JPH05304709A - Work wagon for extending cable - Google Patents

Work wagon for extending cable

Info

Publication number
JPH05304709A
JPH05304709A JP29382992A JP29382992A JPH05304709A JP H05304709 A JPH05304709 A JP H05304709A JP 29382992 A JP29382992 A JP 29382992A JP 29382992 A JP29382992 A JP 29382992A JP H05304709 A JPH05304709 A JP H05304709A
Authority
JP
Japan
Prior art keywords
shaft
cable drum
cable
spline
drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP29382992A
Other languages
Japanese (ja)
Other versions
JP2961270B2 (en
Inventor
Mitsuru Sanpei
充 三幣
Junichi Shionoya
純一 塩野谷
Hirotsugu Inoue
裕嗣 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kandenko Co Ltd
Sanwa Tekki Corp
Original Assignee
Kandenko Co Ltd
Sanwa Tekki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kandenko Co Ltd, Sanwa Tekki Corp filed Critical Kandenko Co Ltd
Priority to JP29382992A priority Critical patent/JP2961270B2/en
Publication of JPH05304709A publication Critical patent/JPH05304709A/en
Application granted granted Critical
Publication of JP2961270B2 publication Critical patent/JP2961270B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Electric Cable Installation (AREA)
  • Unwinding Of Filamentary Materials (AREA)

Abstract

PURPOSE:To provide a work wagon for extending cables which can simultaneously support four cable drums and, at the same time, can quickly and surely load/unload the four cable drums on/from the four supporting devices. CONSTITUTION:Four cable drum supporting devices 2 each of which is composed of a fixing and driving posts 3 and 4 are arranged on the front and rear sides and the left and right sides on the bed of the title wagon. A through shaft 20 is passed through the center of each cable drum D and the drum D is put on a saddle. The position of the drum D in the longitudinal direction is decided by moving the drum D in the front-rear direction along elevating/ lowering rails and the supporting height of the drum D is decided by elevating or lowering the rails. When the drum D is positioned, a spline shaft is protruded and put on the spline putting section of the shaft 20 and, at the same time, a sliding shaft is pushed out and inserted into the bearing 31 of the post 3. When the spline shaft is retreated, the sliding shaft is restored by means of a spring and the drum D can be removed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、電柱間にケーブルを延
線する工事において、ケーブルドラムからケーブルを送
り出し、あるいは撤去するケーブルをケーブルドラムに
巻き取る作業に用いられる作業車に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work vehicle used for winding a cable for sending out or removing the cable from a cable drum in a work for extending a cable between electric poles.

【0002】[0002]

【従来の技術】ケーブルの延線作業においては、ケーブ
ルドラムを荷台上に軸支した延線作業車が用いられてい
る。一般には、延線径間の両側に延線作業車を置き、一
方の延線作業車上のケーブルドラムから延線すべき新ケ
ーブルを送り出し、他方の延線作業車上のケーブルドラ
ムに撤去すべき旧ケーブルあるいは牽引ワイヤを巻き取
っていく。従来の延線作業車としては、荷台上に2機の
ケーブルドラム支持装置を横並びに設置したものが知ら
れている(例えば実開昭53−73493)。このよう
な延線作業車は、2本のケーブルを同時に延線すること
ができる。ところが、4本のケーブルを同時に並行して
架設する形式の延線工事においては、延線作業車も4機
のケーブルドラム支持装置を備えたものが要求されてい
る。この要求に対応するためには、ケーブルドラム支持
装置を前後左右に設置する必要があるが、従来の延線作
業車では、ケーブルドラム支持装置を前後に並べると、
ケーブルドラムの装着が困難になる。また、上記従来の
延線作業車においては、ケーブルドラムを平行アームに
対して着脱する際に、工具を使ってねじを締め付けたり
緩めたりしなければならず、作業が容易でない。
2. Description of the Related Art In the cable drawing work, a drawing work vehicle in which a cable drum is pivotally supported on a carrier is used. Generally, wire-drawing work vehicles are placed on both sides of the wire-drawing diameter, a new cable to be drawn is sent from the cable drum on one wire-drawing work vehicle, and the cable is removed to the cable drum on the other wire-drawing work vehicle. Take up the old cable or tow wire to be wound up. As a conventional wire drawing work vehicle, there is known one in which two cable drum supporting devices are installed side by side on a loading platform (for example, Japanese Utility Model Laid-Open No. 53-73493). Such a wire-drawing work vehicle can wire two cables at the same time. However, in the wire-drawing work in which four cables are simultaneously installed in parallel, the wire-drawing work vehicle is also required to have four cable drum supporting devices. In order to meet this requirement, it is necessary to install the cable drum support devices in the front, rear, left and right, but in the conventional wire drawing work vehicle, when the cable drum support devices are arranged in the front and rear,
Installation of the cable drum becomes difficult. Further, in the above-described conventional wire-drawing work vehicle, when the cable drum is attached to or detached from the parallel arm, the screw must be tightened or loosened using a tool, which is not easy.

【0003】[0003]

【発明が解決しようとする課題】従って、本発明は、荷
台上に前後に並べて設置されたケーブルドラム支持装置
の各々へケーブルドラムを迅速かつ確実に着脱すること
ができるケーブル延線作業車を提供することを課題とし
ている。
SUMMARY OF THE INVENTION Therefore, the present invention provides a cable drawing work vehicle in which the cable drums can be quickly and surely attached to and detached from each of the cable drum supporting devices which are installed side by side on the bed. The task is to do.

