JPH0552103U - Forming device for production of riser weir plate - Google Patents

Forming device for production of riser weir plate

Info

Publication number
JPH0552103U
JPH0552103U JP11076291U JP11076291U JPH0552103U JP H0552103 U JPH0552103 U JP H0552103U JP 11076291 U JP11076291 U JP 11076291U JP 11076291 U JP11076291 U JP 11076291U JP H0552103 U JPH0552103 U JP H0552103U
Authority
JP
Japan
Prior art keywords
plate
riser
frame
base frame
side frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11076291U
Other languages
Japanese (ja)
Inventor
安之 鶴田
Original Assignee
安之 鶴田
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 安之 鶴田 filed Critical 安之 鶴田
Priority to JP11076291U priority Critical patent/JPH0552103U/en
Publication of JPH0552103U publication Critical patent/JPH0552103U/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】 【目的】階段部の仕上げ工事の工期の短縮が可能な埋め
込み式の蹴込堰板を能率よく製造できる型枠装置を提供
する。 【構成】階段施工用の蹴込堰板を製造する型枠装置であ
って、この型枠装置は基枠(1)と、基枠(1) に取り外し
可能に装着される側枠板(20)とを備えている。基枠(1)
は長方形の底板(10)を有し、底板(10)の両短辺側には製
造される蹴込堰板の厚さにほぼ対応する高さの側枠(12)
(13)が立設してある。底板(10)の長辺側の一方には短辺
側の側枠(12)(13)と連続する側枠(11)が立設してある。
側枠板(20)は基枠(1) の他方の長辺側に、締付具(18)な
どの固定具を介して取付けてある。取付け時の側枠板(2
0)または長辺側の側枠(11)のうち少なくとも一方は上部
側が内側へ傾斜して設けてある。
(57) [Abstract] [Purpose] To provide a formwork device capable of efficiently manufacturing an embedded riser weir plate capable of shortening the period of finishing work of stairs. [Structure] A formwork device for manufacturing a riser board for stair construction, the formwork device comprising a base frame (1) and side frame plates (20) detachably attached to the base frame (1). It has and. Base frame (1)
Has a rectangular bottom plate (10), and on both short sides of the bottom plate (10) side frames (12) having a height approximately corresponding to the thickness of the riser weir plate to be manufactured.
(13) is erected. On one of the long sides of the bottom plate (10), a side frame (11) continuous with the side frames (12) and (13) on the short side is erected.
The side frame plate (20) is attached to the other long side of the base frame (1) via a fastener such as a fastener (18). Side frame plate (2
0) or at least one of the long side side frames (11) is provided so that the upper side is inclined inward.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial application]

本考案は階段の仕上げ工事の工期を短縮できるようにした蹴込堰板を製造する ための型枠装置に関するものである。 The present invention relates to a formwork device for manufacturing a riser weir plate that can shorten the period for finishing stairs.

【0002】[0002]

【従来技術】[Prior art]

例えばビル建築におけるコンクリート階段は、上階に各種資材を運ぶための通 路として使用するために、早い時期に施工しておく必要がある。この階段施工が 遅れると工事計画に支障を来すので、迅速な施工が要求される。 従来の施工方法は一般に次の手順で行われる。 スラブパネルをサポートして傾斜させて施工する。 スラブパネルの側部に側壁型枠を組み立てる。 スラブパネル上に配筋を階段状に施工する。 配筋の各前面側に、木製の蹴込堰板を側壁型枠に架けわたすようにして取付け る。 蹴込堰板が打設コンクリートの重みで変形しないように、その中央付近を端太 材や当て板を使用して補強する。 側壁型枠の内部および蹴込堰板の奥側にコンクリートを打設し、蹴込堰板の奥 側のコンクリート面の高さを、蹴込堰板の上面の高さと面一になるように鏝を使 って仕上げる。 養生期間が経過したら、側壁型枠および蹴込堰板を取り外す。 この施工方法では、蹴込堰板の補強作業に手間がかかり、蹴込堰板を取り外し た後で踏面と蹴込面にモルタルを塗って仕上げる必要があるなど、迅速な施工を するにはいくつかの課題があった。 For example, concrete stairs in building construction need to be constructed early so that they can be used as a passage for carrying various materials to the upper floors. If this stairway construction is delayed, it will interfere with the construction plan, so prompt construction is required. The conventional construction method is generally performed in the following procedure. Support the slab panel and incline the construction. Assemble the sidewall formwork on the side of the slab panel. Reinforcing bars are constructed in steps on the slab panel. On each front side of the bar arrangement, a wooden weir board is installed by hanging it over the side wall formwork. In order to prevent deformation of the riser weir board due to the weight of the cast concrete, the area around the center of the riser board should be reinforced with end timbers and caul plates. Concrete is placed inside the side wall form and behind the riser weir plate, and the trowel is used so that the height of the concrete surface behind the riser plate is flush with the top surface of the riser plate. To finish. After the curing period, remove the side wall form and riser weir plate. With this construction method, it takes time to reinforce the riser weir plate, and it is necessary to remove the riser weir plate and then apply mortar to the tread and riser surface to finish it. was there.

