JPH0561879A - Manufacturing control information processing - Google Patents

Manufacturing control information processing

Info

Publication number
JPH0561879A
JPH0561879A JP22144691A JP22144691A JPH0561879A JP H0561879 A JPH0561879 A JP H0561879A JP 22144691 A JP22144691 A JP 22144691A JP 22144691 A JP22144691 A JP 22144691A JP H0561879 A JPH0561879 A JP H0561879A
Authority
JP
Japan
Prior art keywords
product
priority
memory
waiting
progress status
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22144691A
Other languages
Japanese (ja)
Inventor
Makoto Ishino
誠 石野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP22144691A priority Critical patent/JPH0561879A/en
Publication of JPH0561879A publication Critical patent/JPH0561879A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PURPOSE:To automatically alter manufacture priority by always monitoring a progress advance situation including a waiting state in the respective processes of respective products and automatically treating the order of the waiting state in accordance with the sudden alteration of manufacture priority. CONSTITUTION:The respective products which are sequentially inputted to a manufacture line move the respective processes of A, B and C in an inputted order in a state where a manufacture priority alteration request is not inputted from a priority alteration input terminal 2. When a system moves from the waiting state to a starting state, the progress advance situation of the product concerned in a process progress advance situation memory 8 is updated. When the product priority alteration element of one product is inputted in such a state, a priority alteration request reception means 4 retrieves the progress advance situation of the product concerned. Then, the waiting priority of the product concerned in a process supply waiting product memory 6 is altered from low priority to high priority based on the retrieval. Thusd, the troublesome reconsideration of a plan before and after the product line supply of the product can be eliminated.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、工場等の製造ラインで
各工程の生産管理を行う場合において、受注状況の変化
や製造現場の都合等によって各製品相互間の製造優先順
位に変化が生じた場合に、その要求に対して自動的に最
適条件で対応できる製造優先順位変更装置に関する。
[Field of Industrial Application] The present invention, when production control of each process is performed in a production line such as a factory, changes in manufacturing priority order among products due to changes in order status or convenience of manufacturing site. The present invention relates to a manufacturing priority order changing device capable of automatically responding to the request under optimum conditions.

【0002】[0002]

【従来の技術】一般に、一つの製品は複数の工程を経て
製造される。そして、各工程においては、作業内容や処
理内容がそれぞれ異なるので、各工程に費やされる所要
時間が各工程毎に一致しない、また、必ずしも同一仕様
の製品が連続して製造ラインに投入されるとは限らな
い。したがって、所要時間が長い工程に対しては該当工
程に投入される複数の製品が投入待ち状態となる。さら
に、所要時間が長い工程後に所要時間の短い工程が位置
すると逆に該当工程が製品の投入待ち状態となる。
2. Description of the Related Art Generally, one product is manufactured through a plurality of processes. Since the work content and the processing content are different in each process, the required time spent in each process does not match in each process, and when products with the same specifications are continuously input to the manufacturing line. Not necessarily. Therefore, for a process with a long required time, a plurality of products to be put into the corresponding process are in a waiting state. Further, when a process with a short required time is positioned after a process with a long required time, the process is placed in a product input waiting state.

【0003】よって、製造ラインに投入された各製品が
工程の前で待ち状態にならないように、かつ各工程が製
品投入待ち状態にならないように工程管理を行うように
している。特に、製造工場においては、製品を納期通り
に製造し顧客に納品することが至上の命題であり、これ
を達成するために生産管理用の計算機を導入し納期確保
のためにさらにきめ細かな工程管理を行なう必要があ
る。
Therefore, process control is performed so that each product input to the manufacturing line does not enter the waiting state before the process and each process does not enter the product input waiting state. In particular, in manufacturing plants, it is the highest priority to manufacture products on time and deliver them to customers.To achieve this, we have introduced a computer for production control and have made more detailed process control to secure delivery times. Need to do.

【0004】ところで、近年、顧客の都合で突発に発生
する納期変更要求や製造現場で起こる設備系トラブル処
置後の製造計画の見直し等、当初の製造計画にそぐわな
い外乱要素が発生した場合、これに迅速かつ的確に対応
し、納期通りに製品を製造することが強く求められてい
る。
By the way, in recent years, when a disturbance factor that does not fit the original production plan occurs, such as a delivery time change request that suddenly occurs due to the customer's convenience or a revision of the production plan after the trouble of the equipment system at the manufacturing site occurs, There is a strong demand for swift and accurate response and the manufacture of products on time.

