JPH06117094A - Slide formwork device for execution of all weather type concrete column - Google Patents

Slide formwork device for execution of all weather type concrete column

Info

Publication number
JPH06117094A
JPH06117094A JP26475892A JP26475892A JPH06117094A JP H06117094 A JPH06117094 A JP H06117094A JP 26475892 A JP26475892 A JP 26475892A JP 26475892 A JP26475892 A JP 26475892A JP H06117094 A JPH06117094 A JP H06117094A
Authority
JP
Japan
Prior art keywords
concrete
formwork
frame
climbing
slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26475892A
Other languages
Japanese (ja)
Other versions
JP2650820B2 (en
Inventor
Takezo Miyamoto
武三 宮本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP4264758A priority Critical patent/JP2650820B2/en
Publication of JPH06117094A publication Critical patent/JPH06117094A/en
Application granted granted Critical
Publication of JP2650820B2 publication Critical patent/JP2650820B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To efficiently operate the work by elevatably moving an upper frame and a lower frame with climbing cylinders in a measuring worm system and fitting or detaching a concrete formwork with formwork fitting/detaching cylinders in a slide system. CONSTITUTION:Lock pins 16 are inserted into holes formed on a concrete column T by means of lock pun going in and out cylinders 17, and an upper frame 1 and a lower frame are fixed to the concrete column T. Climbing cylinders 3 are mounted between the upper frame 1 and the lower frame 2, a hydraulic power unit 19 is started by means of a control board 20 to expand/contract the climbing cylinders 3, so as to elevate the upper frame 1 and an upper stage 11. Next, a formwork supporting frame 7 is standingly provided on the upper stage 11, and a slide type formwork 9 is supported with formwork slide pins 8 so as to fit/detach them with formwork fitting/detaching cylinders 9. Consequently, a concrete formwork is automatically slid and concrete placing is performed, and hence labor for the work can be saved.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、橋脚などのコンクリー
ト柱製作時、型枠として使用する装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device used as a formwork when manufacturing concrete columns such as bridge piers.

【0002】[0002]

【従来の技術】橋脚などのコンクリート柱を製作するに
際してコンクリート型枠をセットするには、従来は一般
に足場を組み、型枠をクレーン等で吊り上げてセットし
ていた。
2. Description of the Related Art In order to set concrete formwork when manufacturing concrete columns such as bridge piers, conventionally, a scaffold was generally assembled and the formwork was lifted by a crane or the like.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、従来の
足場を組み、型枠をクレーン等で吊り上げてセットする
のは、作業能率が悪く、また作業の安全性に問題があっ
た。また、作業場所を覆うものがなく風雨の影響を受
け、風雨の強い日での作業は、特にきついものであっ
た。
However, when the conventional scaffold is assembled and the formwork is lifted and set by a crane or the like, work efficiency is poor and there is a problem in work safety. In addition, there was nothing to cover the work place, which was affected by wind and rain, and work on a windy and rainy day was particularly difficult.

【0004】したがって、本発明は、コンクリート型枠
を実質上人手を要することなくセットできるようにし
て、コンクリート打設作業の省力化を図り、また、風雨
の影響を受けることなく型枠のセット、コンクリート打
設を行うことができる装置を提供することを目的として
なされたものである。
Therefore, according to the present invention, the concrete formwork can be set substantially without manpower, so that the work of placing concrete can be saved, and the formwork can be set without being affected by wind and rain. The purpose of the present invention is to provide an apparatus capable of pouring concrete.

