JPH055927U - Weir for concrete splicing part - Google Patents

Weir for concrete splicing part

Info

Publication number
JPH055927U
JPH055927U JP5345691U JP5345691U JPH055927U JP H055927 U JPH055927 U JP H055927U JP 5345691 U JP5345691 U JP 5345691U JP 5345691 U JP5345691 U JP 5345691U JP H055927 U JPH055927 U JP H055927U
Authority
JP
Japan
Prior art keywords
concrete
weir
board
plate
deck plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5345691U
Other languages
Japanese (ja)
Inventor
広光 奥谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP5345691U priority Critical patent/JPH055927U/en
Publication of JPH055927U publication Critical patent/JPH055927U/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】 【目的】せき板に対して現場でデッキプレートの凹凸に
係合する切り込み形成作業をする手間をなくし、且つ撤
去する必要がないコンクリート打継ぎ部用せき板を目的
とする。 【構成】上側部分1aが長細い直方体形状からなり、そ
の下側部分に、長手方向に沿って等間隔に並んだ複数の
突起部1bが下方に向かって設けれ、その突起部1bに
よって形成された下端面の形状が、デッキプレート上面
の溝方向に直交する方向(強辺方向)の凹凸に係合可能
な形状をなしている。なお、前記構成のせき板1の側面
には長手方向に並んだ複数の貫通孔1cが軸を水平に向
けて開設されている。そして、前記せき板1を予め工場
等で制作しておき、該せき板1を、鉄骨梁の上などに敷
き並べられたデッキプレート上のコンクリート打継ぎ目
となる部分に配置する。
(57) [Summary] [Purpose] The purpose is to provide a weir board for concrete splicing parts that eliminates the work of forming a notch that engages the unevenness of the deck plate on the weir board at the site and does not need to be removed. .. [Structure] An upper part 1a has a long and thin rectangular parallelepiped shape, and a plurality of protrusions 1b arranged at equal intervals along the longitudinal direction are provided downward on the lower part, and are formed by the protrusions 1b. The shape of the lower end surface is such that it can engage with the unevenness in the direction (strong side direction) orthogonal to the groove direction on the upper surface of the deck plate. In addition, a plurality of through holes 1c arranged in the longitudinal direction are formed on the side surface of the weir plate 1 having the above-described configuration with the axis thereof oriented horizontally. Then, the weir plate 1 is produced in advance in a factory or the like, and the weir plate 1 is arranged at a portion which becomes a concrete joint on a deck plate laid on a steel beam or the like.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial application]

この考案は、デッキプレートを用いた床工法において、特に、敷き並べたデッ キプレート上にコンクリートを打ち込む際、コンクリートの打継ぎ部に配置され て打ち込まれたコンクリートを抑えるせき板に関する。 The present invention relates to a flooring method using a deck plate, and more particularly, to a weir board which is placed in a concrete splicing part and suppresses the concrete which is driven in when concrete is driven on the deck plates which are lined up.

【0002】[0002]

【従来の技術】[Prior Art]

デッキプレートを用いた床工法においては、敷き並べたデッキプレートの上に 、コンクリートを打ち継いで床を形成する。即ち、コンクリートの打継ぎ目とな る部分をせき板で仕切り該仕切られた区画内にコンクリートを打ち込み、該コン クリートが硬化したらせき板を取り外し打継ぎ目表面のレイタンス等を除去した 後、次の打継ぎ部に配置したせき板までコンクリートを打ち込む。これを繰り返 してデッキプレート上にコンクリートを打設し、もってデッキプレートを用いた 床を構築する。 In the floor construction method using deck plates, the floor is formed by splicing concrete on the deck plates that are lined up. In other words, the part to be the joint of concrete is divided by a weir board, concrete is driven into the partitioned compartment, the weir board where the concrete is hardened is removed, and the laitance etc. on the surface of the joint seam is removed, and then the next shot is made. Pour concrete up to the weir board placed at the joint. By repeating this, concrete is placed on the deck plate to build a floor using the deck plate.

