調節可能に押え金具に連結し
た、上記妻枠の構造である。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to provide a girder frame structure which is lightweight and can be easily installed and transported. And That is, according to the present invention, in the structure of the gable frame for closing the end side of the concrete, the rubber tube installed by closing the end side of the concrete, the pressing metal fitting for supporting the rubber tube, and the concrete The structure of the gable frame is characterized in that it comprises an adjusting metal fitting that is connected to the casting mold and the pressing metal fitting and that presses the concrete molding mold side of the rubber tube. Further, the adjustment fitting has the above-mentioned end frame structure connected to the holding fitting so that the position of the concrete can be adjusted in the thickness direction.

【0004】[0004]

【実施例】以下、図面を参照しながら、本発明の一実施
例について説明する。なお、本実施例では、トンネルの
二次覆工コンクリ−トを打設する場合について説明する
が、その他のコンクリ−ト打設方法にも適用できること
は勿論である。<イ>妻枠全体の構造 図1、2に示すように、本発明の妻枠は、二次覆工コン
クリ−トAの妻側を閉塞して設置したゴムチュ−ブ1
と、このゴムチュ−ブ1を支持する押え金具2と、コン
クリ−ト打設用の内型枠Bと前記押え金具2に連結し、
かつ前記ゴムチュ−ブ1の内型枠B側を押える調節金具
3とよりなる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. In this embodiment, the case of placing the secondary lining concrete of the tunnel will be described, but it goes without saying that it can be applied to other concrete placing methods. <A> Overall structure of the gable frame As shown in FIGS. 1 and 2, the gable frame of the present invention is a rubber tube 1 in which the gable side of the secondary lining concrete A is closed.
And a pressing metal fitting 2 for supporting the rubber tube 1, an inner formwork B for concrete placing, and the pressing metal fitting 2.
Further, it comprises an adjusting metal fitting 3 for pressing the inner form B side of the rubber tube 1.

【0005】<ロ>ゴムチュ−ブ ゴムチュ−ブ1は、二次覆工コンクリ−トAの妻側を閉
塞して、周方向に設置する。ゴムチュ−ブ1内には空気
等を充填可能に構成し、膨張させることができる。ま
た、コンクリ−トの打設厚に応じて、複数段に重ねて設
置する。
<B> Rubber tube The rubber tube 1 is installed in the circumferential direction by closing the end side of the secondary lining concrete A. The rubber tube 1 can be filled with air or the like and can be expanded. In addition, depending on the casting thickness of the concrete, it is installed in multiple layers.

【0006】<ハ>押え金具 押え金具2は、図3に示すように、ゴムチュ−ブ1を押
えるための押え板21と、補強用のリブ22からなる断
面L字形等の部材である。この押え板21の上部には、
長手方向に長穴23を開設する。
<C> Pressing Metal Fitting As shown in FIG. 3, the pressing metal fitting 2 is a member having an L-shaped cross section, which includes a pressing plate 21 for pressing the rubber tube 1 and a reinforcing rib 22. At the upper part of this holding plate 21,
The long hole 23 is opened in the longitudinal direction.

【0007】<ニ>調節金具 調節金具3は、図4、5に示すように、円弧状等の側板
31と底板32よりなる断面L字形等の部材である。側
板31の上部には、所定の間隔をおいて連結板33を突
設し、この連結板33にはボルト穴34を開設する。
<D> Adjusting Metal Fitting As shown in FIGS. 4 and 5, the adjusting metal fitting 3 is a member having an L-shaped cross section, which includes an arcuate side plate 31 and a bottom plate 32. A connecting plate 33 is provided on the upper portion of the side plate 31 at a predetermined interval, and a bolt hole 34 is formed in the connecting plate 33.

