JPH0533342A - Device for removing existing concrete pile - Google Patents

Device for removing existing concrete pile

Info

Publication number
JPH0533342A
JPH0533342A JP18892691A JP18892691A JPH0533342A JP H0533342 A JPH0533342 A JP H0533342A JP 18892691 A JP18892691 A JP 18892691A JP 18892691 A JP18892691 A JP 18892691A JP H0533342 A JPH0533342 A JP H0533342A
Authority
JP
Japan
Prior art keywords
casing
auger shaft
concrete pile
crushing
expanding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18892691A
Other languages
Japanese (ja)
Other versions
JPH06104970B2 (en
Inventor
Kazuyo Okada
和代 岡田
Hiroshi Kataoka
博史 片岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OKADAGUMI KK
Original Assignee
OKADAGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=16232308&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JPH0533342(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by OKADAGUMI KK filed Critical OKADAGUMI KK
Priority to JP18892691A priority Critical patent/JPH06104970B2/en
Publication of JPH0533342A publication Critical patent/JPH0533342A/en
Publication of JPH06104970B2 publication Critical patent/JPH06104970B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To remove a concrete pile without difficulty by providing an auger shaft expanding/contracting mechanism between a rotation driving means and an auger shaft while providing a easing expanding/ contracting mechanism between the rotation driving means and a casing. CONSTITUTION:A casing 13 is inserted onto the head of an existing concrete pile P and the head of the pile is held with the casing 13. As the easing 13 is extended by operation of a easing expanding/contracting mechanism 12, soil around the pike P is excavated with an excavating edge 14. As the excavation progresses to a certain extent, an auger shaft 7 is extended by operation of an auger shaft expanding/contracting mechanism 6 and a crushing edge 9 is made to come into contact with the head of the pile P, and the crushing is started. As the crushing edge 9 approaches the lower end of the casing 13, excavation is further progressed while the casing 13 is lowered by operation of the casing expanding/contracting mechanism 12. The auger shaft 7 and the casing 13 are alternately lowered afterward and the crushing is progressed up to the lower end of the pile P, and thereby removal of the pile is completed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、既設建物を解体した
後、地中に残るコンクリート杭やコンクリートパイル等
(以下、単にコンクリート杭という)を破砕して除去す
る既設コンクリート杭の撤去装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an existing concrete pile removing apparatus for crushing and removing concrete piles, concrete piles and the like (hereinafter simply referred to as concrete piles) remaining in the ground after dismantling an existing building.

【0002】[0002]

【従来の技術】古い建物を解体してその場所に新しい建
物を施工する場合、地中に打込まれたコンクリート杭が
邪魔となるために撤去する必要がある。この種の撤去装
置の一例として、コンクリート杭の頭端面を破砕して打
込み杭を撤去するコンクリート杭の破砕装置が知られて
いる。
2. Description of the Related Art When an old building is dismantled and a new building is constructed at the site, it is necessary to remove the concrete piles driven into the ground because they are an obstacle. As an example of this type of removing device, a crushing device for a concrete pile that crushes the head end surface of the concrete pile to remove the driven pile is known.

【0003】このコンクリート杭の破砕装置は、所謂ロ
ックオーガであって、回転駆動手段が2台のモータにて
構成されており、一方のモータにオーガ軸を連結し、他
方のモータに鋼管からなるケーシングを連結している。
そして、オーガ軸の下端部にコンクリート杭の頭端面を
破砕する破砕刃を設けるとともに、ケーシングの下部周
縁にコンクリート杭の外周土壌を掘削する掘削刃を形成
している。
This concrete pile crushing device is a so-called lock auger, in which the rotation driving means is composed of two motors, one motor is connected to the auger shaft, and the other motor is composed of a steel pipe. The casings are connected.
A crushing blade for crushing the head end surface of the concrete pile is provided at the lower end of the auger shaft, and a digging blade for digging the outer peripheral soil of the concrete pile is formed at the lower peripheral edge of the casing.

【0004】次に、このコンクリート杭の破砕装置によ
り地中に残存する既設コンクリート杭を撤去する場合に
ついて説明する。
Next, a case where the existing concrete piles remaining in the ground are removed by this crushing apparatus for concrete piles will be described.

【0005】まず、既設コンクリート杭の頭部上にオー
ガ軸を建込み、この既設コンクリート杭の外周部にケー
シングを挿入して、このケーシングを回転させつつドラ
イブし掘削刃にて既設コンクリート杭の外周土壌を掘削
する。また、このケーシングの掘削刃より上部側に破砕
刃が位置するように、オーガ軸を逆回転させつつ下降さ
せる。すると、掘削刃により既設コンクリート杭の外周
土壌が掘削されるとともに破砕刃によって既設コンクリ
ート杭の頭端面が破砕されることになる。この際、オー
ガ軸にはスクリューが設けられているので、破砕された
コンクリートの破片をスクリューにより排出することが
でき、既設コンクリート杭が地中から撤去されるもので
ある。
First, an auger shaft is built on the head of an existing concrete pile, a casing is inserted into the outer peripheral portion of the existing concrete pile, and the casing is rotated and driven, and the outer periphery of the existing concrete pile is excavated by an excavating blade. Excavate the soil. Further, the auger shaft is reversely rotated and lowered so that the crushing blade is located above the digging blade of this casing. Then, the soil around the existing concrete pile is excavated by the digging blade, and the head end surface of the existing concrete pile is crushed by the crushing blade. At this time, since the auger shaft is provided with the screw, the crushed concrete fragments can be discharged by the screw, and the existing concrete pile is removed from the ground.

【0006】[0006]

【発明が解決しようとする課題】ところで、上記従来の
既設コンクリート杭の破砕装置は、回転駆動手段が2台
のモータにて構成されているので、装置全体の構造が複
雑となるうえ上部側の重量が増して安定性が悪くなると
いう欠点があった。また、オーガ軸およびケーシング
は、通常、コンクリート杭の長さに対応させたものを装
着しており、コンクリート杭の破砕においては常に外周
土壌の掘削を先行させる。ところが、オーガ軸とケーシ
ングの長さが一定で調節不可能であるために、撤去作業
においては種々の不具合があった。
By the way, in the conventional crushing device for existing concrete piles described above, since the rotary driving means is composed of two motors, the structure of the entire device becomes complicated and the structure on the upper side is increased. There was a drawback that the weight increased and the stability deteriorated. Further, the auger shaft and the casing are usually attached corresponding to the length of the concrete pile, and when crushing the concrete pile, excavation of the outer peripheral soil is always preceded. However, since the lengths of the auger shaft and the casing are constant and cannot be adjusted, there are various problems in the removal work.