【0004】[0004]

【課題を解決するための手段】本発明においては、荷台
1上に固定ポスト3と駆動ポスト4とを左右に相対向さ
せて前後に少なくとも2組設け、固定ポスト3と駆動ポ
スト4との間に、前後方向に延長するように昇降レール
5を設け、この昇降レール5上には、上部にケーブルド
ラムDを載せてこれに沿って前後方向に移動自在に移動
サドル12を設けると共に、この移動サドル12を前後
方向に所定距離移動させて前後2組の固定ポスト3と駆
動ポスト4との間で夫々停止させるための移動装置13
を設け、昇降レール5の側方には、ケーブルドラムDを
所定の軸支高さまで上昇させるべく昇降レール5を上昇
させるための昇降装置6を設ける一方、各ケーブルドラ
ムDの中心に貫通させるように着脱自在の貫通軸20を
設け、この貫通軸20は、軸筒21とその内側に軸線方
向摺動自在に挿入された摺動軸22とから構成し、かつ
軸筒21の一端側にはスプライン嵌合部23を設け、ま
た摺動軸22は常時端部を軸筒21内に引っ込める方向
に付勢し、各駆動ポスト4には、油圧機構により固定ポ
スト3側へ水平に出没可能に、かつモータにより回転可
能にスプライン軸24を設け、突出時にこのスプライン
軸24を軸筒21のスプライン嵌合部23に嵌合させる
と共に、摺動軸22の一端を押して他端を軸筒21の他
端から突出させることができるように構成し、各固定ポ
スト3には、スプライン軸24に対向位置して、軸筒2
1から突出した摺動軸22の他端を受け入れ可能な軸受
31を設け、2つのケーブルドラムDを前後2組の固定
ポスト3と駆動ポスト4との間に着脱自在にしてケーブ
ル延線作業車を構成した。
According to the present invention, at least two sets of fixed posts 3 and drive posts 4 are provided on the bed 1 so as to face each other on the left and right, and between the fixed posts 3 and the drive posts 4. In addition, an elevating rail 5 is provided so as to extend in the front-rear direction, a cable drum D is placed on the elevating rail 5, and a movable saddle 12 is provided along the elevating rail 5 so as to be movable in the front-rear direction. A moving device 13 for moving the saddle 12 in the front-rear direction by a predetermined distance and stopping it between the two sets of front and rear fixed posts 3 and drive posts 4, respectively.
And a lifting device 6 for lifting the lifting rails 5 so as to lift the cable drums D to a predetermined shaft support height on the side of the lifting rails 5, while penetrating the center of each cable drum D. A detachable through-shaft 20 is provided on the shaft cylinder 21. The through-shaft 20 includes a shaft cylinder 21 and a sliding shaft 22 that is slidably inserted inside the shaft cylinder 21. A spline fitting portion 23 is provided, and the sliding shaft 22 constantly urges the end portion in a direction in which the end portion is retracted into the barrel 21 so that each drive post 4 can be horizontally retracted to the fixed post 3 side by a hydraulic mechanism. Further, a spline shaft 24 is rotatably provided by a motor, and when the spline shaft 24 is projected, the spline shaft 24 is fitted into the spline fitting portion 23 of the shaft cylinder 21, and one end of the sliding shaft 22 is pushed and the other end thereof is pressed. Project from the other end Configured to allow bets, each fixing post 3, and a position facing the spline shaft 24, the barrel 2
1 is provided with a bearing 31 capable of receiving the other end of the sliding shaft 22 and the two cable drums D are detachably mounted between the front and rear two sets of the fixed post 3 and the drive post 4 to extend the cable drawing work vehicle. Configured.

【0005】[0005]