【0003】 前記コンクリートの打継ぎ目は構造物上の弱点となり易いので、通常、打継ぎ 強度を考慮して該打継ぎ目がデッキプレートの強辺方向(溝方向に直交する方向 )になるように前記せき板は配置される。 このため、前記せき板は、従来、押出発泡ポリスチレン等が用いられて、該せ き板の下側部分がデッキプレートの凹凸に係合する形状になるように、現場で作 業員が切り込んで作成して、前記のように使用していた。Since the joints of the concrete are apt to be weak points in the structure, the joints are usually arranged in the direction of the strong side of the deck plate (the direction orthogonal to the groove direction) in consideration of the joint strength. The weir is placed. Therefore, extruded polystyrene foam or the like is conventionally used for the weir, and an operator cuts it on site so that the lower part of the weir engages with the unevenness of the deck plate. Created and used as described above.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、前記従来のせき板では、作業員が現場でデッキプレートの凹凸 に係合するようにせき板を切り込んで使用することが必要であり、該切り込み作 業に手間がかかる。特に、デッキプレートの溝方向に配設されている鉄筋を通す ための切り込みも考慮する必要がある。 However, in the above-mentioned conventional weir, it is necessary for an operator to cut and use the weir so that the worker can engage with the unevenness of the deck plate on the site, and the incision work is troublesome. In particular, it is necessary to consider the notch for passing the reinforcing bar arranged in the groove direction of the deck plate.

【0005】 また、前記せき板では、コンクリート打設時に該コンクリートの打ち込みの衝 撃等で溝方向にずれ易いために該コンクリートがこぼれることが多く、そのこぼ れたコンクリートの除去作業が必要になる。 さらに、打設したコンクリートが硬化したのち、打継ぎ目に配置した前記せき 板を取り除いてからコンクリートを打ち継ぐ必要があり。該せき板の撤去作業等 に大変手間がかかる。また、打ち込んだコンクリートが硬化してせき板を取り除 かないと、次の打継ぎ部までのコンクリートの打ち込みができないという問題も ある。In addition, when the concrete is poured, the concrete is likely to be spilled because it tends to be displaced in the groove direction due to an impact of driving the concrete, and it is necessary to remove the spilled concrete. Become. In addition, after the placed concrete has hardened, it is necessary to remove the dams placed at the joints and then joint the concrete. It takes a lot of time and labor to remove the weir board. There is also the problem that the concrete cannot be driven to the next joint, unless the concrete is hardened and the dam is removed.

【0006】 本考案は、上記のような問題点に着目してなされたもので、せき板に対して現 場でデッキプレートの凹凸に係合する切り込み形成作業をする手間をなくし、コ ンクリートの硬化後に撤去する必要がないコンクリート打継ぎ部用せき板を目的 とする。The present invention has been made in view of the above problems, and eliminates the work of forming a notch for engaging the unevenness of the deck plate in the field with respect to the weir plate, thereby eliminating the need for the concrete. The purpose is a weir board for concrete joints that does not need to be removed after hardening.

【0007】[0007]

【課題を解決するための手段】[Means for Solving the Problems]

上記目的を達成するために、本考案のコンクリート打継ぎ部用せき板は、敷き 並べられたデッキプレートの上にコンクリートを打ち込む際に、該コンクリート の打継ぎ部へコンクリート止めのために配設されるせき板であって、横方向に長 細い直方体形状からなる上側部分と、その上側部分の下側にあってデッキプレー ト上面の凹凸と係合可能な凹凸形状を形成して前記上側部分と一体になっている 下側部分とからなるPC板から構成され、そのPC板を幅方向へ水平に貫通する 複数の貫通孔が、前記PC板の長手方向等間隔に開設されてなることを特徴とし ている。 In order to achieve the above-mentioned object, the concrete joint spar board of the present invention is disposed for concrete stop at the joint splice portion of concrete when the concrete is driven on the deck plates laid side by side. It is a weir plate, and has an upper part formed of a rectangular parallelepiped shape that is thin in the lateral direction, and an uneven part that is under the upper part and that can be engaged with the unevenness of the upper surface of the deck plate, and the upper part. It is composed of a PC board consisting of an integrated lower part, and a plurality of through holes that horizontally penetrate the PC board in the width direction are formed at equal intervals in the longitudinal direction of the PC board. It is said that.