【0007】まず、コンクリート杭にケーシングを挿入
し、オーガ軸およびケーシングを垂下させつつ掘削する
ので、既設コンクリート杭が傾斜状態で埋設されている
ような場合、掘削の途中で破砕不能となる状態が生じ
る。
First, since a casing is inserted into a concrete pile and the auger shaft and the casing are hung down for excavation, if the existing concrete pile is buried in a slanted state, it may be impossible to crush during the excavation. Occurs.

【0008】即ち、このコンクリート杭が傾いているた
めに、コンクリート杭とオーガ軸およびケーシングの軸
心が一致せず、くの字状となってケーシングを下降させ
ることが困難となることがある。ここで、破砕刃が掘削
刃の上部にあって追従する関係となっているために、掘
削に先行してコンクリート杭の頭端面を破砕するといっ
たことができないことから、ケーシングの停止位置で破
砕が止まり、コンクリート杭の下端が地中に残存するこ
とになる。このとき、無理にオーガ軸およびケーシング
をドライブさせつつ下降すると、コンクリート杭が座屈
して撤去作業を継続できなくなる問題が残されていた。
That is, since the concrete pile is inclined, the concrete pile, the auger shaft, and the casing may not be aligned with each other in a dogleg shape, and it may be difficult to lower the casing. Here, since the crushing blade is in the upper part of the excavating blade and has a relationship to follow, it is not possible to crush the head end surface of the concrete pile prior to excavation, so crushing occurs at the casing stop position. It will stop and the lower end of the concrete pile will remain underground. At this time, if the auger shaft and the casing are forcibly driven to descend, the concrete pile will buckle and the removal work cannot be continued.

【0009】また、比較的短いコンクリート杭が1本の
み埋設されているような場合であると、上記一対のオー
ガ軸およびケーシングによるコンクリート杭の撤去は容
易である。しかし、このオーガ軸およびケーシングは、
長さを調節できないうえ通常は連結手段を設けていない
ので、コンクリート杭が接続された長尺のものである
と、一度の作業によってはコンクリート杭を撤去できな
いことがある。この際は、コンクリート杭の長さに適合
するものと交換する必要があるが、この交換にはオーガ
軸およびケーシングを抜いて再び挿入するといった作業
が伴い、この交換作業は面倒なうえに撤去作業時間が長
くなる欠点があった。
Further, in the case where only one relatively short concrete pile is buried, it is easy to remove the concrete pile by the pair of auger shafts and the casing. However, this auger shaft and casing
Since the length cannot be adjusted and the connecting means is not normally provided, if the concrete pile is long and connected, the concrete pile may not be removed by one operation. In this case, it is necessary to replace it with one that fits the length of the concrete pile, but this replacement involves the work of pulling out and inserting the auger shaft and casing again, and this replacement work is both troublesome and removal work. It had the drawback of lengthening the time.

【0010】本発明は、上記課題を解決することを目的
としている。
An object of the present invention is to solve the above problems.

【0011】[0011]

【課題を解決するための手段】本発明は、上記目的を達
成するため、回転駆動手段に連結されたオーガ軸と、こ
のオーガ軸の下端部に設けられ、コンクリート杭の頭部
を破砕する破砕刃と、前記回転駆動手段に連結され、オ
ーガ軸とは逆方向に回転するケーシングと、このケーシ
ングの下端部に形成され、コンクリート杭の外周部の土
壌を掘削する掘削刃と、前記回転駆動手段とオーガ軸と
の間に設けられ、このオーガ軸の長さを調節するオーガ
軸伸縮機構と、前記回転駆動手段とケーシングとの間に
介設され、このケーシングの長さを調節するケーシング
伸縮機構とを備えてなる。
In order to achieve the above object, the present invention provides an auger shaft connected to a rotary drive means and a crushing unit provided at the lower end of the auger shaft for crushing the head of a concrete pile. A blade, a casing that is connected to the rotation driving means and rotates in a direction opposite to the auger shaft, an excavation blade that is formed at a lower end portion of the casing and excavates soil in an outer peripheral portion of a concrete pile, and the rotation driving means. And an auger shaft, and an auger shaft expanding / contracting mechanism for adjusting the length of the auger shaft, and a casing expanding / contracting mechanism for adjusting the length of the casing, which is interposed between the rotation driving means and the casing. It is equipped with and.

【0012】[0012]

【作用】上記構成により、長尺の既設コンクリート杭を
撤去する場合、このコンクリート杭の頭部上にオーガ軸
を建込み、ケーシング伸縮機構を駆動してケーシングを
伸ばしコンクリート杭の頭部に挿入する。この状態では
破砕刃を掘削刃の上部に位置させる。
[Operation] With the above structure, when removing a long existing concrete pile, an auger shaft is installed on the head of this concrete pile, and the casing expansion mechanism is driven to extend the casing and insert it into the head of the concrete pile. .. In this state, the crushing blade is located above the excavating blade.

【0013】次に、回転駆動手段を駆動すると、掘削刃
によりコンクリート杭の外周部の土壌が掘削される。こ
のとき、オーガ軸伸縮機構を駆動してオーガ軸を伸ばす
と、コンクリート杭の頭部が破砕される。
Next, when the rotation driving means is driven, the soil on the outer peripheral portion of the concrete pile is excavated by the excavating blade. At this time, if the auger shaft expansion / contraction mechanism is driven to extend the auger shaft, the head of the concrete pile is crushed.