【0005】[0005]

【課題を解決するための手段】このため本発明によれ
ば、コンクリート柱に形成した穴にロックピン出入用シ
リンダによりロックピンを差込むことによりコンクリー
ト柱に固定される上部枠及び下部枠を有し、その上部枠
と下部枠との間にはクライミングシリンダが介装されて
おり、また上記上部枠には上部ステージが設けられてい
てその上部ステージには型枠支持架台が立設されてお
り、その型枠支持架台に型枠スライドピンによりスライ
ド式コンクリート型枠が支持されていて、型枠脱着シリ
ンダにより脱着されるようになっており、さらに前記上
部ステージには装置を覆うドームが設けられている全天
候型コンクリート柱施工スライド型枠装置が提供され
る。
Therefore, according to the present invention, there is provided an upper frame and a lower frame fixed to the concrete column by inserting the lock pin into the hole formed in the concrete column by the lock pin loading / unloading cylinder. However, a climbing cylinder is interposed between the upper frame and the lower frame, and an upper stage is provided on the upper frame, and a frame support frame is erected on the upper stage. A sliding concrete formwork is supported on the formwork support frame by formwork slide pins, and is detachable by a formwork attaching / detaching cylinder. Further, a dome for covering the device is provided on the upper stage. An all-weather concrete pillar construction slide formwork device is provided.

【0006】[0006]

【作用】本装置はコンクリート柱がある程度でき上った
後にセットする。装置をセットした後、コンクリートを
打設し、コンクリートが固ったら型枠を外し、次いで装
置をクライミングし、次いで型枠をセットして次のコン
クリートを打設する。
[Operation] This device is set after the concrete columns have been completed to some extent. After setting the device, concrete is poured, when the concrete is hardened, the form is removed, then the device is climbed, then the form is set and the next concrete is placed.

【0007】装置をクライミングするには、上部枠と下
部枠をコンクリート柱に交互に固定して、クライミング
シリンダを伸縮させて尺取虫方式で行う。またコンクリ
ート型枠の脱着は型枠脱着シリンダによりコンクリート
型枠を自動的にスライドさせて行う。そして風雨は装置
を覆うドームにより防ぐ。
[0007] To climb the device, the upper frame and the lower frame are alternately fixed to the concrete column, and the climbing cylinder is expanded and contracted to perform the climbing insect method. In addition, the concrete formwork is removed by automatically sliding the concrete formwork with the formwork removal cylinder. Wind and rain are prevented by the dome that covers the device.

【0008】[0008]

【実施例】本発明は、大別して次の7つの部分から成っ
ており、各部の部品構成を図1及び図2を参照し説明す
る。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention is roughly divided into the following seven parts, and the component construction of each part will be described with reference to FIGS.

【0009】(1) 上部型枠 図2は下部枠部を示すものであるが、上部枠部を構成す
る上部枠1は下部枠2と同様のものであって、橋脚等の
コンクリート柱Tを取り巻く平面四角形のものである。
上部枠部を上部枠1により支持された上部ステージ11
を備えており、その上部ステージ11には資材運搬用開
口部11Aが形成されている。また、上部枠部はコンク
リート柱Tに形成したロック穴t(図4)に差込まれて
上部枠部をコンクリート柱Tに固定する2本のロックピ
ン16及びそのロックピン16を出入するロックピン出
入用シリンダ17を備えており、さらに上昇及び下降を
ガイドする枠用ガイドローラ18が設けられている。な
お、上部ステージ11には四角形状に安全手摺10Aが
設けれている。さらに上部ステージ11と下部ステージ
12の間を上り下りするラダー13が設けられている。
(1) Upper Form Frame FIG. 2 shows the lower frame part. The upper frame 1 constituting the upper frame part is the same as the lower frame 2, and concrete columns T such as piers are It has a rectangular shape surrounding it.
Upper stage 11 with the upper frame part supported by the upper frame 1
The upper stage 11 has an opening 11A for material transportation. Also, the upper frame portion is inserted into a lock hole t (FIG. 4) formed in the concrete pillar T to fix the upper frame portion to the concrete pillar T, and two lock pins 16 and a lock pin for inserting and removing the lock pin 16. It is provided with an in-and-out cylinder 17, and a frame guide roller 18 for guiding ascent and descent. A safety handrail 10A is provided on the upper stage 11 in a rectangular shape. Further, a ladder 13 that goes up and down between the upper stage 11 and the lower stage 12 is provided.