【0008】[0008]

【作用】[Action]

デッキプレート上面のコンクリート打継ぎ部となる箇所に、前もって制作され ているコンクリート打継ぎ部用せき板を配置する。このとき、該コンクリート打 継ぎ部用せき板の下側部分をデッキプレート上面の凹凸に係合させ、且つ、せき 板の貫通穴にデッキプレートの溝方向に配設される鉄筋を貫通させておく。 A pre-fabricated concrete joint splint is placed on the upper surface of the deck plate where it will be the concrete joint. At this time, the lower part of the concrete splicing part weir plate is engaged with the unevenness of the upper surface of the deck plate, and the rebar arranged in the groove direction of the deck plate is passed through the through hole of the weir plate. ..

【0009】 その状態で、該コンクリート打継ぎ部用せき板で形成された打継ぎ部までにコ ンクリートを打ち込む。その打ち込んだコンクリートが硬化したら次の打継ぎ部 までコンクリートを打ち込む。該打継ぎ部に配置された前記せき板は、PC板か らなるためそのまま打ち込んだコンクリート内に埋め殺しにしておくことが可能 となり、該せき板の撤去作業が省略される。In this state, concrete is driven up to the jointing portion formed of the concrete jointing weir plate. When the concrete that has been hardened has hardened, concrete is driven to the next joint. Since the weir plate arranged at the splicing part is made of a PC plate, it can be buried in the concrete that has been driven in as it is, and the work for removing the weir plate is omitted.

【0010】 また、本考案のせき板は打ち込んだコンクリートと一体になるため、一つの前 記せき板までの区画内に打ち込んだコンクリートが硬化する前に次のせき板まで の区画内へコンクリートを打ち込むこともできる。Further, since the weir board of the present invention is integrated with the concrete that has been driven in, before the concrete that has been driven into one compartment up to the aforementioned weir board is cured, the concrete is put into the compartment up to the next weir board. You can also type in.

【0011】[0011]

【実施例】【Example】

本考案の実施例を図面に基づいて説明する。 まず、コンクリート打継ぎ部用せき板1の構成を説明すると、図1に示すよう に、上側部分1aが長細い直方体形状からなり、その下側部分に該上側部分1a と一体になって、長手方向に沿って等間隔に並んだ複数の突起部1bが下方に向 かって設けられ、その突起部1bの形状がデッキプレートの溝部と係合可能とな って、前記下側部分が、デッキプレート上面の溝方向に直交する方向(強辺方向 )の凹凸に係合可能な形状をなしている。なお、前記構成のせき板1の側面には 長手方向に並んだ複数の貫通孔1cが軸を水平に向けて開設されている。 An embodiment of the present invention will be described with reference to the drawings. First, the configuration of the concrete splicing part weir board 1 will be described. As shown in FIG. 1, the upper part 1a has a long and thin rectangular parallelepiped shape, and the lower part thereof is integrally formed with the upper part 1a to form a long length. A plurality of protrusions 1b arranged at equal intervals along the direction are provided downward, and the shape of the protrusions 1b is engageable with the groove of the deck plate, and the lower portion is the deck plate. The shape is such that it can engage with the unevenness in the direction (strong side direction) orthogonal to the groove direction on the upper surface. In addition, a plurality of through holes 1c arranged in the longitudinal direction are formed on the side surface of the weir plate 1 having the above-described configuration with the axis thereof oriented horizontally.

