JPH0552087A - Caisson type pile construction machine - Google Patents

Caisson type pile construction machine

Info

Publication number
JPH0552087A
JPH0552087A JP22945991A JP22945991A JPH0552087A JP H0552087 A JPH0552087 A JP H0552087A JP 22945991 A JP22945991 A JP 22945991A JP 22945991 A JP22945991 A JP 22945991A JP H0552087 A JPH0552087 A JP H0552087A
Authority
JP
Japan
Prior art keywords
machine
guide shaft
underground
work machine
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22945991A
Other languages
Japanese (ja)
Inventor
Sakae Nakai
栄 中井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP22945991A priority Critical patent/JPH0552087A/en
Publication of JPH0552087A publication Critical patent/JPH0552087A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Foundations (AREA)

Abstract

PURPOSE:To reduce the manual work and provide safety by mechanizing the caisson type pile construction. CONSTITUTION:A tubular guide shaft 2 is suspended from a pit mouth frame 10 with shaft hoisting devices 12 and cables 13. Each guide shaft 2 is fixed by shaft grippers 7, 11. A main work machine 20, auxiliary work machines 25, 36, and a man/load-conveying gondola 35 are suspended from external cranes 15, 30 with rope trolleys 17, 32 and cables 18, 33. An optional underground machine, e.g. the main work machine 20, is inserted into the guide shaft 2, and it is lowered to the excavation work area 79. The main work machine 20 is fixed to the guide shaft 2 with a gripper 22 to excavate the ground 80. Various underground machines can be quickly replaced in response to the soil property, and each underground machine can be fixed for a strong excavation.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、深礎工の施工機械に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction machine for deep foundation work.

【0002】[0002]

【従来の技術】深礎工の施工は、元々、人力施工による
工法として開発されたが、苦渋作業(ブレーカー、騒
音、人力作業)、危険作業(深部作業、落下、墜落)が
多く、労働力の確保が困難である。また、深礎工の施工
は、事故発生率が高いため、施工機械の開発が望まれて
いる。そこで、人力施工の代替として、一般施工用の建
設機械の流用などが考えられており、また、一般機械を
小型化した専用機も開発されつつある。
[Prior art] The construction of deep foundation work was originally developed as a construction method by manual labor, but many difficult work (breaker, noise, manual work), dangerous work (deep work, drop, fall), labor force Is difficult to secure. In addition, since the accident rate is high in the construction of deep foundation works, the development of construction machinery is desired. Therefore, diversion of construction machines for general construction is considered as an alternative to manual construction, and dedicated machines that are downsized general machines are also being developed.

【0003】[0003]

【発明が解決しようとする課題】しかし、深礎は、一般
に、直径が小さく(2〜5m)、深い(最大50m)と
いう特殊条件の立穴であるため、一般機械の改造、転用
では、能率的な施工は困難である。即ち、一般機械を小
型化しただけでは、切削能力不足であり、作業性等に問
題がある。また、深礎は、土質的に、軟弱な土礎から硬
岩まで広範囲に亙るので、単一の機械では、各土質を掘
削する事は不可能に近い。
However, since the deep foundation is generally a vertical hole with a small diameter (2 to 5 m) and deep (up to 50 m) special conditions, it is efficient in remodeling and diversion of general machinery. Construction is difficult. That is, simply reducing the size of a general machine is insufficient in cutting ability, and there is a problem in workability. In addition, since the deep foundation covers a wide range of soil from soft foundation to hard rock, it is almost impossible to excavate each soil with a single machine.

【0004】本発明は、上記事情に鑑み、能率的な施工
を行うことが出来る深礎施工機械を提供することを目的
とする。
In view of the above circumstances, an object of the present invention is to provide a deep foundation construction machine capable of performing efficient construction.

【0005】[0005]

【課題を解決するための手段】本発明は、管状のガイド
(2)を、坑内へ伸延する形で設け、ガイド固定手段
(10、13、7、11)を、前記ガイド(2)を固定
する形で設け、複数の坑内機械(20、20′、25、
25′、36、35)を、前記ガイド(2)内を移動可
能な形で設け、坑内機械懸架手段(15、30、18、
33)を、前記各坑内機械(20、20′、25、2
5′、36、35)を坑外から懸架すると共に、前記各
坑内機械(20、20′、25、25′、36)を選択
的に前記ガイド(2)内へ移動させる形で設け、坑内機
械固定手段(22、27、38)を、前記坑内機械(2
0、20′、25、25′、36、35)を前記ガイド
(2)に対して固定する形で設けて構成される。
According to the present invention, a tubular guide (2) is provided so as to extend into a pit, and guide fixing means (10, 13, 7, 11) fixes the guide (2). In the form of a plurality of underground machines (20, 20 ', 25,
25 ', 36, 35) are provided movably in the guide (2), and the downhole mechanical suspension means (15, 30, 18,
33) to each of the downhole machines (20, 20 ', 25, 2)
5 ', 36, 35) is suspended from the outside of the mine, and each of the downhole machines (20, 20', 25, 25 ', 36) is selectively moved into the guide (2). The machine fixing means (22, 27, 38) is connected to the underground machine (2
0, 20 ', 25, 25', 36, 35) are provided so as to be fixed to the guide (2).

【0006】なお、( )内の番号等は、図面における
対応する要素を示す、便宜的なものであり、従って、本
記述は図面上の記載に限定拘束されるものではない。以
下の「作用」の欄についても同様である。
The numbers in parentheses () indicate the corresponding elements in the drawings for the sake of convenience, and the present description is not limited to the description in the drawings. The same applies to the column of "action" below.

【0007】[0007]

【作用】上記した構成により、各坑内機械(20、2
0′、25、25′、36)が、坑内外への移動中は、
ガイド(2)を介して案内され、作業中は、坑内機械固
定手段(22、27、38)を介してガイド(2)に対
して固定されるように作用する。
With the above structure, each downhole machine (20, 2)
0 ', 25, 25', 36) are moving in and out of the mine,
It is guided through the guide (2) and, during work, acts so as to be fixed to the guide (2) through the downhole machine fixing means (22, 27, 38).