【0014】続いて、ケーシングの下端に破砕刃が接近
したときは、ケーシングを下降させつつ土壌の掘削を進
める。そして、ある程度掘削した時点で再びオーガ軸を
伸ばしつつ下降させると、破砕刃によりコンクリート杭
の頭部が破砕される。このような動作を繰り返して破砕
を続けると、コンクリート杭の下端部まで撤去すること
ができる。
Then, when the crushing blade approaches the lower end of the casing, the casing is lowered to excavate the soil. Then, when the auger shaft is extended again and lowered when excavated to some extent, the head of the concrete pile is crushed by the crushing blade. By repeating such an operation and continuing the crushing, it is possible to remove up to the lower end portion of the concrete pile.

【0015】ここで、コンクリート杭が傾いているため
に、コンクリート杭とオーガ軸およびケーシングが同軸
上とならず、ケーシングを下降させることが困難となっ
た場合は、オーガ軸を下降させて破砕を続け、この後は
ケーシングとオーガ軸とを交互に下降させることによ
り、掘削刃と破砕刃とを接近させたり離間させる動作を
繰り返す。
Here, when the concrete pile, the auger shaft and the casing are not coaxial with each other due to the inclination of the concrete pile and it is difficult to lower the casing, the auger shaft is lowered to crush. Subsequently, thereafter, the operation of moving the excavating blade and the crushing blade closer to or away from each other is repeated by alternately lowering the casing and the auger shaft.

【0016】このときは、コンクリート杭の頭部を常に
把持した状態で破砕を進めると、コンクリート杭の傾き
に合わせてケーシングを追従させることができる状態と
なり、ケーシングが途中で停止することなく破砕を続行
できる。
At this time, if the head of the concrete pile is constantly gripped and the crushing is proceeded, the casing can be made to follow the inclination of the concrete pile, and the crushing can be performed without stopping the casing midway. I can continue.

【0017】また、コンクリート杭が長尺の場合、オー
ガ軸の長さが不足して破砕を進められない状態も生じる
が、この際は、ケーシング伸縮機構およびオーガ軸伸縮
機構を作動させてケーシングとオーガ軸とを伸長させ
る。これにより、コンクリート杭の破砕を進行させるこ
とができるので、相当長尺のコンクリート杭であっても
撤去が可能となる。
When the concrete pile is long, there is a case where the auger shaft cannot be crushed due to an insufficient length of the auger shaft. In this case, the casing expansion mechanism and the auger shaft expansion mechanism are operated to operate the casing. Extend the auger shaft. As a result, the crushing of the concrete pile can be promoted, and therefore even a concrete pile of a considerably long length can be removed.

【0018】[0018]

【実施例】以下、本発明の一実施例について、図を参照
しながら説明する。図1は既設コンクリート杭の撤去装
置の全体構成図である。この既設コンクリート杭の撤去
装置は、クローラクレーン1のリーダマスト2に駆動装
置4を設けており、この駆動装置4に回転伝達機構5を
介してオーガ軸伸縮機構6とケーシング伸縮機構12と
を配設している。前記オーガ軸伸縮機構6には、スクリ
ュー8、破砕刃9およびガイド部材11を設けたオーガ
軸7が、前記ケーシング伸縮機構12には、掘削刃14
を備えたケーシング13がそれぞれ連結されていて、地
中に埋設された既設のコンクリート杭Pを破砕する構成
となっている。
An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is an overall configuration diagram of an existing concrete pile removing device. This existing concrete pile removing device is provided with a driving device 4 on a leader mast 2 of a crawler crane 1, and an auger shaft expanding / contracting mechanism 6 and a casing expanding / contracting mechanism 12 are arranged in the driving device 4 via a rotation transmission mechanism 5. It is set up. The auger shaft 7 provided with a screw 8, a crushing blade 9 and a guide member 11 is provided in the auger shaft expanding / contracting mechanism 6, and the excavating blade 14 is provided in the casing expanding / contracting mechanism 12.
The casings 13 provided with are connected to each other, and the existing concrete piles P buried in the ground are crushed.

【0019】前記駆動装置4は、本体ケース4a内にモ
ータと減速機とを収容している。そして、本体ケース4
aの上部とリーダマスト2の笠木2aとの間には、ワイ
ヤ3が張設されおり、本体ケース4aの側部にはガイド
部4bが設けられている。これにより、駆動装置4は、
ワイヤ3の巻取りおよび巻戻しによってリーダマスト2
のガイドレール2bに沿って昇降自在となっている。2
cは、ケーシング13の振止具である。
The drive unit 4 contains a motor and a speed reducer in a main body case 4a. And body case 4
A wire 3 is stretched between the upper part of a and the headstock 2a of the leader mast 2, and a guide portion 4b is provided on a side portion of the main body case 4a. Thereby, the drive device 4 is
By winding and unwinding the wire 3, the leader mast 2
It is movable up and down along the guide rail 2b. Two
Reference numeral c is an antivibration tool for the casing 13.

【0020】前記回転伝達機構5は、従来周知のドーナ
ツオーガ方式であって、チャック5aを備えるととも
に、図示省略しているが駆動装置4の減速機に連結され
たシャフトと、このシャフトに設けたギャと、このギャ
に噛合する内歯ギャおよび外歯ギャを設けている。
The rotation transmission mechanism 5 is a conventionally well-known donut auger system, has a chuck 5a, and a shaft (not shown) connected to a speed reducer of the drive unit 4 and provided on this shaft. A gear and an internal gear and an external gear that mesh with the gear are provided.

【0021】チャック5aは、固定部と回転部とからな
り、固定部が本体ケース4aの下部に固定されている。
一方、回転部の内周面には、前記内歯ギャが形成されて
おり、この回転部にケーシング伸縮機構12が連結され
る。なお、前記外歯ギャはロッド5bに固着されてお
り、このロッド5bにオーガ軸伸縮機構6が連結される
ようになっている。これにより、モータの回転駆動に回
転伝達機構5が連動しオーガ軸伸縮機構6が正回転する
とき、ケーシング伸縮機構12が逆回転する構成となっ
ている。
The chuck 5a comprises a fixed portion and a rotating portion, and the fixed portion is fixed to the lower portion of the main body case 4a.
On the other hand, the inner tooth gear is formed on the inner peripheral surface of the rotating portion, and the casing expansion / contraction mechanism 12 is connected to the rotating portion. The external gear is fixed to the rod 5b, and the auger shaft extension / contraction mechanism 6 is connected to the rod 5b. As a result, when the rotation transmission mechanism 5 is interlocked with the rotational drive of the motor and the auger shaft expansion / contraction mechanism 6 rotates in the forward direction, the casing expansion / contraction mechanism 12 rotates in the reverse direction.