【0008】<ホ>組立方法 先ず、図1、2に示すように、一次覆工セグメントCと
の間に所定のコンクリ−ト打設空間を確保して、内型枠
Bを設置する。次に、ゴムチュ−ブ1を所定数設置した
後、内型枠Bの妻側端面に、調節金具3と押え金具2を
固定する。固定する場合は、ボルト4を調節金具3のボ
ルト穴34及び押え金具2の長穴23に貫通させて、内
型枠Bのボルト穴に挿入して締結する。そして、ゴムチ
ュ−ブ1に空気等を充填して膨張させ、調節金具3の底
板32に圧接させる。これによって、ゴムチュ−ブ1
は、押え金具2の押え板21と調節金具3の底板32に
より位置固定される。なお、二次覆工コンクリ−トAの
打設空間内には、所要の鉄筋Dを配置する。
<E> Assembling Method First, as shown in FIGS. 1 and 2, a predetermined concrete placing space is secured between the primary lining segment C and the inner form B is installed. Next, after a predetermined number of rubber tubes 1 are installed, the adjusting metal fitting 3 and the pressing metal fitting 2 are fixed to the end surface of the inner form B on the side of the end. In the case of fixing, the bolt 4 is passed through the bolt hole 34 of the adjusting metal fitting 3 and the elongated hole 23 of the holding metal fitting 2, and is inserted into the bolt hole of the inner form B to be fastened. Then, the rubber tube 1 is filled with air or the like to be expanded and brought into pressure contact with the bottom plate 32 of the adjustment fitting 3. As a result, the rubber tube 1
Is fixed by the holding plate 21 of the holding metal fitting 2 and the bottom plate 32 of the adjusting metal fitting 3. In addition, a required reinforcing bar D is arranged in the casting space of the secondary lining concrete A.

【0009】<ヘ>コンクリ−トの打設 打型枠Bと一次覆工コンクリ−トCとの間にコンクリ−
トを打設し、二次覆工コンクリ−トAを施工する。この
とき、調節金具3と押え金具2とを連結するボルト4
は、長穴23内に挿入されているため、調節金具3はコ
ンクリ−トの打設厚さ方向に移動が可能である。そのた
め、二次覆工コンクリ−トAの巻圧に応じて、調節金具
3の位置調節を行い、二次覆工コンクリ−トAの妻側を
隙間無く閉塞することができる。そして、二次覆工コン
クリ−トAの硬化後、押え金具2と調節金具3とを撤去
する。なお、調節金具3の撤去部分には防水シ−ルを貼
ることができる。
<F> Concrete placing: A concrete is placed between the casting form B and the primary lining concrete C.
The secondary lining concrete A is installed. At this time, the bolt 4 that connects the adjustment fitting 3 and the holding fitting 2
Is inserted into the long hole 23, so that the adjustment fitting 3 can move in the thickness direction of the concrete. Therefore, the position of the adjustment fitting 3 can be adjusted according to the winding pressure of the secondary lining concrete A, and the end side of the secondary lining concrete A can be closed without a gap. Then, after the secondary lining concrete A is cured, the holding metal fitting 2 and the adjusting metal fitting 3 are removed. A waterproof seal can be attached to the removed portion of the adjustment fitting 3.

【0010】[0010]

【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。 <イ>コンクリ−トの打設厚さに応じて、調節金具の位
置調節を行い、コンクリ−トの妻側を隙間無く閉塞する
ことができる。
Since the present invention is as described above, the following effects can be obtained. <A> The position of the adjustment fitting can be adjusted according to the thickness of the concrete to be cast, and the end of the concrete can be closed without any gap.

【0011】<ロ>ゴムチュ−ブと間単な金具よりなる
ため、妻枠の重量が軽量である。従って、妻枠の設置作
業や運搬作業を容易に行うことができる。
<B> Since the rubber tube and the metal fitting are provided as a single piece, the weight of the end frame is light. Therefore, the installation work and the transportation work of the gable frame can be easily performed.

【0012】<ハ>妻枠がゴムチュ−ブ製であるため、
鉄筋はゴムチュ−ブの間を通すことによって容易に施工
することができる。
<C> Since the wife frame is made of rubber tube,
Reinforcing bars can be easily installed by passing them between rubber tubes.