【0010】(2) 下部枠部 上部枠部と同様に、コンクリート柱Tを取り巻く平面四
角形の下部枠2、下部枠部をコンクリート柱Tに固定す
る2本のロックピン4及びロックピン出入用シリンダ
5、下部ステージ12、枠用ガイドローラ15を備えて
いる。
(2) Lower frame part Similar to the upper frame part, the lower frame 2 is a rectangular plane surrounding the concrete column T, the two lock pins 4 for fixing the lower frame part to the concrete column T, and the lock pin insertion / removal cylinder. 5, a lower stage 12, and a frame guide roller 15.

【0011】(3) クライミング装置部 上部枠1と下部枠2との間に介装された片側2本で計4
本のクライミングシリンダ3、及び下部ステージ12に
設けた油圧パワーユニット19と同制御盤20からなっ
ている。
(3) Climbing device section Two pieces on one side interposed between the upper frame 1 and the lower frame 2 for a total of 4
It comprises a climbing cylinder 3 of a book, a hydraulic power unit 19 provided on the lower stage 12, and a control board 20.

【0012】(4) コンクリート型枠部 周囲4面を囲む4枚のスライド式コンクリート型枠6、
型枠6を支持する型枠スライドピン8及び型枠6に取り
付けたバイブレータ23からなっている。Sは鉄筋を示
す。
(4) Concrete formwork part Four slide type concrete formwork 6, which surrounds the four sides.
It is composed of a form slide pin 8 for supporting the form 6 and a vibrator 23 attached to the form 6. S indicates a reinforcing bar.

【0013】(5) 型枠支持架台部 上部ステージ11に型枠の一面につき両側に各1基、計
8基の型枠支持架台7が立設されており、その型枠支持
架台7に設けられた穴に型枠スライドピン8が挿入し、
型枠脱着シリンダ9により型枠6を脱着する。また型枠
支持架台7には型枠スライド用の油圧パワーユニット2
1及び同制御盤22が設けられている。
(5) Formwork support pedestal part The upper stage 11 is provided with a total of eight formwork support pedestals 7, one on each side for each surface of the formwork, and provided on the formwork support pedestal 7. Form slide pin 8 is inserted into the hole,
The mold 6 is removed by the mold removing cylinder 9. Further, the formwork support base 7 has a hydraulic power unit 2 for formwork slide.
1 and the control panel 22 are provided.

【0014】(6) クレーン部 型枠支持架台7に頂部にクレーン10が設けられてお
り、このクレーン10で資材の揚重を行う。またコンク
リート打設パイプ24がクレーンの脚部で支持される。
(6) Crane section A crane 10 is provided on the top of the frame support frame 7, and the crane 10 hoists the material. Further, the concrete placing pipe 24 is supported by the legs of the crane.

【0015】(7) ドーム部 上部ステージ11を全面カバーするドーム14が設けら
れている。
(7) Dome Part A dome 14 is provided to cover the entire upper stage 11.

【0016】次に動作について説明すると、本装置はコ
ンクリート柱がある程度でき上った後にセットする。装
置をセットした後、コンクリートを打設し、次のコンク
リートを打設するまでの動作は、コンクリート打設に次
いで、(1)型枠外し、次に(2)クライミング、次に
(3)型枠セット、次に(4)次位のコンクリート打設
の順である。各動作を図3ないし図9にしたがい説明す
る。
Next, the operation will be described. This apparatus is set after the concrete columns have been completed to some extent. After setting the device, concrete is placed and the next concrete is placed. (1) Removing the form, then (2) Climbing, then (3) Frame set, then (4) second-order concrete pouring. Each operation will be described with reference to FIGS. 3 to 9.

【0017】(1) 型枠外し コンクリート型枠6をセットしコンクリートを打設す
る。この時、上部枠1のロックピン16及び下部枠2の
ロックピン4は共にコンクリート柱Tのロックピン用穴
tに挿入しており、上部枠1及び下部枠2はコンクリー
ト柱Tに固定されている(図3)。
(1) Removing formwork Concrete formwork 6 is set and concrete is poured. At this time, the lock pin 16 of the upper frame 1 and the lock pin 4 of the lower frame 2 are both inserted into the lock pin holes t of the concrete pillar T, and the upper frame 1 and the lower frame 2 are fixed to the concrete pillar T. (Fig. 3).