【0005】この要求に対し、現状の製造ラインでは、
納期が急に短縮された製品でまだ製造ラインへ投入され
てないものは製造計画を組み直す。また、該当製品が既
に製造ラインへ投入されてしまったものについては、現
在どの工程で製造しているかを人間系で把握し次の工程
への投入を他の製品に対して優先的に行うようにしてい
る。また、設備系の突発的トラブルの処置後もその場で
管理者の判断により製造計画の組み直しをする運用が行
われている。
In response to this request, the current production line is
For products whose delivery time has been drastically shortened and which have not yet been put on the production line, re-establish the production plan. In addition, if the relevant product has already been put into the manufacturing line, the human system should know which process it is currently manufacturing, and give priority to the next process for other products. I have to. Moreover, even after the treatment of a sudden trouble in the equipment system, the operation of reassembling the manufacturing plan is performed on the spot by the judgment of the administrator.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、前述し
たように、予め各製品の生産計画を組み、実際に製造が
開始された後に、納期等の変更が発生すると、計画を組
みなおしたり、各工程の投入優先所順位をマニアル操作
で変更したりする手法においては次のような問題が発生
する。
However, as described above, a production plan for each product is prepared in advance, and if the delivery date or the like changes after the actual production is started, the plan can be reconstructed or each process can be performed. The following problems occur in the method of changing the priority order of input by manual operation.

【0007】すなわち、納期変更が発生した製品が製造
ラインに投入される前においては、計画の全面組み直し
を行う必要があるが、この全面組み直し作業には多大の
時間と労力が必要となり、緊急の場合間に合わない懸念
が発生する。
That is, it is necessary to completely reconfigure the plan before the product whose delivery date has been changed is introduced into the manufacturing line. However, this total reassembling work requires a great deal of time and labor and is urgent. There is a concern that it will not be in time.

【0008】また、該当製品が製造ラインに投入された
後においては、製造ライン投入後の製品の計画変更が製
造ラインの管理者の判断によって実行されるために、人
為敵ミスが発生しやすく、また必ずしも最良の選択が実
行されるとは限らない。したがって、その判断に正確さ
が不足し、変更対象の製品への影響までは読み切れず製
品の納期確保ができないことが発生したり、製品をいた
ずらに早く作り過ぎてしまい、結果的に他の製品に対す
る納期に悪影響を与える懸念がある。
Further, after the relevant product has been introduced into the manufacturing line, the plan change of the product after the introduction of the manufacturing line is executed according to the judgment of the manager of the manufacturing line. Also, the best choice is not always performed. Therefore, the accuracy of the judgment is insufficient, and it may not be possible to read the impact on the product to be changed and it may not be possible to secure the delivery date of the product, or the product may be mischievously made too quickly, resulting in other products. There is a concern that it will adversely affect the delivery time for.

【0009】本発明はこのような事情に鑑みてなされた
ものであり、製造ラインに投入された各製品の各工程に
おける待ち状態を含む進捗状況を常時監視し、製造優先
順位の突発的な変更に対応して待ち状態の順位を自動的
に組替えることで、製品の製造ライン投入前後の煩雑な
計画の見直しを排除でき、他の計画との整合性を踏ま
え、簡単で正確にかつ短時間で、製造優先順位を自動的
に変更できる製造優先順位変更装置を提供することを目
的とする。
The present invention has been made in view of such circumstances, and constantly monitors the progress status including the waiting state in each process of each product put on the manufacturing line to suddenly change the manufacturing priority order. By automatically rearranging the order of the waiting states in response to, it is possible to eliminate the complicated review of the plan before and after the product manufacturing line is introduced, and in consideration of the consistency with other plans, it is easy, accurate, and short time. It is an object of the present invention to provide a manufacturing priority order changing device capable of automatically changing the manufacturing priority order.

【0010】[0010]

【課題を解決するための手段】上記課題を解消するため
に本発明の製造優先順位変更装置においては、製造ライ
ン上における各工程毎に投入待ちの各製品をそれぞれ投
入順位付けて記憶する工程投入待製品メモリと、各工程
毎に着手中の各製品を記憶する工程着手中製品メモリ
と、各製品毎に待ち状態を含む工程の進捗状況を記憶す
る工程進捗状況メモリと、各工程において着手中の製品
の工程処理が完了したとき完了通知を出力するととも
に、該当工程に対して次の製品が着手されたとき着手通
知を出力する工程着完入力端末と、この工程着完入力端
末からの完了通知および着手通知入力に応動して、工程
進捗状況メモリの該当製品の進捗状況を更新するととも
に、着手通知の場合は該当製品を工程投入待製品メモリ
から工程着手中製品メモリ内の同一工程へ移動させ、完
了通知の場合は該当製品を工程着手中製品メモリから工
程投入待製品メモリ内の次の工程へ移動させる進捗情報
更新手段と、製品の製造優先順位変更要求が入力される
優先順位変更入力端末と、この優先順位変更入力端末か
ら入力された製造優先順位変更要求に該当する製品の現
在の進捗状況を工程進捗状況メモリから検索する優先順
位変更要求受付手段と、この優先順位変更要求受付手段
にて検出された該当製品の工程進捗状況および優先順位
順要求に基づいて前記工程投入待製品メモリの該当製品
の投入順位を変更する優先順位変更登録手段とを備えた
ものである。
In order to solve the above-mentioned problems, in the manufacturing priority changing apparatus of the present invention, a process input is performed in which each product on the manufacturing line is awaiting input for each process and is stored in the order of input. Waiting product memory, process in-process product memory that stores each product under process for each process, process progress status memory that stores process progress status including waiting status for each product, and each process is underway Process completion input terminal that outputs a completion notification when the process processing of the product is completed and also outputs a notification when the next product is started for the process, and the completion from the process completion input terminal In response to the notification and the input of the start notification, the progress status of the corresponding product in the process progress memory is updated. In the case of a completion notification, the progress information updating means for moving the relevant product from the in-process product memory to the next process in the process input waiting product memory and the product manufacturing priority change request are sent. A priority change input terminal to be inputted, and a priority change request receiving means for searching the process progress memory for the current progress status of the product corresponding to the manufacturing priority change request inputted from the priority change input terminal, The priority order change request receiving means detects the process progress status of the corresponding product and the priority order change registering means for changing the order of introduction of the corresponding products in the process introduction waiting product memory based on the priority order request. It is a thing.