【0003】 本考案者はこれらの課題を解決できる蹴込堰板を開発した。 図5は蹴込堰板およびその施工方法を示す説明図である。 蹴込堰板5はコンクリート製で、所要の厚さを有する長方形の板状体である。 蹴込み堰板5の表面50は、そのままで蹴込み面となり得るように平滑に仕上げ られており、一方の端部には高さ方向の全長にわたって流水溝59が設けられて いる。蹴込堰板5の裏面51には全面にわたって多数の凹凸部を有する櫛目(図 では見えない)が設けてある。櫛目は、打設コンクリートとの接着面積を広くし て接着力を増すためのものである。また裏面51には、取着具である番線54が 三箇所に設けてある。 蹴込堰板5の上辺55および下辺56は、裏面51側へ向かってすぼまるよう に、全面が所要の角度で傾斜して形成されている。これによって、蹴込堰板5を 表面50側へ所要の角度で傾斜させて設置したときに、上辺55を水平にして施 工しやすくする。また、蹴込堰板5は対称形であるので、階段の流水溝59を反 対側に施工するときには下辺56側を上辺とすればよい。 蹴込堰板5の施工方法は次のとおりである。 スラブパネル3を支保部材(図示省略)で支持して所要の角度に施工する。 スラブパネル3の両側に、内枠41と外枠42とからなる側壁型枠4を施工す る。(図5では手前側の側壁型枠4は省略している) スラブパネル3の上に階段の形状に対応した配筋8を施す。 両側の内枠41のうち、配筋8における各段の縦筋80の前方に対応する位置 に支持器具2を固定する。各支持器具2は、図に示すように前方へやや傾斜して 取付けてある。 両側の支持器具2の支持板28に蹴込堰板5を載置して掛け渡し、蹴込堰板5 を板片22に当接させて所要の角度で前方へ傾斜するようにし、裏面51に設け てある番線54を配筋8に括りつける。このとき、蹴込堰板5の上辺55は水平 になっている。 支持器具2の調整ボルト26を回して支持板28を昇降させ、各蹴込堰板5の 高さを適宜調整する。 側壁型枠4及び各蹴込堰板5の奥側にコンクリートを打設し、踏面6を蹴込堰 板5の上辺55と面一に仕上げる。一定期間養生した後、踏面6にモルタルで仕 上げ面を施工する。この際、蹴込堰板5の流水溝59と連続する流水溝を施工す るようにする。 蹴込堰板5を埋めたまま他の側壁型枠4やスラブパネル3等を取り外す。この とき、支持器具2は、調整ボルト26を回して支持板28を埋め殺した状態で取 り外すようにし、残った穴をモルタルで塞ぐ。 このようにこの施工方法では蹴込堰板5の表面10がそのまま蹴込み面となる ので仕上げの手間が軽減され、また蹴込堰板5の補強工事も不要であるので、迅 速な施工ができる。 本考案は、上記した蹴込堰板5を能率よく製造できる蹴込堰板製造用型枠装置 である。The present inventor has developed a riser weir plate that can solve these problems. FIG. 5 is an explanatory diagram showing a riser weir board and a method of constructing the riser board. The riser weir board 5 is made of concrete and is a rectangular plate-like body having a required thickness. The surface 50 of the riser weir plate 5 is finished so as to be a riser surface as it is, and a flowing water groove 59 is provided at one end over the entire length in the height direction. The back surface 51 of the riser weir plate 5 is provided with combs (not visible in the figure) having a large number of irregularities over the entire surface. The combs are for increasing the adhesion area by increasing the adhesion area with the cast concrete. Further, the back surface 51 is provided with a numbering wire 54 which is an attachment at three places. The upper side 55 and the lower side 56 of the riser weir plate 5 are formed so that the entire surface is inclined at a required angle so as to narrow toward the back surface 51 side. Thus, when the riser weir plate 5 is installed on the surface 50 side at a desired angle, the upper side 55 is made horizontal to facilitate the work. Further, since the riser weir plate 5 is symmetrical, the lower side 56 side may be the upper side when the running water groove 59 of the stairs is constructed on the opposite side. The construction method of the riser weir plate 5 is as follows. The slab panel 3 is supported by a supporting member (not shown) and is installed at a required angle. On both sides of the slab panel 3, the side wall form 4 including the inner frame 41 and the outer frame 42 is constructed. (The side wall form 4 on the front side is omitted in FIG. 5) On the slab panel 3, a bar arrangement 8 corresponding to the shape of the stairs is provided. In the inner frames 41 on both sides, the support device 2 is fixed at a position corresponding to the front of the vertical streaks 80 of each step in the bar arrangement 8. As shown in the figure, each supporting device 2 is attached so as to be inclined slightly forward. The riser weir plate 5 is placed on the support plates 28 of the support devices 2 on both sides and bridged, and the riser weir plate 5 is brought into contact with the plate piece 22 so as to be inclined forward at a required angle, and is provided on the back surface 51. The numbered line 54 that is marked is bound to the bar arrangement 8. At this time, the upper side 55 of the riser weir plate 5 is horizontal. The height of each riser dam 5 is adjusted as appropriate by turning the adjustment bolt 26 of the support device 2 to move the support plate 28 up and down. Concrete is placed on the back side of the side wall form 4 and each riser weir plate 5, and the tread surface 6 is finished flush with the upper side 55 of the riser weir plate 5. After curing for a certain period of time, a finishing surface is constructed on the tread 6 with mortar. At this time, a running water groove that is continuous with the running water groove 59 of the riser weir plate 5 is constructed. The other side wall form 4, slab panel 3 and the like are removed with the riser weir plate 5 being buried. At this time, in the supporting device 2, the adjusting bolt 26 is rotated to remove the supporting plate 28 in a buried state, and the remaining hole is closed with mortar. In this way, in this construction method, since the surface 10 of the riser weir plate 5 becomes the riser surface as it is, the labor of finishing is reduced, and since the reinforcement work of the riser weir plate 5 is unnecessary, the construction can be performed quickly. The present invention is a formwork device for manufacturing a riser weirboard that can efficiently produce the riser weirboard 5 described above.