【0018】コンクリート打設後コンクリートが固った
ら型枠6を外す。制御盤22により油圧パワーユニット
21を起動し型枠脱着シリンダ9を縮めることにより、
型枠6を型枠支持架台7側に引き寄せ型枠6を打設した
コンクリート柱Tから外す。これを各面順次行う。この
とき型枠6はスライドピン8により支持されスライドす
る。
After the concrete is poured, when the concrete is hardened, the form 6 is removed. By activating the hydraulic power unit 21 by the control board 22 and contracting the form removing cylinder 9,
The formwork 6 is pulled toward the formwork support base 7 side and removed from the concrete pillar T on which the formwork 6 has been placed. This is sequentially performed on each plane. At this time, the mold 6 is supported by the slide pin 8 and slides.

【0019】(2) クライミング 制御盤20により油圧パワーユニット19を起動し上部
枠1のロックピン出入用シリンダ17を引き寄せること
により、ロックピン16をコンクリート柱Tのロック穴
tから引き抜く(図4)。
(2) Climbing The control pin 20 pulls out the lock pin 16 from the lock hole t of the concrete pillar T by activating the hydraulic power unit 19 and pulling the lock pin loading / unloading cylinder 17 of the upper frame 1 (FIG. 4).

【0020】制御盤20により油圧パワーユニット19
を起動し、クライミングシリンダ3を延ばし上部枠1を
上昇させる。この時、上部ステージ11も上部枠1と共
に上昇する(図5)。
The hydraulic power unit 19 is controlled by the control panel 20.
Is started, the climbing cylinder 3 is extended, and the upper frame 1 is raised. At this time, the upper stage 11 also rises together with the upper frame 1 (FIG. 5).

【0021】上昇が終ったら制御盤20により油圧パワ
ーユニット19を起動しロックピン出入用シリンダ17
を延ばすことにより、ロックピン16をコンクリート柱
Tの1つ上のロック穴tに差し込む(図6)。
When the ascent is completed, the control panel 20 activates the hydraulic power unit 19 to lock / unlock the lock pin cylinder 17.
The lock pin 16 is inserted into the lock hole t one above the concrete pillar T by extending (FIG. 6).

【0022】同様に下部枠2を上昇させる。すなわち、
制御盤20により油圧パワーユニット19を起動し下部
枠2のロックピン出入用シリンダ5を縮めることによ
り、ロックピン4をコンクリート柱Tのロックピン用穴
tから引き抜く(図7)。
Similarly, the lower frame 2 is raised. That is,
The control panel 20 activates the hydraulic power unit 19 to retract the lock pin loading / unloading cylinder 5 of the lower frame 2 to pull out the lock pin 4 from the lock pin hole t of the concrete column T (FIG. 7).

【0023】制御盤20により油圧パワーユニット19
を起動しクライミングシリンダ3を縮めることにより、
下部枠2を上昇させる。この時、下部ステージ12も下
部枠2と共に上昇する(図8)。
The hydraulic power unit 19 is controlled by the control panel 20.
By activating and retracting the climbing cylinder 3,
Raise the lower frame 2. At this time, the lower stage 12 also rises together with the lower frame 2 (FIG. 8).

【0024】上昇が終ったら制御盤20により油圧パワ
ーユニット19を起動しロックピン出入用シリンダ5を
延ばすことにより、ロックピン4をコンクリート柱Tの
1つ上のロック穴tに差し込む(図9)。
When the ascent is finished, the control panel 20 activates the hydraulic power unit 19 to extend the lock pin loading / unloading cylinder 5 to insert the lock pin 4 into the lock hole t above the concrete column T (FIG. 9).

【0025】(3) 型枠セット 上部枠1及び下部枠2がコンリート柱Tに固定されてセ
ットできたら(図9)、型枠6をセットする。
(3) Form Set When the upper frame 1 and the lower frame 2 are fixed and set on the concrete pillar T (FIG. 9), the form 6 is set.