【0008】[0008]

【実施例】以下、図面に基づき、本発明の実施例を説明
する。図1は、本発明による深礎施工機械の一実施例を
示す断面図、図2は、図1に示す深礎施工機械の平面
図、図3は、図1に示す深礎施工機械において、主作業
機械(クラムセル掘削機)を坑内に移動させた場合を示
す図、図4は、図1に示す深礎施工機械において、人荷
ゴンドラを坑内に移動させた場合を示す図、図5は、本
発明による深礎施工機械の別の実施例を示す図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 is a sectional view showing an embodiment of a deep foundation construction machine according to the present invention, FIG. 2 is a plan view of the deep foundation construction machine shown in FIG. 1, and FIG. 3 is a diagram showing the deep foundation construction machine shown in FIG. FIG. 4 is a diagram showing a case where the main work machine (clam cell excavator) is moved into the mine, FIG. 4 is a diagram showing a case where the manpowered gondola is moved into the mine in the deep foundation construction machine shown in FIG. 1, and FIG. It is a figure which shows another Example of the deep foundation construction machine by this invention.

【0009】本発明による深礎施工機械1は、図3又は
図4に示すように、ガイドシャフト2を有しており、ガ
イドシャフト2は、先端部材3と複数の中間部材4によ
って、図中上下端が開口した円管状に形成されている。
先端部材3と各中間部材4は、それぞれ、深礎70の口
径(図1乃至図4の場合は4m)より小さな口径(図1
乃至図4の場合は1.5m)の鋼管によって、図中上下
方向に伸延した形に形成されている。そして、先端部材
3と中間部材4間、および各中間部材4間は、ジョイン
ト部2cを介して、ボルト等によって図中上下方向に連
結されている。ガイドシャフト2の先端部材3の外周に
は、天井防護部材6が固着されている。そして、天井防
護部材6には、複数のシャフトグリッパ7が、油圧ジャ
ッキ等を介して外側(矢印X方向)へ突出駆動して、後
述のように施工中の深礎70のライナプレート72を押
圧する形で設けられている。また、天井防護部材6の図
中下部には、スライド式落下物防護板8が、施工中の深
礎70の口径に応じて図中左右方向に伸縮して、ガイド
シャフト2と深礎70の穴壁71の間隙を遮蔽する形で
で設けられている。また、ガイドシャフト12の外周に
は、非常用ハシゴ2bが、図中上下方向に伸延した形で
設けられている。
The deep foundation construction machine 1 according to the present invention has a guide shaft 2 as shown in FIG. 3 or FIG. 4. The guide shaft 2 includes a tip member 3 and a plurality of intermediate members 4 in the drawing. It is formed in a circular tube shape with upper and lower ends open.
The tip member 3 and each intermediate member 4 have a diameter smaller than that of the deep foundation 70 (4 m in the case of FIGS. 1 to 4) (see FIG. 1).
In the case of FIG. 4, a steel pipe of 1.5 m) is formed in a shape extending vertically in the figure. The tip member 3 and the intermediate member 4 and the intermediate members 4 are connected to each other in the vertical direction in the drawing by bolts or the like via the joint portion 2c. A ceiling protection member 6 is fixed to the outer periphery of the tip member 3 of the guide shaft 2. Then, a plurality of shaft grippers 7 are driven to project outward (in the direction of arrow X) via a hydraulic jack or the like to the ceiling protection member 6, and press the liner plate 72 of the deep foundation 70 under construction as described later. It is provided in the form of. Further, on the lower part of the ceiling protection member 6 in the figure, a slide-type falling object protection plate 8 expands and contracts in the left-right direction in the figure in accordance with the diameter of the deep foundation 70 under construction, so that the guide shaft 2 and the deep foundation 70 are separated. It is provided so as to shield the gap between the hole walls 71. In addition, an emergency ladder 2b is provided on the outer periphery of the guide shaft 12 so as to extend vertically in the drawing.

【0010】また、深礎施工機械1には、坑口架台10
が設けられており、坑口架台10には、前記ガイドシャ
フト12の口径に比して大きな口径のシャフト貫通穴1
0aが形成されている。そして、坑口架台10には、シ
ャフト上下装置12(ウィンチ)が設けられており、シ
ャフト上下装置12には、ケーブル13を介して、前記
ガイドシャフト12の先端部材3が、矢印A、B方向に
昇降駆動自在に懸架されている。また、坑口架台10に
は、シャフトグリッパ11が、油圧ジャッキ等を介して
シャフト貫通穴10aから内側(矢印Y方向)へ突出駆
動して、後述のようにガイドシャフト2の外周面を押圧
する形で設けられている。
Further, the deep foundation construction machine 1 includes a wellhead mount 10
The shaft through hole 1 having a diameter larger than that of the guide shaft 12 is provided in the wellhead mount 10.
0a is formed. A shaft lifting device 12 (winch) is provided on the wellhead 10 and the tip member 3 of the guide shaft 12 is attached to the shaft lifting device 12 via a cable 13 in the directions of arrows A and B. Suspended so that it can be driven up and down. Further, the shaft gripper 11 is driven to project inward (in the direction of arrow Y) from the shaft through hole 10a via a hydraulic jack or the like on the wellhead gantry 10 to press the outer peripheral surface of the guide shaft 2 as described later. It is provided in.

【0011】更に、深礎施工機械1には、図1に示すよ
うに、第一坑外クレーン15と第二坑外クレーン30
が、地上81に敷設されたレール15a、30aを介し
て、それぞれ、図2矢印E、F方向に移動駆動自在に設
けられている。第一坑外クレーン15は、図1に示すよ
うに、門型フレーム16を有しており、門型フレーム1
6のビームには、2つのロープトロリ17が、それぞ
れ、矢印C、D方向に移動駆動自在に設けられている。
同様に、第二坑外クレーン30は、門型フレーム31を
有しており、門型フレーム31のビームには、2つのロ
ープトロリ32が、それぞれ、矢印C、D方向に移動駆
動自在に設けられている。
Furthermore, as shown in FIG. 1, the deep foundation construction machine 1 includes a first underground crane 15 and a second underground crane 30.
2 are movably driven in the directions of arrows E and F in FIG. 2 via rails 15a and 30a laid on the ground 81, respectively. The first underground crane 15 has a portal frame 16 as shown in FIG.
Two rope trolleys 17 are provided on the beam 6 so as to be movable in the directions of arrows C and D, respectively.
Similarly, the second underground crane 30 has a portal frame 31, and two rope trolleys 32 are provided on the beams of the portal frame 31 so as to be movable in the directions of arrows C and D, respectively. ing.