【作用】本発明のケーブル延線作業車においては、荷台
1の後尾側に配置した移動サドル12上にケーブルドラ
ムDを載せ、油圧機構のような移動装置13によって移
動サドル12を昇降レール5に沿って前方へ移動させ、
荷台1の前方にあるケーブルドラム支持装置2の一対の
軸支装置、即ち固定ポスト3,駆動ポスト4の間に持ち
来す。ケーブルドラムDは移動サドル12に載って、荷
台1の後方のケーブルドラム支持装置2の固定ポスト
3,駆動ポスト4の間を難なく通り抜けて、荷台1の前
方のケーブルドラム支持装置2まで移動する。そして、
油圧機構のような昇降装置6によってケーブルドラムD
を所定の軸支高さまで持ち上げる。ケーブルドラムDに
は、予め貫通軸20を装着しておく。ケーブルドラムD
が軸支高さまで上昇したとき、貫通軸20、駆動ポスト
4のスプライン軸24、固定ポスト3の軸受31の三者
の軸心が一致する。この状態で、油圧機構を動作させ
て、スプライン軸24を駆動ポスト4から固定ポスト3
側へ水平に突出させる。スプライン軸24は、軸筒21
のスプライン嵌合部23に嵌合すると共に、摺動軸22
の一端を押して、その他端を軸筒21の他端から突出さ
せ、固定ポスト3の軸受31に挿入させる。スプライン
軸24をモータ28で回転させれば、貫通軸20と共に
ケーブルドラムDを回転させることができる。次いで、
昇降レール5、移動サドル12を復旧させ、同様の動作
を行わせて荷台1の後方のケーブルドラム支持装置2に
ケーブルドラムDを装着する。こうすれば、荷台1の前
後左右に4機のケーブルドラム支持装置2を設置するこ
とができる。ケーブルドラムDを取り外すときには、サ
ドル12をケーブルドラムDの下に当接する位置まで上
昇させ、スプライン軸24を引っ込めると駆動ポスト4
との係合が外れ、同時に、ばね32により摺動軸22が
復帰して、その端部が軸筒21内に引っ込み、固定ポス
ト3の軸受31との係合が外れる。この後サドル12を
下降させてケーブルドラムDを排除する。ケーブルドラ
ムDの取外しは、後方のものから先に行う。
In the cable drawing work vehicle of the present invention, the cable drum D is placed on the moving saddle 12 arranged on the rear side of the loading platform 1, and the moving saddle 12 is moved to the lifting rail 5 by the moving device 13 such as a hydraulic mechanism. Move forward along
It is brought in between the pair of shaft supporting devices of the cable drum supporting device 2 in front of the luggage carrier 1, that is, the fixed post 3 and the drive post 4. The cable drum D is placed on the movable saddle 12, passes through the fixed posts 3 and the drive posts 4 of the cable drum supporting device 2 behind the loading platform 1 without difficulty, and moves to the cable drum supporting device 2 in front of the loading platform 1. And
The cable drum D is moved by the lifting device 6 such as a hydraulic mechanism.
Lift up to the specified shaft support height. The penetrating shaft 20 is attached to the cable drum D in advance. Cable drum D
Is raised to the shaft supporting height, the three shaft centers of the penetrating shaft 20, the spline shaft 24 of the drive post 4 and the bearing 31 of the fixed post 3 are aligned. In this state, the hydraulic mechanism is operated to move the spline shaft 24 from the drive post 4 to the fixed post 3
Project horizontally to the side. The spline shaft 24 is the barrel 21.
Is fitted to the spline fitting part 23 of the sliding shaft 22
1 is pushed, the other end is projected from the other end of the barrel 21, and is inserted into the bearing 31 of the fixed post 3. By rotating the spline shaft 24 with the motor 28, the cable drum D can be rotated together with the penetrating shaft 20. Then
The elevating rail 5 and the moving saddle 12 are restored, and the same operation is performed to mount the cable drum D on the cable drum supporting device 2 behind the loading platform 1. In this way, four cable drum supporting devices 2 can be installed on the front, rear, left and right of the loading platform 1. When removing the cable drum D, the saddle 12 is moved up to a position where it abuts under the cable drum D, and the spline shaft 24 is retracted.
At the same time, the sliding shaft 22 is returned by the spring 32, the end of the sliding shaft 22 is retracted into the barrel 21, and the fixed post 3 is disengaged from the bearing 31. Then, the saddle 12 is lowered to remove the cable drum D. When removing the cable drum D, the rear one should be removed first.

【0006】[0006]

【実施例】本発明の一実施例を図について説明する。図
1はケーブル延線作業車の正面図、図2はケーブル延線
作業車の平面図、図3はケーブルドラム支持装置の正面
図、図4は駆動ポストの縦断正面図、図5は駆動ポスト
の横断平面図、図6は貫通軸の断面図、図7は昇降レー
ルの正面図、図8は昇降レールの平面図、図9は昇降レ
ールの側面図、図10は移動サドルの正面図、図11は
移動サドルの側面図である。
An embodiment of the present invention will be described with reference to the drawings. 1 is a front view of a cable drawing work vehicle, FIG. 2 is a plan view of a cable drawing work vehicle, FIG. 3 is a front view of a cable drum supporting device, FIG. 4 is a vertical cross-sectional front view of a drive post, and FIG. 5 is a drive post. FIG. 6 is a cross-sectional plan view of the through shaft, FIG. 6 is a front view of the lifting rail, FIG. 8 is a plan view of the lifting rail, FIG. 9 is a side view of the lifting rail, and FIG. 10 is a front view of the moving saddle. FIG. 11 is a side view of the mobile saddle.

【0007】図1,2に示すように、荷台1上には、ケ
ーブルドラムDを着脱自在に支持するためのケーブルド
ラム支持装置2が前後左右に位置して4つ設けられてい
る。ケーブルドラム支持装置2は、左右対向一対の軸支
装置である固定ポスト3と駆動ポスト4とを備えてい
る。図2,図7ないし9に示すように、固定ポスト3と
駆動ポスト4との間には、前後方向に延長するように並
行一対の昇降レール5が設けられている。昇降レール5
は、両端において連結杆で連結され矩形枠状に構成され
ている。昇降レール5の側方には、前後の駆動ポスト4
の間に位置して昇降装置6が設けられている。昇降装置
6は、一方のレール5の側部に垂直に起立するように固
着された矩形の支持枠7と、この支持枠7を前後の駆動
ポスト4の間で昇降させるように案内するガイドレール
8と、支持枠7と荷台1との間に立設された油圧シリン
ダ9とから構成されている。支持枠7は、下端部におい
てアーム10を介して昇降レール5に連結されている。
ガイドレール8は前後の駆動ポスト4の相対向する側面
に垂直に固着され、支持枠7の上部両側のガイドブロッ
ク11がこのガイドレール8に摺動自在に係合してい
る。
As shown in FIGS. 1 and 2, four cable drum supporting devices 2 for detachably supporting the cable drum D are provided on the loading platform 1 in the front, rear, left and right directions. The cable drum support device 2 includes a fixed post 3 and a drive post 4, which are a pair of left and right shaft support devices. As shown in FIGS. 2 and 7 to 9, a pair of elevating rails 5 are provided between the fixed post 3 and the drive post 4 so as to extend in the front-rear direction. Lift rail 5
Are connected at both ends by connecting rods to form a rectangular frame shape. On the side of the lifting rail 5, there are front and rear drive posts 4.
A lifting device 6 is provided between the two. The elevating device 6 includes a rectangular support frame 7 fixed vertically to the side of one rail 5, and a guide rail for guiding the support frame 7 so as to move up and down between the front and rear drive posts 4. 8 and a hydraulic cylinder 9 provided upright between the support frame 7 and the luggage carrier 1. The support frame 7 is connected to the elevating rail 5 via the arm 10 at the lower end.
The guide rails 8 are vertically fixed to opposite side surfaces of the front and rear drive posts 4, and guide blocks 11 on both upper sides of the support frame 7 are slidably engaged with the guide rails 8.

