JPH0546632A - Molding machine layout planning device - Google Patents

Molding machine layout planning device

Info

Publication number
JPH0546632A
JPH0546632A JP20908391A JP20908391A JPH0546632A JP H0546632 A JPH0546632 A JP H0546632A JP 20908391 A JP20908391 A JP 20908391A JP 20908391 A JP20908391 A JP 20908391A JP H0546632 A JPH0546632 A JP H0546632A
Authority
JP
Japan
Prior art keywords
work
file
job
data
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20908391A
Other languages
Japanese (ja)
Inventor
Hisao Aoki
久穂 青木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Solution Innovators Ltd
Original Assignee
NEC Software Hokuriku Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Software Hokuriku Ltd filed Critical NEC Software Hokuriku Ltd
Priority to JP20908391A priority Critical patent/JPH0546632A/en
Publication of JPH0546632A publication Critical patent/JPH0546632A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Multi-Process Working Machines And Systems (AREA)

Abstract

PURPOSE:To solve the point of a problem such as the delay of the data for delivery, etc., due to the increase of the burden or the planning mistake of a person in charge caused by manual operation by executing automatically the layout of job plan data for each molding machine by changing it from the manual operation by the person in charge. CONSTITUTION:This device is operated by giving the instruction of execution from an input means 1. First, last time job data is delivered from a last time job management file 6 to a machine number means 3, and the data is re-arranged in the ascending order of last time job finish data and time, and the data of the smallest last time job finish data and time is delivered to a job number layout means 4. In the job number layout means 4, cating order is retrieved from a job plan file 7 in conformity to an layout condition, and the last time job management file 6, a job plan file 7, and a job instruction file 9 are updated. Above operation are repeated until all the determinative sections of the job file 7 are determined, and the job instruction from the job instruction file 9 is outputted from an output means 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、プラスチック加工業に
おける生産管理システムの成形工程の作業計画データに
よる整形機割付計画装置(以下成形機割付装置と称す
る)に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a shaping machine allocation planning device (hereinafter referred to as a molding machine allocation device) based on work plan data of a molding process of a production management system in a plastic processing industry.

【0002】[0002]

【従来の技術】生産管理システムは、部品表で管理され
ている製品、部品、材料(以下品目と称する)に対し
て、いつまでにいくつ必要かという製造計画の立案を行
ったり、立案された製造計画から品目の作業工程に対し
て作業指示を行ったり、作業指示された作業工程につい
ての作業実績をとることにより作業工程の進捗を管理し
たり、品目の入出庫数の入力による在庫数量を管理した
り、部品表や品目の作業工程を管理するマスタの整備を
行っている。
2. Description of the Related Art A production management system makes a manufacturing plan for how many products, parts and materials (hereinafter referred to as "items") managed by a parts table are required, and makes a planned manufacturing process. From the plan, give work instructions to the work process of the item, manage the progress of the work process by taking the work record of the work process for which the work order is given, and manage the inventory quantity by entering the number of goods in and out of the item. And maintain a master that manages the parts bill and the work process of the item.

【0003】このような生産管理システムに対し、従来
のプラスチック加工業では成形機に対する作業番号の割
り付けを作業指示データに基づいて、限定機械番号(専
用作業を行う機械番号)のある作業番号を優先に割り付
けたり、前回作業した色と同じ色の作業番号を優先に割
り付け等の条件を加味、担当者が手作業にて計画を立案
していた。
In contrast to such a production control system, in the conventional plastics processing industry, the work numbers assigned to the molding machines are assigned priority based on the work instruction data based on the work instruction data. The person in charge made a plan manually by adding conditions such as assigning to, or giving priority to the work number of the same color as the previous work and assigning it.