【0026】制御盤22により油圧パユーユニット21
を起動して型枠脱着シリンダ9を延ばし、型枠6を順次
4面所定位置にセットする。この時必要な資材は上部ス
テージ11の開口部11Aからクレーン10により揚重
する。
The hydraulic pay unit 21 is controlled by the control panel 22.
Is activated to extend the mold attachment / detachment cylinder 9, and the molds 6 are sequentially set at predetermined positions on four sides. At this time, necessary materials are lifted by the crane 10 from the opening 11A of the upper stage 11.

【0027】(4) コンクリート打設 コンクリート打設パイプ24等をセットし、図示してい
ないコンクリート打設ポンプ等の手段によりコンクリー
トを打設する。打設時型枠6に取付けられているバイブ
レータ23によりコンクリートを縮め固める。
(4) Concrete Placing Concrete placing pipe 24 and the like are set and concrete is poured by means such as a concrete placing pump (not shown). The concrete is shrunk and solidified by the vibrator 23 attached to the form 6 at the time of placing.

【0028】以降、順次これを繰り返す。Thereafter, this is sequentially repeated.

【0029】(5) コンクリート打設後の装置の回収 クライミングと同じ要領でコンクリート柱Tによって下
降クライミングをし、地上に下ろす。コンクリート柱T
に形成したロックピン用穴tは作業終了後下降時にモル
タルを詰める。なお、下降クライミングの前にあらかじ
めドーム14の頂部幕を撤去し、下降クライミング時コ
ンクリート柱に干渉しないようにしておく。
(5) Recovery of the device after placing concrete In the same manner as climbing, the concrete pillar T is used for descending climbing and lowering to the ground. Concrete pillar T
The lock pin hole t formed in 1 is filled with mortar when descending after the work is completed. Before the descending climbing, the top curtain of the dome 14 is removed so that it does not interfere with the concrete columns during the descending climbing.

【0030】[0030]

【発明の効果】本発明によればコンクリート型枠を自動
的にスライドさせることができるためコンクリート打設
作業の省力化ができる。またドームで作業場所を全面的
に覆うことにより風雨の影響がなく、安全作業、作業の
能率向上が図れる。
According to the present invention, since the concrete formwork can be automatically slid, the labor of concrete placing work can be saved. Also, by covering the work area entirely with the dome, there is no effect of wind and rain, and safety work and work efficiency can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る全天候型コンクリート柱施工スラ
イド型枠装置によりコンクリート柱を製作している状態
を一部を断面で示す正面図。
FIG. 1 is a front view showing a state in which a concrete pillar is manufactured by an all-weather concrete pillar construction slide formwork apparatus according to the present invention, in which a part thereof is shown in section.

【図2】下部枠部の平面図。FIG. 2 is a plan view of a lower frame portion.

【図3】クライミング動作の第1工程を示す図。FIG. 3 is a diagram showing a first step of a climbing operation.

【図4】クライミング動作の第2工程を示す図。FIG. 4 is a diagram showing a second step of the climbing operation.

【図5】クライミング動作の第3工程を示す図。FIG. 5 is a diagram showing a third step of the climbing operation.

【図6】クライミング動作の第4工程を示す図。FIG. 6 is a diagram showing a fourth step of the climbing operation.

【図7】クライミング動作の第5工程を示す図。FIG. 7 is a diagram showing a fifth step of the climbing operation.

【図8】クライミング動作の第6工程を示す図。FIG. 8 is a diagram showing a sixth step of the climbing operation.

【図9】クライミング動作の第7工程を示す図。FIG. 9 is a diagram showing a seventh step of the climbing operation.

【符号の説明】[Explanation of symbols]

1・・・上部枠 2・・・下部枠 3・・・クライミングシリンダ 4・・・ロックピン 5・・・ロックピン出入用シリンダ 6・・・型枠 7・・・型枠支持架台 8・・・型枠スイラドピン 9・・・型枠脱着シリンダ 11・・・上部ステージ 12・・・下部ステージ 14・・・ドーム 16・・・ロックピン 17・・・ロックピン出入用シリンダ 1 ... Upper frame 2 ... Lower frame 3 ... Climbing cylinder 4 ... Lock pin 5 ... Lock pin loading / unloading cylinder 6 ... Formwork 7 ... Formwork support frame 8 ...・ Form frame sluad pin 9 ・ ・ ・ Form frame detaching cylinder 11 ・ ・ ・ Upper stage 12 ・ ・ ・ Lower stage 14 ・ ・ ・ Dome 16 ・ ・ ・ Lock pin 17 ・ ・ ・ Lock pin loading / unloading cylinder