【0022】前記オーガ軸伸縮機構6は、図2に示すよ
うに、上部支持部材15と下部支持部材16との間に2
本の油圧シリンダ17,18を配設している。そして、
上部支持部材15にはガイドロッド19が、下部支持部
材16にはガイド部20がそれぞれ一体的に固着されて
いる。また、上部支持部材16にオスジョイント21
が、下部支持部材12にメスジョイント22がそれぞれ
固設されている。さらに、オスジョイント21は、前記
外歯ギャを固着したロッド5bに連結される一方、メス
ジョイント22にはオーガ軸7の上端が連結されるよう
になっている。なお、このオーガ軸伸縮機構6は、ケー
シング伸縮機構12の本体部12aに収容され、メスジ
ョイント21が本体部12aより突出していて、オーガ
軸7の着脱が自在な構成になっている。
As shown in FIG. 2, the auger shaft expanding / contracting mechanism 6 has a space between the upper support member 15 and the lower support member 16 and is arranged between the upper support member 15 and the lower support member 16.
Book hydraulic cylinders 17 and 18 are provided. And
A guide rod 19 is integrally fixed to the upper support member 15, and a guide portion 20 is integrally fixed to the lower support member 16. In addition, the upper support member 16 has a male joint 21.
However, the female joints 22 are fixedly attached to the lower support member 12. Further, the male joint 21 is connected to the rod 5b to which the external gear is fixed, while the female joint 22 is connected to the upper end of the auger shaft 7. The auger shaft extension / contraction mechanism 6 is housed in the main body portion 12a of the casing extension / contraction mechanism 12, the female joint 21 projects from the main body portion 12a, and the auger shaft 7 is detachable.

【0023】油圧シリンダ17,18は、図示しない油
圧装置に接続されており、この油圧装置を駆動して油圧
シリンダ17,18を作動させると、ガイドロッド19
に沿ってガイド部20が伸縮し、オーガ軸7の全長を自
在に調節できる。本例では、この油圧シリンダ17,1
8によりオーガ軸7を3m程度伸長可能となっている
が、必要に応じて油圧シリンダ17,18および各部の
長さを設定し、オーガ軸7をより長く伸長させ得るのは
勿論である。
The hydraulic cylinders 17 and 18 are connected to a hydraulic device (not shown). When the hydraulic device is driven to operate the hydraulic cylinders 17 and 18, the guide rod 19 is moved.
The guide portion 20 expands and contracts along the length of the auger shaft 7 so that the entire length of the auger shaft 7 can be freely adjusted. In this example, the hydraulic cylinders 17, 1
Although the auger shaft 7 can be extended by about 3 m by 8, the auger shaft 7 can be extended further by setting the lengths of the hydraulic cylinders 17 and 18 and each part as needed.

【0024】前記オーガ軸7は、図3に示すように、外
周にコンクリート杭Pの砕片を排出するためのスクリュ
ー8を設けており、下端部にはロッド10を着脱自在に
連結している。そして、このロッド10にコンクリート
杭Pの頭部を破砕するための破砕刃9を固設し、ロッド
10の下端部にはコンクリート杭Pの中空孔に挿入され
るガイド部材11が取付けられている。なお、このオー
ガ軸7は、前記オーガ軸伸縮機構6の作動により、後述
のケーシング13内で上下動しその下端部から破砕刃9
を出没させるようになっている。
As shown in FIG. 3, the auger shaft 7 is provided with a screw 8 for discharging the fragments of the concrete pile P on the outer periphery thereof, and a rod 10 is detachably connected to the lower end thereof. Then, a crushing blade 9 for crushing the head of the concrete pile P is fixed to the rod 10, and a guide member 11 to be inserted into the hollow hole of the concrete pile P is attached to the lower end of the rod 10. .. The auger shaft 7 is moved up and down in a casing 13 described later by the operation of the auger shaft extension / contraction mechanism 6, and the crushing blade 9 is moved from the lower end thereof.
Is supposed to appear and disappear.

【0025】前記ケーシング伸縮機構12は、図4に示
すように、本体部23に連結部25を形成したもので、
上部にはフランジ24を一体形成している。本体部23
は、円筒状の鋼管からなり、周面の対向部にはガイド溝
26,26が長さ方向に一対形成されている。これらガ
イド溝26,26の両側部には、ケーシング13の全長
を自在に調節するための凹状連結部27a,27b・・
および28a,28b・・が、同一ピッチで各4対づつ
設けられている。
As shown in FIG. 4, the casing expanding / contracting mechanism 12 has a connecting portion 25 formed in a main body portion 23.
A flange 24 is integrally formed on the upper portion. Body 23
Is made of a cylindrical steel pipe, and a pair of guide grooves 26, 26 are formed in the lengthwise direction at opposing portions of the peripheral surface. On both sides of these guide grooves 26, 26, there are concave connecting portions 27a, 27b ... For adjusting the overall length of the casing 13 freely.
., And 28a, 28b, ... Are provided in four pairs with the same pitch.

【0026】フランジ24は、ボルト孔24aを複数個
形成しており、このボルト孔24aにボルトを挿通しチ
ャック5aのネジ孔に螺合して本体部23をチャック5
aに固着する構成となっている。これにより、ケーシン
グ伸縮機構12は、前記モータが回転駆動し回転伝達機
構5の内歯ギャが逆回転すると、チャック5aおよび本
体部23が連動することでケーシング13を回転させ
る。なお、本体部23の上端にカバーが装着されること
により、このフランジ24部分は露出しないようになっ
ている。
The flange 24 has a plurality of bolt holes 24a formed therein. Bolts are inserted through the bolt holes 24a and screwed into the screw holes of the chuck 5a so that the main body portion 23 is chucked.
It is configured to be fixed to a. As a result, when the motor is rotationally driven and the internal gear of the rotation transmission mechanism 5 is reversely rotated, the casing expansion / contraction mechanism 12 rotates the casing 13 by interlocking the chuck 5a and the main body 23. The flange 24 is not exposed by the cover mounted on the upper end of the main body 23.