【0012】 そして、前記構成のせき板1を予め工場等で制作しておき、該せき板1を、図 示しない鉄骨梁の上などに敷き並べられたデッキプレート2上のコンクリートの 打継ぎ目となる部分に配置する。即ち、前記せき板1は、図2に示されるように 、デッキプレート2の強辺方向にせき板1の長手方向を合わせ、該デッキプレー ト2の溝部2aにせき板1の突起部1bが嵌合されるように配置される。そして 、該デッキプレート2の打継ぎ目となる部分に沿って複数のせき板1をその端部 同士を当接させて図2に示すように配置する。前記のようにして、各コンクリー トの打継ぎ目となる部分に夫々前記せき板1を配置しておく。Then, the weir board 1 having the above-described structure is produced in advance in a factory or the like, and the weir board 1 is used as a concrete seam on a deck plate 2 laid on a steel beam (not shown) or the like. Place it in That is, as shown in FIG. 2, the weir plate 1 is such that the longitudinal direction of the weir plate 1 is aligned with the direction of the strong side of the deck plate 2, and the projection 1b of the weir plate 1 is fitted into the groove 2a of the deck plate 2. It is arranged to be fitted. Then, the plurality of weir plates 1 are arranged along the portion of the deck plate 2 which is to be the seam as shown in FIG. As described above, the weirs 1 are arranged at the portions which become the joints of the concretes.

【0013】 また、前記せき板1を設置するときに、デッキプレート2の溝部2aに沿って 配設される鉄筋3で、夫々前記せき板1の貫通孔1cを貫通させて、該せき板1 の貫通孔1cで該鉄筋3間のセパレータの役割をさせると共に、該せき板1の両 側面を挟むように前記鉄筋3に夫々、図3に示すようにスペーサ4を配置する。 該スペーサ4は、図4に示すような円形をしており中心の中空部4aに切り欠け 部4bを介して鉄筋3を嵌め込み該鉄筋3を挟持可能になっている。そのスペー サ4を前記のように配置することで、せき板1が鉄筋3に固定されて後述するコ ンクリートの打ち込み時に該せき板1がずれることがなくなる。When installing the weir 1, the rebars 3 arranged along the groove 2a of the deck plate 2 penetrate the through holes 1c of the weir 1, respectively. The through holes 1c serve as separators between the reinforcing bars 3, and spacers 4 are arranged on the reinforcing bars 3 so as to sandwich both side surfaces of the weir plate 1, as shown in FIG. The spacer 4 has a circular shape as shown in FIG. 4, and the reinforcing bar 3 can be sandwiched by inserting the reinforcing bar 3 into the central hollow part 4a through the cutout part 4b. By arranging the spacer 4 as described above, the weir plate 1 is fixed to the rebar 3 and the weir plate 1 does not shift when the concrete is driven, which will be described later.

【0014】 なお、図2においては、せき板1の貫通孔1cを貫通している鉄筋3は図示さ れていない。 前記のようにせき板1を配置して、コンクリート打ち継ぎ部強化等の目的で図 3に示すようにワイヤーメッシュ5を被せた後、コンクリート6をデッキプレー ト2上のせき板1で仕切られた区画内に打ち込む。このとき、せき板1は、スペ ーサ4によって鉄筋3に固定されているためにコンクリート6の打ち込み時の衝 撃等によってずれることがないので、該コンクリート打設時にコンクリート6の こぼれが少なくなり、該こばれたコンクリート6の除去作業が楽になる。Note that, in FIG. 2, the reinforcing bar 3 penetrating the through hole 1 c of the weir plate 1 is not shown. After placing the weir plate 1 as described above and covering it with the wire mesh 5 as shown in FIG. 3 for the purpose of strengthening the concrete joint, etc., the concrete 6 is partitioned by the weir plate 1 on the deck plate 2. Drive into the compartment. At this time, since the weir board 1 is fixed to the reinforcing bar 3 by the spacer 4, it does not shift due to an impact at the time of driving the concrete 6, so that the spillage of the concrete 6 at the time of placing the concrete is reduced. The work of removing the spilled concrete 6 becomes easier.

【0015】 また、打ち込んだコンクリート6が硬化するにつれて該コンクリート6とPC 板からなるせき板1とが一体となり、該せき板1を取り外す必要もない。 せき板1によって仕切られた区画単位ごとにコンクリート6を順次打ち込み、 もって床が構築される。 このとき、従来であれば、コンクリート6を打継ぐ毎にせき板1の撤去作業を する必要があったが、該せき板1は、コンクリート6と一体となって埋め殺しさ れるため撤去する必要がなくなりコンクリート6の打継ぎ作業が大変楽になる。Further, as the poured concrete 6 hardens, the concrete 6 and the weir board 1 made of a PC board become integrated, and it is not necessary to remove the weir board 1. Concrete 6 is sequentially driven into each unit divided by the weir board 1 to construct a floor. At this time, in the past, it was necessary to remove the weir board 1 each time the concrete 6 was spliced, but since the weir board 1 is buried together with the concrete 6, it is necessary to remove it. Is eliminated, and the splicing work of concrete 6 becomes very easy.