【0004】[0004]

【本考案の構成】[Configuration of the present invention]

本考案の構成は次のとおりである。 階段施工用の蹴込堰板を製造する型枠装置であって、この型枠装置は、 基枠と; この基枠に取り外し可能に装着される側枠板と; を備え、 前記基枠は、長方形の底板を有し、この底板の両短辺側には製造される蹴込堰 板の厚さにほぼ対応する高さの側枠が立設してあり、 長辺側の一方には前記短辺側の側枠と連続する側枠が立設してあり、 前記側枠板は、前記基枠の他方の長辺側に、固定具を介して取付けてあり、 取付け時の前記側枠板または前記長辺側の側枠のうち少なくとも一方は上部側 が内側へ傾斜して設けてある、型枠装置である。 The structure of the present invention is as follows. A formwork device for producing a riser for a staircase construction, the formwork device comprising: a base frame; and a side frame plate removably attached to the base frame; It has a rectangular bottom plate, and on both short sides of this bottom plate, side frames with a height approximately corresponding to the thickness of the riser plate to be manufactured are erected. A side frame continuous with the side frame on the side is erected, and the side frame plate is attached to the other long side of the base frame via a fixture, and the side frame plate at the time of attachment Alternatively, at least one of the side frames on the long side is a formwork device in which the upper side is inclined inward.