【0004】[0004]

【発明が解決しようとする課題】前述の従来の成形割付
計画のように担当者が手作業にて計画を立案した場合、
成形機台数が多大であったり、作業指示データが多数の
際に、担当者が負担が増大し、また、計画ミスによる納
期遅れ、成形機の稼働率が低下が発生するという問題点
がある。
When a person in charge makes a plan manually as in the conventional molding allocation plan described above,
When there are a large number of molding machines or a large amount of work instruction data, there is a problem that the person in charge increases the burden, the delivery time is delayed due to a mistake in planning, and the operating rate of the molding machines decreases.

【0005】本発明はこのような担当者の手作業による
整形機割付計画における問題点を解決し、成形機毎に前
回の作業を管理している前回作業管理ファイルをもと
に、各成形機に対し作業計画データを割り付けを自動的
に行われることを目的とする。
The present invention solves such a problem in the shaping machine allocation plan manually by the person in charge, and based on the previous work management file that manages the previous work for each molding machine, The purpose is to automatically assign work plan data to.

【0006】[0006]

【課題を解決するための手段】本発明の成形機割付計画
装置は、成形機毎に前回の作業内容を管理している前回
作業管理ファイルと、成形工程の作業計画データを作業
優先順に管理している作業計画ファイルと、稼働日を管
理しているカレンダファイルと、成形工程の各作業に成
形機械番号を指定した作業計画データを管理している作
業指示ファイルと、前記前回作業管理ファイルより割り
付けを行う成形機械番号を選択する機械番号選択手段
と、この機械番号選択手段により選択された成形機械番
号に前記作業計画ファイルの作業番号を割り付けて前記
作業指示ファイルに出力する作業番号割付手段とを有す
る。
A molding machine allocation planning device of the present invention manages a previous work management file that manages the contents of the previous work for each molding machine and work plan data of the molding process in order of work priority. Assigned from the previous work management file, the work schedule file that manages the working days, the work instruction file that manages the work plan data that specifies the molding machine number for each work in the molding process, A machine number selecting means for selecting a molding machine number for performing the work number and a work number assigning means for allocating the work number of the work plan file to the molding machine number selected by the machine number selecting means and outputting the work number to the work instruction file. Have.

【0007】[0007]

【実施例】次に、本発明について図面を参照して説明す
る。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, the present invention will be described with reference to the drawings.

【0008】図1は本発明の一実施例を示すブロック
図、図2は本実施例における動作を示すフローチャー
ト、図3は本実施例の動作前の前回作業管理ファイルと
作業計画ファイルの一例を示す図、図4はカレンダファ
イルの一例と本実施例により出力された作業指示ファイ
ルの一例を示す図、図5は本発明の一実施例により更新
された前回作業管理ファイルと作業計画ファイルの一例
を示す図である。
FIG. 1 is a block diagram showing an embodiment of the present invention, FIG. 2 is a flow chart showing the operation in this embodiment, and FIG. 3 is an example of a previous work management file and work plan file before the operation of this embodiment. FIG. 4 is a diagram showing an example of a calendar file and an example of a work instruction file output by this embodiment, and FIG. 5 is an example of a previous work management file and work plan file updated by an embodiment of the present invention. FIG.

【0009】本実施例の整形機割付計画装置は実行指示
を行う入力手段1と、制御部2と、ファイル部5と、作
業指示を行う出力手段10とから構成されている。ファ
イル部5は、前回作業管理ファイル6と作業計画ファイ
ル7とカレンダファイル8と作業指示ファイル9を保持
し、制御部2は前回作業管理ファイル6より割り付けを
行う成形機械番号を選択する機械番号選択手段3と、作
業番号を割り付ける作業番号割付手段4とを備えてい
る。
The shaping machine allocation planning apparatus of this embodiment comprises an input means 1 for giving an execution instruction, a control section 2, a file section 5, and an output means 10 for giving a work instruction. The file unit 5 holds the previous work management file 6, the work plan file 7, the calendar file 8 and the work instruction file 9, and the control unit 2 selects the molding machine number to be assigned from the previous work management file 6 Machine number selection Means 3 and work number assigning means 4 for assigning work numbers are provided.

