JPH0545378U JP8257890U JP8257890U JPH0545378U JP H0545378 U JPH0545378 U JP H0545378U JP 8257890 U JP8257890 U JP 8257890U JP 8257890 U JP8257890 U JP 8257890U JP H0545378 U JPH0545378 U JP H0545378U
Authority
JP
Japan
Prior art keywords
pipe
fume
tube
pipes
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8257890U
Other languages
Japanese (ja)
Other versions
JPH083817Y2 (en
Inventor
幹雄 丸山
秋雄 竹田
五男 平田
十二 藤村
Original Assignee
建設省北陸地方建設局長
藤村ヒユーム管株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 建設省北陸地方建設局長, 藤村ヒユーム管株式会社 filed Critical 建設省北陸地方建設局長
Priority to JP1990082578U priority Critical patent/JPH083817Y2/en
Publication of JPH0545378U publication Critical patent/JPH0545378U/en
Application granted granted Critical
Publication of JPH083817Y2 publication Critical patent/JPH083817Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)
  • Joints With Sleeves (AREA)

Abstract

(57)【要約】 電子出願以前の出願であるので 要約・選択図及び出願人の識別番号は存在しない。(57) [Summary]   Because it is an application before electronic filing There is no abstract / selection drawing and applicant identification number.

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、施工現場においてヒューム管の早期 施工が可能な連結ヒューム管及びその吊り方法に 関するものである。[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a connected fume pipe capable of early construction of a fume pipe at a construction site and a method for suspending the same.

〔従来の技術〕[Conventional technology]

従来におけるヒューム管は、ヒューム管と鋼製 カラー又はコンクリート製カラーと止水用ゴム輪 を別々に搬入して、施工現場で一本ずつ吊り上げ 、吊り下げを繰り返しながら所定の位置に設置し ている。 Conventionally, the fume pipe and the steel collar or the concrete collar and the rubber ring for waterproofing are carried in separately, and they are lifted one by one at the construction site, and they are installed at predetermined positions by repeating the suspension. ..

また、第7図に図示したように、施工に当たっ ては、ヒューム管Hを芯出し用ワイヤロープ9と ワイヤロープ10を用い、レバーブロックで位置調 整し、一個一個並べて施工している。 Further, as shown in FIG. 7, in the construction, the fume pipes H are arranged one by one using the centering wire rope 9 and the wire rope 10 and adjusting the position with the lever block.

〔考案が解決しようとする課題〕[Problems to be solved by the invention]

建設現場における最近の状況は、建設作業者の 高齢化と人手不足が深刻な問題となっており、ヒ ューム管の施工の効率化が要求されているという 問題点がある。 The recent situation at the construction site is that the aging of construction workers and the shortage of manpower are serious problems, and there is a need for more efficient construction of fume pipes.

施工の効率化をすすめるために、1本の管の長 さを現在の2m〜2.43mから5m〜10mに長尺化 することがあげられるが、この事により或る延長 で施工するのに製品の吊り込み回数が軽減され、 施工の効率化が図られる。この長尺化をすすめる 方法として、管1本を一体成形で製造する方法が あるが、この方法では、現有の設備が1本の長さ 2m〜2.43mに対応させたものであるため、大幅 な設備投資が必要となる。 In order to improve the efficiency of construction, it is possible to increase the length of one pipe from the current 2m to 2.43m to 5m to 10m. The number of hangings of the building will be reduced, and the efficiency of construction will be improved. As a method of promoting this lengthening, there is a method of manufacturing one tube by integral molding, but in this method, since the existing equipment is compatible with a length of 2 m to 2.43 m, it is significantly Equipment investment is required.

また、施工箇所が管軸方向に活荷重等の偏荷重 の作用を受け場所である場合或いは軟弱地盤であ る場合には、管の長さが長くなる程大きな曲げ力 を受けることとなり、これに対応するため、管軸 方向の補強が必要となるという問題がある。 In addition, if the construction location is a location that is subjected to an eccentric load such as live load in the axial direction of the pipe or is on soft ground, the longer the pipe length, the greater the bending force that will be applied. Therefore, there is a problem in that it is necessary to reinforce the pipe in the axial direction.

