JPH0610434A - Unit slab and method for constructing it - Google Patents

Unit slab and method for constructing it

Info

Publication number
JPH0610434A
JPH0610434A JP16796892A JP16796892A JPH0610434A JP H0610434 A JPH0610434 A JP H0610434A JP 16796892 A JP16796892 A JP 16796892A JP 16796892 A JP16796892 A JP 16796892A JP H0610434 A JPH0610434 A JP H0610434A
Authority
JP
Japan
Prior art keywords
deck plate
slab
building structure
electric wire
unit slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16796892A
Other languages
Japanese (ja)
Inventor
Kenji Hiki
健次 比企
Masaaki Go
正明 郷
Satoru Masuda
悟 舛田
Koichi Sakurai
孝一 桜井
Yukio Murase
幸男 村瀬
Takeshi Nakajima
健 中島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP16796892A priority Critical patent/JPH0610434A/en
Publication of JPH0610434A publication Critical patent/JPH0610434A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To enhance the construction workability for a floor slab. CONSTITUTION:A unit slab 1 comprises deck plates 5 supported to the beams 4 of a building structure 2 and precast concrete panels 6 provided to the deck plates 5, the deck plates 5 and the precast concrete panels 6 being integrated together. Since the unit slab 1 can be constructed in the building structure 2 simply by supporting the deck plates 5 to the beams 4 of the building structure 2, the need for the work of placing concrete on site is eliminated and the construction workability for the unit slab 1 can then be enhanced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ユニットスラブとその
施工方法にかかり、特に、建築構造物の床スラブに用い
て好適なユニットスラブとその施工方法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a unit slab and a construction method thereof, and more particularly to a unit slab suitable for a floor slab of a building structure and a construction method thereof.

【0002】[0002]

【従来の技術】従来、建築構造物の床スラブは、建築構
造物の複数の梁に支持されたデッキプレートと、このデ
ッキプレートに打設されたコンクリートとから構成され
ている。前記床スラブのデッキプレートには、水道管、
空調ダクト、スプリンクラー管等の配管が吊り下げられ
るとともに、電線が配線されている。
2. Description of the Related Art Conventionally, a floor slab for a building structure is composed of a deck plate supported by a plurality of beams of the building structure and concrete cast on the deck plate. The floor slab deck plate includes a water pipe,
Pipes such as air-conditioning ducts and sprinkler pipes are suspended and electric wires are laid.

【0003】このような床スラブの施工方法では、複数
の柱に梁を架け渡し、これら梁にデッキプレートを支持
させ、このデッキプレート上面にコンクリートを打設
し、床スラブを施工している。その後、前記デッキプレ
ートに配管を吊り下げるとともに、電線をデッキプレー
トに直接配設していた。
In such a floor slab construction method, a beam is bridged over a plurality of columns, a deck plate is supported by these beams, concrete is placed on the upper surface of the deck plate, and the floor slab is constructed. After that, the piping was suspended on the deck plate and the electric wires were directly arranged on the deck plate.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、床スラ
ブの施工にあっては、現場でデッキプレートにコンクリ
ートを打設するため、床スラブの施工作業が煩雑である
とともに、床スラブの施工に長期間を要していた。この
床スラブを施工した後に、現場で床スラブに配管、電線
を取り付けるため、これら配管の配設作業と電線の配設
作業とが煩雑であるとともに、配管の配設作業と電線の
配設作業との施工に長期間を要していた。
However, in the construction of the floor slab, since the concrete is placed on the deck plate at the site, the construction work of the floor slab is complicated and the floor slab construction takes a long time. Was needed. After installing this floor slab, piping and electric wires are attached to the floor slab on site, so the work of arranging these pipes and the work of arranging the electric wires are complicated, and the work of arranging the pipe and the electric wire It took a long time to build with.

【0005】このため、現場での作業工程が多くなり、
これら作業に要する費用が多大になるとともに、床スラ
ブの品質の安定が図れない。また、現場でコンクリート
を打設することから、高層の建築構造物の床スラブを施
工する場合にあっては、コンクリート打設作業が煩雑で
ある。
As a result, the number of work steps on site increases,
The cost required for these operations becomes large, and the quality of the floor slab cannot be stabilized. Moreover, since concrete is poured at the site, when placing a floor slab of a high-rise building structure, the concrete placing work is complicated.

【0006】本発明は前記課題を有効に解決するもの
で、床スラブの施工作業性を向上させるとともに、床ス
ラブの施工期間を短縮させたユニットスラブとその施工
方法を提供することを目的とする。
The present invention effectively solves the above-mentioned problems, and an object of the present invention is to provide a unit slab and a method for constructing the unit slab, which improves the workability of constructing the floor slab and shortens the construction period of the floor slab. .

【0007】[0007]

【課題を解決するための手段】請求項1記載のユニット
スラブは、建築構造物の柱に梁が架け渡され、該梁に支
持されるユニットスラブであって、前記梁に支持される
デッキプレートと、該デッキプレートに設けられたプレ
キャストコンクリート版とから一体に構成されているこ
とを特徴とするものである。
The unit slab according to claim 1 is a unit slab supported by the beam, in which a beam is bridged over a pillar of a building structure, and the deck plate is supported by the beam. And a precast concrete slab provided on the deck plate.