【0027】前記ケーシング13は、図3に示す如く下
端部に掘削刃14を設けており、モータの回転駆動にケ
ーシング伸縮機構7が連動するとともに、ケーシング1
3が下降するときコンクリート杭Pの外周土壌を掘削す
るものである。また、このケーシング13は、図4およ
び図5に示すように、上部側の外周面における対向部に
前記本体部23の凹状連結部27a,27b・・および
28a,28b・・のピッチに等しい間隔で2個の凸状
連結部13a,13bをそれぞれ突設している。そし
て、この凸状連結部13a,13bは、前記凹状連結部
27a,27b・・または28a,28b・・の何れか
に係合されることにより、ケーシング13の長さを自在
に調節可能となっている。
As shown in FIG. 3, the casing 13 is provided with an excavating blade 14 at the lower end thereof, and the casing expansion / contraction mechanism 7 is interlocked with the rotational driving of the motor, and the casing 1
When 3 descends, the soil around the concrete pile P is excavated. As shown in FIG. 4 and FIG. 5, the casing 13 has an interval equal to the pitch of the concave connecting portions 27a, 27b ... and 28a, 28b .. Two projecting connecting portions 13a and 13b are provided so as to project. The convex connecting portions 13a, 13b are engaged with either of the concave connecting portions 27a, 27b ... Or 28a, 28b .. ing.

【0028】即ち、このケーシング13の長さ調節に際
して、例えば、最上部の凹状連結部27a,27b・・
または28a,28b・・の一方に凸状連結部13a,
13bを係合させている場合に、ケーシング13を伸ば
すときは、まず、前記駆動装置4を下降させて本体部2
3に連結されたケーシング13の下端部を地上に接地さ
せる。
That is, when adjusting the length of the casing 13, for example, the uppermost concave connecting portions 27a, 27b ...
Or 28a, 28b ... One of the convex connecting portions 13a,
When the casing 13 is extended while the 13b is engaged, first, the drive device 4 is lowered to lower the main body 2
The lower end of the casing 13 connected to 3 is grounded to the ground.

【0029】次に、モータを駆動し本体部23を回動さ
せてガイド溝26の中心に凸状連結部13a,13bを
一致させる。続いて、前記駆動装置4を上昇させた後、
本体部23を左または右方向に回動させる。すると、凹
状連結部27a,27b・・または28a,28b・・
と凸状連結部13a,13bとの係合位置が変えられて
ケーシング13を所要の長さだけ延長できるものであ
る。
Next, the motor is driven to rotate the main body portion 23 to align the convex connecting portions 13a and 13b with the center of the guide groove 26. Then, after raising the drive device 4,
The main body 23 is rotated leftward or rightward. Then, the concave connecting portions 27a, 27b ... Or 28a, 28b ...
The engaging positions of the convex connecting portions 13a and 13b are changed so that the casing 13 can be extended by a required length.

【0030】本例では、前記オーガ軸伸縮機構6による
オーガ軸7とともに、このケーシング伸縮機構6の調節
によりケーシング13を3m程度伸長可能となってい
る。なお、前記ケーシング13の変形例として、相当長
いコンクリート杭Pや連結されたコンクリート杭Pに対
応し得るように、延長用ケーシング29,30を備えて
いる。図6に示す延長用ケーシング29は、前記ケーシ
ング13と同様に上部側の外周面に2個の凸状連結部2
9a,29bを各一対設ける一方、下部側の外周面に1
個の係合溝29cを一対形成している。
In this example, the casing 13 can be extended by about 3 m by adjusting the casing expansion / contraction mechanism 6 together with the auger shaft 7 by the auger shaft expansion / contraction mechanism 6. In addition, as a modified example of the casing 13, extension casings 29 and 30 are provided so as to correspond to a considerably long concrete pile P or a connected concrete pile P. The extension casing 29 shown in FIG. 6 has two convex connecting portions 2 on the outer peripheral surface on the upper side similarly to the casing 13.
While each pair of 9a and 29b is provided, one on the outer peripheral surface on the lower side
A pair of individual engaging grooves 29c are formed.

【0031】また、図7に示す延長用ケーシング30
は、上部側の外周面に1個の凸状連結部30aを設ける
一方、下部側の外周面に1個の係合溝30bを形成して
いる。これにより、延長用ケーシング29,30を連結
する場合は、前記本体部23の凹状連結部27a,27
bまたは28a,28bに、延長用ケーシング29の凸
状連結部29a,29bを係合して、ケーシング13に
延長用ケーシング29を連結する。
Further, the extension casing 30 shown in FIG.
Has one convex connecting portion 30a on the outer peripheral surface on the upper side, and one engaging groove 30b on the outer peripheral surface on the lower side. Thereby, when connecting the extension casings 29 and 30, the concave connecting portions 27a and 27 of the main body portion 23 are connected.
The convex connecting portions 29a and 29b of the extension casing 29 are engaged with b or 28a and 28b to connect the extension casing 29 to the casing 13.

【0032】この後、延長用ケーシング29の係合溝2
9cに延長用ケーシング30の凸状連結部30aを係合
して、ケーシング29に延長用ケーシング30を連結す
る。そして、係合溝30cに前記ケーシング13の凸状
連結部13aを係合し、延長用ケーシング30にケーシ
ング13を連結してもよいし、延長用ケーシング29に
ケーシング13を連結してもよい。次に、上記既設コン
クリート杭の撤去装置によるコンクリート杭の破砕作業
について説明する。
After this, the engaging groove 2 of the extension casing 29
The convex connecting portion 30a of the extension casing 30 is engaged with 9c to connect the extension casing 30 to the casing 29. The convex connecting portion 13a of the casing 13 may be engaged with the engaging groove 30c to connect the casing 13 to the extension casing 30 or the casing 13 to the extension casing 29. Next, the crushing work of the concrete pile by the above-mentioned existing concrete pile removing device will be described.