一方、長尺化をすすめるもう1つの方法として 、現在の長さの管を接合することによって行う方 法がある。この方法では、現有の設備をそのまま 使用でき、前者の手段に比べて大変経済的である 。さらに、この方法をとる場合の接合の仕方に、 PC鋼棒によって管を一体化するやり方や、硬化 後に鋼性の高い接着剤を用いて行うやり方がある が、これでは、連結後の管が一体的となり、先の 一体成形にする場合と同様に、使用箇所によって は管軸方向に大きな曲げの力が作用し、前者同様 、この曲げの力に対応した補強が必要となる問題 がある。 On the other hand, another method of increasing the length is to join the tubes of the current length. With this method, existing equipment can be used as is, and it is much more economical than the former method. Furthermore, when joining this method, there are methods of joining the tubes with a PC steel rod, and methods of using an adhesive with high steel property after hardening. As in the former case, there is a problem that a large bending force acts in the axial direction of the pipe depending on the place of use, and reinforcement is required to cope with this bending force as in the former case.

そこで、この様な問題点を解決するためには、 長尺化が図られ、尚かつ、1本の長尺化された管 には適度な可撓性を備えたものでなければならな いということになる。 Therefore, in order to solve such a problem, it is necessary to increase the length of the pipe and to provide one elongated pipe with appropriate flexibility. It turns out that.

さて、この様な可撓性を備えた管を実際に施工 する際、安全に効率よく吊り込み作業を行う必要 がある。この方法として、連結された複数の管を 第8図の如く、個々の管を独自に吊る方式にせざ るを得ないが、これでは、施工の効率化という点 で問題となる。 Now, when actually constructing such a flexible pipe, it is necessary to carry out the lifting work safely and efficiently. As a method of this, it is inevitable to use a method in which a plurality of connected pipes are individually suspended as shown in Fig. 8, but this poses a problem in terms of construction efficiency.

そこで、複数の管を連結し、可撓性を備えた連 結管を安全を考慮して2点吊りとした場合には、 ワイヤーを固定する位置によって安定度が異なる 。すなわち、第5図の様に、A点とB点の距離が 短すぎると両端の管は上に弓状となる。 Therefore, if multiple pipes are connected and a flexible connecting pipe is suspended at two points in consideration of safety, the stability differs depending on the position where the wire is fixed. That is, as shown in FIG. 5, if the distance between points A and B is too short, the tubes at both ends will have an upward arcuate shape.

また、第7図のように、A点とB点の距離が短 いと、下に弓状となり均衡がとれなくなるという 問題点がある。 In addition, as shown in FIG. 7, if the distance between points A and B is short, there is a problem in that a downward bow is formed and the balance becomes unbalanced.

そこで、本考案は、上記従来の技術の問題点に 鑑み案出されたもので、製造段階で予め短尺の複 数本のヒューム管を可撓性を備えた状態で一本に 接合しておいて、ヒューム管の早期施工を可能に すると伴に、管軸方向の曲げの力を分散させる可 撓性を有しつつも、効率よく吊り込みができる連 結ヒューム管の提供を目的としている。 Therefore, the present invention was devised in view of the problems of the above-mentioned conventional techniques, and in the manufacturing stage, a plurality of short fume pipes are preliminarily joined to each other in a flexible state. The purpose of the present invention is to provide a connected fume pipe that can be efficiently suspended while having the flexibility to disperse the bending force in the pipe axial direction while enabling early construction of the fume pipe.

〔課題を解決するための手段〕[Means for solving the problem]

上記目的を達成するために、本考案における連 結ヒューム管においては、 先頭管と後続管の管端に接合部を形成し、前記 管の接合部に弾性を有する接着剤で接着若しくは ゴム輪を配置し、各管の接合部同士をカラーで連 結して一本のヒューム管に形成した構成にされて いる。 In order to achieve the above object, in the connected fume pipe according to the present invention, a joint portion is formed at the pipe ends of the leading pipe and the succeeding pipe, and the joint portion of the pipe is bonded with an adhesive having elasticity or a rubber ring. It is arranged and the joints of each pipe are connected with a collar to form a single fume pipe.