【0012】そして、第一坑外クレーン15の一方のロ
ープトロリ17には、主作業機械20が、ケーブル1
8、ウィンチ18aを介して、矢印A、B方向に昇降駆
動自在に懸架されている。主作業機械20には、図3に
示すように、パワーユニット部21が設けられており、
パワーユニット部21は、ガイドシャフト12の口径に
比して小さな外形に形成されている。そして、パワーユ
ニット部21の外周部には、複数のローラ21aが、ガ
イドシャフト12の内周面2aに対して転動する形で設
けられており、複数のグリッパ22が、油圧ジャッキ等
を介して外側(矢印Z方向)へ突出駆動して、後述のよ
うにガイドシャフト12の内周面2aを押圧する形で設
けられている。そして、パワーユニット部21の図中下
部には、クラムセル掘削機23が設けられている。クラ
ムセル掘削機23には、バケット23a、アーム23b
が、パワーユニット部21を介して駆動される形で、旋
回、屈曲、伸長自在に設けられている。尚、パワーユニ
ット部21内には、クラムセル掘削機23を駆動制御す
る自動回路が組み込まれている(後述の補助作業機械2
5、36のパワーユニット部26、27についても同様
である)。
On the rope trolley 17 of the first underground crane 15, the main work machine 20 is connected to the cable 1
8 and a winch 18a, which are suspended in the directions of arrows A and B so as to be vertically driven. As shown in FIG. 3, the main work machine 20 is provided with a power unit section 21,
The power unit portion 21 is formed in an outer shape smaller than the diameter of the guide shaft 12. A plurality of rollers 21a are provided on the outer peripheral portion of the power unit portion 21 so as to roll with respect to the inner peripheral surface 2a of the guide shaft 12, and a plurality of grippers 22 are provided via a hydraulic jack or the like. It is provided so as to project outwardly (in the direction of arrow Z) and press the inner peripheral surface 2a of the guide shaft 12 as described later. A clam cell excavator 23 is provided below the power unit section 21 in the figure. The clam cell excavator 23 includes a bucket 23a and an arm 23b.
Is provided so that it can be swung, bent, and extended while being driven via the power unit section 21. Incidentally, an automatic circuit for driving and controlling the clam cell excavator 23 is incorporated in the power unit section 21 (the auxiliary work machine 2 described later).
The same applies to the power unit portions 26 and 27 of the reference numerals 5 and 36).

【0013】第一坑外クレーン15の他方のロープトロ
リ17には、図1に示すように、補助作業機械25が、
ケーブル18、ウィンチ18aを介して、矢印A、B方
向に昇降駆動自在に懸架されている。補助作業機械25
には、主作業機械20と同様に、パワーユニット部26
が設けられており、パワーユニット部26は、ガイドシ
ャフト12の口径に比して小さな外形に形成されてい
る。そして、パワーユニット部26の外周部には、複数
のローラ26aが、ガイドシャフト12の内周面2aに
対して転動する形で設けられており、複数のグリッパ2
7が、油圧ジャッキ等を介して外側へ突出駆動して、ガ
イドシャフト12の内周面2aを押圧する形で設けられ
ている。そして、パワーユニット部26の図中下部に
は、ブレーカー、ヘッダー、削孔機、ライナ設置マニピ
ュレータ等の各種のアタッチメント28が、作業内容、
土質に応じて交換可能な形で、パワーユニット部26を
介して駆動される形で装着されている。
As shown in FIG. 1, an auxiliary work machine 25 is attached to the other rope trolley 17 of the first underground crane 15.
The cable 18 and the winch 18a are suspended so as to be vertically driven in the directions of arrows A and B. Auxiliary work machine 25
In the same manner as the main work machine 20, the power unit 26
Is provided, and the power unit portion 26 is formed in an outer shape smaller than the diameter of the guide shaft 12. A plurality of rollers 26 a are provided on the outer peripheral portion of the power unit portion 26 so as to roll with respect to the inner peripheral surface 2 a of the guide shaft 12, and the plurality of grippers 2 a.
7 is provided so as to be driven to project outward through a hydraulic jack or the like to press the inner peripheral surface 2a of the guide shaft 12. Further, various attachments 28 such as a breaker, a header, a drilling machine, and a liner-installed manipulator are provided at the lower part of the power unit portion 26 in the drawing.
It is replaceable according to the soil type and is mounted so as to be driven through the power unit portion 26.

【0014】また、第二坑外クレーン30の一方のロー
プトロリ32には、材料、人員の運搬用に、人荷ゴンド
ラ35が、ケーブル33、ウィンチ33aを介して、矢
印A、B方向に昇降駆動自在に懸架されている。人荷ゴ
ンドラ35は、図4に示すように、ガイドシャフト12
の口径に比して小さな外形に形成されており、人荷ゴン
ドラ35の外周部には、複数のローラ35aが、ガイド
シャフト12の内周面2aに対して転動する形で設けら
れている。また、人荷ゴンドラ35の図中下部にはクレ
ーンフック35bが設けられている。
Further, on one of the rope trolleys 32 of the second underground crane 30, a cargo gondola 35 is vertically moved in the directions of arrows A and B through a cable 33 and a winch 33a for carrying materials and personnel. Suspended freely. As shown in FIG. 4, the cargo gondola 35 has a guide shaft 12
Is formed in a smaller outer diameter than the caliber, and a plurality of rollers 35a are provided on the outer peripheral portion of the passenger-carried gondola 35 so as to roll with respect to the inner peripheral surface 2a of the guide shaft 12. .. Further, a crane hook 35b is provided at the lower part of the cargo gondola 35 in the figure.