【0011】[0011]

【作用】このように構成された製造優先順位変更装置に
よれば、製造ラインを構成する各工程毎に該当工程に対
して投入待状態の各製品が順位付けられて工程投入待製
品メモリに記憶されている。同様に、各工程において着
手中の製品が工程着手中製品メモリに記憶されている。
さらに、各製品毎に待ち状態を含む工程の進捗状況が工
程進捗状況メモリに記憶されている。
According to the manufacturing priority changing apparatus configured as described above, the products in the waiting state for the corresponding process are ranked and stored in the process waiting product memory for each process constituting the manufacturing line. Has been done. Similarly, the product under process in each process is stored in the product under process process memory.
Further, the progress status of the process including the waiting state for each product is stored in the process progress status memory.

【0012】そして、実際の製造ラインの各工程におい
ては、一つの製品に対する処理工程が終了すると、該当
製品を送出して、次の工程の投入待ちの各製品の最終位
置に搬送する。そして、自己の工程の投入待ち位置に並
べてある一番手前の製品、すなわち待ち順位0番の製品
を取込んで工程処理を着手する。
In each step of the actual manufacturing line, when the processing step for one product is completed, the corresponding product is sent out and conveyed to the final position of each product waiting to be input in the next step. Then, the frontmost product, that is, the product with the waiting order of 0, which is lined up at the input waiting position of its own process, is taken in and the process processing is started.

【0013】工程着完入力端末は、例えばマニアル装置
または各工程からの自動操作によって、各工程毎に一つ
の製品に対する処理工程が完了したことを示す完了通知
と、各工程毎に新規の製品に対する処理工程を着手した
ことを示す着手通知を出力する。
The process arrival completion input terminal, for example, a manual device or an automatic operation from each process, notifies the completion of the processing process for one product for each process and a new product for each process. The start notification indicating that the processing step is started is output.

【0014】進捗情報更新手段は、工程着完入力端末か
ら製品を指定した完了通知を受領すると、該当製品を工
程着手中製品メモリから工程投入待製品メモリの次工程
の最終順位に移動させる。また、製品を指定した着手通
知を受領すると、該当製品を工程投入待製品メモリから
工程着手中製品メモリの同一工程に移動させる。さら
に、この進捗情報更新手段は、完了通知および着手通知
に基づいて工程進捗状況メモリの各製品の進捗状況を更
新する。
When the progress information updating means receives the completion notification designating the product from the process completion input terminal, the progress information updating means moves the corresponding product from the product memory in process start to the final order of the next process in the process waiting product memory. Further, when the notice of the start of designating the product is received, the corresponding product is moved from the process-waiting product memory to the same process in the process-starting product memory. Further, the progress information updating means updates the progress status of each product in the process progress status memory based on the completion notification and the start notification.

【0015】すなわち、製造ラインに挿入された各製品
は現在どの工程で着手中であるか、また、どの工程に対
する投入待ち状態であるか、さらに投入待ち状態の場合
は、投入される順位は何番かの状態が常時把握されてい
る。
That is, which process is currently under way for each product inserted in the manufacturing line, which process is waiting to be loaded, and when it is in the waiting state, what is the order of loading? The condition of the turn is always known.

【0016】そして、優先順位変更入力端子を介して製
品の製造優先順位変更要求が入力されると、優先順位変
更要求受付手段によって該当製品の進捗状況が検索され
る。検索された進捗状況に基づいて工程投入待製品メモ
リ内の該当製品の待ち順序を例えば下位順位から上位順
位へ変更する。
When a manufacturing priority change request for a product is input through the priority change input terminal, the priority change request receiving means retrieves the progress status of the product. Based on the retrieved progress status, the waiting order of the corresponding products in the process-waiting product memory is changed from, for example, lower order to higher order.

【0017】その結果、該当製品が他の製品を追い越し
て、先に工程に取込まれて処理工程が着手される。よっ
て、待ち時間が短縮され、結果的に該当製品の製造全体
に対する所要時間が短縮される。なお、場合によって
は、優先順位を故意に下げて、製造期間を故意に長くす
る場合も発生する。
As a result, the corresponding product overtakes other products and is taken into the process first to start the processing process. Therefore, the waiting time is shortened, and as a result, the time required for the entire manufacturing of the corresponding product is shortened. In some cases, the priority may be intentionally lowered to intentionally lengthen the manufacturing period.