また、連結ヒューム管は、前記ヒューム管をワ イヤで吊り下げるに際し、先頭管と最後尾管の隣 接する管との接合管端から1/3〜1/4位置に ワイヤを固定可能な吊り具を備えた構成にされて いる。 In addition, the connecting fume pipe is a hanger that can fix the wire at a position of 1/3 to 1/4 from the end of the joint pipe between the leading pipe and the pipe next to the last pipe when the fume pipe is suspended by the wire. It is configured with.

〔作用〕[Action]

先頭管と後続管の接合部同士とカラーを弾性を 有する接着剤で接着して連結し一本のヒューム管 に形成する。 また、各管の接合部にゴム輪を配 置した後、カラーを外側から装着して一本のヒュ ーム管に形成している。 The joint between the leading pipe and the succeeding pipe and the collar are bonded together by an elastic adhesive to form a single fume pipe. After placing a rubber ring at the joint of each tube, the collar is attached from the outside to form a single Hume tube.

さらに、前記連結したヒューム管をワイヤで吊 り下げるに際し、先頭管と最後尾管の接合管端か ら1/3〜1/4位置にワイヤを固定して吊られ る。 Further, when suspending the connected Hume pipe with a wire, the wire is fixed and hung from the joint pipe ends of the leading pipe and the tail pipe at 1/3 to 1/4 positions.

〔実施例〕〔Example〕

本考案の一実施例について図面を参照して説明 する。 An embodiment of the present invention will be described with reference to the drawings.

第1図から第4図において、本考案に係るヒュ ーム管は、複数のヒューム管1、2を接合して一 本の連結されたヒューム管に形成されている。 1 to 4, the Hume tube according to the present invention is formed by joining a plurality of fume tubes 1 and 2 into one connected fume tube.

すなわち、先頭管1と後続管2の管端に接合部 4が形成されている。 That is, the joint portion 4 is formed at the pipe ends of the leading pipe 1 and the succeeding pipe 2.

また、前記管1、2同士の接合部4は、カラー 3で連結するに際し、第2図に図示したように、 接合部4又はカラー3内面に、弾性を有する接着 剤例えばウレタン樹脂等を塗布して接着するか、 第3図に図示したように、接合部4に溝7を削設 し、この溝7にゴム輪8を配置し、各管の接合部 4同士をカラー3で連結して一本のヒューム管に 形成されている。 When connecting the joints 4 of the pipes 1 and 2 with the collar 3, as shown in FIG. 2, the joint 4 or the inner surface of the collar 3 is coated with an elastic adhesive such as urethane resin. Then, as shown in FIG. 3, a groove 7 is cut in the joint 4 and a rubber ring 8 is arranged in the groove 7, and the joints 4 of the respective pipes are connected by a collar 3. Formed into a single fume tube.

接合部4とカラー3を接着剤6で接着して連結 したものの場合は、比較的地盤の安定した場所の ように、管軸方向に大きな曲げの力が作用しない 箇所に適用される。 In the case where the joint 4 and the collar 3 are connected by adhering with an adhesive 6, they are applied to a place where a large bending force does not act in the pipe axis direction, such as a relatively stable place on the ground.

また、接合部4とカラー3間にゴム輪8を配置 した場合は、これ以外の地盤、特に、施工後部分 的に不等沈下の危険がある場所のように、管軸方 向に大きな曲げの力が作用する箇所に適用される 。 In addition, when the rubber ring 8 is placed between the joint 4 and the collar 3, a large bend is made in the pipe axis direction, such as in the ground other than this, especially in a place where there is a risk of uneven settlement after the construction. It is applied to the place where the force of.

また、ゴム輪8は、やや硬度の高いものが使用 され、接合部4に1本又は複数本配設してもよい 。 Further, the rubber ring 8 having a slightly high hardness is used, and one or more rubber rings 8 may be arranged in the joint portion 4.

また、ゴム輪8は、接合部4に複数本配置した 場合や幅広のものを用いた場合は、連結管同士を 水平に保つことができ、管の抜け出し抵抗力が大 きくなる。 Further, when a plurality of rubber rings 8 are arranged in the joining portion 4 or when a wide one is used, the connecting pipes can be kept horizontal, and the resistance force of the pipes coming out becomes large.