【0008】昇降レール5上には、これに沿って前後方
向に移動自在に移動サドル12が設けられている。移動
サドル12は、上部にケーブルドラムDを載せて前後の
ケーブルドラム支持装置2の間で移動するものである。
即ち、移動サドル12は、図10,11に示すように、
昇降レール5に摺動自在に係合するベース16と、その
上に設けられたサドル本体17とを具備し、サドル本体
17は、前方においてピン18によりベース16に枢着
されている。ベース16上には、ばね33が設けられて
いる。このばね33は、ケーブルドラムDを載せたサド
ル本体17を支持することができるばね力を有する。こ
のばね33の近傍位置に、図示しないリミットスイッチ
が設けられている。そして、サドル本体17が上昇し、
後記貫通軸20の一部が、ポスト3,4のストッパ34
に当接し、サドル本体17にケーブルDの重量以上の荷
重がかかり、ばね33が圧縮されたときにリミットスイ
ッチが動作して、油圧シリンダ9への送油を停止するよ
うになっている。サドル本体17と荷台1との間には油
圧シリンダ19が介設されており、油圧シリンダ19の
伸縮によりサドル本体17は、起立転倒自在である。サ
ドル12を前後方向に所定距離移動させるための移動装
置13は、油圧シリンダ14とチェーン15とから成る
(図7,8,9)。油圧シリンダ14は、2本の昇降レ
ール5の中間部に、これらと並行して固着されており、
両端から交互にロッド14a,14bを突出させる形式
のものである。ロッド14a,14bの先端にはチェー
ンスプロケット14c,14dが軸支されている。チェ
ーン15は、昇降レール5の中間部と移動サドル12の
前後両端との間に張られ、このチェーン15の内側にチ
ェーンスプロケット14c,14dが噛み合っている。
従って、ロッド14a,14bの出入りにより、移動サ
ドル12を前後に所定距離移動させることができる。そ
して、ロッド14aまたは14bの最大突出状態におい
て、移動サドル12上のケーブルドラムDを前または後
のケーブルドラム支持装置2に対応する位置に配置し、
また油圧シリンダ9の最大伸長状態において、移動サド
ル12上のケーブルドラムDをその軸支高さ位置に配置
するようになっている。
A movable saddle 12 is provided on the elevating rail 5 so as to be movable back and forth along the rail. The moving saddle 12 has the cable drum D placed on the upper portion thereof and moves between the front and rear cable drum supporting devices 2.
That is, the moving saddle 12 is, as shown in FIGS.
It comprises a base 16 slidably engaged with the elevating rail 5 and a saddle body 17 provided thereon, and the saddle body 17 is pivotally attached to the base 16 by a pin 18 at the front. A spring 33 is provided on the base 16. The spring 33 has a spring force capable of supporting the saddle body 17 on which the cable drum D is placed. A limit switch (not shown) is provided near the spring 33. Then, the saddle body 17 rises,
A part of the through shaft 20 described later is provided with a stopper 34 for the posts 3 and 4.
When the load on the saddle body 17 is greater than the weight of the cable D and the spring 33 is compressed, the limit switch operates to stop the oil supply to the hydraulic cylinder 9. A hydraulic cylinder 19 is provided between the saddle body 17 and the luggage carrier 1, and the saddle body 17 can be erected and tilted by expanding and contracting the hydraulic cylinder 19. A moving device 13 for moving the saddle 12 in the front-rear direction by a predetermined distance includes a hydraulic cylinder 14 and a chain 15 (FIGS. 7, 8 and 9). The hydraulic cylinder 14 is fixed to the middle part of the two lifting rails 5 in parallel with them,
The rods 14a and 14b are alternately projected from both ends. Chain sprockets 14c and 14d are pivotally supported at the tips of the rods 14a and 14b. The chain 15 is stretched between the intermediate portion of the elevating rail 5 and the front and rear ends of the moving saddle 12, and the chain sprockets 14 c and 14 d are meshed with the inside of the chain 15.
Therefore, the movable saddle 12 can be moved back and forth by a predetermined distance by moving the rods 14a and 14b in and out. Then, in the maximum protruding state of the rod 14a or 14b, the cable drum D on the moving saddle 12 is arranged at a position corresponding to the front or rear cable drum supporting device 2,
Further, when the hydraulic cylinder 9 is in the maximum extension state, the cable drum D on the moving saddle 12 is arranged at the shaft supporting height position.