【0010】作業管理ファイル6は図3(a)に示すよ
うに各データについて機械番号301、前回作業番号3
02,前回作業終了日303,前回作業終了時間304
および前回作業色305を有する。作業計画ファイル7
は図3(b)に示すように各データについて作業番号3
06,限定機械番号307,作業時間308,予定着手
日309,色310および決定区分1を有し、各データ
は各作業を表わし、各作業の優先順に並ベられている。
カレンダファイル8図4(a)に示すように稼働日40
1が早いものから順に並べられている。作業指示ファイ
ル9は図4(b)に示すように作業番号402,機械番
号403,色404,作業開始日405および作業開始
時間406を有する。
As shown in FIG. 3A, the work management file 6 has a machine number 301 and a previous work number 3 for each data.
02, last work end date 303, last work end time 304
And a previous work color 305. Work plan file 7
Is the work number 3 for each data as shown in FIG.
06, limited machine number 307, work time 308, scheduled start date 309, color 310 and decision section 1, each data represents each work, and is arranged in order of priority of each work.
Calendar file 8 Working day 40 as shown in Figure 4 (a)
1s are arranged in order from the earliest one. As shown in FIG. 4B, the work instruction file 9 has a work number 402, a machine number 403, a color 404, a work start date 405, and a work start time 406.

【0011】次に図2により本実施例の動作について説
明する。
Next, the operation of this embodiment will be described with reference to FIG.

【0012】最初に、成形機割付計画実行指示を入力手
段1から行うことで本装置は動作する。まず、前回作業
管理ファイル6から前回作業管理データを機械番号選択
手段3へ受け渡す(ステップ201)。機械番号選択手
段3では、前回作業管理データを前回作業終了日30
3、前回作業終了時間304(以下、前回作業終了日時
と称する)で、昇順に並べ替えを行う(ステップ20
2)。次に、前回作業終了日時の一番小さいデータを抽
出し、作業番号割付手段4へ受け渡す。例えば、図3
(a)の場合、前回作業終了日時が一番小さいデータ2
が作業番号割付手段4へ受け渡される(ステップ20
3)。
First, the present apparatus operates by issuing a molding machine allocation plan execution instruction from the input means 1. First, the previous work management data is transferred from the previous work management file 6 to the machine number selection means 3 (step 201). In the machine number selection means 3, the last work management data is stored as the last work end date 30.
3. Sorting is performed in ascending order at the last work end time 304 (hereinafter referred to as the last work end date and time) (step 20).
2). Next, the data with the smallest work end date and time of the previous time is extracted and passed to the work number assigning means 4. For example, in FIG.
In the case of (a), the data 2 with the smallest work completion date and time last time
Is transferred to the work number assigning means 4 (step 20).
3).

【0013】次に、作業番号割付手段4の動作について
説明する。
Next, the operation of the work number assigning means 4 will be described.

【0014】まず最初に、作業計画ファイル7より前回
作業管理ファイル6での機械番号301と同じ限定機械
番号307(専用作業を行う機械番号)を作業優先順位
の高い順に検索する。この時、決定区分311に決定済
みを示す区分“1”がセットされたデータは読み飛ば
す。例えば図3(a)のデータ2が作業番号割付手段4
へ受け渡された場合、機械番号301が“2”であるの
で、“2”で限定機械番号307を検索する(ステップ
204)。
First, the work plan file 7 is searched for a limited machine number 307 (machine number for dedicated work) which is the same as the machine number 301 in the previous work management file 6 in descending order of work priority. At this time, the data in which the section “1” indicating the determined state is set in the determined section 311 is skipped. For example, the data 2 in FIG. 3A is the work number assigning means 4
When it is delivered to the machine, since the machine number 301 is "2", the limited machine number 307 is searched by "2" (step 204).