連結ヒューム管の吊り方法は、前述したヒュー ム管をワイヤで吊り下げるに際し、先頭管1と最 後尾管2の接合管端から1/3〜1/4位置にワ イヤAを固定して行われる。 The method of suspending the connected fume pipe is as follows. When suspending the above-mentioned fume pipe with a wire, fix the wire A at a position of 1/3 to 1/4 from the joint pipe end of the front pipe 1 and the rearmost tail pipe 2. Be seen.

〔考案の効果〕[Effect of the device]

本考案は、上述の通り構成されているので、次 に記載する効果を奏する。 Since the present invention is configured as described above, it has the following effects.

従来は、短尺のヒューム管の連結を施工現場で 何回となく繰り返して施工していたが、複数の短 尺物のヒューム管を一本の連結した長尺のヒュー ム管に形成することにより、施工作業が数倍早く できるようになった。 In the past, the connection of short fume pipes was repeatedly performed at the construction site, but by forming multiple short fume pipes into a single long fume pipe. , Construction work is now several times faster.

また、先頭管と最後尾管の隣接する管との接合 管端から1/3〜1/4位置にワイヤを固定ワイ ヤでの吊り上げるため、管は第5図や第6図のよ うに上又は下に弓状となる状態から第4図のよう に1本の管として、水平に均衡を以て吊り上げる ことが可能となる。 In addition, since the wire is hung up with fixed wire at the position of 1/3 to 1/4 from the end of the pipe where the leading pipe and the adjacent pipe of the tail pipe adjoin, the pipe is lifted as shown in Fig. 5 and Fig. 6. Alternatively, it can be lifted in a horizontal balance as a single pipe as shown in Fig. 4 from the state of being bowed downward.

さらに、個々に連結された管の接合部では可撓 性があるため、管軸方向の曲げの力を接合部で吸 収することができる。このことにより、長尺化さ れた管であるにもかかわらず管体に無理な力が作 用せず、部分的に不等沈下が起こる場所等でも対 応ができるものである。 Further, since the joints of the individually connected pipes are flexible, the bending force in the pipe axial direction can be absorbed at the joints. As a result, even though it is a long pipe, it does not exert excessive force on the pipe body, and it is possible to deal with it in places where uneven settlement occurs partially.

【図面の簡単な説明】[Brief description of drawings]

第1図は推進ヒューム管の分解断面図、第2図 及び第3図は連結部の断面図、第4図は吊り方法 の説明図、第5図〜第8図は従来例の説明図であ る。 FIG. 1 is an exploded sectional view of a propulsion fume tube, FIGS. 2 and 3 are sectional views of a connecting portion, FIG. 4 is an explanatory view of a suspension method, and FIGS. 5 to 8 are explanatory views of a conventional example. is there.

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平4.3.19 図面の簡単な説明を次のように補正する。 第9頁第5行から同頁第8行目までに「第1図は推進
ヒューム管の分解断面図、第2図及び第3図は連結部の
断面図、第4図は吊り方法の説明図、第5図〜第8図は
従来例の説明図である。」とあるを「第1図は推進ヒュ
ーム管の分解断面図、第2図は連結部の断面図、第3図
は連結部の断面図、第4図は吊り方法の説明図、第5図
は従来例の説明図、第6図は従来例の説明図、第7図は
従来例の説明図、第8図は従来例の説明図である。」と
補正する。 図面を次のように補正する。 図面(全図)を別紙の通り補正する。
[Submission date] Flat 4.3.19 Amend the simple explanation of the drawings as follows. From page 9, line 5 to page 8, line 8 "Fig. 1 is an exploded cross-sectional view of the propulsion fume pipe, Figs. 2 and 3 are cross-sectional views of the connecting portion, and Fig. 4 is an explanation of the hanging method. FIGS. 5 to 8 are explanatory views of a conventional example. ”,“ FIG. 1 is an exploded sectional view of a propulsion fume pipe, FIG. 2 is a sectional view of a connecting portion, and FIG. 3 is a connecting portion. FIG. 4 is an explanatory view of a conventional example, FIG. 6 is an explanatory view of a conventional example, FIG. 7 is an explanatory view of a conventional example, and FIG. It is an explanatory view of an example. " The drawings are corrected as follows. Correct the drawings (all drawings) as shown in the attached sheet.