【0008】請求項2記載のユニットスラブは、請求項
1記載のユニットスラブであって、前記デッキプレート
に配管が設けられていることを特徴とするものである。
A unit slab according to a second aspect of the present invention is the unit slab according to the first aspect, wherein the deck plate is provided with piping.

【0009】請求項3記載のユニットスラブは、請求項
1記載のユニットスラブであって、前記デッキプレート
には、セルラーダクトが設けられ、該セルラーダクトに
電線が配されていることを特徴とするものである。
A unit slab according to a third aspect of the present invention is the unit slab according to the first aspect, wherein the deck plate is provided with a cellular duct, and an electric wire is arranged in the cellular duct. It is a thing.

【0010】請求項4記載のユニットスラブは、請求項
3記載のユニットスラブであって、前記デッキプレート
には、各デッキプレートのセルラーダクトを接続するブ
ッシングが設けられていることを特徴とするものであ
る。
The unit slab according to claim 4 is the unit slab according to claim 3, wherein the deck plate is provided with a bushing for connecting the cellular ducts of the respective deck plates. Is.

【0011】請求項5記載のユニットスラブの施工方法
は、請求項1記載のユニットスラブの施工方法であっ
て、あらかじめデッキプレートにプレキャストコンクリ
ート版を一体に設け、前記建築構造物の梁にデッキプレ
ートを支持させることを特徴とするものである。。
A construction method of the unit slab according to claim 5 is the construction method of the unit slab according to claim 1, wherein a precast concrete plate is integrally provided on a deck plate in advance, and the deck plate is attached to the beam of the building structure. It is characterized by supporting. .

【0012】請求項6記載のユニットスラブの施工方法
は、請求項2記載のユニットスラブの施工方法であっ
て、あらかじめデッキプレートにプレキャストコンクリ
ート版を一体に設け、前記建築構造物の梁にデッキプレ
ートを支持させるとともに、前記配管を接続することを
特徴とするものである。
A method for constructing a unit slab according to claim 6 is the method for constructing a unit slab according to claim 2, wherein a precast concrete slab is integrally provided on a deck plate in advance, and the deck plate is attached to the beam of the building structure. Is supported and the pipe is connected.

【0013】請求項7記載のユニットスラブの施工方法
は、請求項3記載のユニットスラブの施工方法であっ
て、あらかじめデッキプレートにセルラーダクトを設
け、該セルラーダクトに電線を配し、該電線を配したデ
ッキプレートの反対面にプレキャストコンクリート版を
設け、前記建築構造物の梁にデッキプレートを支持させ
るとともに、前記電線を接続することを特徴とするもの
である。
A method for constructing a unit slab according to claim 7 is the method for constructing a unit slab according to claim 3, wherein a cellular duct is provided in advance on the deck plate, and an electric wire is arranged in the cellular duct. It is characterized in that a precast concrete slab is provided on the opposite surface of the arranged deck plate, the deck plate is supported by the beam of the building structure, and the electric wire is connected.

【0014】[0014]

【作用】請求項1記載のユニットスラブでは、デッキプ
レートと、このデッキプレートに設けられたプレキャス
トコンクリート版とから一体に構成されているため、建
築構造物の梁にデッキプレートを支持させることによ
り、建築構造物にユニットスラブが施工される。
In the unit slab according to claim 1, since the deck plate and the precast concrete slab provided on the deck plate are integrally formed, by supporting the deck plate on the beam of the building structure, A unit slab is installed on the building structure.

【0015】請求項2記載のユニットスラブでは、請求
項1記載の作用を有するとともに、前記デッキプレート
に配管が設けられているため、建築構造物の梁にデッキ
プレートを支持させることにより、建築構造物に配管が
配設される。
According to the unit slab of the second aspect, in addition to the function of the first aspect, since the deck plate is provided with piping, the beam of the building structure is supported by the deck plate to thereby support the building structure. A pipe is arranged on the object.

【0016】請求項3記載のユニットスラブでは、請求
項1記載の作用を有するとともに、前記デッキプレート
のセルラーダクトに電線が配されたため、デッキプレー
ト5を梁4に支持させることにより、建築構造物に電線
が配設される。
The unit slab according to claim 3 has the function according to claim 1, and since the electric wire is arranged in the cellular duct of the deck plate, the deck plate 5 is supported by the beam 4 to thereby construct the building structure. An electric wire is arranged at.

【0017】請求項4記載のユニットスラブでは、請求
項3記載の作用を有するとともに、前記ブッシングで各
デッキプレートのセルラーダクトを接続することによ
り、これらセルラーダクト内の電線が接続される。この
ため、セルラーダクトの接続部の電線がブッシングで保
護される。
According to the unit slab of the fourth aspect, in addition to the effect of the third aspect, the electric wires in the cellular ducts are connected by connecting the cellular ducts of the deck plates with the bushing. Therefore, the electric wire at the connection portion of the cellular duct is protected by the bushing.