【0033】なお、本例では長尺のコンクリート杭Pを
撤去する場合について説明する。まず、図8に示すよう
に、コンクリート杭Pの頭部上にオーガ軸7を建込む。
この状態では、破砕刃9をケーシング13内に引き込め
て掘削刃14の上部に位置させておく。
In this example, the case of removing the long concrete pile P will be described. First, as shown in FIG. 8, the auger shaft 7 is built on the head of the concrete pile P.
In this state, the crushing blade 9 is retracted into the casing 13 and is positioned above the excavating blade 14.

【0034】次に、駆動手段4を回転させつつ下降させ
てコンクリート杭Pの頭部にケーシング13を挿入す
る。すると、頭部がケーシング13に把持される。この
状態でケーシング伸縮機構12を駆動してケーシング1
3を伸ばすと、掘削刃14によりコンクリート杭Pの外
周部の土壌が掘削される。
Next, the drive means 4 is rotated and lowered to insert the casing 13 into the head of the concrete pile P. Then, the head is gripped by the casing 13. In this state, the casing expansion / contraction mechanism 12 is driven to drive the casing 1
When 3 is extended, the excavating blade 14 excavates the soil on the outer peripheral portion of the concrete pile P.

【0035】この掘削がある程度進むと、オーガ軸伸縮
機構12を駆動してオーガ軸7を伸ばし、図9に示す如
く破砕刃9をコンクリート杭Pの頭部に接触させて破砕
を開始する。この際、ケーシング13がコンクリート杭
Pを覆っているので、破砕に伴って発生する騒音が抑制
されるとともに、粉塵の飛散が防止される。そして、破
砕が進みケーシング13の下端に破砕刃9が接近したと
きは、上述の方法でケーシング伸縮機構12を調整操作
しケーシング13を下降させつつ土壌の掘削を進める。
When this excavation progresses to a certain extent, the auger shaft expansion / contraction mechanism 12 is driven to extend the auger shaft 7, and the crushing blade 9 is brought into contact with the head of the concrete pile P as shown in FIG. 9 to start crushing. At this time, since the casing 13 covers the concrete pile P, noise generated due to the crushing is suppressed and dust is prevented from scattering. When the crushing progresses and the crushing blade 9 approaches the lower end of the casing 13, the casing expanding / contracting mechanism 12 is adjusted and the casing 13 is lowered by the above-described method to excavate the soil.

【0036】ここで、土壌がある程度掘削されると、図
10に示すように、再びオーガ軸7を伸ばし、破砕刃9
によりコンクリート杭Pの頭部を破砕する。このような
動作は、主としてコンクリート杭Pの上部側で繰り返
し、後は駆動手段4を下降させつつ破砕を続けると、コ
ンクリート杭Pの下端部まで撤去することができる。と
ころで、コンクリート杭Pが傾斜して埋設されている場
合があるが、この撤去装置によれば支障なく撤去作業を
継続することができる。
Here, when the soil is excavated to some extent, the auger shaft 7 is extended again and the crushing blade 9 is extended as shown in FIG.
The head of the concrete pile P is crushed by. Such an operation is repeated mainly on the upper side of the concrete pile P. After that, if the driving means 4 is lowered and the crushing is continued, the concrete pile P can be removed to the lower end. By the way, although the concrete pile P may be buried in an inclined manner, this removal device allows the removal work to be continued without trouble.

【0037】即ち、コンクリート杭Pが傾いているため
に、コンクリート杭Pとオーガ軸7およびケーシング1
3が同軸上とならないとき、くの字状となっている部分
でケーシング13が停止するが、このような場合はケー
シング13の下端に破砕刃9が接近するまで破砕を行
う。
That is, since the concrete pile P is inclined, the concrete pile P, the auger shaft 7 and the casing 1 are
When 3 is not on the same axis, the casing 13 stops at the V-shaped portion. In such a case, the crushing is performed until the crushing blade 9 approaches the lower end of the casing 13.

【0038】この後は、コンクリート杭Pの頭部をケー
シング13で把持しつつ、ケーシング13とオーガ軸7
とを交互に下降させることにより、掘削刃14と破砕刃
9とを接近させたり離間させる。これにより、コンクリ
ート杭Pの頭部が常に把持された状態で破砕が進められ
るので、コンクリート杭Pの傾きに合わせてケーシング
13を追従させることができる状態となり、また、コン
クリート杭Pの座屈も防止されるから、コンクリート杭
Pの下端部まで撤去できる。
After that, the casing 13 and the auger shaft 7 are held while the head of the concrete pile P is being held by the casing 13.
By alternately lowering and, the excavating blade 14 and the crushing blade 9 are moved closer to or apart from each other. As a result, since the crushing proceeds while the head of the concrete pile P is constantly gripped, the casing 13 can be made to follow the inclination of the concrete pile P, and the buckling of the concrete pile P also occurs. Since it is prevented, the lower end of the concrete pile P can be removed.

【0039】なお、本発明の既設コンクリート杭の撤去
装置によれば、上述の撤去作業に加え所謂ロックアンド
ソイル作業も可能である。
According to the existing concrete pile removing apparatus of the present invention, so-called lock and soil work can be performed in addition to the above-mentioned removing work.