【0009】ケーブルドラムDをケーブルドラム支持装
置2に軸支するために、ケーブルドラムDの中心に貫通
軸20が装着される。図6に示すように、貫通軸20
は、軸筒21と、その内側に軸線方向摺動自在に挿入さ
れた摺動軸22とから構成される。軸筒21の一端側に
はスプライン嵌合部23が設けられている。摺動軸22
は、図6において左側へ端部を出没可能であり、常時は
ばね32により引き込まれているが、突出状態において
固定ポスト3の軸受31に軸支される。貫通軸20は、
カラー29とスペーサ30とを介してケーブルドラムD
の中心孔へ固着される。カラー29とスペーサ30とを
変更することによって、各種寸法のケーブルドラムDに
適用することができる。図4,5に示すように、各駆動
ポスト4には、固定ポスト3の軸受31に向かって水平
に出没可能に、かつ回転可能にスプライン軸24が設け
られている。スプライン軸24は、リンク25を介して
油圧シリンダ26に連結されており、油圧シリンダ26
の伸縮により水平に移動可能である。また、スプライン
軸24は、チェーンスプロケット27を備えており、こ
れに噛み合うチェーンを介して油圧モータ28に連結さ
れている。しかして、昇降レール5が上昇したときに、
移動サドル12上のケーブルドラムDは、その貫通軸2
0を、軸受31、スプライン軸24の軸線上に置くよう
に配置される。そして、スプライン軸24が駆動ポスト
4から突出した時に、これが軸筒21のスプライン嵌合
部23に嵌合すると共に、摺動軸22を押し出して軸受
31へ挿入する。この状態でスプライン軸24が回転
し、軸20を介してケーブルドラムDが回転する。
In order to pivotally support the cable drum D on the cable drum supporting device 2, a through shaft 20 is mounted at the center of the cable drum D. As shown in FIG. 6, the through shaft 20
Is composed of a shaft cylinder 21 and a sliding shaft 22 which is slidably inserted in the shaft cylinder 21 in the axial direction. A spline fitting portion 23 is provided on one end side of the shaft cylinder 21. Sliding shaft 22
6, the end of which can be projected and retracted to the left side in FIG. 6, and is normally pulled in by the spring 32, but is axially supported by the bearing 31 of the fixed post 3 in the protruding state. The penetrating shaft 20 is
Cable drum D via collar 29 and spacer 30
Is fixed to the central hole of the. By changing the collar 29 and the spacer 30, it can be applied to the cable drum D of various sizes. As shown in FIGS. 4 and 5, each drive post 4 is provided with a spline shaft 24 that is capable of horizontally projecting and retracting toward the bearing 31 of the fixed post 3 and is rotatable. The spline shaft 24 is connected to a hydraulic cylinder 26 via a link 25, and the hydraulic cylinder 26
It can be moved horizontally by expanding and contracting. The spline shaft 24 has a chain sprocket 27, and is connected to a hydraulic motor 28 via a chain that meshes with the chain sprocket 27. Then, when the lifting rail 5 rises,
The cable drum D on the movable saddle 12 has a through shaft 2
0 is placed on the axis of the bearing 31 and the spline shaft 24. Then, when the spline shaft 24 projects from the drive post 4, the spline shaft 24 is fitted into the spline fitting portion 23 of the barrel 21, and the sliding shaft 22 is pushed out and inserted into the bearing 31. In this state, the spline shaft 24 rotates, and the cable drum D rotates via the shaft 20.

【0010】この実施例のケーブル延線作業車において
は、荷台1の後尾側に配置した移動サドル12上にケー
ブルドラムDを載せ、油圧シリンダ14のロッド14b
を伸長させ、移動サドル12を昇降レール5に沿って前
方へ移動させる。ケーブルドラムDには予め貫通軸20
を装着しておく。移動サドル12は、荷台1の前方にあ
るケーブルドラム支持装置2の固定ポスト3と駆動ポス
ト4の間で停止する。この間、ケーブルドラムDは、移
動サドル12に載って、荷台1の後方の固定ポスト3と
駆動ポスト4の間を難なく通り抜ける。この状態で、油
圧シリンダ9を伸長させ、ケーブルドラムD及び移動サ
ドル12もろとも昇降レール5を上昇させる。移動サド
ル12が上昇し、これに載っているケーブルドラムDの
貫通軸20の一部がポスト3,4のストッパ34に当接
し、サドル本体17にケーブルDの重量以上の荷重がか
かると、ばね33が圧縮され、リミットスイッチが動作
して、油圧シリンダ9への送油が停止される。これで貫
通軸20、スプライン軸24、軸受31の三者の軸心が
一致する。この状態で、油圧シリンダ26を伸長させる
と、スプライン軸24が軸筒21のスプライン嵌合部2
3に嵌合し、同時に摺動軸22が押し出されて軸受31
へ挿入される。これでケーブルドラムDが前方のケーブ
ルドラム支持装置2に装着される。次いで、昇降レール
5、移動サドル12を復旧させ、同様の動作を行わせて
荷台1の後方のケーブルドラム支持装置2にケーブルド
ラムDを装着する。こうして、荷台1の前後左右の4機
のケーブルドラム支持装置2にケーブルドラムDを装着
した後、油圧モータ28を回転させ、スプライン軸2
4、軸20を介してケーブルドラムDを回転させ、それ
に巻かれているケーブルを送り出し、あるいはこれにケ
ーブル、牽引ワイヤ等を巻き取る作業を行う。
In the cable drawing work vehicle of this embodiment, the cable drum D is mounted on the movable saddle 12 arranged on the rear side of the loading platform 1, and the rod 14b of the hydraulic cylinder 14 is mounted.
Is extended and the movable saddle 12 is moved forward along the elevating rail 5. The cable drum D has a through shaft 20 in advance.
Put on. The moving saddle 12 stops between the fixed post 3 and the drive post 4 of the cable drum support device 2 in front of the luggage carrier 1. During this time, the cable drum D is placed on the movable saddle 12 and passes through between the fixed post 3 and the drive post 4 at the rear of the loading platform 1 without difficulty. In this state, the hydraulic cylinder 9 is extended to raise the elevating rail 5 together with the cable drum D and the moving saddle 12. When the movable saddle 12 rises and a part of the through shaft 20 of the cable drum D mounted on the movable saddle 12 contacts the stoppers 34 of the posts 3 and 4, and the saddle body 17 receives a load more than the weight of the cable D, the spring 33 is compressed, the limit switch operates, and the oil supply to the hydraulic cylinder 9 is stopped. With this, the three axes of the through shaft 20, the spline shaft 24, and the bearing 31 are aligned with each other. In this state, when the hydraulic cylinder 26 is extended, the spline shaft 24 moves the spline fitting portion 2 of the barrel 21.
3, the sliding shaft 22 is pushed out at the same time, and the bearing 31
Is inserted into. The cable drum D is now mounted on the front cable drum support device 2. Next, the elevating rail 5 and the movable saddle 12 are restored, and the same operation is performed to mount the cable drum D on the cable drum supporting device 2 behind the loading platform 1. In this way, after the cable drums D are mounted on the four cable drum supporting devices 2 on the front, rear, left and right of the loading platform 1, the hydraulic motor 28 is rotated to rotate the spline shaft 2
4. Rotate the cable drum D via the shaft 20 to feed the cable wound around it, or wind the cable, pulling wire or the like around it.