【0018】請求項5記載のユニットスラブの施工方法
では、あらかじめデッキプレートにプレキャストコンク
リート版を一体に設け、前記建築構造物の梁にデッキプ
レートを支持させるため、ユニットスラブが建築構造物
に施工される。
In the method for constructing a unit slab according to claim 5, the precast concrete slab is integrally provided on the deck plate in advance and the deck plate is supported by the beam of the building structure, so that the unit slab is constructed on the building structure. It

【0019】請求項6記載のユニットスラブの施工方法
では、請求項5記載の作用を有するとともに、前記建築
構造物の梁にデッキプレートを支持させるとともに、前
記配管を接続するため、デッキプレートの施工作業とと
もに配管の配設作業が行なわれる。
In the method for constructing a unit slab according to a sixth aspect of the present invention, in addition to having the action of the fifth aspect, the deck plate is supported by the beam of the building structure and the pipes are connected, so that the deck plate is constructed. Along with the work, the piping work is performed.

【0020】請求項7記載のユニットスラブの施工方法
では、あらかじめデッキプレートにセルラーダクトを設
け、該セルラーダクトに電線を配し、該電線を配したデ
ッキプレートの反対面にプレキャストコンクリート版を
設け、前記建築構造物の梁にデッキプレートを支持させ
るとともに、前記電線を接続する構成にしたため、デッ
キプレートの施工作業とともに電線の配設作業が行なわ
れる。
In the method for constructing a unit slab according to claim 7, a cellular duct is provided in advance on the deck plate, an electric wire is arranged on the cellular duct, and a precast concrete slab is provided on the opposite surface of the deck plate on which the electric wire is arranged. Since the deck plate is supported by the beam of the building structure and the electric wire is connected, the work of arranging the electric wire is performed together with the construction work of the deck plate.

【0021】[0021]

【実施例】以下、本発明のユニットスラブとその施工方
法の一実施例について、図1ないし図3を参照しながら
説明する。図1に示すように、符号1はユニットスラブ
であり、このユニットスラブ1は、建築構造物2の柱3
に梁4が架け渡され、これら梁4に支持される。すなわ
ち、前記ユニットスラブ1は、図2に示すように、前記
梁4に支持されるデッキプレート5と、このデッキプレ
ート5に設けられたプレキャストコンクリート(PC)
版6とから構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the unit slab and its construction method of the present invention will be described below with reference to FIGS. As shown in FIG. 1, reference numeral 1 is a unit slab, and the unit slab 1 is a pillar 3 of a building structure 2.
Beams 4 are bridged over and supported by these beams 4. That is, as shown in FIG. 2, the unit slab 1 includes a deck plate 5 supported by the beams 4, and precast concrete (PC) provided on the deck plate 5.
It is composed of version 6.

【0022】前記ユニットスラブ1では、H鋼等の梁4
の下方に水道管、空調ダクト、スプリンクラー管等の複
数の配管8が金属製棒状部材9で吊り下げられている。
これら棒状部材9では、一端が前記配管8に固定され、
他端がデッキプレート5にナット等の締結部材10で固
定されている。
In the unit slab 1, a beam 4 made of H steel or the like is used.
A plurality of pipes 8 such as a water pipe, an air-conditioning duct, and a sprinkler pipe are hung under the metal rod-shaped member 9.
One end of each of these rod-shaped members 9 is fixed to the pipe 8,
The other end is fixed to the deck plate 5 with a fastening member 10 such as a nut.

【0023】前記デッキプレート5では、前記梁4に支
持される複数の凸状部11と、これら凸状部11の間に
それぞれ設けられた溝状部12とが交互に平列されてい
る。この溝状部12では、該溝状部12に隣接する凸状
部11にカバープレート14が接続され、これらカバー
プレート14と溝状部12とからセルラーダクト15が
設けられ、このセルラーダクト15に電線16が配され
ている。この電線16が配されたカバープレート14
は、例えば、金属材料、合成樹脂からなり、耐火被覆部
17を介して前記梁14に載置されている。
On the deck plate 5, a plurality of convex portions 11 supported by the beams 4 and groove portions 12 provided between the convex portions 11 are alternately arranged in a plane. In this groove-shaped portion 12, a cover plate 14 is connected to the convex portion 11 adjacent to the groove-shaped portion 12, and a cellular duct 15 is provided from the cover plate 14 and the groove-shaped portion 12. The electric wire 16 is arranged. The cover plate 14 on which the electric wire 16 is arranged
Is made of, for example, a metal material or a synthetic resin, and is placed on the beam 14 via the fireproof coating portion 17.

【0024】一方、電線16が配された溝状部12の底
部には、隣接する溝状部12の底部にカバープレート1
4が架け渡され、これらカバープレート14と溝状部1
2の側壁とから空間部13が設けられている。この空間
部13では、各セルラーダクト15の電線16が接続可
能にされるとともに、これら電線16を冷却する通風路
が形成可能にされている。
On the other hand, at the bottom of the groove portion 12 in which the electric wire 16 is arranged, the cover plate 1 is provided at the bottom of the adjacent groove portion 12.
4 are bridged, and these cover plate 14 and groove-shaped portion 1
A space 13 is provided from the side wall of 2. In the space 13, the electric wires 16 of each cellular duct 15 can be connected, and an air passage for cooling the electric wires 16 can be formed.