【0015】第二坑外クレーン30の他方のロープトロ
リ32には、図1に示すように、補助作業機械36が、
ケーブル33、ウィンチ33aを介して、矢印A、B方
向に昇降駆動自在に懸架されている。補助作業機械36
には、パワーユニット部37が設けられており、パワー
ユニット部37は、ガイドシャフト12の口径に比して
小さな外形に形成されている。そして、パワーユニット
部37の外周部には、複数のローラ37aが、ガイドシ
ャフト12の内周面2aに対して転動する形で設けられ
ており、複数のグリッパ38が、油圧ジャッキ等を介し
て外側へ突出駆動して、ガイドシャフト12の内周面2
aを押圧する形で設けられている。そして、パワーユニ
ット部37の図中下部には、硬岩、転石用に、削岩機3
9が、パワーユニット部37を介して駆動される形で設
けられている。尚、削岩機39は、ジャンボ機能を利用
して、ライナ工、吹付け工の作業用マニピュレーターと
して使用することも可能である。
As shown in FIG. 1, an auxiliary work machine 36 is attached to the other rope trolley 32 of the second underground crane 30.
The cable 33 and the winch 33a are suspended so as to be vertically driven in the directions of arrows A and B. Auxiliary work machine 36
Is provided with a power unit portion 37, and the power unit portion 37 is formed in an outer shape smaller than the diameter of the guide shaft 12. A plurality of rollers 37a are provided on the outer peripheral portion of the power unit portion 37 so as to roll with respect to the inner peripheral surface 2a of the guide shaft 12, and a plurality of grippers 38 are provided via a hydraulic jack or the like. The outer peripheral surface 2 of the guide shaft 12 is driven by projecting outward.
It is provided so as to press a. And, in the lower part of the power unit part 37 in the figure, the rock drill 3 is used for hard rock and boulders.
9 is provided so as to be driven via the power unit portion 37. The rock drill 39 can also be used as a work manipulator for liners and sprayers by utilizing the jumbo function.

【0016】深礎施工機械1は以上のような構成を有す
るので、深礎施工機械1を使用して、深礎70を施工す
るには、まず、図3に示すように、坑口架台10を坑口
に設置固定する。そして、シャフトグリッパ7、11を
後退させた状態で、ガイドシャフト2をシャフト挿入穴
10aに挿入する。そして、坑口架台10上のシャフト
上下装置12からケーブル13を図中下方に送り出し
て、ガイドシャフト2を掘削作業域79へ下降させる。
そして、ガイドシャフト2の各シャフトグリッパ7を、
矢印X方向に突出させて、深礎70の既に設置されてい
るライナプレート72を押圧する。また、坑口架台10
のシャフトグリッパ11を、矢印Y方向に突出させて、
ガイドシャフト2の外周面を押圧する。すると、ガイド
シャフト2は、シャフトグリッパ7、11を介して、施
工中の深礎70の穴壁71に対して確実に固定される。
Since the deep foundation construction machine 1 has the above-described structure, in order to construct the deep foundation 70 using the deep foundation construction machine 1, first, as shown in FIG. Install and fix at the wellhead. Then, with the shaft grippers 7 and 11 retracted, the guide shaft 2 is inserted into the shaft insertion hole 10a. Then, the cable 13 is sent downward from the shaft up-and-down device 12 on the wellhead gantry 10 to lower the guide shaft 2 to the excavation work area 79.
And, each shaft gripper 7 of the guide shaft 2,
The liner plate 72 already installed on the deep foundation 70 is pressed by projecting it in the direction of the arrow X. In addition, the wellhead 10
The shaft gripper 11 of is projected in the arrow Y direction,
The outer peripheral surface of the guide shaft 2 is pressed. Then, the guide shaft 2 is securely fixed to the hole wall 71 of the deep foundation 70 under construction via the shaft grippers 7 and 11.

【0017】次に、坑外クレーン15、30の何れか一
方、例えば、第一坑外クレーン15を、図2に実線で示
す施工中の深礎70の位置まで、矢印F方向へ移動させ
る。この際、他方の第二坑外クレーン30は、図中左方
の退避位置まで、矢印E方向へ移動させる。尚、実線と
2点鎖線で図示したように、2箇所で、深礎70、70
を同時施工することも出来る。この際、実線で図示した
箇所の深礎70側で、第一坑外クレーン15を使用する
場合には、2点鎖線で図示した他の箇所の深礎70側で
は、第二坑外クレーン30を使用するようにして、効率
的に施工を行うことが出来る。
Next, one of the subsurface cranes 15 and 30, for example, the first subsurface crane 15 is moved in the direction of arrow F to the position of the deep foundation 70 under construction shown by the solid line in FIG. At this time, the other second underground crane 30 is moved in the direction of arrow E to the retracted position on the left side in the figure. In addition, as shown by the solid line and the two-dot chain line, two deep foundations 70, 70
It is also possible to construct simultaneously. At this time, when the first underground crane 15 is used on the side of the deep foundation 70 shown by the solid line, the second underground crane 30 is provided on the side of the deep foundation 70 shown by another two-dot chain line. Can be used for efficient construction.