【0018】このように、製品のライン投入前後の煩雑
な計画の見直しを人為的に行うことなしに優先順位変更
要求の入力さえすれば、他の計画との整合性をとって正
確に安易にかつ迅速に製造対象製品群の優先順位の変更
が可能となる。
As described above, if the priority change request is input without artificially revising the complicated plan before and after the product is put into the line, it can be accurately and easily matched with other plans. In addition, it is possible to quickly change the priority order of the product group to be manufactured.

【0019】[0019]

【実施例】以下本発明の一実施例を図面を用いて詳説す
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail below with reference to the drawings.

【0020】第1図は実施例の製造優先順位変更装置の
概略構成を示すブロック図である。この実施例の製造優
先順位変更装置は大きく分けて、各種情報処理を実行す
る計算機システム1と、キーボードおよびCRT等で構
成された優先順位変更入力端末2と、同じく、キーボー
ドおよびCRT等で構成された工程着完入力端末3とで
構成されている。
FIG. 1 is a block diagram showing the schematic arrangement of a manufacturing priority order changing apparatus of the embodiment. The manufacturing priority changing apparatus of this embodiment is roughly divided into a computer system 1 for executing various kinds of information processing, a priority changing input terminal 2 including a keyboard and a CRT, and a keyboard and a CRT. And the process completion input terminal 3.

【0021】計算機システム1内には、工程投入待製品
メモリ6,工程着手中製品メモリ7および工程進捗状況
メモリ8との3つのメモリが例えばハードディスク装置
でもって構成されている。さらに、制御プログラム等の
ソフト的手法でもって、優先順位変更要求受付手段4,
優先順位変更登録手段5および進捗情報更新手段9の3
っの各手段が構成されている。
In the computer system 1, three memories including a process-waiting product memory 6, a process-in-process product memory 7 and a process progress status memory 8 are configured by a hard disk device, for example. Furthermore, the priority order change request receiving means 4, 4 can be obtained by a software method such as a control program.
Priority change registration means 5 and progress information update means 9 3
Each means is configured.

【0022】そして、説明を簡単にするために、この製
造優先順位変更装置が適用される製造ラインは、図2に
示すように「工程A」,「工程B」,「工程C」の3つ
の工程10a,10b,10cが順番に配列されている
とする。
For simplification of explanation, the manufacturing line to which this manufacturing priority changing apparatus is applied is divided into three processes, "process A", "process B", and "process C", as shown in FIG. It is assumed that the steps 10a, 10b, and 10c are arranged in order.

【0023】工程投入待製品メモリ6内には、図2に示
すように、各工程10a,10b,10c毎に、各工程
10a〜10cに投入するための順番を待っている投入
待製品領域6a,6b.6cが形成されており、各投入
待製品領域6a〜6c内には各製品の製品番号が記憶さ
れている。具体的には、「工程A」に対しては3つの製
品が投入待状態であることを示す。そして、複数の製品
が待ち状態にある場合は、上位に位置する製品から順番
に「工程A」に着手される。したがって、図2において
は、「0006」の製品番号の製品が最優先順位(優先
順位0番)でもって「工程A」に着手される。
As shown in FIG. 2, in the process-waiting product memory 6, a product-waiting product region 6a is waiting for each process 10a, 10b, 10c to wait for the order of the process 10a to 10c. , 6b. 6c is formed, and the product number of each product is stored in each of the product-waiting product areas 6a to 6c. Specifically, for “process A”, three products are in the waiting state for loading. Then, when a plurality of products are in a waiting state, the “process A” is started in order from the product at the higher position. Therefore, in FIG. 2, the product with the product number "0006" is started in the "process A" with the highest priority (priority 0).

【0024】同様に、工程着手中製品メモリ7内には、
図2に示すように、各工程10a,10b,10c毎
に、各工程10a〜10cが実際に着手中の製品を記憶
する着手中製品領域7a,7b,7cが形成されてい
る。そして、この実施例においては、各工程10a〜1
0cは同時に1個の製品に対してのみ処理工程が実行さ
れるので、各着手中製品領域7a〜7cにはそれぞれ1
個の製品のみが記憶される。例えば、「工程A」におい
ては「0005」の製品番号の製品が着手中である。
Similarly, in the product memory 7 under process start,
As shown in FIG. 2, in-process product areas 7a, 7b, and 7c are formed for each of the processes 10a, 10b, and 10c to store the products that are actually in process of the processes 10a to 10c. And in this Example, each process 10a-1
For 0c, the processing steps are executed on only one product at the same time, so that 1 is set in each of the in-process product areas 7a to 7c.
Only individual products are stored. For example, in the “process A”, the product with the product number “0005” is underway.