【0015】機械番号301と同じ限定機械番号307
が検索できた場合、作業指示ファイル9へ検索した作業
番号306、色310及び、作業番号割付手段4から機
械番号301、前回作業終了日303、前回作業終了時
間304を出力する。例えば図3(a)のデータ2の場
合、図3(b)でデータ4が検索され、作業指示ファイ
ル9へは図4(b)のデータ1の様に出力される(ステ
ップ205)。この時に前回作業終了日303および前
回作業終了時間304は作業指示ファイル9では作業開
始日405、作業開始時間406とされる。
Limited machine number 307 which is the same as machine number 301
When it is possible to search for, the work number 306, the color 310, and the work number allocating means 4 output the machine number 301, the last work end date 303, and the last work end time 304 to the work instruction file 9. For example, in the case of the data 2 in FIG. 3A, the data 4 is retrieved in FIG. 3B and is output to the work instruction file 9 like the data 1 in FIG. 4B (step 205). At this time, the last work end date 303 and the last work end time 304 are set as the work start date 405 and the work start time 406 in the work instruction file 9.

【0016】次に、前回作業管理ファイル6へは、前回
作業番号302を作業番号306に、前回作業色305
を色310に更新し、前回作業終了時間304は作業時
間308を加算し、更新する。前回作業終了時間304
の加算した結果が“24”以上となった場合、加算した
結果に“24”を減算して更新し、さらに稼働日を管理
しているカレンダファイル8に、前回作業終了日303
で位置付けを行い、その次の稼働日401で前回作業終
了日303を更新する。また、作業計画ファイル7の決
定区分311を“1”に更新する。例えば図3(b)の
データ4で図3(a)のデータ2を更新する場合、前回
作業番号302は、“d”に、前回作業色305は
“B”に更新される。前回作業終了時間304に作業時
間308を加算すると結果が“28”になるため加熱結
果から“24”減算した“04”で前回作業終了時間3
04を更新し、前回作業終了日303は“190062
6”なので、まず図4(a)のカレンダファイルのデー
タ2に位置付けられ、その次のデータ3の“19006
27”で前回作業終了日303が更新される。また図3
(b)のデータ4の決定区分311は“1”で更新され
る(ステップ206)。
Next, in the previous work management file 6, the previous work number 302 is set to the work number 306, and the previous work color 305 is set.
Is updated to the color 310, and the previous work end time 304 is updated by adding the work time 308. Last work end time 304
If the added result of is greater than or equal to "24", "24" is subtracted from the added result and updated, and the previous work end date 303 is added to the calendar file 8 that manages the working days.
Positioning is performed and the previous work end date 303 is updated with the next working day 401. Further, the decision division 311 of the work plan file 7 is updated to "1". For example, when updating the data 2 in FIG. 3A with the data 4 in FIG. 3B, the previous work number 302 is updated to “d” and the previous work color 305 is updated to “B”. When the work time 308 is added to the previous work end time 304, the result becomes "28".
04 is updated, and the last work end date 303 is "190062".
Since it is 6 ", it is first positioned in the data 2 of the calendar file of FIG.
27 "is used to update the last work end date 303. Also, FIG.
The decision division 311 of the data 4 in (b) is updated with "1" (step 206).

【0017】機械番号301と同じ限定機械番号307
が検索できなかった場合、作業計画ファイル7より前回
作業色305と同じ色310を作業優先順位の高い順に
検索する。この時、ステップ204と同様決定区分31
1に区分“1”がセットされたデータは読み飛ばす。例
えば図3(a)のデータ3が作業番号割付手段4に受け
渡された場合、前回作業色305が“OR”であるの
で、“OR”で色310を検索する(ステップ20
7)。
Limited machine number 307, which is the same as machine number 301
Is not found, the same color 310 as the previous work color 305 is searched from the work plan file 7 in descending order of work priority. At this time, as in step 204, the decision division 31
The data for which the division "1" is set to 1 is skipped. For example, when the data 3 in FIG. 3A is transferred to the work number assigning unit 4, since the previous work color 305 is "OR", the color 310 is searched by "OR" (step 20).
7).