【0016】 また、従来、コンクリートを打ち込んでだ区画の該コンクリート6が硬化し且 つせき板1を取り除かなければ次の打継ぎ部までの区画へコンクリート6を打ち 込むことが出来なかったが、本実施例では、せき板1を撤去する必要がないため 、あるせき板1で仕切られる区画でのコンクリート6が硬化する前に、次のせき 板1までの区画にコンクリート6が打ち込めるようになる。Further, conventionally, it was impossible to drive the concrete 6 into the section up to the next splicing section unless the concrete 6 in the section into which the concrete has been driven hardens and the weir board 1 is removed. In this embodiment, since it is not necessary to remove the weir board 1, before the concrete 6 in the section partitioned by a certain weir board 1 is hardened, the concrete 6 can be poured into the compartments up to the next weir board 1. ..

【0017】 なお、せき板1に開設されている前記実施例の貫通孔1cの位置は一例であり 、他の位置にあってもよいし、上下2段になっていてもよい。要は、デッキプレ ート2に配設される鉄筋3に対応する貫通可能な穴が開設されていればよい。The positions of the through holes 1c of the above-described embodiment provided in the weir plate 1 are merely examples, and may be at other positions, or may be vertically arranged in two stages. In short, it is only necessary to provide a penetrable hole corresponding to the reinforcing bar 3 arranged on the deck plate 2.

【0018】[0018]

【考案の効果】[Effect of the device]

以上説明してきたように、本考案のコンクリート打継ぎ部用せき板は、せき板 を前もってPC板で形成したため、コンクリート打設後に該せき板を取り除く必 要がなくなり、コンクリート打継ぎ作業の能率が向上する。 As explained above, since the weir board for the concrete splicing part of the present invention is formed of the PC board in advance, it is not necessary to remove the weir board after the concrete is placed, and the efficiency of the concrete splicing work is improved. improves.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例に係るコンクリート打継ぎ部用せき板を
示す斜視図である。
FIG. 1 is a perspective view showing a weir board for a concrete splicing part according to an embodiment.

【図2】せき板をデッキプレートに取り付けた状態を示
す斜視図である。
FIG. 2 is a perspective view showing a state in which a weir board is attached to a deck plate.

【図3】せき板と鉄筋との関係,及び打ち込んだコンク
リートとせき板との関係を示す断面側面図である。
FIG. 3 is a cross-sectional side view showing a relationship between a weir board and a reinforcing bar, and a relationship between driven concrete and a weir board.

【図4】本実施例のスペーサを示す斜視図である。FIG. 4 is a perspective view showing a spacer of this embodiment.

【符号の説明】[Explanation of symbols]

1 コンクリート打継ぎ部用せき板 1a 上側部分 1b 突起 1c 貫通孔 2 デッキプレート 3 鉄筋 4 スペーサ 1 Cement board for concrete splicing part 1a Upper part 1b Protrusion 1c Through hole 2 Deck plate 3 Reinforcing bar 4 Spacer

Claims (1)