【0018】そして、図1に示すように、第1坑外クレ
ーン15の主作業機械20、補助作業機械25の何れか
一方、例えば、主作業機械20を、ガイドシャフト12
の図中上方まで、ロープトロリ17を介して矢印D方向
へ移動させる。この際、他方の補助作業機械25は、図
中右端の退避位置まで、ロープトロリ17を介して矢印
D方向へ移動させる。次に、主作業機械20のグリッパ
22を後退させた状態で、ロープトロリ17からケーブ
ル18を送り出して、主作業機械20をガイドシャフト
12内に挿入する。そして、更にロープトロリ17から
ケーブル18を送り出して、主作業機械20を矢印B方
向へ下降させる。すると、主作業機械20は、ローラ2
1aがガイドシャフト12の内面2aに対して転動する
形で、掘削作業域79まで下降する。即ち、主作業機械
20の移動は(その他の坑内機械についても同様であ
る。)、ガイドシャフト12を介して案内する形で行わ
れるので、施工中の深礎70の口径の大小に拘らず、高
速移動が可能であり、ケーブル18の捩じれが無く、安
全である。また、主作業機械20は(その他の坑内機械
についても同様である。)、ケーブル18によって吊り
下げられており、ガイドシャフト12は後述のように延
長することが出来るので、深礎70の深度が大きくても
対応することが出来る。
Then, as shown in FIG. 1, one of the main work machine 20 and the auxiliary work machine 25 of the first underground crane 15, for example, the main work machine 20 is connected to the guide shaft 12.
Is moved in the direction of arrow D through the rope trolley 17 to the upper side in the figure. At this time, the other auxiliary work machine 25 is moved in the direction of arrow D via the rope trolley 17 to the retracted position at the right end in the figure. Next, with the gripper 22 of the main work machine 20 retracted, the cable 18 is sent out from the rope trolley 17 and the main work machine 20 is inserted into the guide shaft 12. Then, the cable 18 is further sent out from the rope trolley 17 to lower the main work machine 20 in the arrow B direction. Then, the main work machine 20 moves the roller 2
1a descends to the excavation work area 79 in a form of rolling with respect to the inner surface 2a of the guide shaft 12. That is, since the main work machine 20 is moved (similarly for other underground machines), the main work machine 20 is guided through the guide shaft 12, regardless of the diameter of the deep foundation 70 under construction. High-speed movement is possible, and there is no twist of the cable 18, which is safe. Further, the main work machine 20 (similarly for other underground machines) is suspended by the cable 18, and the guide shaft 12 can be extended as described later, so that the depth of the deep foundation 70 is increased. Even if it is big, we can handle it.

【0019】主作業機械20がガイドシャフト12の図
3下端まで移動すると、グリッパ22を、矢印Z方向に
突出して、ガイドシャフト12の内周面12aを押圧す
る。すると、主作業機械20は、クラムセル掘削機23
がガイドシャフト12の図中下端から掘削作業域79に
突出した状態で、ガイドシャフト12に対して(従っ
て、穴壁71に対して)固定される。主作業機械20が
固定されると、クラムセル掘削機23のバケット23
a、アーム23bを坑外から遠隔操作または自動運転し
て、地盤80の掘削作業を行う。即ち、主作業機械20
は、作業中、穴壁71に対して固定されたガイドシャフ
ト12に対して固定されているので、深度のある場合で
も、掘削時の反力をガイドシャフト12から取ることが
出来る(その他の坑内機械についても同様である)。従
って、主作業機械20、補助作業機械25、36等の坑
内機械として、強力な掘削力の機械を使用することが出
来る。また、掘削作業域79が深い場合でも、機械の能
力が低下することを防止できる。尚、坑外へのズリ搬出
は、クラムセル掘削機23のバケット23aを使用し
て、主作業機械20を、グリッパ22を後退させた状態
で、ケーブル18等を介して矢印A、B方向へ昇降させ
ることによって、ガイドシャフト2内を通過する形で行
われる。
When the main work machine 20 moves to the lower end of the guide shaft 12 in FIG. 3, the gripper 22 projects in the direction of arrow Z and presses the inner peripheral surface 12a of the guide shaft 12. Then, the main work machine 20 uses the clam cell excavator 23.
Is fixed to the guide shaft 12 (and thus to the hole wall 71) in a state of protruding from the lower end of the guide shaft 12 in the drawing to the excavation work area 79. When the main work machine 20 is fixed, the bucket 23 of the clam cell excavator 23
a, the arm 23b is remotely operated or automatically operated from the outside of the mine to excavate the ground 80. That is, the main work machine 20
Is fixed to the guide shaft 12 fixed to the hole wall 71 during the work, so that the reaction force at the time of excavation can be taken from the guide shaft 12 even if there is depth (other underground The same is true for machines). Therefore, a machine having a strong excavating force can be used as the underground machine such as the main work machine 20 and the auxiliary work machines 25 and 36. Further, even when the excavation work area 79 is deep, it is possible to prevent the ability of the machine from decreasing. In addition, when carrying out to the outside of the mine, using the bucket 23a of the clam cell excavator 23, the main work machine 20 is moved up and down in the directions of arrows A and B via the cable 18 or the like with the gripper 22 retracted. By doing so, it is performed while passing through the inside of the guide shaft 2.