【0018】前回作業色305と同じ色310を検索で
きた場合、ステップ205、ステップ206を行う。
If the same color 310 as the previous working color 305 can be retrieved, steps 205 and 206 are performed.

【0019】前回作業色305と同じ色310を検索で
きなかった場合、作業計画ファイル7の作業優先順位の
一番高いデータを抽出し、作業指示ファイル9へ抽出し
た作業番号306、色310及び、作業番号割付手段4
から機械番号301、前回作業終了日303、前回作業
終了時間304を出力する。例えば図3(a)のデータ
1が作業番号割付手段4に受け渡された場合、図3
(b)では限定機械番号307及び色310は、検索条
件に合うデータが存在しないため、決定区分が“1”で
あるデータ1を除き専業優先順位の高いデータ2が抽出
され、作業指示ファイル9へは図4(b)のデータ3の
様に出力される(ステップ208)。その後、ステップ
206を行う。以上の動作は、作業計画ファイル7の決
定区分311が全て“1”になるまで繰り返される。例
えば図5(b)の結果になるまで動作は繰り返される
(ステップ209)。
When the same color 310 as the previous work color 305 cannot be retrieved, the data having the highest work priority in the work plan file 7 is extracted and the work number 306, the color 310 and the work number 306 extracted into the work instruction file 9 are extracted. Work number allocation means 4
Output the machine number 301, the last work end date 303, and the last work end time 304. For example, when the data 1 of FIG. 3A is transferred to the work number assigning means 4,
In (b), the limited machine number 307 and the color 310 have no data matching the search conditions, so data 2 having a higher priority of specialization is extracted except for the data 1 whose determination category is "1", and the work instruction file 9 Is output as to the data 3 in FIG. 4B (step 208). Then, step 206 is performed. The above operation is repeated until all the decision categories 311 of the work plan file 7 become "1". For example, the operation is repeated until the result shown in FIG. 5B is obtained (step 209).

【0020】最終的に出力手段10により、作業指示フ
ァイル9から作業指示書を出力する(ステップ21
0)。
Finally, the output means 10 outputs the work instruction form from the work instruction file 9 (step 21).
0).

【0021】[0021]

【発明の効果】以上説明したように、本発明によれば成
形機に対する作業番号の割り付けが自動的に計画される
ことにより、担当者による手作動の計画立案が不要とな
り、担当者の負担を軽減し、また、成形機の稼働率の向
上、及び計画ミスによる納期遅れを防止することができ
るという利点を有する。
As described above, according to the present invention, the allocation of work numbers to the molding machine is automatically planned, which eliminates the need for a person in charge to make a plan for manual operation, thereby imposing a burden on the person in charge. It has the advantages that it can be reduced, the operating rate of the molding machine can be improved, and the delivery delay due to a planning error can be prevented.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示すブロック図である。FIG. 1 is a block diagram showing an embodiment of the present invention.

【図2】図1に示す実施例における動作を示すフローチ
ャートである。
FIG. 2 is a flowchart showing an operation in the embodiment shown in FIG.

【図3】(a)および(b)はそれぞれ図1中の前回作
業管理ファイル6および作業計画ファイル7の一例を示
す図である。
3 (a) and 3 (b) are diagrams showing an example of a previous work management file 6 and a work plan file 7 in FIG. 1, respectively.

【図4】(a)および(b)はそれぞれ図1中のカレン
ダファイル8および作業指示ファイル9の一例を示す図
である。
4 (a) and 4 (b) are diagrams showing an example of a calendar file 8 and a work instruction file 9 in FIG. 1, respectively.