【図面の簡単な説明】[Brief description of drawings]

【図1】 妻枠全体構造の側面図[Figure 1] Side view of the overall structure of the gable frame

【図2】 妻枠全体構造の正面図[Figure 2] Front view of the overall structure of the wife frame

【図3】 押え金具の説明図[Fig. 3] Explanatory drawing of the presser fitting

【図4】 調節金具の説明図[Figure 4] Illustration of the adjustment bracket

【図5】 調節金具の説明図[Fig. 5] Illustration of the adjustment bracket

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 コンクリ−トの妻側を閉塞する妻枠の構
造において、 コンクリ−トの妻側を閉塞して設置したゴムチュ−ブ
と、 このゴムチュ−ブを支持する押え金具と、 コンクリ−ト打設用型枠と前記押え金具に連結し、かつ
前記ゴムチュ−ブのコンクリ−ト打設用型枠側を押える
調節金具とよりなることを特徴とした、 妻枠の構造。
1. A structure of a gable frame for closing the end side of the concrete, a rubber tube installed by closing the end side of the concrete, a metal fitting for supporting the rubber tube, and a concrete A structure of a gable frame, which comprises an adjusting metal fitting which is connected to the mold for casting and the pressing metal fitting and which presses the concrete molding mold side of the rubber tube.
【請求項2】 調節金具は、コンクリ−トの打設厚さ方
向の位置調節可能に押え金具に連結した、請求項1記載
の妻枠の構造。
2. The gable frame structure according to claim 1, wherein the adjusting fitting is connected to the holding fitting so that the position of the concrete can be adjusted in the thickness direction.
JP4300659A 1992-10-14 1992-10-14 Gable frame structure Pending JPH06129190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4300659A JPH06129190A (en) 1992-10-14 1992-10-14 Gable frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4300659A JPH06129190A (en) 1992-10-14 1992-10-14 Gable frame structure

Publications (1)

Publication Number Publication Date
JPH06129190A true JPH06129190A (en) 1994-05-10

Family

ID=17887526

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4300659A Pending JPH06129190A (en) 1992-10-14 1992-10-14 Gable frame structure

Country Status (1)

Country Link
JP (1) JPH06129190A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011184869A (en) * 2010-03-05 2011-09-22 Nishimatsu Constr Co Ltd Centering gable side form apparatus
CN113356891A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining formwork trolley end-sealing construction method
CN113356892A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining template trolley end sealing system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011184869A (en) * 2010-03-05 2011-09-22 Nishimatsu Constr Co Ltd Centering gable side form apparatus
CN113356891A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining formwork trolley end-sealing construction method
CN113356892A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining template trolley end sealing system
CN113356891B (en) * 2021-07-19 2022-04-01 中铁一局集团有限公司 Tunnel secondary lining formwork trolley end-sealing construction method

Similar Documents

Publication Publication Date Title
CN109707173B (en) Construction method of assembly type laminated beam plate installation auxiliary device
US20070276526A1 (en) Construction element form and method of fabricating same
JP3017911B2 (en) Steel plate concrete structure building and its construction method
JPH06129190A (en) Gable frame structure
KR101791248B1 (en) Seismic retrofit structure for reinforcing wall of mansonry
CN110344584A (en) A kind of prefabricated construction beam slab nodal support aluminum alloy mould plate structure
JPH0619132B2 (en) Lining method for the inner surface of the waterway
CN110424731B (en) Cast-in-place end post template combined type reinforcing device with assembly type structure and implementation method
JP2017137730A (en) Fixing method and connection structure of connection steel frame in composite structure
CN110714410A (en) Construction method of special-shaped curve cast-in-place runner beam
CN114109087B (en) End frame structure, mould frame and transportation/construction method thereof
JPH08114030A (en) Form for joint of precast concrete beam and column capital part
JPS5923162Y2 (en) Mounting device for facing material
JPS6345476Y2 (en)
CN114541749A (en) Lower supporting template structure of bracket at ultrahigh position and construction method thereof
JPH07310498A (en) Form opening and closing device for tunnel
JPH11255454A (en) Landing doorway frame for elevator
JPH0626274A (en) Sash mounting method for concrete building
JP2985073B2 (en) Formwork for precast concrete members on balconies
JPH11182039A (en) Column form method and fastening metal fittings therefor
JP2579093Y2 (en) Outer wall base rim in renovation work
JP3010723B2 (en) Installation method of expansion joint device
JP3040599U (en) Inner formwork for gutter construction that also serves as a supporting frame for the grating receiving frame
CN116533355A (en) Template for improving concrete forming quality of SPCS structural system
JP2000192655A (en) Joint bar metal for concrete floor opening part