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート柱に形成した穴にロックピ
ン出入用シリンダによりロックピンを差込むことにより
コンクリート柱に固定される上部枠及び下部枠を有し、
その上部枠と下部枠との間にはクライミングシリンダが
介装されており、また上記上部枠には上部ステージが設
けられていてその上部ステージには型枠支持架台が立設
されており、その型枠支持架台に型枠スライドピンによ
りスライド式コンクリート型枠が支持されていて、型枠
脱着シリンダにより脱着されるようになっており、さら
に前記上部ステージには装置を覆うドームが設けられて
いることを特徴とする全天候型コンクリート柱施工スラ
イド型枠装置。
1. An upper frame and a lower frame which are fixed to a concrete column by inserting a lock pin into a hole formed in the concrete column by a lock pin loading / unloading cylinder,
A climbing cylinder is interposed between the upper frame and the lower frame, and an upper stage is provided on the upper frame, and a frame support frame is erected on the upper stage. A slide concrete mold is supported by a mold slide pin on a mold support frame, and is detachable by a mold detaching cylinder. Further, the upper stage is provided with a dome for covering the device. An all-weather concrete pillar construction slide formwork device characterized in that
JP4264758A 1992-10-02 1992-10-02 All-weather concrete column construction slide formwork device Expired - Lifetime JP2650820B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4264758A JP2650820B2 (en) 1992-10-02 1992-10-02 All-weather concrete column construction slide formwork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4264758A JP2650820B2 (en) 1992-10-02 1992-10-02 All-weather concrete column construction slide formwork device

Publications (2)

Publication Number Publication Date
JPH06117094A true JPH06117094A (en) 1994-04-26
JP2650820B2 JP2650820B2 (en) 1997-09-10

Family

ID=17407780

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4264758A Expired - Lifetime JP2650820B2 (en) 1992-10-02 1992-10-02 All-weather concrete column construction slide formwork device

Country Status (1)

Country Link
JP (1) JP2650820B2 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030016510A (en) * 2001-08-20 2003-03-03 진성토건 주식회사 Automatic system for low pier construction
KR100919255B1 (en) * 2007-10-02 2009-09-30 주식회사 신호시스템 Apparatus for climbing
CN110905192A (en) * 2020-01-02 2020-03-24 荆门市佰思机械科技有限公司 Automatic alignment clamping device of creeping formwork device
CN110905190A (en) * 2019-12-26 2020-03-24 荆门市佰思机械科技有限公司 Automatic clamping device of creeping formwork device
CN110905189A (en) * 2019-12-24 2020-03-24 荆门市佰思机械科技有限公司 Climbing system of climbing formwork device
CN110905191A (en) * 2019-12-27 2020-03-24 荆门市佰思机械科技有限公司 Automatic climbing system of climbing formwork device
CN110952773A (en) * 2019-12-05 2020-04-03 荆门市佰思机械科技有限公司 Climbing formwork device for lifting by tower crane body
CN110965768A (en) * 2020-01-03 2020-04-07 荆门市佰思机械科技有限公司 Control system of climbing device
CN110984564A (en) * 2020-01-03 2020-04-10 荆门市佰思机械科技有限公司 Control system of automatic alignment clamping device of creeping formwork device
CN111519887A (en) * 2020-04-20 2020-08-11 孙长野 Building outside formula construction operation platform that climbs
CN113585789A (en) * 2020-06-24 2021-11-02 汪晨 Shock attenuation protector for building
CN115012308A (en) * 2022-04-19 2022-09-06 胡国栋 High-speed railway bridge construction platform
WO2022231086A1 (en) * 2021-04-26 2022-11-03 주식회사 파워엠엔씨 Magnetic lifting type crane apparatus for installing and maintaining wind-power generation system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0346625A (en) * 1989-07-14 1991-02-27 Matsushita Electric Ind Co Ltd Production of oriented film for liquid crystal display
JPH0410950A (en) * 1990-04-27 1992-01-16 Seiko Epson Corp Wire dot head
JPH04237769A (en) * 1991-01-18 1992-08-26 Kumagai Gumi Co Ltd Climb-up method and device for constructing building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0346625A (en) * 1989-07-14 1991-02-27 Matsushita Electric Ind Co Ltd Production of oriented film for liquid crystal display
JPH0410950A (en) * 1990-04-27 1992-01-16 Seiko Epson Corp Wire dot head
JPH04237769A (en) * 1991-01-18 1992-08-26 Kumagai Gumi Co Ltd Climb-up method and device for constructing building