【0005】[0005]

【実施例】【Example】

本考案を図面に示した実施例に基づき更に詳細に説明する。 図1は型枠装置の一実施例を示す分解斜視図である。 符号Aは型枠装置で、鉄板で形成された基枠1を備えている。基枠1は、長方 形の底板10を有している。底板10の一方の長辺側には側枠11が立設してあ る。なお側枠11の上部側は内側へ向けてやや傾斜している(図3参照)。 そして底板10の両短辺側には側枠11と同じ高さの側枠12、13が、側枠 11と連続して垂直に立設してある。またこれによって、側枠が設けられていな い長辺側は側枠板装着部11aとなっている。 底板10の裏面側には、幅方向において両端部寄りに、長さ方向の全長にわた って断面L形状の脚板14、15が設けてある。 側枠板装着部11a側の脚板14には、固定具である取着ボルト16と止めナ ット17が設けてある。取着ボルト16は三箇所に外側へ向けて水平に設けてあ り、止めナット17はその中間部に固定されている。 側枠板装着部11aには、側枠板装着部11aを塞ぐようにして底板10と同 じ長さの側枠板20が取付けられる。側枠板20は鉄板製で、底片20aと側片 20bを有し、折曲角が直角よりやや鋭角に形成された断面L形状に形成されて いる。側枠板20は図3に示すように、底片20aの上面を底板10の下面に当 接させ、底片20aの下面を止めナット17の上部に当接させてあり、締付具1 8によって押圧して取付けてある。 The present invention will be described in more detail based on the embodiments shown in the drawings. FIG. 1 is an exploded perspective view showing an embodiment of the formwork apparatus. Reference numeral A is a formwork device, which includes a base frame 1 formed of an iron plate. The base frame 1 has a rectangular bottom plate 10. A side frame 11 is erected on one long side of the bottom plate 10. The upper side of the side frame 11 is slightly inclined inward (see FIG. 3). On both short sides of the bottom plate 10, side frames 12 and 13 having the same height as that of the side frame 11 are vertically provided so as to be continuous with the side frame 11. Further, by this, the long side without the side frame is the side frame plate mounting portion 11a. On the rear surface side of the bottom plate 10, leg plates 14 and 15 having an L-shaped cross section are provided near both ends in the width direction over the entire length in the length direction. The leg plate 14 on the side of the side frame plate mounting portion 11a is provided with an attachment bolt 16 and a fixing nut 17 which are fixtures. The attachment bolts 16 are horizontally provided at three locations toward the outside, and the lock nut 17 is fixed to an intermediate portion thereof. A side frame plate 20 having the same length as the bottom plate 10 is attached to the side frame plate mounting portion 11a so as to close the side frame plate mounting portion 11a. The side frame plate 20 is made of an iron plate, has a bottom piece 20a and a side piece 20b, and is formed to have an L-shaped cross section in which the bending angle is slightly acute rather than a right angle. As shown in FIG. 3, in the side frame plate 20, the upper surface of the bottom piece 20a is in contact with the lower surface of the bottom plate 10, and the lower surface of the bottom piece 20a is in contact with the upper portion of the lock nut 17, and is pressed by the tightening tool 18. And installed.