───────────────────────────────────────────────────── フロントページの続き (72)考案者 藤村 十二 新潟県柏崎市小倉町6―14 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor, Juji Fujimura 6-14, Kokuramachi, Kashiwazaki City, Niigata Prefecture

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 先頭管と後続管の管端に接合部を形成
し、前記 管の接合部に弾性を有する接着剤で接着若しくは ゴム輪を配置し、各管の接合部同士をカラーで連 結して一本のヒューム管に形成してなる連結ヒュ ーム管。
1. A joint is formed at the pipe ends of the leading pipe and the succeeding pipe, and the joint of the pipes is bonded by an adhesive having elasticity or a rubber ring is arranged, and the joints of the pipes are connected by a collar. A connected Hume tube formed by joining and forming a single Hume tube.
【請求項2】 請求項第1項に記載のヒューム管をワイ
ヤで吊 り下げるに際し、先頭管と最後尾管の接合管端か ら1/3〜1/4位置にワイヤを固定する吊り金 具を備えた連結ヒューム管。
2. A hanger for fixing the wire to the position of 1/3 to 1/4 from the joining pipe end of the leading pipe and the tail pipe when suspending the fume pipe according to claim 1 with a wire. Connected fume tube with fittings.
JP1990082578U 1990-08-03 1990-08-03 Connected fume tube Expired - Lifetime JPH083817Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1990082578U JPH083817Y2 (en) 1990-08-03 1990-08-03 Connected fume tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1990082578U JPH083817Y2 (en) 1990-08-03 1990-08-03 Connected fume tube

Publications (2)

Publication Number Publication Date
JPH0545378U true JPH0545378U (en) 1993-06-18
JPH083817Y2 JPH083817Y2 (en) 1996-01-31

Family

ID=13778369

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1990082578U Expired - Lifetime JPH083817Y2 (en) 1990-08-03 1990-08-03 Connected fume tube

Country Status (1)

Country Link
JP (1) JPH083817Y2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6173987U (en) * 1984-10-23 1986-05-19
JPS62276196A (en) * 1986-01-23 1987-12-01 佐田建設株式会社 Joint device of small-bore hume pipe for method of propulsion construction
JPS6376095U (en) * 1986-11-06 1988-05-20
JPS6412053U (en) * 1987-07-13 1989-01-23

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6173987U (en) * 1984-10-23 1986-05-19
JPS62276196A (en) * 1986-01-23 1987-12-01 佐田建設株式会社 Joint device of small-bore hume pipe for method of propulsion construction
JPS6376095U (en) * 1986-11-06 1988-05-20
JPS6412053U (en) * 1987-07-13 1989-01-23

Also Published As

Publication number Publication date
JPH083817Y2 (en) 1996-01-31

Similar Documents

Publication Publication Date Title
US6340141B1 (en) Cable support systems, methods, and rack therefor
CN105649342A (en) Steel strand temporary traction connector and application method thereof
FI77311C (en) Rörläggningsarbetsredskap.
JP6338308B1 (en) Support
JPH0545378U (en) Connected Huym tube
CN216196723U (en) Frame post reinforcing bar puts in device
CN207794442U (en) A kind of concrete reinforcement node connecting structure
JPS5910454B2 (en) Reinforcement fittings for reinforced concrete perforated beams
KR960001380A (en) Concrete joint
CN220203435U (en) Reinforcing bar ligature appurtenance
CN220285636U (en) Steel pipe cat ladder structure and steel pipe support
KR200207470Y1 (en) Electric wire fixing clip for bilding
CN217400108U (en) Clamp for fixing prestressed reinforcing steel and spiral reinforcing steel
CN211572254U (en) Easily-disassembled stirrup
JPH01135992A (en) Flexible hose
EP0213250A1 (en) Method for connecting members and connection according to said method
CN213898122U (en) Reusable embedded sleeve and sleeve lifting and stressing tool
US9856648B2 (en) Construction and a method of making a construction
CN214531923U (en) Exhaust passage floor department reinforcing bar bearing embedded structure
CN216699355U (en) Spool fastener suitable for coincide floor truss muscle
CN213591487U (en) Bending tool for building construction
JPH045083B2 (en)
EP0216429A1 (en) Contruction for connecting wooden construction parts
CN208280599U (en) For non-solder pipeline through-wall or the device of the fixed service sleeve placed in the middle of floor
KR200193117Y1 (en) Clamp for electric box

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term