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030016510A (en) * 2001-08-20 2003-03-03 진성토건 주식회사 Automatic system for low pier construction
KR100919255B1 (en) * 2007-10-02 2009-09-30 주식회사 신호시스템 Apparatus for climbing
CN110952773A (en) * 2019-12-05 2020-04-03 荆门市佰思机械科技有限公司 Climbing formwork device for lifting by tower crane body
CN110905189A (en) * 2019-12-24 2020-03-24 荆门市佰思机械科技有限公司 Climbing system of climbing formwork device
CN110905190A (en) * 2019-12-26 2020-03-24 荆门市佰思机械科技有限公司 Automatic clamping device of creeping formwork device
CN110905191A (en) * 2019-12-27 2020-03-24 荆门市佰思机械科技有限公司 Automatic climbing system of climbing formwork device
CN110905192A (en) * 2020-01-02 2020-03-24 荆门市佰思机械科技有限公司 Automatic alignment clamping device of creeping formwork device
CN110965768A (en) * 2020-01-03 2020-04-07 荆门市佰思机械科技有限公司 Control system of climbing device
CN110984564A (en) * 2020-01-03 2020-04-10 荆门市佰思机械科技有限公司 Control system of automatic alignment clamping device of creeping formwork device
CN111519887A (en) * 2020-04-20 2020-08-11 孙长野 Building outside formula construction operation platform that climbs
CN113585789A (en) * 2020-06-24 2021-11-02 汪晨 Shock attenuation protector for building
WO2022231086A1 (en) * 2021-04-26 2022-11-03 주식회사 파워엠엔씨 Magnetic lifting type crane apparatus for installing and maintaining wind-power generation system
CN115012308A (en) * 2022-04-19 2022-09-06 胡国栋 High-speed railway bridge construction platform

Also Published As

Publication number Publication date
JP2650820B2 (en) 1997-09-10

Similar Documents

Publication Publication Date Title
JPH06117094A (en) Slide formwork device for execution of all weather type concrete column
JP3026161B2 (en) Self-elevating formwork apparatus and method of lifting the apparatus
JP3218519B2 (en) Building demolition method
JP3013688B2 (en) Construction method of concrete structure
JPH102108A (en) Method for constructing tower-shaped rc structure
JP4172564B2 (en) How to build tower structures
JP3531111B2 (en) Apparatus and method for constructing tower-like structure
JP2957328B2 (en) Peripheral holding self-elevating construction method
JPH05280012A (en) Movable formwork process and device used therefor
JP2962122B2 (en) Sliding form method
JPH01190877A (en) Concrete column forming method
JPH09137506A (en) Construction method of building
US5329742A (en) Process for constructing a concrete building
JPH08105229A (en) Construction of building
JP2633199B2 (en) How to build a concrete foundation
JP2944998B1 (en) Scaffolding equipment for building tower structures
JP2002114485A (en) Tower crane and floor climbing system
JPH11343734A (en) Construct method for concrete structure
JP2962121B2 (en) Sliding form method
JPH03287974A (en) Form construction and form device
JPH0128186Y2 (en)
JPH06108415A (en) Main concrete tower constructing method
JP2000160834A (en) Step-up construction of concrete caisson
KR960013838B1 (en) Wall form and process for placing concrete to the wall forms