【0025】前記溝状部12の底部には、図3に示すよ
うに、セルラーダクト15の電線16を取り出す筒状電
線取り出し部19が設けられているとともに、セルラー
ダクト15の延在方向に直交する方向にヘッダーダクト
20が延在されている。このヘッダーダクト20では、
内部に電線が配線され、その上面に前記プレキャストコ
ンクリート版6が設けられるとともに、ヘッダーダクト
20の電線を取り出す筒状電線取り出し部21が設けら
れている。これら電線取り出し部19、21では、その
周囲に前記プレキャストコンクリート版6が設けられて
いる。
As shown in FIG. 3, a cylindrical electric wire take-out portion 19 for taking out the electric wire 16 of the cellular duct 15 is provided at the bottom of the groove-like portion 12 and is orthogonal to the extending direction of the cellular duct 15. The header duct 20 is extended in the direction in which it runs. In this header duct 20,
An electric wire is laid inside, the precast concrete slab 6 is provided on the upper surface thereof, and a cylindrical electric wire take-out portion 21 for taking out the electric wire of the header duct 20 is provided. The precast concrete slab 6 is provided around the electric wire take-out portions 19 and 21.

【0026】また、各ユニットスラブ1の端部では、図
4に示すように、セルラーダクト15内の電線16を接
続する電線接続部25が設けられている。この電線接続
部25では、前記デッキプレート5のカバープレート1
4が耐火被覆部17を介して前記梁4に載置され、デッ
キプレート5のセルラーダクト15を接続するブッシン
グ26が設けられている。このブッシング26では、両
端部が各セルラーダクト15に挿入され、内部に電線が
配されている。
At the end of each unit slab 1, as shown in FIG. 4, an electric wire connecting portion 25 for connecting the electric wire 16 in the cellular duct 15 is provided. In the wire connecting portion 25, the cover plate 1 of the deck plate 5 is
4 is mounted on the beam 4 via a fireproof coating 17, and a bushing 26 for connecting the cellular duct 15 of the deck plate 5 is provided. Both ends of the bushing 26 are inserted into the respective cellular ducts 15, and electric wires are arranged inside.

【0027】前記配管8の接続部では、ジョイント部3
0が設けられている。このジョイント部は、例えば、図
5に示すスパイラル管28と、図6に示す嵌合管31と
が設けられている。前記スパイラル管28では、対向す
る配管8内に両端部が挿入され、これら配管8とスパイ
ラル管28とがテープ等の接続手段29で接続されてい
る。一方、嵌合管31では、外周に設けられた嵌合溝3
2が両端部に設けられ、この嵌合溝32に配管8の係止
部33が嵌め合わされている。
At the connecting portion of the pipe 8, the joint portion 3
0 is provided. The joint portion is provided with, for example, a spiral pipe 28 shown in FIG. 5 and a fitting pipe 31 shown in FIG. Both ends of the spiral pipe 28 are inserted into the opposed pipes 8, and the pipe 8 and the spiral pipe 28 are connected by connecting means 29 such as a tape. On the other hand, in the fitting pipe 31, the fitting groove 3 provided on the outer circumference is provided.
2 is provided at both ends, and the engaging portion 33 of the pipe 8 is fitted in the fitting groove 32.

【0028】このようなユニットスラブ1の施工方法を
説明する。あらかじめ工場等でデッキプレート5の溝状
部12に電線16を配する。この電線16に隣接する凸
状部11にカバープレート14を接続するとともに、前
記電線16を配した溝状部12の反対面にプレキャスト
コンクリート版6を設ける。
A method of constructing such a unit slab 1 will be described. The electric wire 16 is previously arranged in the groove portion 12 of the deck plate 5 in a factory or the like. The cover plate 14 is connected to the convex portion 11 adjacent to the electric wire 16, and the precast concrete slab 6 is provided on the opposite surface of the groove portion 12 in which the electric wire 16 is arranged.

【0029】その後、建築構造物2の現場に前記ユニッ
トスラブ1を搬入し、このユニットスラブ1をクレーン
等の揚重設備40で吊り上げる。そして、建築構造物2
の梁4にユニットスラブ1のデッキプレート5を載置す
る。このデッキプレート5を梁4に支持・固定するとと
もに、前記配管8を建築構造物2に配設された配管8に
ジョイント部30で接続する。一方、デッキプレート5
のセルラーダクト15の電線16をブッシング26の内
部に挿通させ、ユニットスラブ1の電線16を建築構造
物2に配線された電線16に接続し、建築構造物2にユ
ニットスラブ1を施工する。
Then, the unit slab 1 is carried into the site of the building structure 2, and the unit slab 1 is lifted by a lifting equipment 40 such as a crane. And building structure 2
The deck plate 5 of the unit slab 1 is placed on the beam 4. The deck plate 5 is supported and fixed to the beam 4, and the pipe 8 is connected to the pipe 8 arranged in the building structure 2 by the joint portion 30. Meanwhile, deck plate 5
The electric wire 16 of the cellular duct 15 is inserted into the bushing 26, the electric wire 16 of the unit slab 1 is connected to the electric wire 16 wired in the building structure 2, and the unit slab 1 is installed in the building structure 2.