【0011】ケーブルドラムDをケーブルドラム支持装
置2から取り外すときには、まず移動サドル12を後方
のケーブルドラム支持装置2の位置に持ち来し、これを
上昇させてケーブルドラムDを下から押し上げる。この
押し上げによって、ケーブルドラムDの貫通軸20の一
部がストッパ34に当接し、サドル本体17にケーブル
Dの重量以上の荷重がかかると、ばね33が圧縮され、
リミットスイッチが動作して、油圧シリンダ9への送油
が停止され、移動サドル12の上昇が止まる。この後、
スプライン軸24を引っ込めて摺動軸22を復元させ、
ケーブルドラム支持装置2との係合を解く。そして、移
動サドル12を下降させて、油圧シリンダ19を伸長さ
せると、サドル本体17が起立し、その上にあるケーブ
ルドラムDが荷台1上に転がり落ちる。次いで、移動サ
ドル12を復旧させ、これを前方のケーブルドラム支持
装置2の位置に持ち来し、同様の動作を行わせてケーブ
ルドラムDを取り外す。
When removing the cable drum D from the cable drum supporting device 2, first, the moving saddle 12 is brought to the position of the rear cable drum supporting device 2 and is raised to push the cable drum D from below. By this pushing up, a part of the through shaft 20 of the cable drum D abuts on the stopper 34, and when a load more than the weight of the cable D is applied to the saddle body 17, the spring 33 is compressed,
The limit switch operates, the oil supply to the hydraulic cylinder 9 is stopped, and the moving saddle 12 stops rising. After this,
Retract the spline shaft 24 to restore the sliding shaft 22,
The engagement with the cable drum supporting device 2 is released. Then, when the movable saddle 12 is lowered and the hydraulic cylinder 19 is extended, the saddle body 17 is erected, and the cable drum D on the saddle body 17 rolls down on the luggage carrier 1. Then, the movable saddle 12 is restored, brought to the position of the front cable drum supporting device 2, and the same operation is performed to remove the cable drum D.

【0012】[0012]

【発明の効果】以上のように、本発明においては、荷台
1上に固定ポスト3と駆動ポスト4とを左右に相対向さ
せて前後に少なくとも2組設け、固定ポスト3と駆動ポ
スト4との間に、前後方向に延長するように昇降レール
5を設け、この昇降レール5上には、上部にケーブルド
ラムDを載せてこれに沿って前後方向に移動自在に移動
サドル12を設けると共に、この移動サドル12を前後
方向に所定距離移動させて前後2組の固定ポスト3と駆
動ポスト4との間で夫々停止させるための移動装置13
を設け、昇降レール5の側方には、ケーブルドラムDを
所定の軸支高さまで上昇させるべく昇降レール5を上昇
させるための昇降装置6を設ける一方、各ケーブルドラ
ムDの中心に貫通させるように着脱自在の貫通軸20を
設け、この貫通軸20は、軸筒21とその内側に軸線方
向摺動自在に挿入された摺動軸22とから構成し、かつ
軸筒21の一端側にはスプライン嵌合部23を設け、ま
た摺動軸22は常時端部を軸筒21内に引っ込める方向
に付勢し、各駆動ポスト4には、油圧機構により固定ポ
スト3側へ水平に出没可能に、かつモータにより回転可
能にスプライン軸24を設け、突出時にこのスプライン
軸24を軸筒21のスプライン嵌合部23に嵌合させる
と共に、摺動軸22の一端を押して他端を軸筒21の他
端から突出させることができるように構成し、各固定ポ
スト3には、スプライン軸24に対向位置して、軸筒2
1から突出した摺動軸22の他端を受け入れ可能な軸受
31を設け、2つのケーブルドラムDを前後2組の固定
ポスト3と駆動ポスト4との間に着脱自在にしてケーブ
ル延線作業車を構成したため、荷台上に前後、左右に並
べて設置されたケーブルドラム支持装置2の各々へケー
ブルドラムDを容易、迅速かつ確実に着脱することがで
き、4本のケーブルを同時に延線することができるとい
う効果を有する。
As described above, in the present invention, at least two sets of fixed posts 3 and drive posts 4 are provided on the bed 1 so as to face each other in the left and right directions, and the fixed posts 3 and the drive posts 4 are provided. An elevating rail 5 is provided so as to extend in the front-rear direction, and a cable drum D is placed on the elevating rail 5 and a movable saddle 12 is provided so as to be movable in the front-rear direction along the cable drum D. A moving device 13 for moving the movable saddle 12 in the front-rear direction by a predetermined distance to stop the two sets of front and rear fixed posts 3 and drive posts 4, respectively.
And a lifting device 6 for lifting the lifting rails 5 so as to lift the cable drums D to a predetermined shaft support height on the side of the lifting rails 5, while penetrating the center of each cable drum D. A detachable through-shaft 20 is provided on the shaft cylinder 21. The through-shaft 20 includes a shaft cylinder 21 and a sliding shaft 22 that is slidably inserted inside the shaft cylinder 21. A spline fitting portion 23 is provided, and the sliding shaft 22 constantly urges the end portion in a direction in which the end portion is retracted into the barrel 21 so that each drive post 4 can be horizontally retracted to the fixed post 3 side by a hydraulic mechanism. Further, a spline shaft 24 is rotatably provided by a motor, and when the spline shaft 24 is projected, the spline shaft 24 is fitted into the spline fitting portion 23 of the shaft cylinder 21, and one end of the sliding shaft 22 is pushed and the other end thereof is pressed. Project from the other end Configured to allow bets, each fixing post 3, and a position facing the spline shaft 24, the barrel 2
1 is provided with a bearing 31 capable of receiving the other end of the sliding shaft 22 and the two cable drums D are detachably mounted between the front and rear two sets of the fixed post 3 and the drive post 4 to extend the cable drawing work vehicle. Since the cable drum D is configured as described above, the cable drum D can be easily, quickly and surely attached / detached to / from each of the cable drum supporting devices 2 installed side by side on the loading platform in the front-rear direction and the left-right direction, and four cables can be simultaneously extended. It has the effect of being able to.