【0020】主作業機械20による掘削中に、土質が変
化して、主作業機械20では掘削が困難になった場合、
又はライナプレート72の設置作業を行う場合には、補
助作業機械25に入れ替える。まず、グリッパ22を後
退させ、図1に示すロープトロリ17からケーブル18
を引き上げて、主作業機械20を、矢印A方向へ上昇さ
せてガイドシャフト12内から取り出す。そして、主作
業機械20を、図1左端の退避位置まで、ロープトロリ
17を介して矢印C方向へ移動させる。また、補助作業
機械25に、アタッチメント28として、ブレーカー、
ヘッダー、削孔機、ライナ設置マニピュレータ等の中か
ら適切なものを選択して装着しておく。そして、補助作
業機械25を、主作業機械20の場合と同様に、ロープ
トロリ17を介して、矢印C方向へ移動させ、矢印B方
向へ下降させて、ガイドシャフト12内に挿入する。そ
して、補助作業機械25を、アタッチメント28が掘削
作業域79に突出した状態で、グリッパ27を突出し
て、ガイドシャフト12内の図中下端に固定する。即
ち、主作業機械20と補助作業機械25は、第一坑外ク
レーン15から吊り下げる構造であり、また、穴壁71
に固定されたガイドシャフト2によって案内されるの
で、主作業機械20と補助作業機械25の入替えは、一
般機械の入替えに比して、迅速、安全に行うことが出来
る(第二坑外クレーン30から吊り下げる構造の人荷ゴ
ンドラ35、補助作業機械36、後述の深礎施工機械
1′の主作業機械20′、補助作業機械25′について
も同様である)。
During excavation by the main work machine 20, if the soil quality changes and it becomes difficult for the main work machine 20 to excavate,
Alternatively, when installing the liner plate 72, the auxiliary work machine 25 is replaced. First, the gripper 22 is retracted, and the rope trolley 17 shown in FIG.
Is pulled up, the main work machine 20 is lifted in the direction of arrow A, and is taken out from the guide shaft 12. Then, the main work machine 20 is moved to the retracted position at the left end in FIG. In addition, the auxiliary work machine 25 has a breaker as an attachment 28,
Select an appropriate one from the header, drilling machine, liner installation manipulator, etc. and install it. Then, as in the case of the main work machine 20, the auxiliary work machine 25 is moved in the arrow C direction via the rope trolley 17, lowered in the arrow B direction, and inserted into the guide shaft 12. Then, the auxiliary work machine 25 is fixed to the lower end of the guide shaft 12 in the drawing by projecting the gripper 27 while the attachment 28 projects into the excavation work area 79. That is, the main work machine 20 and the auxiliary work machine 25 have a structure in which they are suspended from the first underground crane 15, and the hole wall 71 is used.
The main work machine 20 and the auxiliary work machine 25 can be replaced more quickly and safely than the replacement of the general machine because the guide shaft 2 fixed to the second work crane 30 is used. The same applies to the man-operated gondola 35 having a structure of suspending from above, the auxiliary work machine 36, the main work machine 20 'and the auxiliary work machine 25' of the deep foundation construction machine 1'described later).

【0021】また、第二坑外クレーン30側の人荷ゴン
ドラ35又は補助作業機械36に入れ替えることも出来
る。即ち、主作業機械20又は補助作業機械25をガイ
ドシャフト2内から取り出した後に、図2に2点鎖線で
図示した箇所の深礎70の位置まで、第一坑外クレーン
30を矢印E方向へ移動させる。また、第二坑外クレー
ン30を、実線で図示した箇所の深礎70の位置まで、
矢印F方向へ移動させる。そして、人荷ゴンドラ35又
は補助作業機械36を、ロープトロリ32を介して図1
矢印C方向へ移動させ、ケーブル33を送り出して矢印
B方向へ下降させて、ガイドシャフト12内に挿入す
る。そして、補助作業機械36の場合は、削岩機39が
掘削作業域79に突出した状態で、グリッパ38を突出
して、ガイドシャフト12内の図中下端に固定する。
尚、人荷ゴンドラ35の移動は、図4に示すように、ガ
イドシャフト12を介して案内する形で行われるので、
荷振れを防止することが出来る。
It is also possible to replace it with the manpowered gondola 35 or the auxiliary work machine 36 on the side of the second underground crane 30. That is, after taking out the main work machine 20 or the auxiliary work machine 25 from the inside of the guide shaft 2, the first underground crane 30 is moved in the direction of arrow E to the position of the deep foundation 70 at the position shown by the two-dot chain line in FIG. To move. In addition, the second underground crane 30 to the position of the deep foundation 70 at the position shown by the solid line,
Move in the direction of arrow F. Then, the cargo gondola 35 or the auxiliary work machine 36 is connected to the rope trolley 32 as shown in FIG.
The cable 33 is moved in the direction of the arrow C, the cable 33 is fed out, lowered in the direction of the arrow B, and inserted into the guide shaft 12. In the case of the auxiliary work machine 36, the rock drill 39 is projected into the excavation work area 79, and the gripper 38 is projected and fixed to the lower end of the guide shaft 12 in the figure.
In addition, since the movement of the cargo gondola 35 is performed by guiding it through the guide shaft 12, as shown in FIG.
It is possible to prevent the shake of the load.

【0022】所定の深さまで掘削作業が進行すると、ガ
イドシャフト2を延長するために、図1に示す主作業機
械20、補助作業機械25、36、人荷ゴンドラ35
を、ガイドシャフト2内から取り出す。そして、坑口架
台10から突出した状態のガイドシャフト2の図中上端
に、中間部材4をジョイント部2cを介して継ぎ足す。
次に、シャフトグリッパ7、11を後退させた後に、坑
口架台10上のシャフト上下装置12からケーブル13
を図中下方に送り出して、ガイドシャフト2を、継ぎ足
された中間部材4の長さに対応した距離だけ下降させ
る。そして、再び、シャフトグリッパ7、11を突出さ
せて、ガイドシャフト2を、施工中の深礎70のライナ
プレート72(穴壁71)に対して固定する。こうし
て、ガイドシャフト2が延長されると、再び、主作業機
械20等の坑内機械を、ガイドシャフト2を介して掘削
作業域79へ移動させて、掘削作業を再開する。尚、ガ
イドシャフト2は、施工完了後、深礎70から撤去して
再使用する。
When the excavation work progresses to a predetermined depth, in order to extend the guide shaft 2, the main work machine 20, the auxiliary work machines 25 and 36, and the manpowered gondola 35 shown in FIG.
Is taken out from inside the guide shaft 2. Then, the intermediate member 4 is added to the upper end in the figure of the guide shaft 2 protruding from the wellhead mount 10 via the joint portion 2c.
Next, after retracting the shaft grippers 7 and 11, the shaft lifting device 12 on the wellhead mount 10 to the cable 13
Is sent downward in the drawing to lower the guide shaft 2 by a distance corresponding to the length of the intermediate member 4 added. Then, the shaft grippers 7 and 11 are projected again to fix the guide shaft 2 to the liner plate 72 (hole wall 71) of the deep foundation 70 under construction. In this way, when the guide shaft 2 is extended, the underground machine such as the main work machine 20 is again moved to the excavation work area 79 via the guide shaft 2 and the excavation work is restarted. The guide shaft 2 is removed from the deep foundation 70 and reused after the construction is completed.