【0006】 締付具18は、中程から底板10側にやや「く」形状に折曲された形状の板片 で、その一端寄りには取着ボルト16よりやや径の大きい挿通孔180が設けて ある。締付具18は挿通孔180に前記取着ボルト16を挿通して装着してあり 、締付ナット19によって締め付けて側枠板20を固定している。この際、締付 具18の前面は側枠板20の内側へ傾斜した側片20bの後面に密着するように なっている。 なお符号30は、型枠装置Aによって製造する蹴込堰板5の表面の一端側に流 水溝部を形成するための型板であり、流水溝部を両端側に設ける場合には左右に 配設される。また型板30の裏面に磁石を設けると底板10に磁着し動かないの で蹴込堰板5の製造の際に型板30の動きに気を付けなくてすむ。 図2は型枠装置の他の実施例を示す要部斜視図である。 本実施例においては、基枠1の底板10の一端側に装着されるスペーサ具6を 備えている。スペーサ具6は、スペーサ枠60と所要枚数のスペーサ板64から なる。スペーサ枠60は底板61を有している。底板61の長さ方向の一端側に は、装着時に側枠11と同じ高さになる端板61aが立設してあり、底板61の 中央部にはコ状の把手63が設けてある。スペーサ枠60とスペーサ板64は底 板10とほぼ同じ幅に形成してあり、基枠1の底板10の側枠板装着部11a端 縁からはみ出さないように設定されている。そして端板61の外面側には端板6 1と同じ高さの枠木62が固定してあり、さらにその外側には金属製で四角筒状 の調整部材65が必要に応じて配置される。 この構造によると、横方向の長さが相違する数種類の蹴込堰板5を製造する際 に、いちいち長さの違う型枠装置Aを用意する必要はなく、一種類の型枠装置A で製造できる利点がある。The fastener 18 is a plate piece bent from the middle to the side of the bottom plate 10 in a slightly “” shape, and an insertion hole 180 having a diameter slightly larger than that of the attachment bolt 16 is provided near one end thereof. It is provided. The fastener 18 is mounted by inserting the attachment bolt 16 into the insertion hole 180, and the side frame plate 20 is fixed by tightening with a tightening nut 19. At this time, the front surface of the fastener 18 comes into close contact with the rear surface of the side piece 20b inclined inward of the side frame plate 20. Reference numeral 30 is a mold plate for forming a flowing water groove portion on one end side of the surface of the riser weir plate 5 manufactured by the formwork apparatus A. When the flowing water groove portion is provided on both end sides, it is arranged on the left and right sides. It Further, when a magnet is provided on the back surface of the template 30, it does not move because it is magnetically attached to the bottom plate 10, so that the movement of the template 30 need not be taken into consideration when manufacturing the riser dam 5. FIG. 2 is a perspective view of an essential part showing another embodiment of the formwork apparatus. In this embodiment, a spacer tool 6 mounted on one end side of the bottom plate 10 of the base frame 1 is provided. The spacer tool 6 includes a spacer frame 60 and a required number of spacer plates 64. The spacer frame 60 has a bottom plate 61. An end plate 61a, which is at the same height as the side frame 11 when mounted, is erected on one end side in the length direction of the bottom plate 61, and a U-shaped handle 63 is provided at the center of the bottom plate 61. The spacer frame 60 and the spacer plate 64 are formed to have substantially the same width as the bottom plate 10, and are set so as not to protrude from the edge of the side frame plate mounting portion 11a of the bottom plate 10 of the base frame 1. A frame 62 having the same height as that of the end plate 61 is fixed to the outer surface of the end plate 61, and a square metal tubular adjustment member 65 is arranged on the outside thereof as required. .. According to this structure, when manufacturing several types of riser weir plates 5 having different lateral lengths, it is not necessary to prepare formwork devices A having different lengths, and only one formwork device A is used. There are advantages.