【0030】このようなユニットスラブ1によれば、デ
ッキプレート5と、このデッキプレート5に設けられた
プレキャストコンクリート版6とから構成されているた
め、建築構造物2の梁4にデッキプレート5を支持させ
ることにより、建築構造物2にユニットスラブ1を施工
できる。このため、現場でコンクリートの打設作業が不
要になるから、ユニットスラブ1の施工作業性を向上で
きる。そして、ユニットスラブ1を工場で製造できるか
ら、ユニットスラブ1を工業化でき、ユニットスラブ1
の品質を向上できる。そして、現場でコンクリート打設
作業がなくされることから、高層の建築構造物2にユニ
ットスラブ1を施工する場合にあっても、このユニット
スラブ1の施工作業の安全性を向上できる。
According to the unit slab 1 as described above, the deck plate 5 and the precast concrete slab 6 provided on the deck plate 5 are provided, so that the deck plate 5 is attached to the beam 4 of the building structure 2. By supporting it, the unit slab 1 can be constructed on the building structure 2. For this reason, the work of placing concrete on the site is not necessary, so that the workability of the unit slab 1 can be improved. Since the unit slab 1 can be manufactured at the factory, the unit slab 1 can be industrialized, and the unit slab 1 can be manufactured.
Can improve the quality of. Further, since the concrete pouring work is eliminated on site, even when the unit slab 1 is constructed on the high-rise building structure 2, the safety of the construction work on the unit slab 1 can be improved.

【0031】前記デッキプレート5に配管8が設けられ
ているため、建築構造物2の梁4にデッキプレート5を
支持させることにより、建築構造物2に配管8が配設さ
れる。このため、現場で配管8を配設する必要性がなく
なるから、配管8の配設作業性を向上できる。
Since the piping 8 is provided on the deck plate 5, the piping 8 is arranged on the building structure 2 by supporting the deck plate 5 on the beam 4 of the building structure 2. For this reason, it is not necessary to dispose the pipe 8 on the site, and the workability of disposing the pipe 8 can be improved.

【0032】前記デッキプレート5のセルラーダクト1
5に電線16が配されたため、建築構造物2の梁4にデ
ッキプレート5を支持させることにより、建築構造物2
に電線16が配設される。このため、現場で電線16を
配設する必要性がなくなるから、電線16の配設作業性
を向上できる。そして、電線16付きセルラーダクト1
5をユニットスラブ1に設けたため、建築構造物2をオ
フィスオートメーション化することができ、電線16の
増設作業性を向上できる。
Cellular duct 1 of the deck plate 5
Since the electric wire 16 is disposed on the building structure 5, the deck plate 5 is supported on the beam 4 of the building structure 2 so that the building structure 2
The electric wire 16 is disposed in the. For this reason, it is not necessary to dispose the electric wire 16 on site, and therefore the workability of disposing the electric wire 16 can be improved. And the cellular duct 1 with the electric wire 16
Since 5 is provided in the unit slab 1, the building structure 2 can be office-automated, and the workability of adding the electric wire 16 can be improved.

【0033】一方、空間部13をセルラーダクト15に
隣接設置したため、前記空間部13に冷却空気を通風さ
せることにより、電線16の過熱を防止でき、電線16
の安全性を向上できる。そして、セルラーダクト15を
耐火被覆部17を介して梁4に支持させたため、電線1
6の安全性及び建築構造物2の安全性を向上できる。さ
らに、ヘッダーダクト20をデッキプレート5に設けた
ため、ユニットスラブ1の縦横に電線16を配設できる
から、建築構造物2をオフィスオートメーション化する
ことができる。
On the other hand, since the space portion 13 is installed adjacent to the cellular duct 15, overheating of the electric wire 16 can be prevented by passing cooling air through the space portion 13, and the electric wire 16 can be prevented.
The safety of can be improved. Then, since the cellular duct 15 is supported by the beam 4 via the fireproof coating portion 17, the electric wire 1
The safety of 6 and the safety of the building structure 2 can be improved. Further, since the header duct 20 is provided on the deck plate 5, the electric wires 16 can be arranged in the vertical and horizontal directions of the unit slab 1, so that the building structure 2 can be office-automated.

【0034】前記デッキプレート5には、各デッキプレ
ート5のセルラーダクト15を接続するブッシング26
がそれぞれ設けられているため、これらブッシング26
で各セルラーダクト15内の電線16が接続される。こ
のため、セルラーダクト15の接続部の電線16をブッ
シング26で保護できるから、電線16の安全性を維持
できる。
A bushing 26 for connecting the cellular duct 15 of each deck plate 5 to the deck plate 5 is provided.
Since the bushings 26 are provided respectively,
Then, the electric wires 16 in each cellular duct 15 are connected. For this reason, the electric wire 16 at the connecting portion of the cellular duct 15 can be protected by the bushing 26, so that the safety of the electric wire 16 can be maintained.

【0035】一方、ユニットスラブの施工方法によれ
ば、あらかじめ工場等でデッキプレート5にプレキャス
トコンクリート版6を設け、前記建築構造物2の梁4に
デッキプレート5を支持させる構成にしたため、現場で
のコンクリート打設作業を不要にできる。このため、ユ
ニットスラブ1の施工期間を短くすることができる。そ
して、建築構造物2の梁4にデッキプレート5を支持さ
せて、建築構造物2にユニットスラブ1を施工できるこ
とから、現場で必要な作業工程を減少でき、これら作業
工程に要する費用を低減できる。
On the other hand, according to the method of constructing the unit slab, the precast concrete slab 6 is provided on the deck plate 5 in advance in a factory or the like, and the beam 4 of the building structure 2 is made to support the deck plate 5, so that the construction is performed on site. It is possible to eliminate the work of placing concrete. Therefore, the construction period of the unit slab 1 can be shortened. Since the deck plate 5 can be supported by the beam 4 of the building structure 2 and the unit slab 1 can be installed on the building structure 2, the work steps required on site can be reduced, and the cost required for these work steps can be reduced. .