【0023】尚、主作業機械、補助作業機械等の坑内機
械としては、上述のもの以外にも、種々のものを使用す
ることが出来る。例えば、図5に示す深礎施工機械1′
は、比較的小径(図5の場合は、2.5m)の深礎70
の施工に対応させたものであり、深礎施工機械1′に
は、主作業機械20′と補助作業機械25′が設けられ
ている。主作業機械20′には、オレンジピールバケッ
ト23′がパワーユニット部21を介して駆動される形
で設けられており、補助作業機械25′には、ブレーカ
ー28′(又はロードヘッダ)が、パワーユニット部2
6を介して駆動される形で設けられている。尚、当該深
礎施工機械1′は上述の深礎施工機械1と略同様に構成
されているので、同様の構成要素については、同一の符
号を図面に付して説明を省略する。
As the underground machine such as the main work machine and the auxiliary work machine, various machines other than those mentioned above can be used. For example, the deep foundation construction machine 1'shown in FIG.
Is a deep foundation 70 with a relatively small diameter (2.5 m in the case of FIG. 5)
The deep foundation construction machine 1'is provided with a main work machine 20 'and an auxiliary work machine 25'. The main work machine 20 'is provided with an orange peel bucket 23' driven by the power unit section 21, and the auxiliary work machine 25 'is provided with a breaker 28' (or load header). Two
It is provided so as to be driven via 6. Since the deep foundation construction machine 1'is configured substantially the same as the above-mentioned deep foundation construction machine 1, the same components are designated by the same reference numerals and the description thereof will be omitted.

【0024】そして、当該深礎施工機械1′において
は、地盤80の中央部(ガイドシャフト2の図中下方)
の掘削は、主作業機械20′のオレンジピールバケット
23′を使用して行い、地盤80の周辺部の掘削は、補
助作業機械25′のブレーカー28′を使用して行う。
この場合にも、主作業機械20′、補助作業機械25′
は、ガイドシャフト2に対して固定されるので、強力な
掘削を行うことが出来る。尚、坑外へのズリ搬出は、補
助作業機械25′のブレーカー28′を使用して、地盤
80の周辺部から中央部に掻き寄せ、次に、主作業機械
20′のオレンジピールバケット23′を使用して、ガ
イドシャフト12の内部を通過する形で行われる。
In the deep foundation construction machine 1 ', the central portion of the ground 80 (lower side of the guide shaft 2 in the figure).
Is excavated using the orange peel bucket 23 'of the main work machine 20', and the peripheral portion of the ground 80 is excavated using the breaker 28 'of the auxiliary work machine 25'.
Also in this case, the main work machine 20 'and the auxiliary work machine 25'
Is fixed to the guide shaft 2, so that strong excavation can be performed. In order to carry out the slip to the outside of the mine, the breaker 28 'of the auxiliary work machine 25' is used to scrape it from the peripheral portion of the ground 80 to the central portion, and then the orange peel bucket 23 'of the main work machine 20'. Is used to pass through the inside of the guide shaft 12.

【0025】尚、深礎施工機械1、1′を構成する各装
置は、小型または分解可能であるので、山中での施工に
も対応することが出来る。
Since each of the devices constituting the deep foundation construction machines 1, 1'can be downsized or disassembled, they can be used for construction in the mountains.

【0026】尚、上述の実施例においては、主作業機械
20を第一坑外クレーン15側に装着した場合について
述べたが、主作業機械20を第二坑外クレーン30側に
装着するようにしてもよい。また、上述の実施例におい
ては、2機の坑外クレーン15、30を使用した場合に
ついて述べたが、3機以上の坑外クレーンを使用するよ
うにしてもよい。
In the above embodiment, the case where the main work machine 20 is mounted on the side of the first underground crane 15 has been described, but the main work machine 20 is mounted on the side of the second underground crane 30. May be. Further, in the above-described embodiment, the case where the two off-road cranes 15 and 30 are used has been described, but three or more off-road cranes may be used.

【0027】[0027]

【発明の効果】以上、説明したように、本発明によれ
ば、ガイドシャフト2等の管状のガイドを、坑内へ伸延
する形で設け、坑口架台10、ケーブル13、シャフト
グリッパ7、11等のガイド固定手段を、前記ガイドを
固定する形で設け、主作業機械20、20′、補助作業
機械25、25′、36等の複数の坑内機械を、前記ガ
イド内を移動可能な形で設け、坑外クレーン15、3
0、ケーブル18、33等の坑内機械懸架手段を、前記
各坑内機械を坑外から懸架すると共に、前記各坑内機械
を選択的に前記ガイド内へ移動させる形で設け、グリッ
パ22、27、38等の坑内機械固定手段を、前記坑内
機械を前記ガイドに対して固定する形で設けて構成した
ので、各坑内機械は、坑内外への移動中、ガイドを介し
て案内され、各坑内機械を迅速に移動させることが出来
る。従って、土質に応じて、坑内機械の入替えを迅速に
行うことが出来る。また、各坑内機械は、作業中、坑内
機械固定手段を介してガイド対して固定されるので、強
力に掘削を行うことが出来る。
As described above, according to the present invention, the tubular guide such as the guide shaft 2 is provided so as to extend into the mine, and the wellhead mount 10, the cable 13, the shaft grippers 7, 11 and the like are provided. Guide fixing means is provided to fix the guide, and a plurality of underground machines such as main work machines 20 and 20 'and auxiliary work machines 25, 25' and 36 are provided so as to be movable in the guide. Off-road crane 15, 3
0, cables 18, 33, etc. are installed in the form of means for suspending each of the underground machines from the outside and selectively moving each of the underground machines into the guide, and grippers 22, 27, 38. Since the underground machine fixing means such as is provided by being configured to fix the underground machine to the guide, each underground machine is guided through the guide during movement to the inside and outside of the underground machine, It can be moved quickly. Therefore, it is possible to quickly replace the underground machine according to the soil quality. Further, since each underground machine is fixed to the guide via the underground machine fixing means during the work, it is possible to strongly excavate.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による深礎施工機械の一実施例を示す断
面図である。
FIG. 1 is a sectional view showing an embodiment of a deep foundation construction machine according to the present invention.

【図2】図1に示す深礎施工機械の平面図である。FIG. 2 is a plan view of the deep foundation construction machine shown in FIG.