【0040】例えば、図11および図12に示すよう
に、地下2階(F2)部分に埋設されている既設コンク
リート杭Pを、地下1階(F1)から地下2階(F2)
の床面を介して破砕することもできる。この場合は、ま
ず地中に残存するコンクリート杭Pの頭部上における地
下1階の床面にオーガ軸7を建込む。次いで、床面に形
成された貫通孔にケーシング13を挿入して地下2階の
床面に到達させ、図11に示す如く地下2階の貫通孔に
ケーシング13を挿入する。続いて、前述のようにケー
シング伸縮機構12を調整操作しケーシング13を下降
させつつ土壌の掘削を進める。そして、オーガ軸伸縮機
構6の油圧シリンダ17,18を作動させてオーガ軸7
を伸長しつつコンクリート杭Pを破砕する。このときも
ケーシング伸縮機構12およびオーガ軸伸縮機構6を交
互に作動させると、破砕作業は効果的に行われる。ここ
で、コンクリート杭Pが長くオーガ軸7が届かない場合
は、ケーシング伸縮機構12に延長ケーシング29を連
結し、かつこの延長ケーシング29にケーシング13を
連結する。すると、図12に示す如くケーシングを2倍
の長さにできるので、コンクリート杭Pの破砕を進める
と、地下2階の下部に埋設されたコンクリート杭Pを地
下1階において撤去することができるものである。
For example, as shown in FIG. 11 and FIG. 12, the existing concrete pile P buried in the second basement (F2) part is used from the first basement (F1) to the second basement (F2).
It can also be crushed through the floor surface of. In this case, first, the auger shaft 7 is built on the floor surface of the first basement floor on the head of the concrete pile P remaining in the ground. Next, the casing 13 is inserted into the through hole formed in the floor surface to reach the floor surface of the second basement floor, and the casing 13 is inserted into the through hole of the second basement floor as shown in FIG. Then, as described above, the casing expanding / contracting mechanism 12 is adjusted and the casing 13 is lowered to proceed with soil excavation. Then, the hydraulic cylinders 17 and 18 of the auger shaft extension / contraction mechanism 6 are operated to operate the auger shaft 7.
The concrete pile P is crushed while extending. Also at this time, the crushing work is effectively performed by alternately operating the casing expansion / contraction mechanism 12 and the auger shaft expansion / contraction mechanism 6. Here, when the concrete pile P is long and the auger shaft 7 cannot reach, the extension casing 29 is connected to the casing expansion / contraction mechanism 12, and the casing 13 is connected to the extension casing 29. Then, as shown in FIG. 12, the casing can be doubled in length, so if the crushing of the concrete pile P is promoted, the concrete pile P buried in the lower part of the second basement can be removed on the first basement. Is.

【0041】以上のように、本発明のオーガ軸伸縮機構
6およびケーシング伸縮機構12は、伸縮自在であるか
ら、前述の他に例えば建て込み時にクローラクレーン1
のリーダマスト2を高くできない場合、ケーシング13
とオーガ軸7との長さを短くしておき、建て込み後に伸
長すればスペースが確保できない場所であっても支障な
く撤去作業を行うことができる。
As described above, since the auger shaft expanding / contracting mechanism 6 and the casing expanding / contracting mechanism 12 of the present invention are expandable / contractible, in addition to the above, for example, the crawler crane 1 at the time of installation.
If the leader mast 2 cannot be raised, the casing 13
By shortening the lengths of the auger shaft 7 and the auger shaft 7 and extending them after they are built, the removal work can be performed without trouble even in a place where space cannot be secured.

【0042】また、コンクリート杭Pが長尺の場合、通
常サイズのオーガ軸7では長さが不足して撤去作業を進
められないこともあるが、このときは、オーガ軸伸縮機
構6およびケーシング伸縮機構12を作動させてオーガ
軸7とケーシング13とを伸長させることにより、コン
クリート杭Pの破砕を続行することができるので、相当
長尺のコンクリート杭Pであっても一度の作動で撤去が
可能となる。
When the concrete pile P is long, the auger shaft 7 of a normal size may be too short to proceed with the removal work. By activating the mechanism 12 to extend the auger shaft 7 and the casing 13, the crushing of the concrete pile P can be continued, so even a concrete pile P of a considerably long length can be removed in one operation. Becomes

【0043】[0043]

【発明の効果】以上のように、本発明によれば、ケーシ
ングを下降させつつ土壌の掘削を進め、ある程度掘削し
た時点でオーガ軸を伸ばして破砕刃によりコンクリート
杭の頭部を破砕する動作を繰り返すと、コンクリート杭
の下端部まで撤去することができる。よって、コンクリ
ート杭が傾いて埋設されているような場合でも、ケーシ
ングとオーガ軸とを交互に下降させることにより、コン
クリート杭の傾斜状態に合わせて破砕を進めることがで
きるから、従来のようにケーシングが途中で停止するこ
となく破砕が行われ、コンクリート杭を残存させること
なく撤去できる効果がある。
As described above, according to the present invention, the operation of crushing the head of the concrete pile with the crushing blade by extending the auger shaft at the time of excavating the soil while lowering the casing and excavating the soil to some extent. By repeating, it is possible to remove up to the lower end of the concrete pile. Therefore, even when the concrete pile is buried in a slanted state, by cascading the casing and the auger shaft alternately, the crushing can be advanced according to the inclined state of the concrete pile. The concrete is crushed without stopping in the middle, and there is an effect that it can be removed without leaving the concrete pile.

【0044】また、コンクリート杭が長尺の場合、オー
ガ軸の長さが不足して破砕を進められない状態が生じる
ことがあっても、ケーシング伸縮機構およびオーガ軸伸
縮機構を作動させてケーシングとオーガ軸とを伸長させ
ることにより、コンクリート杭の破砕を続行することが
できるので、相当長尺のコンクリート杭であっても一度
の作業でコンクリート杭を撤去できる利点もある。
In the case where the concrete pile is long, even if the auger shaft cannot be crushed due to the insufficient length of the auger shaft, the casing expanding and contracting mechanism and the auger shaft expanding and contracting mechanism are operated to form the casing. Since the crushing of the concrete pile can be continued by extending the auger shaft, there is also an advantage that the concrete pile can be removed in one operation even if the concrete pile has a considerably long length.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例を示す全体構成図である。FIG. 1 is an overall configuration diagram showing an embodiment of the present invention.

【図2】オーガ軸伸縮機構の正面図である。FIG. 2 is a front view of an auger shaft extension / contraction mechanism.

【図3】オーガ軸およびケーシングの断面図である。FIG. 3 is a sectional view of an auger shaft and a casing.

【図4】ケーシング伸縮機構の斜視図である。FIG. 4 is a perspective view of a casing expansion / contraction mechanism.

【図5】ケーシングの平面図である。FIG. 5 is a plan view of a casing.

【図6】延長ケーシングの斜視図である。FIG. 6 is a perspective view of an extension casing.

【図7】他の延長ケーシングの斜視図である。FIG. 7 is a perspective view of another extension casing.

【図8】ケーシングを伸長させて土壌を掘削する状態を
示す説明図である。
FIG. 8 is an explanatory diagram showing a state in which the casing is extended to excavate the soil.