【0025】そして、実際の装置においては、図3に示
すように、工程投入待製品メモリ6と工程着手中製品メ
モリ7とをまとめて、一つのメモリ領域内に、製品番号
毎に、現在の工程10a〜10bの種類と、投入待状態
(0)か着手中(1)であるかを示すステータスと、該
当製品に対する詳細処理手順を示す製造情報と、待ち状
態の場合における0〜9番の優先順位が記憶されてい
る。
In the actual device, as shown in FIG. 3, the process-waiting product memory 6 and the process-in-process product memory 7 are put together into one memory area for each product number. Types of the processes 10a to 10b, a status indicating whether the process is in the waiting state (0) or in the process of starting (1), manufacturing information indicating a detailed processing procedure for the corresponding product, and 0 to 9 in the waiting state. The priority is stored.

【0026】工程進捗状況メモリ8内には、図4に示す
ように、各製品の製品番号毎に、該当製品が現在所属し
ている工程10a〜10cを示す記号と、該当製品がそ
の工程において投入待ち状態(0)であるか着手中
(1)であるかを示すステータスが記憶されている。す
なわち、この工程進捗状況メモリ8内には各製品の進捗
状況が記憶されている。
In the process progress status memory 8, as shown in FIG. 4, for each product number of each product, a symbol indicating the process 10a to 10c to which the corresponding product currently belongs and the corresponding product in the process. The status indicating whether it is in the insertion waiting state (0) or in the process of starting (1) is stored. That is, the progress status of each product is stored in the process progress status memory 8.

【0027】そして、図2に示す3つの工程を有する製
造ラインの各工程10a〜10cにおいては、一つの製
品に対する処理工程が終了すると、該当製品を送出し
て、次の工程の投入待ちの各製品の最終位置に搬送す
る。そして、自己の工程の投入待ち位置に並べてある一
番手前の製品、すなわち優先順位0番の製品を取込んで
工程処理を着手する。
Then, in each of the steps 10a to 10c of the manufacturing line having three steps shown in FIG. 2, when the processing step for one product is completed, the corresponding product is sent out, and each of the waiting steps for the next step is waited for. Transport to the final position of the product. Then, the frontmost product, that is, the product with the priority 0 is lined up at the input waiting position of its own process, and the process processing is started.

【0028】工程着完入力端末3は、例えばマニアル装
置または各工程からの自動操作によって、各工程毎に一
つの製品に対する処理工程が完了した場合に、製品を指
定した完了通知を計算機システム1内の進捗情報更新手
段9へ送出する。また、工程着完入力端末3は、各工程
10a〜10c毎に該当工程が新規の製品に対する処理
工程を着手した場合に、製品を指定した完了通知を進捗
情報更新手段9へ送出する。
The process arrival completion input terminal 3 sends a completion notice designating a product in the computer system 1 when a processing process for one product is completed in each process by, for example, a manual device or an automatic operation from each process. To the progress information updating means 9. Further, the process completion input terminal 3 sends a completion notification designating a product to the progress information updating means 9 when the process starts a processing process for a new product in each of the processes 10a to 10c.

【0029】進捗情報更新手段9は、工程着完入力端末
3から完了通知および着手通知を受領すると、図5に示
す流れ図に従って、工程着手中製品メモリ7および工程
投入待製品メモリ6の変更処理を実行する。
When the progress information updating means 9 receives the completion notice and the start notice from the process finish input terminal 3, the progress information updating means 9 changes the process start product memory 7 and the process introduction waiting product memory 6 according to the flowchart shown in FIG. Run.

【0030】まず、工程進捗状況メモリ8から該当製品
の進捗状況を調べる(ステップS1)。そして、該当製
品が属している工程および着手中か投入待状態かを確認
する。次に、入力した通知の種類を調べる(S2)。
First, the progress status of the relevant product is checked from the process progress status memory 8 (step S1). Then, the process to which the corresponding product belongs and whether it is in the process of starting or in a waiting state are confirmed. Next, the type of the input notification is checked (S2).

【0031】完了通知の場合、工程着手中製品メモリ7
内の該当工程10a〜10cの着手中製品領域7a〜7
bから該当製品をクリアし、工程投入待製品メモリ6の
次工程の投入待製品領域6a〜6c内の最終順位位置に
格納する(S3〜S7)。
In the case of the completion notification, the product memory 7 under process start
In-process product areas 7a-7 of the corresponding steps 10a-10c
The relevant product is cleared from b, and the final product is stored in the final product position 6a to 6c in the product standby product memory 6 for the next process (S3 to S7).

【0032】また、着手通知の場合、工程投入待製品メ
モリ6の該当工程10a〜10cの投入待製品領域6a
〜6cの該当商品をクリアし、工程着手中製品メモリ7
内の同一工程10a〜10cの着手中製品領域7a〜7
bに格納する(S4〜S8)。
Further, in the case of the start notification, the product waiting product area 6a of the corresponding process 10a to 10c of the product product waiting to be processed 6a.
Clear the corresponding products from ~ 6c, and start the process memory 7
In-process product areas 7a to 7 of the same process 10a to 10c
It is stored in b (S4 to S8).