【0036】そして、前記建築構造物2の梁4にデッキ
プレート5を支持させるとともに、前記配管8を接続す
る構成にしたため、デッキプレート5の施工作業ととも
に配管8の配設作業を行なうことができる。このため、
配管8の配設期間を短くすることができる。
Since the deck plate 5 is supported on the beam 4 of the building structure 2 and the pipe 8 is connected, the deck plate 5 can be installed and the pipe 8 can be installed. . For this reason,
The arrangement period of the pipe 8 can be shortened.

【0037】さらに、工場等でデッキプレート5の溝状
部12に電線16を配し、この電線16に隣接する凸状
部11にカバープレート14を接続するとともに、前記
電線16を配した溝状部12の反対面にプレキャストコ
ンクリート版6を設け、前記建築構造物2の梁4にデッ
キプレート5を支持させるとともに、前記電線16を接
続する構成にしたため、デッキプレート5の施工作業と
ともに電線16の配設作業を行なうことができる。この
ため、電線8の配設期間を短くすることができる。
Further, at the factory or the like, the electric wire 16 is arranged in the groove portion 12 of the deck plate 5, the cover plate 14 is connected to the convex portion 11 adjacent to the electric wire 16, and the groove shape in which the electric wire 16 is arranged is formed. Since the precast concrete slab 6 is provided on the opposite surface of the portion 12 to support the deck plate 5 on the beam 4 of the building structure 2 and to connect the electric wire 16, the construction of the deck plate 5 and the electric wire 16 are performed. Installation work can be performed. Therefore, the period for disposing the electric wire 8 can be shortened.

【0038】[0038]

【発明の効果】以上説明したように、本発明のユニット
スラブとその施工方法によれば、以下の効果を奏するこ
とができる。請求項1記載のユニットスラブによれば、
デッキプレートと、このデッキプレートに設けられたプ
レキャストコンクリート版とから一体に構成されている
ため、建築構造物の梁にデッキプレートを支持させるこ
とにより、建築構造物にユニットスラブを施工できる。
このため、現場でコンクリートの打設作業が不要になる
から、ユニットスラブの施工作業性を向上できる。そし
て、ユニットスラブを工場で製造できるから、ユニット
スラブを工業化でき、ユニットスラブの品質を向上でき
る。そして、現場でコンクリート打設作業がなくされる
ことから、高層の建築構造物にユニットスラブを施工す
る場合にあっても、このユニットスラブの施工作業の安
全性を向上できる。
As described above, according to the unit slab of the present invention and the construction method thereof, the following effects can be obtained. According to the unit slab of claim 1,
Since the deck plate and the precast concrete plate provided on the deck plate are integrally formed, a unit slab can be constructed on the building structure by supporting the deck plate on the beam of the building structure.
For this reason, it is possible to improve the workability of constructing the unit slab because the concrete placing work is not required on site. Since the unit slab can be manufactured at the factory, the unit slab can be industrialized and the quality of the unit slab can be improved. Since the concrete pouring work is eliminated on site, the safety of the construction work of the unit slab can be improved even when the unit slab is constructed on a high-rise building structure.

【0039】請求項2記載のユニットスラブによれば、
請求項1記載の効果を奏することができるとともに、前
記デッキプレートに配管を設けた構成にしたため、建築
構造物の梁にデッキプレートを支持させることにより、
建築構造物に配管が配設される。このため、現場で配管
を配設する必要性がなくなるから、配管の配設作業性を
向上できる。
According to the unit slab of claim 2,
The effect of claim 1 can be obtained, and since the deck plate is provided with piping, by supporting the deck plate on the beam of the building structure,
Piping is provided in a building structure. Therefore, it is not necessary to dispose the pipes on site, and the workability of disposing the pipes can be improved.

【0040】請求項3記載のユニットスラブによれば、
請求項1記載の効果を奏することができるとともに、前
記デッキプレートのセルラーダクトに電線を配した構成
にしたため、建築構造物の梁にデッキプレートを支持さ
せることにより、建築構造物に電線が配設される。この
ため、現場で電線を配設する必要性がなくなるから、電
線の配設作業性を向上できる。そして、電線付きセルラ
ーダクトをユニットスラブに設けたため、建築構造物を
オフィスオートメーション化することができる。
According to the unit slab of claim 3,
The electric wire is arranged in the building structure by supporting the deck plate on the beam of the building structure because the electric wire is arranged in the cellular duct of the deck plate in addition to the effect of claim 1. To be done. For this reason, it is not necessary to dispose the electric wire on the spot, and thus the workability of disposing the electric wire can be improved. Since the cellular duct with electric wires is provided in the unit slab, the building structure can be office-automated.