【図9】オーガ軸を伸長させて既設杭を破砕する状態を
示す説明図である。
FIG. 9 is an explanatory view showing a state in which the auger shaft is extended and the existing pile is crushed.

【図10】ケーシングとオーガ軸とを交互に伸長させる
撤去作業を示す説明図である。
FIG. 10 is an explanatory view showing a removing operation for alternately extending the casing and the auger shaft.

【図11】地下2階部分の既設杭を撤去する作業を開始
する状態を示す説明図である。
FIG. 11 is an explanatory view showing a state in which the work for removing the existing piles on the second basement portion is started.

【図12】地下2階部分の既設杭の破砕状態を示す説明
図である。
FIG. 12 is an explanatory diagram showing a crushed state of existing piles on the second basement.

【符号の説明】[Explanation of symbols]

1 クローラクレーン 2 リーダマスト 4 駆動装置 5 回転伝達機構 6 オーガ軸伸縮機構 7 オーガ軸 9 破砕刃 12 ケーシング伸縮機構 13 ケーシング 14 掘削刃 P 既設コンクリート杭 DESCRIPTION OF SYMBOLS 1 Crawler crane 2 Leader mast 4 Drive device 5 Rotation transmission mechanism 6 Auger shaft expansion / contraction mechanism 7 Auger shaft 9 Crushing blade 12 Casing expansion / contraction mechanism 13 Casing 14 Excavation blade P Existing concrete pile

Claims (1)

【特許請求の範囲】 【請求項1】 回転駆動手段に連結されたオーガ軸と、
このオーガ軸の下端部に設けられ、コンクリート杭の頭
部を破砕する破砕刃と、前記回転駆動手段に連結され、
オーガ軸とは逆方向に回転するケーシングと、このケー
シングの下端部に形成され、コンクリート杭の外周部の
土壌を掘削する掘削刃と、前記回転駆動手段とオーガ軸
との間に設けられ、このオーガ軸の長さを調節するオー
ガ軸伸縮機構と、前記回転駆動手段とケーシングとの間
に介設され、このケーシングの長さを調節するケーシン
グ伸縮機構とを備えてなる既設コンクリート杭の撤去装
置。
Claims: 1. An auger shaft connected to a rotation drive means,
Provided at the lower end of the auger shaft, a crushing blade for crushing the head of the concrete pile, and connected to the rotation driving means,
A casing that rotates in the opposite direction to the auger shaft, a drilling blade that is formed at the lower end of the casing and excavates the soil in the outer peripheral portion of the concrete pile, and is provided between the rotation driving means and the auger shaft, An existing concrete pile removing device comprising an auger shaft expanding / contracting mechanism for adjusting the length of the auger shaft, and a casing expanding / contracting mechanism interposed between the rotation driving means and the casing for adjusting the length of the casing. ..
JP18892691A 1991-07-29 1991-07-29 Removal equipment for existing concrete piles Expired - Fee Related JPH06104970B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18892691A JPH06104970B2 (en) 1991-07-29 1991-07-29 Removal equipment for existing concrete piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18892691A JPH06104970B2 (en) 1991-07-29 1991-07-29 Removal equipment for existing concrete piles

Publications (2)

Publication Number Publication Date
JPH0533342A true JPH0533342A (en) 1993-02-09
JPH06104970B2 JPH06104970B2 (en) 1994-12-21

Family

ID=16232308

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18892691A Expired - Fee Related JPH06104970B2 (en) 1991-07-29 1991-07-29 Removal equipment for existing concrete piles

Country Status (1)

Country Link
JP (1) JPH06104970B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001003362A (en) * 1999-06-22 2001-01-09 Somagumi:Kk Pull-out device for underground buried pile
US7461388B2 (en) 2004-09-16 2008-12-02 Sharp Kabushiki Kaisha Optical disk device
JP2011226179A (en) * 2010-04-21 2011-11-10 Alpha Civil Engineering:Kk Existing concrete pile crushing/discharging device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4606973B2 (en) * 2005-08-30 2011-01-05 古河ロックドリル株式会社 Dismantling device for underground foundation pile and dismantling method of underground foundation pile using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001003362A (en) * 1999-06-22 2001-01-09 Somagumi:Kk Pull-out device for underground buried pile
US7461388B2 (en) 2004-09-16 2008-12-02 Sharp Kabushiki Kaisha Optical disk device
JP2011226179A (en) * 2010-04-21 2011-11-10 Alpha Civil Engineering:Kk Existing concrete pile crushing/discharging device

Also Published As

Publication number Publication date
JPH06104970B2 (en) 1994-12-21

Similar Documents

Publication Publication Date Title
EP0316747B1 (en) Method and apparatus for building pipeline
JPH0533342A (en) Device for removing existing concrete pile
JP3052195B2 (en) Drilling method and equipment for large diameter pits
JP2596802B2 (en) Ring cut excavator
JPH0515879B2 (en)
JPH0643796B2 (en) Shield machine
JP2854838B2 (en) Method and apparatus for excavating a vertical hole and excavator
JP3527644B2 (en) Cutter head
JPH07293167A (en) Rock-bed excavating method and its device
JP2695676B2 (en) Obstacle cutting equipment of shield excavator
JP2596803B2 (en) Ring cut excavator
JPH0523672Y2 (en)
JP3094325B2 (en) Drilling trench widening excavator and its widening excavation method
SU817145A1 (en) Borehole drilling unit
JPH0932480A (en) Cutter head for drilling concrete structure
JP3217073B2 (en) Expanding method of existing buried pipe
JP2868702B2 (en) Excavator
JPS6343244Y2 (en)
JPH07229146A (en) Continuous excavator
JPH02140396A (en) Annular excavating device
JP3137743B2 (en) Existing tunnel removal shield machine
JP3631892B2 (en) Drilling rig
JP3400091B2 (en) Underground retracting method for buried pipes
JPH09279972A (en) Drilling device and inner excavation
JPH09273374A (en) Excavating device for earth drill

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081221

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081221

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091221

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091221

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20101221

LAPS Cancellation because of no payment of annual fees