【0033】その後、完了通知および着手通知に基づい
て工程進捗状況メモリ8の各製品の進捗状況を更新する
(S9)。すなわち、完了通知を受領すると、工程進捗
状況メモリ8内の該当製品の工程を次の工程へ進めると
ともに、状況を1の着手中から0の投入待ちのステータ
スへ変更する。さらに、着手通知を受領すると、工程進
捗状況メモリ8内の該当製品の状況を0の投入待ちから
1の着手中へ変更する。
Thereafter, the progress status of each product in the process progress status memory 8 is updated based on the completion notification and the start notification (S9). That is, when the completion notification is received, the process of the corresponding product in the process progress status memory 8 is advanced to the next process, and the status is changed from the start of 1 to the standby status of 0. Further, when the notification of the start of work is received, the status of the corresponding product in the process progress status memory 8 is changed from the wait for the input of 0 to the start of 1.

【0034】したがって、工程進捗状況メモリ8の記憶
内容は一つの工程10a〜10cの動作状態が変化する
と必ずそれに合わせて更新される。すなわち、常時最新
の工程進捗状況が記憶される。
Therefore, the contents stored in the process progress memory 8 are always updated in accordance with the change in the operating state of one process 10a to 10c. That is, the latest process progress status is always stored.

【0035】外部のホストコンピュータからの製品を指
定した製造優先順位変更要求が優先順位変更入力端末2
を介してこの計算機システム1の優先順位変更要求受付
手段4へ入力されると、この優先順位変更要求受付手段
4は工程進捗状況メモリ8から該当製品がどの工程に属
しているか、および該当工程において待ち状態か、また
は着手中状態であるかを示す進捗状況を検索する。そし
て、入力された製造優先順位変更要求および検索した該
当製品の進捗状況を優先順位変異登録手段5へ送出す
る。
A manufacturing priority change request designating a product from an external host computer is a priority change input terminal 2
When input to the priority order change request receiving unit 4 of the computer system 1 via the, the priority order change request receiving unit 4 determines from the process progress memory 8 to which process the corresponding product belongs, and in the corresponding process. Search for the progress status indicating whether it is in a waiting state or in a starting state. Then, the input manufacturing priority order change request and the progress status of the searched corresponding product are sent to the priority order variation registration means 5.

【0036】優先順位変更登録手段5は、検索された進
捗状況に基づいて工程投入待製品メモリ6内の検索され
た工程の投入待製品領域6a〜6cに記憶されている該
当製品の製品番号の待ち順序を例えば下位順位から上位
順位へ変更する。なお、必要に応じて、順位を下げる場
合も発生する。さらに、優先順位変更登録手段5は、必
要に応じて、工程着手中製品メモリ7内の記憶された製
品番号を変更する場合もある。
The priority change registering means 5 stores the product number of the corresponding product stored in the product waiting product areas 6a to 6c of the searched process in the process waiting product memory 6 based on the retrieved progress status. The waiting order is changed from, for example, lower rank to higher rank. It should be noted that the order may be lowered if necessary. Further, the priority order change registration means 5 may change the product number stored in the product memory 7 under process start, if necessary.

【0037】このように構成された製造優先順位変更装
置によれば、優先順位変更入力端末2から製造優先順位
変更要求が入力していない状態においては、図2に示す
ように、この製造ラインに順次入力される各製品は「工
程A」「工程B」「工程C」の各工程10a〜10cを
入力された順番に移動していく。そして、各製品が工程
を移動した場合と同一工程であっても待ち状態から着手
中状態に移動した場合に、工程進捗状況メモリ8内の該
当製品の進捗状況が更新される。
According to the manufacturing priority changing apparatus configured as described above, when the manufacturing priority changing request is not input from the priority changing input terminal 2, as shown in FIG. The products that are sequentially input move in the order in which the processes 10a to 10c of "process A", "process B", and "process C" are input. Then, even if each product is in the same process as the process, the progress status of the corresponding product in the process progress status memory 8 is updated when the product moves from the waiting state to the in-progress state.

【0038】そして、この状態で、優先順位変更入力端
2を介して一つの製品の製造優先順位変更要求が入力さ
れると、優先順位変更要求受付手段4によって該当製品
の進捗状況が検索される。検索された進捗状況に基づい
て工程投入待製品メモリ6内の該当製品の待ち優先順序
を例えば下位順位から上位順位へ変更する。
Then, in this state, when a manufacturing priority change request for one product is input through the priority change input terminal 2, the priority change request receiving means 4 retrieves the progress status of the product. .. Based on the retrieved progress status, the waiting priority order of the corresponding products in the process-waiting product memory 6 is changed from, for example, lower order to higher order.

【0039】その結果、該当工程が一つの製品に対する
工程処理が完了して、次の製品に対する工程処理が着手
されると、該当製品が他の製品を追い越して、先に工程
に取込まれる。よって、待ち時間が短縮され、結果的に
該当製品の製造全体に対する所要時間が短縮される。な
お、場合によっては、出荷時期が延期されて完成製品の
置き場等が十分確保できない状態においては、優先順位
を適当に下げて、製造期間を故意に長くする場合も発生
する。
As a result, when the process of one product is completed in the corresponding process and the process of the next product is started, the corresponding product overtakes other products and is taken into the process first. Therefore, the waiting time is shortened, and as a result, the time required for the entire manufacturing of the corresponding product is shortened. In some cases, when the shipping time is postponed and the storage space for finished products cannot be sufficiently secured, the priority may be appropriately lowered to intentionally lengthen the manufacturing period.