【0041】請求項4記載のユニットスラブによれば、
請求項3記載の効果を奏することができるとともに、前
記デッキプレートには、各デッキプレートのセルラーダ
クトを接続するブッシングを設けた構成にしたため、こ
のブッシングで各セルラーダクト内の電線が接続され
る。このため、セルラーダクトの接続部の電線をブッシ
ングで保護できるから、電線の安全性を維持できる。
According to the unit slab of claim 4,
In addition to being able to achieve the effect of claim 3, since the deck plate is provided with a bushing for connecting the cellular ducts of each deck plate, the electric wire in each cellular duct is connected by this bushing. For this reason, the electric wire at the connection portion of the cellular duct can be protected by the bushing, so that the safety of the electric wire can be maintained.

【0042】請求項5記載のユニットスラブの施工方法
によれば、あらかじめデッキプレートにプレキャストコ
ンクリート版を一体に設け、前記建築構造物の梁にデッ
キプレートを支持させる構成にしたため、現場でのコン
クリート打設作業を不要にできる。このため、ユニット
スラブの施工期間を短くすることができる。そして、建
築構造物の梁にデッキプレートを支持させて、建築構造
物にユニットスラブを施工できることから、現場で必要
な作業工程を減少でき、これら作業工程に要する費用を
低減できる。
According to the unit slab construction method of claim 5, since the precast concrete slab is integrally provided on the deck plate in advance and the deck plate is supported by the beam of the building structure, the concrete slab is cast on site. Installation work can be eliminated. Therefore, the construction period of the unit slab can be shortened. Further, since the deck plate is supported by the beam of the building structure and the unit slab can be installed on the building structure, it is possible to reduce the work steps required on site and reduce the cost required for these work steps.

【0043】請求項6記載のユニットスラブの施工方法
によれば、請求項5記載の効果を奏することができると
ともに、前記建築構造物の梁にデッキプレートを支持さ
せるとともに、前記配管を接続する構成にしたため、デ
ッキプレートの施工作業とともに配管の配設作業を行な
うことができる。このため、配管の配設期間を短くする
ことができる。
According to the method for constructing the unit slab of claim 6, the effect of claim 5 can be obtained, and the deck plate is supported by the beam of the building structure and the pipe is connected. Therefore, the work of arranging the pipes can be performed together with the work of constructing the deck plate. For this reason, the arrangement period of the pipe can be shortened.

【0044】請求項7記載のユニットスラブの施工方法
によれば、デッキプレートにセルラーダクトを設け、こ
のセルラーダクトに電線を配し、この電線を配したデッ
キプレートの反対面にプレキャストコンクリート版を設
け、前記建築構造物の梁にデッキプレートを支持させる
とともに、前記電線を接続する構成にしたため、デッキ
プレートの施工作業とともに電線の配設作業を行なうこ
とができる。このため、電線の配設期間を短くすること
ができる。
According to the unit slab construction method of claim 7, a cellular duct is provided on the deck plate, an electric wire is arranged on the cellular duct, and a precast concrete slab is provided on the opposite surface of the deck plate on which the electric wire is arranged. Since the deck plate is supported by the beam of the building structure and the electric wire is connected, the work of arranging the electric wire can be performed together with the construction work of the deck plate. Therefore, it is possible to shorten the installation period of the electric wires.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のユニットスラブを示す全体斜視図であ
る。
FIG. 1 is an overall perspective view showing a unit slab of the present invention.

【図2】図1のユニットスラブを示す断面図である。FIG. 2 is a sectional view showing the unit slab of FIG.

【図3】図1のユニットスラブを示す一部断面の斜視図
である。
3 is a partial cross-sectional perspective view showing the unit slab of FIG. 1. FIG.

【図4】図3のセルラーダクトの接続部を示す断面図で
ある。
FIG. 4 is a cross-sectional view showing a connection portion of the cellular duct of FIG.

【図5】図3の配管の接続部を示す側面図である。5 is a side view showing a connecting portion of the pipe of FIG.

【図6】図5の他の実施例を示す側面図である。FIG. 6 is a side view showing another embodiment of FIG.

【符号の説明】[Explanation of symbols]

1 ユニットスラブ 2 建築構造物 3 柱 4 梁 5 デッキプレート 6 プレキャストコンクリート版 8 配管 15 セルラーダクト 16 電線 1 Unit Slab 2 Building Structure 3 Pillar 4 Beam 5 Deck Plate 6 Precast Concrete Plate 8 Piping 15 Cellular Duct 16 Electric Wire

───────────────────────────────────────────────────── フロントページの続き (72)発明者 桜井 孝一 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 村瀬 幸男 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 中島 健 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Koichi Sakurai 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Yukio Murase 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Incorporated (72) Inventor Ken Nakajima 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd.