【実用新案登録請求の範囲】 【請求項1】 敷き並べられたデッキプレートの上にコ
ンクリートを打ち込む際に、該コンクリートの打継ぎ部
へコンクリート止めのために配設されるせき板であっ
て、横方向に長細い直方体形状からなる上側部分と、そ
の上側部分の下側にあってデッキプレート上面の凹凸と
係合可能な凹凸形状を形成して前記上側部分と一体にな
っている下側部分とからなるPC板から構成され、その
PC板を幅方向へ水平に貫通する複数の貫通孔が、前記
PC板の長手方向等間隔に開設されてなることを特徴と
するコンクリート打継ぎ部用せき板。
[Claims for utility model registration] [Claim 1] A weir board which is provided for concrete stopping at a jointing portion of concrete when concrete is driven on deck decks laid out, An upper portion formed of a rectangular parallelepiped shape that is long in the lateral direction, and a lower portion that is integrated with the upper portion by forming an uneven shape on the lower side of the upper portion that can engage with the unevenness on the upper surface of the deck plate. And a plurality of through-holes that horizontally penetrate the PC board in the width direction are formed at equal intervals in the longitudinal direction of the PC board. Board.
JP5345691U 1991-07-10 1991-07-10 Weir for concrete splicing part Pending JPH055927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5345691U JPH055927U (en) 1991-07-10 1991-07-10 Weir for concrete splicing part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5345691U JPH055927U (en) 1991-07-10 1991-07-10 Weir for concrete splicing part

Publications (1)

Publication Number Publication Date
JPH055927U true JPH055927U (en) 1993-01-29

Family

ID=12943363

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5345691U Pending JPH055927U (en) 1991-07-10 1991-07-10 Weir for concrete splicing part

Country Status (1)

Country Link
JP (1) JPH055927U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014095256A (en) * 2012-11-12 2014-05-22 Haseko Corp Ribbed precast concrete plate, and method for separately placing concrete in composite floor slab and beam using the ribbed precast concrete plate
JP2020084547A (en) * 2018-11-22 2020-06-04 株式会社ハナミズキ・ブリッジ・プランニング Steel floor slab pavement structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50120009A (en) * 1974-03-09 1975-09-19
JPS61229051A (en) * 1985-04-04 1986-10-13 清水建設株式会社 Method for cast connection of floor panel concrete and partition member used therein

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50120009A (en) * 1974-03-09 1975-09-19
JPS61229051A (en) * 1985-04-04 1986-10-13 清水建設株式会社 Method for cast connection of floor panel concrete and partition member used therein

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014095256A (en) * 2012-11-12 2014-05-22 Haseko Corp Ribbed precast concrete plate, and method for separately placing concrete in composite floor slab and beam using the ribbed precast concrete plate
JP2020084547A (en) * 2018-11-22 2020-06-04 株式会社ハナミズキ・ブリッジ・プランニング Steel floor slab pavement structure

Similar Documents

Publication Publication Date Title
KR101588115B1 (en) Prefab double wall using truss deck and manufacturing method thereof
JPH055927U (en) Weir for concrete splicing part
JP2017002560A (en) Pretension floor slab construction method based on overhanging construction
JPH05106339A (en) Precast concrete mold for jointing concrete
JPH0637794B2 (en) Building wall structure and construction method
JP6854689B2 (en) How to place fiber reinforced concrete and boundary members
JPH09221706A (en) Floor slab for road surface and layout method thereof
JP2019044444A (en) Connection structure and connection method
JP2959325B2 (en) Construction method of steel frame reinforced concrete structure
JP4404263B2 (en) Concrete jointing method
US4020132A (en) Construction joint for reinforced concrete structures
JP3503760B2 (en) Method for reinforcing joint of PCa concrete plate and reinforcing bar composite
JPH08184120A (en) Precast flooring joint structure
JP3271810B2 (en) A method for manufacturing a heat-insulated half-PC plate.
JP3586692B2 (en) Formwork for forming prefabricated concrete panels
JP6737722B2 (en) Body joint structure and concrete pouring method
JP2004084209A (en) Recyclable prefabricated continuous footing member and method of constructing foundation footing using it
JP2749474B2 (en) Reverse construction method for underground structures
JPH08177155A (en) Connecting structure of steel girder with pc floor board and connecting method thereof
KR100517373B1 (en) Wall Structure Using Tapered Hollow Precast Concrete Pannel and Constructing Method thereof
KR200317090Y1 (en) Tapered Hollow Precast Concrete Pannel
JP2849927B2 (en) Construction method of earthquake-resistant wall with large reinforcing block
JP2943142B1 (en) Precast concrete slab and manufacturing method thereof
JP2009114625A (en) Embedded board for placing joint
JPH03140568A (en) Construction for reinforced combination mold for beam