【0040】このように、製品のライン投入前後の煩雑
な計画の見直しを人間系で行うことなしに製造優先順位
変更要求の入力さえすれば、他の計画との整合性をとっ
て正確に安易にかつ迅速に製造対象製品群の優先順位の
変更が可能となる。
As described above, as long as a manufacturing priority change request is input without the need for a human system to review a complicated plan before and after the introduction of a product into a line, it can be accurately and easily performed in conformity with other plans. In addition, it is possible to quickly and quickly change the priority order of the product group to be manufactured.

【0041】[0041]

【発明の効果】以上説明したように本発明の製造優先順
位変更装置によれば、顧客の都合で突発に発生する納期
変更要求や製造現場で起こる設備系トラブル処置後の製
造計画の見直し等、当初の製造計画にそぐわない外乱要
素が発生した場合でも、製品の製造ライン投入前後の煩
雑な計画の見直しを管理者が行う運用をせずとも、製造
優先順位の変更をしたい該当製品の製造優先順位変更要
求の入力さえすれば、他の製品に対する生産計画との整
合性をとって正確に安易にかつ迅速に製造対象製品群の
優先順位変更が可能となる。
As described above, according to the manufacturing priority changing apparatus of the present invention, the delivery schedule change request that occurs suddenly due to the customer's convenience, the review of the manufacturing plan after the trouble of the equipment system occurring at the manufacturing site, etc. Even if a disturbance factor that does not match the original manufacturing plan occurs, you want to change the manufacturing priority order without changing the complicated review plan before and after the product is put into the manufacturing line by the administrator. As long as the change request is input, it is possible to change the priority order of the product group to be manufactured accurately, easily and promptly in conformity with the production plan for other products.

【0042】したがって、製品の製造優先順位変更に起
因し現状の製造ラインで発生が顕在していた、製造ライ
ン投入後の製品計画変更が製造ラインの人為的判断に起
因して、正確さを欠いたり、変更対象外の製品への影響
までは読み切れず製品の納期確保ができない状態になっ
たり、製品を必要以上に早く作り過ぎてしまう等の問題
が発生することを未然に防止できる。
Therefore, the change in the product plan after the introduction of the production line, which has occurred in the current production line due to the change in the production priority of the products, is not accurate due to the human judgment of the production line. It is possible to prevent the occurrence of problems such as being unable to read the impact on the products that are not subject to change and not being able to secure the delivery date of the products, or making the products too quickly than necessary.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の一実施例に関わる製造優先順位変更
装置の概略構成を示すブロック図、
FIG. 1 is a block diagram showing a schematic configuration of a manufacturing priority order changing device according to an embodiment of the present invention;

【図2】 同実施例装置における各工程と工程投入待製
品メモリと工程着手中製品メモリとの関係を模式的に示
す図、
FIG. 2 is a diagram schematically showing the relationship between each process, the process-waiting product memory, and the process-in-process product memory in the apparatus of the embodiment;

【図3】 同実施例装置における工程投入待製品メモリ
と工程着手中製品メモリの詳細記憶内容を示す図、
FIG. 3 is a diagram showing details of stored contents of a product memory waiting to be processed and a product memory in process start in the apparatus of the embodiment;

【図4】 同実施例装置における工程進捗状況メモリの
記憶内容を示す図、
FIG. 4 is a diagram showing stored contents of a process progress status memory in the apparatus of the embodiment,

【図5】 同実施例装置における進捗情報更新手段の動
作を示す流れ図。
FIG. 5 is a flowchart showing the operation of the progress information updating means in the apparatus of the embodiment.

【符号の説明】[Explanation of symbols]