【0007】 (作 用) 図3は使用状態を示す断面図、図4は蹴込堰板を製造する際の養生の方法を示 す説明図である。図1ないし図4を参照して本実施例の作用を説明する。 まず、上記実施例において説明したように型枠装置Aを組み立て、底板10の 一端側に枠板30を設置する。次に底板10と各側枠11、12、13と側枠板 20とで囲まれた部分に、一杯になるまでコンクリートを流し込む。そして、補 強用のメタルラス53をコンクリートの上に乗せ、バイブレータにより軽く振動 をかけて、図3に示す深さまで沈める。メタルラス53は底板10の大きさより やや小さく形成されており、その幅方向の一端側には、等間隔で三箇所に任意の 長さの番線54が裏面51から延出されて取付けてある。番線54は、蹴込堰板 5の施工の際に倒れないように支持するためのものである。また蹴込堰板5の裏 面51には、ほぼ全面に櫛目やほうき目による凹凸部52が設けられる。 養生が済んだら締付ナット19を緩め、側枠板20を取り外して蹴込堰板5を 型枠装置Aから抜く。これによって表面50の一端側に流水溝59(図5参照) を有する蹴込堰板5が製造できる。またこの際、締付ナット19を緩めると締付 具18が取着ボルト16を中心にして下方に回動するので、締付具18を取着ボ ルト16に取付けたまま側枠板20の取り外しが簡単にできる。またこの構造に より締付具18や締付ナット19の紛失が防止できる。 なお養生する期間は、図4に示すようにパレットPの上にスペーサ7を介して 数枚ずつ縦横に積み重ねておく。これによると、広い設置スペースは必要でなく 、工場内での移動もフォークリフトによって効率よく容易にできる。 本考案は図示の実施例に限定されるものではなく、実用新案登録請求の範囲の 記載内において種々の変形が可能である。(Operation) FIG. 3 is a cross-sectional view showing a use state, and FIG. 4 is an explanatory view showing a curing method when manufacturing a riser weir plate. The operation of this embodiment will be described with reference to FIGS. First, the frame apparatus A is assembled as described in the above embodiment, and the frame plate 30 is installed on one end side of the bottom plate 10. Next, concrete is poured into a portion surrounded by the bottom plate 10, the side frames 11, 12, 13 and the side frame plate 20 until it is full. Then, the metal lath 53 for reinforcement is placed on the concrete and lightly vibrated by the vibrator to sink it to the depth shown in FIG. The metal lath 53 is formed to be slightly smaller than the size of the bottom plate 10. On one end side in the width direction of the metal lath 53, numbered wires 54 of arbitrary length are attached at three equal intervals extending from the back surface 51. The number line 54 is for supporting the riser weir plate 5 so as not to fall when it is installed. In addition, the back surface 51 of the riser weir plate 5 is provided with an uneven portion 52 having combs or brooms almost all over the surface. When the curing is completed, the tightening nut 19 is loosened, the side frame plate 20 is removed, and the riser weir plate 5 is removed from the formwork apparatus A. As a result, the riser weir plate 5 having the running water groove 59 (see FIG. 5) at one end of the surface 50 can be manufactured. Further, at this time, when the tightening nut 19 is loosened, the tightening tool 18 pivots downward about the attachment bolt 16, so that the side frame plate 20 of the side frame plate 20 remains attached to the mounting bolt 16. Easy to remove. Further, with this structure, the tightening tool 18 and the tightening nut 19 can be prevented from being lost. During the curing period, several sheets are stacked vertically and horizontally on the pallet P via the spacer 7 as shown in FIG. According to this, a large installation space is not required, and the forklift can efficiently and easily move within the factory. The present invention is not limited to the illustrated embodiment, but various modifications can be made within the scope of the claims for utility model registration.

【0008】[0008]

【考案の効果】[Effect of the device]

本考案の型枠装置は、基枠と、基枠に取り外し可能に装着される側枠板とを備 え、基枠は長方形の底板を有し、底板の両短辺側には製造される蹴込堰板の厚さ にほぼ対応する高さの側枠が立設してあり、長辺側の一方には短辺側の側枠と連 続する側枠が立設してあり、側枠板は基枠の他方の長辺側に固定具を介して取付 けてあり、装着時の側枠板または長辺側の側枠のうち少なくとも一方は内側へ向 けて傾斜して設けてあるので、階段の仕上げ工事の工期の短縮が可能な蹴込堰板 が能率よく製造できる。 The formwork device of the present invention comprises a base frame and side frame plates removably attached to the base frame, and the base frame has a rectangular bottom plate, and is manufactured on both short sides of the bottom plate. A side frame with a height approximately corresponding to the thickness of the riser is installed upright, and one side on the long side is installed upright with a side frame continuous with the side frame on the short side. The plate is attached to the other long side of the base frame via a fixing tool, and at least one of the side frame plate and the side frame on the long side at the time of mounting is provided so as to be inclined inward. Therefore, it is possible to efficiently manufacture a riser weir plate that can shorten the construction period of stair finishing work.

【図面の簡単な説明】[Brief description of drawings]

【図1】型枠装置の一実施例を示す分解斜視図である。FIG. 1 is an exploded perspective view showing an embodiment of a formwork apparatus.

【図2】型枠装置の他の実施例を示す要部斜視図であ
る。
FIG. 2 is a main part perspective view showing another embodiment of the formwork apparatus.

【図3】使用状態を示す断面図である。FIG. 3 is a cross-sectional view showing a usage state.

【図4】蹴込堰板を製造する際の養生の方法を示す説明
図である。
FIG. 4 is an explanatory diagram showing a curing method when manufacturing a riser weir plate.

【図5】蹴込堰板およびその施工方法を示す説明図であ
る。
FIG. 5 is an explanatory view showing a riser weir plate and a construction method thereof.