【図5】(a)および(b)はそれぞれ更新された図1
中の前回作業管理ファイル6および作業計画ファイル7
の一例を示す図である。
5 (a) and (b) are updated FIG. 1 respectively.
Previous work management file 6 and work plan file 7 in
It is a figure which shows an example.

【符号の説明】 1 入力手段 2 制御部 3 機械番号選択手段 4 作業番号割付手段 5 ファイル部 6 前回作業管理ファイル 7 作業計画ファイル 8 カレンダファイル 9 作業指示ファイル 10 出力手段[Explanation of symbols] 1 input means 2 control section 3 machine number selection means 4 work number allocation means 5 file section 6 previous work management file 7 work plan file 8 calendar file 9 work instruction file 10 output means

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 成形機毎に前回の作業内容を管理してい
る前回作業管理ファイルと、成形工程の作業計画データ
を作業優先順に管理している作業計画ファイルと、稼働
日を管理しているカレンダファイルと、成形工程の各作
業に成形機械番号を指定した作業計画データを管理して
いる作業指示ファイルと、前記前回作業管理ファイルよ
り割り付けを行う成形機械番号を選択する機械番号選択
手段と、この機械番号選択手段により選択された成形機
械番号に前記作業計画ファイルの作業番号を割り付けて
前記作業指示ファイルに出力する作業番号割付手段とを
有することを特徴とする成形機割付計画装置。
1. A previous work management file that manages the contents of the previous work for each molding machine, a work plan file that manages the work plan data of the molding process in the order of work priority, and the working days are managed. A calendar file, a work instruction file that manages work plan data that specifies a molding machine number for each work of the molding process, and a machine number selection unit that selects a molding machine number to be assigned from the previous work management file, A molding machine allocation planning device, comprising a work number allocation means for allocating a work number of the work plan file to the molding machine number selected by the machine number selection means and outputting the work number to the work instruction file.
JP20908391A 1991-08-21 1991-08-21 Molding machine layout planning device Pending JPH0546632A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20908391A JPH0546632A (en) 1991-08-21 1991-08-21 Molding machine layout planning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20908391A JPH0546632A (en) 1991-08-21 1991-08-21 Molding machine layout planning device

Publications (1)

Publication Number Publication Date
JPH0546632A true JPH0546632A (en) 1993-02-26

Family

ID=16566989

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20908391A Pending JPH0546632A (en) 1991-08-21 1991-08-21 Molding machine layout planning device

Country Status (1)

Country Link
JP (1) JPH0546632A (en)

Similar Documents

Publication Publication Date Title
CN112561253A (en) Order assignment method, system, platform and storage medium based on production plan
US20030158769A1 (en) Management method based on stream management in supply chain product management
CN112396322A (en) Production plan-based process technology unit productivity assessment method and system
JP2004054678A (en) Method and system for managing production
JPS59214964A (en) Conversational scheduling system
CN112396323A (en) Production plan-based process sheet distribution method and system
JP2007148635A (en) Production scheduling program and production scheduling device
US6917843B2 (en) System and method for scheduling production of molds
JP2739858B2 (en) Production control system and device
JPH0425350A (en) Preparation device for schedule of production process
JPH0546632A (en) Molding machine layout planning device
JP2811827B2 (en) Production scheduling device
JPH05314143A (en) Product production planning system in batch plant
JPH10291144A (en) Production planning making device
Vignier et al. Resolution of some 2-stage hybrid flowshop scheduling problems
JP2705649B2 (en) Work assignment method
JP2921991B2 (en) Unmanned operation scheduling system
JPH07175856A (en) Method and apparatus for provision of selection of installation
JPH08147366A (en) Production planning device
JPH06332909A (en) Plan managing system
JP2953223B2 (en) Scheduling planning equipment
JP2008276412A (en) Process progress management system and process progress management method
JPH064558A (en) Cost controller
KR0139378B1 (en) Production plan preparation method and device
JPH0966442A (en) Process control device