【図面の簡単な説明】[Brief description of drawings]

【図1】ケーブル延線作業車の正面図である。FIG. 1 is a front view of a cable drawing work vehicle.

【図2】ケーブル延線作業車の平面図である。FIG. 2 is a plan view of a cable drawing work vehicle.

【図3】ケーブルドラム支持装置の正面図である。FIG. 3 is a front view of a cable drum supporting device.

【図4】駆動ポストの縦断正面図である。FIG. 4 is a vertical sectional front view of a drive post.

【図5】駆動ポストの横断平面図である。FIG. 5 is a cross-sectional plan view of a drive post.

【図6】貫通軸の断面図である。FIG. 6 is a sectional view of a through shaft.

【図7】昇降レールの正面図である。FIG. 7 is a front view of a lifting rail.

【図8】昇降レールの平面図である。FIG. 8 is a plan view of a lifting rail.

【図9】昇降レールの側面図である。FIG. 9 is a side view of the lifting rail.

【図10】移動サドルの正面図である。FIG. 10 is a front view of a mobile saddle.

【図11】移動サドルの側面図である。FIG. 11 is a side view of the moving saddle.

【符号の説明】[Explanation of symbols]

1 荷台 2 ケーブルドラム支持装置 3 固定ポスト(軸支装置) 4 駆動ポスト(軸支装置) 5 昇降レール 6 昇降装置 12 移動サドル 13 移動装置 20 貫通軸 21 軸筒 22 摺動軸 23 スプライン嵌合部 24 スプライン軸 26 油圧シリンダ 27 スプロケット 31 軸受 32 ばね D ケーブルドラム 1 Loading Platform 2 Cable Drum Support Device 3 Fixed Post (Axial Support Device) 4 Drive Post (Axial Support Device) 5 Elevating Rail 6 Elevating Device 12 Moving Saddle 13 Moving Device 20 Through Shaft 21 Shaft Tube 22 Sliding Shaft 23 Spline Fitting Part 24 Spline shaft 26 Hydraulic cylinder 27 Sprocket 31 Bearing 32 Spring D Cable drum