1…計算機システム、2…優先順位変更入力端末、3…
工程着完入力端末、4…優先順位変更要求受付手段、5
…優先順位変更登録手段、6…工程投入待製品メモリ、
7…工程着手中製品メモリ、8…工程進捗状況メモリ、
9…進捗情報更新手段、10a,10b,10c…工
程。
1 ... Computer system, 2 ... Priority change input terminal, 3 ...
Process completion input terminal, 4 ... Priority change request receiving means, 5
... Priority change registration means, 6 ... Process entry waiting product memory,
7 ... Process in-process product memory, 8 ... Process progress status memory,
9 ... Progress information updating means, 10a, 10b, 10c ... Process.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 製造ライン上における各工程毎に投入待
ちの各製品をそれぞれ投入順位付けて記憶する工程投入
待製品メモリと、前記各工程毎に着手中の各製品を記憶
する工程着手中製品メモリと、各製品毎に前記待ち状態
を含む工程の進捗状況を記憶する工程進捗状況メモリ
と、前記各工程において着手中の製品の工程処理が完了
したとき完了通知を出力するとともに、該当工程に対し
て次の製品が着手されたとき着手通知を出力する工程着
完入力端末と、この工程着完入力端末からの完了通知お
よび着手通知入力に応動して、前記工程進捗状況メモリ
の該当製品の進捗状況を更新するとともに、着手通知の
場合は該当製品を前記工程投入待製品メモリから工程着
手中製品メモリ内の同一工程へ移動させ、完了通知の場
合は該当製品を工程着手中製品メモリから工程投入待製
品メモリ内の次の工程へ移動させる進捗情報更新手段
と、製品の製造優先順位変更要求が入力される優先順位
変更入力端末と、この優先順位変更入力端末から入力さ
れた製造優先順位変更要求に該当する製品の現在の進捗
状況を前記工程進捗状況メモリから検索する優先順位変
更要求受付手段と、この優先順位変更要求受付手段にて
検出された該当製品の工程進捗状況および優先順位順要
求に基づいて前記工程投入待製品メモリの該当製品の投
入順位を変更する優先順位変更登録手段とを備えた製造
優先順位変更装置。
1. A process-waiting product memory that stores the products that are waiting to be put into each process on the manufacturing line in a prioritized order, and a product that is in the process of starting to store each product that has been started at each process. A memory, a process progress status memory that stores the progress status of the process including the waiting state for each product, and a completion notification when the process process of the product underway in each process is completed, and the corresponding process On the other hand, when the next product is started, a process completion input terminal that outputs a notification of the start of the process, and in response to the completion notification and the start notification input from the process completion input terminal, In addition to updating the progress status, in the case of a start notification, the relevant product is moved from the process input waiting product memory to the same process in the process in-process product memory, and in the case of a completion notification, the relevant product is started The progress information updating means for moving from the hand-held product memory to the next process in the process-waiting product memory, the priority-change input terminal to which the manufacturing priority change request of the product is input, and the priority-change input terminal are input. And the process progress status of the corresponding product detected by the priority change request reception means, which retrieves the current progress status of the product corresponding to the manufacturing priority change request from the process progress status memory. And a priority order change registration means for changing the order of introduction of the corresponding products in the process introduction waiting product memory based on the priority order request.
JP22144691A 1991-09-02 1991-09-02 Manufacturing control information processing Pending JPH0561879A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22144691A JPH0561879A (en) 1991-09-02 1991-09-02 Manufacturing control information processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22144691A JPH0561879A (en) 1991-09-02 1991-09-02 Manufacturing control information processing

Publications (1)

Publication Number Publication Date
JPH0561879A true JPH0561879A (en) 1993-03-12

Family

ID=16766867

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22144691A Pending JPH0561879A (en) 1991-09-02 1991-09-02 Manufacturing control information processing

Country Status (1)

Country Link
JP (1) JPH0561879A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02109666A (en) * 1988-10-19 1990-04-23 Fujitsu Ltd Preparing system for work schedule
JPH0324664A (en) * 1989-06-21 1991-02-01 Toshiba Corp Work commanding system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02109666A (en) * 1988-10-19 1990-04-23 Fujitsu Ltd Preparing system for work schedule
JPH0324664A (en) * 1989-06-21 1991-02-01 Toshiba Corp Work commanding system

Similar Documents

Publication Publication Date Title
US6415266B1 (en) Dynamic instruction system for input of parts in vehicle production line
US6834214B2 (en) System, method and computer-program product for transferring a numerical control program to thereby control a machine tool controller
US6480755B1 (en) Process control device and process control method permitting processing order and processing condition to be changed while manufacturing process continues
US11927940B2 (en) Management method for cutting tool of machine tool
US5850343A (en) Machine tool control system
US20050096774A1 (en) System and method for integrating transactional and real-time manufacturing data
JPH05143613A (en) Production planning system
JPH11345267A (en) Method and system for supporting inventory management job
JPH0561879A (en) Manufacturing control information processing
CN115760009B (en) Engineering progress management method, device, equipment and storage medium
US20050096957A1 (en) System and method for manufacturing job rescheduling
JP2002049676A (en) Inventory control apparatus for urgent parts of facility equipment
JPH10301799A (en) System for applying test program
JPH1050571A (en) Method and device for controlling production
US20020165629A1 (en) Backup control system (BCS) for optimizing utilization of multiple fabrication facilities
JPH0786112A (en) Production control method
US5726876A (en) Information communicating system and method
US20020198617A1 (en) System and method for controlling priority of lots employed in MES
CN112200412A (en) Production work order management control method and device, computer equipment and storage medium
US7139628B2 (en) System and method for fabrication backup control
JP2001290525A (en) Recording medium with recorded lot size calculating program, lot size calculating method, and manufacturing method using lot size calculating method
JP2003241819A (en) Production progress management system, production progress management method, and production progress management program
JP2954439B2 (en) Production plan creation method and device
JPH03239460A (en) Production completion schedule calculating method and device
JPH10198402A (en) Method and device for identifying initial value of learning parameter