【図3】図1に示す深礎施工機械において、主作業機械
(クラムセル掘削機)を坑内に移動させた場合を示す図
である。
FIG. 3 is a diagram showing a case where the main work machine (clam cell excavator) is moved into the mine in the deep foundation construction machine shown in FIG. 1.

【図4】図1に示す深礎施工機械において、人荷ゴンド
ラを坑内に移動させた場合を示す図である。
FIG. 4 is a diagram showing a case where a man-powered gondola is moved into a mine in the deep foundation construction machine shown in FIG. 1.

【図5】本発明による深礎施工機械の別の実施例を示す
図である。
FIG. 5 is a diagram showing another embodiment of the deep foundation construction machine according to the present invention.

【符号の説明】[Explanation of symbols]

1、1′……深礎施工機械 2……ガイド(ガイドシャフト) 7……ガイド固定手段(シャフトグリッパ) 10……ガイド固定手段(坑口架台) 11……ガイド固定手段(シャフトグリッパ) 13……ガイド固定手段(ケーブル) 15……坑内機械懸架手段(第一坑外クレーン) 18……坑内機械懸架手段(ケーブル) 20、20′……坑内機械(主作業機械) 22……坑内機械固定手段(グリッパ) 25、25′……坑内機械(補助作業機械) 27……坑内機械固定手段(グリッパ) 30……坑内機械懸架手段(第二坑外クレーン) 33……坑内機械懸架手段(ケーブル) 36……坑内機械(補助作業機械) 38……坑内機械固定手段(グリッパ) 1, 1 '... Deep foundation construction machine 2 ... Guide (guide shaft) 7 ... Guide fixing means (shaft gripper) 10 ... Guide fixing means (wellhead) 11 ... Guide fixing means (shaft gripper) 13 ... … Guide fixing means (cable) 15 …… Underground machine suspension means (first underground crane) 18 …… Underground machine suspension means (cable) 20, 20 ′ …… Underground machine (main work machine) 22 …… Underground machine fixing Means (gripper) 25, 25 '... Underground machine (auxiliary work machine) 27 ... Underground machine fixing means (gripper) 30 ... Underground machine suspension means (second underground crane) 33 ... Underground machine suspension means (cable) ) 36 ... Underground machine (auxiliary work machine) 38 ... Underground machine fixing means (gripper)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】管状のガイドを、坑内へ伸延する形で設
け、 ガイド固定手段を、前記ガイドを固定する形で設け、 複数の坑内機械を、前記ガイド内を移動可能な形で設
け、 坑内機械懸架手段を、前記各坑内機械を坑外から懸架す
ると共に、前記各坑内機械を選択的に前記ガイド内へ移
動させる形で設け、 坑内機械固定手段を、前記坑内機械を前記ガイドに対し
て固定する形で設けて構成した深礎施工機械。
1. A tubular guide is provided so as to extend into the mine, guide fixing means is provided so as to fix the guide, and a plurality of underground machines are provided so as to be movable in the guide. Mechanical suspension means is provided such that each of the downhole machines is suspended from the outside of the well and each of the downhole machines is selectively moved into the guide, and downhole machine fixing means is provided for the downhole machine with respect to the guide. A deep foundation construction machine that is installed and configured to be fixed.
JP22945991A 1991-08-15 1991-08-15 Caisson type pile construction machine Pending JPH0552087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22945991A JPH0552087A (en) 1991-08-15 1991-08-15 Caisson type pile construction machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22945991A JPH0552087A (en) 1991-08-15 1991-08-15 Caisson type pile construction machine

Publications (1)

Publication Number Publication Date
JPH0552087A true JPH0552087A (en) 1993-03-02

Family

ID=16892536

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22945991A Pending JPH0552087A (en) 1991-08-15 1991-08-15 Caisson type pile construction machine

Country Status (1)

Country Link
JP (1) JPH0552087A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015113683A (en) * 2013-12-13 2015-06-22 株式会社高知丸高 Obstruction ground pile driving device and method for driving steel pipe pile into obstruction ground

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63110390A (en) * 1986-10-27 1988-05-14 中部電力株式会社 Shaft excavator with clamshell

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63110390A (en) * 1986-10-27 1988-05-14 中部電力株式会社 Shaft excavator with clamshell

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015113683A (en) * 2013-12-13 2015-06-22 株式会社高知丸高 Obstruction ground pile driving device and method for driving steel pipe pile into obstruction ground

Similar Documents

Publication Publication Date Title
US6540443B2 (en) Apparatus for and a method of boring the ground
JP6310198B2 (en) Pier construction method
JP4545774B2 (en) Cutting and lifting of underground buried objects
JP7008314B2 (en) Tubular pile driving method, tubular pile holding device
RU2358107C2 (en) Drilling facility for shaft deepening and method of shaft deepening
JP2019148070A (en) Construction method of underground structure
JP2012026089A (en) Lifting method and lifting device of work floor
JP2797244B2 (en) Shaft excavation device and shaft construction method
JPH0552087A (en) Caisson type pile construction machine
US3085794A (en) Raise driving apparatus
JP3169911B2 (en) Heavy weight type steel pipe digging and driving method using the same
CN108952568B (en) Drilling machine
JPH0243420A (en) Soil removing device at time of excavation of deep ditch
CN212953766U (en) Shaft excavation construction system
JPH10205263A (en) Earth-removing device for excavator
CN111648426A (en) Drilling and grabbing device and winch for underground diaphragm wall construction
CN218025011U (en) Hole assembled longmen gallows is dug in manual work
JP2002147157A (en) Underwater excavator and underwater excavation method
JP3240328U (en) Demolition tool for segments that shield first and then enlarge the tunnel
JPH05248163A (en) Excavation work for deep foundation
JPS6022132B2 (en) Drilling equipment around the caisson cutting edge
JP3232305B2 (en) Drilling rig
JPH1018754A (en) Large bore hole excavating construction method and hole excavating device
JPH11229394A (en) Open caisson construction system
JP2004257156A (en) Pile drawing device