───────────────────────────────────────────────────── フロントページの続き (72)発明者 井上 裕嗣 東京都品川区南品川6丁目5番19号 三和 テッキ株式会社内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Yuuji Inoue 6-5-19 Minami-Shinagawa, Shinagawa-ku, Tokyo Sanwa Techk Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 荷台上に固定ポストと駆動ポストとを左
右に相対向させて前後に少なくとも2組設け、固定ポス
トと駆動ポストとの間に、前後方向に延長するように昇
降レールを設け、この昇降レール上には、上部にケーブ
ルドラムを載せてこれに沿って前後方向に移動自在に移
動サドルを設けると共に、この移動サドルを前後方向に
所定距離移動させて前後2組の固定ポストと駆動ポスト
との間で夫々停止させるための移動装置を設け、前記昇
降レールの側方には、ケーブルドラムを所定の軸支高さ
まで上昇させるべく昇降レールを上昇させるための昇降
装置を設ける一方、各ケーブルドラムの中心に貫通させ
るように着脱自在の貫通軸を設け、この貫通軸は、軸筒
とその内側に軸線方向摺動自在に挿入された摺動軸とか
ら構成し、かつ軸筒の一端側にはスプライン嵌合部を設
け、また摺動軸は常時端部を軸筒内に引っ込める方向に
付勢し、前記各駆動ポストには、油圧機構により前記固
定ポスト側へ水平に出没可能に、かつモータにより回転
可能にスプライン軸を設け、突出時にこのスプライン軸
を前記軸筒のスプライン嵌合部に嵌合させると共に、前
記摺動軸の一端を押して他端を軸筒の他端から突出させ
ることができるように構成し、前記各固定ポストには、
前記スプライン軸に対向位置して、前記軸筒から突出し
た摺動軸の他端を受け入れ可能な軸受を設け、2つのケ
ーブルドラムを前後2組の固定ポストと駆動ポストとの
間に着脱自在にしたことを特徴とするケーブル延線作業
車。
1. A fixed post and a drive post are opposed to each other on the cargo bed, and at least two sets are provided in front and back. An elevating rail is provided between the fixed post and the drive post so as to extend in the front-rear direction. On this lifting rail, a cable drum is placed on the upper part, and a movable saddle is provided so as to be movable in the front-rear direction along the cable drum. The movable saddle is moved in the front-rear direction by a predetermined distance to drive two sets of front and rear fixed posts. A moving device for stopping each of the posts is provided, and an elevating device for elevating the elevating rail to elevate the cable drum to a predetermined shaft supporting height is provided on a side of the elevating rail, while A detachable through shaft is provided so as to pass through the center of the cable drum, and the through shaft is composed of a shaft cylinder and a sliding shaft that is slidably inserted in the shaft cylinder in the axial direction. A spline fitting part is provided on one end side of the drive shaft, and the sliding shaft constantly urges the end part in a direction to retract the end part into the barrel, and each drive post is horizontally retracted to the fixed post side by a hydraulic mechanism. A spline shaft is rotatably and rotatably provided by a motor. When the spline shaft is projected, the spline shaft is fitted to the spline fitting portion of the barrel, and one end of the sliding shaft is pushed to cause the other end to be the other end of the barrel. It is configured so that it can be projected from each of the fixed posts,
A bearing is provided at a position facing the spline shaft and capable of receiving the other end of the sliding shaft protruding from the barrel, and two cable drums are detachably attached between two sets of front and rear fixed posts and a drive post. A cable extension work vehicle characterized by the above.
JP29382992A 1992-10-07 1992-10-07 Cable extension work vehicle Expired - Lifetime JP2961270B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29382992A JP2961270B2 (en) 1992-10-07 1992-10-07 Cable extension work vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29382992A JP2961270B2 (en) 1992-10-07 1992-10-07 Cable extension work vehicle

Publications (2)

Publication Number Publication Date
JPH05304709A true JPH05304709A (en) 1993-11-16
JP2961270B2 JP2961270B2 (en) 1999-10-12

Family

ID=17799703

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29382992A Expired - Lifetime JP2961270B2 (en) 1992-10-07 1992-10-07 Cable extension work vehicle

Country Status (1)

Country Link
JP (1) JP2961270B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1208624A1 (en) * 2000-06-14 2002-05-29 Dong-Hae Corporation Air distributing wires building device
KR100903964B1 (en) * 2009-03-16 2009-06-25 주식회사 청우에스이 A spreader system very high pressure cable
JP5536946B1 (en) * 2013-10-31 2014-07-02 株式会社フジクラ Cable drum loader, cable drum loader, and cable drum load method
CN111747221A (en) * 2020-06-18 2020-10-09 上海祖越通信技术有限公司 Communication engineering is with spreading traditional thread binding putting

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1208624A1 (en) * 2000-06-14 2002-05-29 Dong-Hae Corporation Air distributing wires building device
EP1208624A4 (en) * 2000-06-14 2002-08-28 Dong Hae Corp Air distributing wires building device
KR100903964B1 (en) * 2009-03-16 2009-06-25 주식회사 청우에스이 A spreader system very high pressure cable
JP5536946B1 (en) * 2013-10-31 2014-07-02 株式会社フジクラ Cable drum loader, cable drum loader, and cable drum load method
CN111747221A (en) * 2020-06-18 2020-10-09 上海祖越通信技术有限公司 Communication engineering is with spreading traditional thread binding putting

Also Published As

Publication number Publication date
JP2961270B2 (en) 1999-10-12

Similar Documents

Publication Publication Date Title
US20070154295A1 (en) Side loading vehicle system
DE19842680A1 (en) Multiple car-parking equipment
CN111641155B (en) Automatic laying device for blasting deicing detonating cord of overhead transmission line and using method thereof
JPH05304709A (en) Work wagon for extending cable
JP2961269B2 (en) Cable drum attachment / detachment device for extension line work vehicles
JPH05304707A (en) Work wagon for extending cable
DE2847142B2 (en) Trolley for picking up, storing and introducing a link-shaped starting strand from above into the continuous casting mold
US7513731B2 (en) Truck bed elevator
JP3416251B2 (en) Method of changing rolls of multi-high rolling mill, roll changing apparatus used for the same, and multi-high rolling mill
JP3172290B2 (en) Cable drum attachment / detachment device for extension line work vehicles
JPH11172626A (en) Bridge girder continuously sending-out device
KR200287768Y1 (en) A movable maintenance car
JP3172291B2 (en) Cable drum attachment / detachment device for extension line work vehicles
JP3336113B2 (en) Long rail transport vehicles
KR100883494B1 (en) Small size roll exchanging apparatus in a milling stand
CN218576561U (en) Core pulling vehicle
JPH04118706U (en) Cable extension work vehicle
JPH09256768A (en) Positioning device of casing forced machine
JPH04118704U (en) Cable extension work vehicle
JP2001112132A (en) Cable-removing equipment
JP3828229B2 (en) Vehicle detachable traffic sign device
JP2003267118A (en) Side surface lifting device for traction vehicle
JPH04118705U (en) Cable drum attachment/detachment device for wire extension work vehicles
JP3193438B2 (en) Material distribution device for block assembly
CN114934702B (en) Rotary stereo garage

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090806

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100806

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100806

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100806

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110806

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110806

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110806

Year of fee payment: 12