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 建築構造物の柱に梁が架け渡され、該梁
に支持されるユニットスラブであって、前記梁に支持さ
れるデッキプレートと、該デッキプレートに設けられた
プレキャストコンクリート版とから一体に構成されてい
ることを特徴とするユニットスラブ。
1. A unit slab in which a beam is bridged over a pillar of a building structure and supported by the beam, a deck plate supported by the beam, and a precast concrete slab provided on the deck plate. A unit slab characterized by being integrally formed from.
【請求項2】 請求項1記載のユニットスラブであっ
て、前記デッキプレートに配管が設けられていることを
特徴とするユニットスラブ。
2. The unit slab according to claim 1, wherein the deck plate is provided with piping.
【請求項3】 請求項1記載のユニットスラブであっ
て、前記デッキプレートには、セルラーダクトが設けら
れ、該セルラーダクトに電線が配されていることを特徴
とするユニットスラブ。
3. The unit slab according to claim 1, wherein the deck plate is provided with a cellular duct, and an electric wire is arranged in the cellular duct.
【請求項4】 請求項3記載のユニットスラブであっ
て、前記デッキプレートには、各デッキプレートのセル
ラーダクトを接続するブッシングが設けられていること
を特徴とするユニットスラブ。
4. The unit slab according to claim 3, wherein the deck plate is provided with a bushing for connecting a cellular duct of each deck plate.
【請求項5】 請求項1記載のユニットスラブの施工方
法であって、あらかじめデッキプレートにプレキャスト
コンクリート版を一体に設け、前記建築構造物の梁にデ
ッキプレートを支持させることを特徴とするユニットス
ラブの施工方法。
5. The unit slab construction method according to claim 1, wherein a precast concrete slab is integrally provided on the deck plate in advance, and the deck plate is supported by the beam of the building structure. Construction method.
【請求項6】 請求項2記載のユニットスラブの施工方
法であって、あらかじめデッキプレートにプレキャスト
コンクリート版を一体に設け、前記建築構造物の梁にデ
ッキプレートを支持させるとともに、前記配管を接続す
ることを特徴とするユニットスラブの施工方法。
6. The method for constructing a unit slab according to claim 2, wherein a precast concrete slab is integrally provided on the deck plate in advance, the deck plate is supported by the beam of the building structure, and the piping is connected. A method for constructing a unit slab, which is characterized in that
【請求項7】 請求項3記載のユニットスラブの施工方
法であって、あらかじめデッキプレートにセルラーダク
トを設け、該セルラーダクトに電線を配し、該電線を配
したデッキプレートの反対面にプレキャストコンクリー
ト版を設け、前記建築構造物の梁にデッキプレートを支
持させるとともに、前記電線を接続することを特徴とす
るユニットスラブの施工方法。
7. The unit slab construction method according to claim 3, wherein a cellular duct is provided in advance on the deck plate, an electric wire is arranged on the cellular duct, and precast concrete is provided on the opposite surface of the deck plate on which the electric wire is arranged. A method for constructing a unit slab, comprising providing a plate, supporting a deck plate on a beam of the building structure, and connecting the electric wire.
JP16796892A 1992-06-25 1992-06-25 Unit slab and method for constructing it Pending JPH0610434A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16796892A JPH0610434A (en) 1992-06-25 1992-06-25 Unit slab and method for constructing it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16796892A JPH0610434A (en) 1992-06-25 1992-06-25 Unit slab and method for constructing it

Publications (1)

Publication Number Publication Date
JPH0610434A true JPH0610434A (en) 1994-01-18

Family

ID=15859376

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16796892A Pending JPH0610434A (en) 1992-06-25 1992-06-25 Unit slab and method for constructing it

Country Status (1)

Country Link
JP (1) JPH0610434A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014152482A (en) * 2013-02-07 2014-08-25 Takasago Thermal Eng Co Ltd Horizontal pipeline unit construction method
JP2019108770A (en) * 2017-12-20 2019-07-04 前田建設工業株式会社 Deck plate slab, and joining method of deck plate slab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014152482A (en) * 2013-02-07 2014-08-25 Takasago Thermal Eng Co Ltd Horizontal pipeline unit construction method
JP2019108770A (en) * 2017-12-20 2019-07-04 前田建設工業株式会社 Deck plate slab, and joining method of deck plate slab

Similar Documents

Publication Publication Date Title
RU2040646C1 (en) Structural member for erecting a building
JPH0610434A (en) Unit slab and method for constructing it
RU2738049C1 (en) Slab and method of its production (versions)
JP2003003603A (en) Precast concrete beam
JPH11196525A (en) Wiring method in unit constructing method
JP2020041311A (en) Staircase structure and unit building
JPH01226961A (en) Hollow slab
JPH0396551A (en) Floor construction in building
JP2529612B2 (en) Hollow slab
JP3439958B2 (en) Floor structure of nuclear facilities and construction method
JPH0648045Y2 (en) Unit for piping
JPH08232366A (en) High damping building and construction method therefor
JP3062810B2 (en) Assembling method of plumbing unit in building and plumbing unit
JPH0414560A (en) Installing structure for floor board for placing concrete for vertical pipe unit of building
JP2733507B2 (en) Industrialization of racks for piping and wiring
KR20010075746A (en) A Mesh for Preventing Cracks on Concrete Slab
JPH05306572A (en) Construction method for building
JP3045841B2 (en) Beam formwork structure for unit building
JPS5967810A (en) Method of burying box for electric wire in concrete wall
JPH0258542B2 (en)
JP3045840B2 (en) Column formwork for unit buildings
CN113802754A (en) Metal plate ceiling and construction method thereof
JPH0438348A (en) Execution method of equipment duct utilizing hollow slab
JPH1114779A (en) Construction of substructure in nuclear reactor containment vessel and module structure therefor
JPS61102592A (en) Package control chamber and method of installing said control chamber

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20010313