【符号の説明】[Explanation of symbols]

A 型枠装置 1 基枠 20 側枠板 10 底板 11、12、13 側枠 16 取着ボルト 17 止めナット 18 締付具 19 締付ナット A Formwork device 1 Base frame 20 Side frame plate 10 Bottom plate 11, 12, 13 Side frame 16 Attachment bolt 17 Lock nut 18 Fastening tool 19 Tightening nut

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 階段施工用の蹴込堰板を製造する型枠装
置であって、この型枠装置は、 基枠(1) と;この基枠(1) に取り外し可能に装着される
側枠板(20)と;を備え、 前記基枠(1) は、長方形の底板(10)を有し、この底板(1
0)の両短辺側には製造される蹴込堰板の厚さにほぼ対応
する高さの側枠(12)(13)が立設してあり、長辺側の一方
には前記短辺側の側枠(12)(13)と連続する側枠(11)が立
設してあり、前記側枠板(20)は、前記基枠(1) の他方の
長辺側に、固定具を介して取付けてあり、 取付け時の前記側枠板(20)または前記長辺側の側枠(11)
のうち少なくとも一方は上部側が内側へ傾斜して設けて
あることを特徴とする型枠装置。
1. A formwork device for manufacturing a riser for a staircase construction, comprising: a base frame (1); and a side frame detachably mounted on the base frame (1). The base frame (1) has a rectangular bottom plate (10).
On both short sides of (0), side frames (12) (13) having a height approximately corresponding to the thickness of the riser weir plate to be manufactured are erected, and one of the long sides is the short side. A side frame (11) continuous with the side frames (12) (13) is erected, and the side frame plate (20) is a fixture on the other long side of the base frame (1). And the side frame plate (20) or the side frame (11) on the long side at the time of mounting.
At least one of the above is a formwork device, wherein an upper side thereof is provided so as to be inclined inward.
JP11076291U 1991-12-17 1991-12-17 Forming device for production of riser weir plate Pending JPH0552103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11076291U JPH0552103U (en) 1991-12-17 1991-12-17 Forming device for production of riser weir plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11076291U JPH0552103U (en) 1991-12-17 1991-12-17 Forming device for production of riser weir plate

Publications (1)

Publication Number Publication Date
JPH0552103U true JPH0552103U (en) 1993-07-09

Family

ID=14543930

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11076291U Pending JPH0552103U (en) 1991-12-17 1991-12-17 Forming device for production of riser weir plate

Country Status (1)

Country Link
JP (1) JPH0552103U (en)

Similar Documents

Publication Publication Date Title
JP2003293538A (en) Stair structure and method for construction of the same
JPH08312090A (en) Construction method of concrete stair with stepped form left, and stepped form
JPH0552103U (en) Forming device for production of riser weir plate
KR100356352B1 (en) A method and an apparatus for constructing the floor horizontally
JPH1181660A (en) Form construction method for staircase
JP2706742B2 (en) Construction method of reinforced concrete stairs, stair handrail precast concrete slab and stair step formwork used for it
JPH0572503B2 (en)
JP2004360392A (en) Concrete stairs
JP2002227408A (en) Method for executing stair in building and rise directly used for its method
JP2001254495A (en) Internal stairway for building, and building method therefor
JP2543752Y2 (en) Formwork connection bracket
JP2556217Y2 (en) Sinking board for stair construction
JP2909609B2 (en) Lifting board equipment, riser, connecting member and concrete stair finishing construction used for concrete stair finishing.
JP2004204508A (en) Construction method of staircase, and form for staircase
KR0127132Y1 (en) Nonslip -united vertical block
JPH0776484B2 (en) Outer wall of building, its construction method and its net support metal fittings
KR200223187Y1 (en) kicker bracket
JP3239921B2 (en) Driving formwork for stairs and stairs construction method using the same
JP2003082852A (en) Form holding fixture
JPH0237466B2 (en)
JP2759229B2 (en) Construction method of RC construction stairs
JPH05187030A (en) Gravity-type retaining wall and manufacture thereof
JPH04315641A (en) Construction method for concrete stairway and footstep riser and support tool used for it
JP3074235B2 (en) Method of constructing temporary scaffold for steel stairs and support fitting used for the method
JP2002364139A (en) Steel stair mounting hardware, mounting device and mounting method