JPH05247933A - Construction method of cast-in-place concrete pile - Google Patents

Construction method of cast-in-place concrete pile

Info

Publication number
JPH05247933A
JPH05247933A JP13319491A JP13319491A JPH05247933A JP H05247933 A JPH05247933 A JP H05247933A JP 13319491 A JP13319491 A JP 13319491A JP 13319491 A JP13319491 A JP 13319491A JP H05247933 A JPH05247933 A JP H05247933A
Authority
JP
Japan
Prior art keywords
pile
cage
concrete
cast
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13319491A
Other languages
Japanese (ja)
Inventor
Koichi Tamura
幸一 田村
Tatsuo Sato
龍生 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP13319491A priority Critical patent/JPH05247933A/en
Publication of JPH05247933A publication Critical patent/JPH05247933A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To simplify greatly stage of work, to save man-power and, at the same time, to reduce a construction period as well as promotion of execution reliability and earthquake resistance by incorporating a leg section of a steel frame column as a reinforcing steel frame of a pile head section. CONSTITUTION:Cage-shaped reinforcing bars 2 are inserted into a bored hole 10 in the ground to erect, and a leg section 5a of a steel frame column 5 is inserted into at least the upper part of the cage-shaped reinforcing bars 2 to provide. Concrete 6 is placed in an erection part of the cage-shaped reinforcing bars 2 in the bored hole 10, and the leg section 5a of the steel frame column 5 is constructed as a pile having a pile head section 1b of steel framed concrete construction reinforced by concrete.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、各種コンクリート建造
物の基礎杭として好適な場所打ち杭の築造方法に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing cast-in-place piles suitable as foundation piles for various concrete structures.

【0002】[0002]

【従来の技術】従来の場所打ち杭は、図2に示すように
地中深く掘削した削孔(図示省略)内に、多数本の杭主
筋12及び帯筋13で組み立てられた籠状鉄筋11を挿
入して建て込み、削孔内の籠状鉄筋11の建込部にコン
クリートを打設して構築され、図2A,Bに示すように
大きい地震荷重を受ける杭頭部11bは、杭主筋12及
び帯筋13を狭い間隔で配筋して補強し曲げ強度、剪断
強度を高めた耐震構造とし、そのフーチング部11aと
一体にコンクリート又は鉄骨造建築物の柱15をアンカ
ーボルト等により結合、連結して建て込んでいる。
2. Description of the Related Art A conventional cast-in-place pile is a cage-shaped reinforcing bar 11 assembled with a large number of pile main bars 12 and band bars 13 in a drilling hole (not shown) deeply drilled in the ground as shown in FIG. 2), the pile head 11b, which receives a large seismic load, is constructed by placing concrete in the built-in portion of the cage-shaped rebar 11 in the drilled hole 12 and strips 13 are arranged at narrow intervals to reinforce them to form a seismic-resistant structure in which bending strength and shear strength are increased, and the footing portion 11a is integrally connected to a pillar 15 of concrete or a steel structure by anchor bolts or the like. It is connected and built.

【0003】[0003]

【発明が解決しようとする課題】従来の上記場所打ち杭
は、前記のように杭頭部に多数本の杭主筋及び帯筋を狭
い間隔で配筋して補強し、また、そのフーチング上に建
築物の柱15を一体に連結して建て込むため、前記柱の
連結、建て込みは、地中の狭い削孔内で行なわれる面倒
な作業となり多くの手数、手間を要し、省力化、工期短
縮等が課題になつている。
As described above, the conventional cast-in-place pile is reinforced by arranging a large number of pile main bars and straps at narrow intervals on the pile head, and also on the footing thereof. Since the pillars 15 of the building are integrally connected and built, connecting and building the pillars is a troublesome work performed in a narrow drilling hole in the ground, requires a lot of labor and time, and saves labor. Shortening the construction period has become an issue.

【0004】本発明は、上記のような課題に対処するた
めに開発されたものであつて、その目的とする処は、鉄
骨柱の脚部を杭頭部の補強用鉄骨として組み込むことに
より、大幅に工程を簡素化し、省力化するとともに工期
を短縮し、施工信頼性、耐震性を向上した場所打ち杭の
築造方法を提供することにある。
The present invention was developed to address the above-mentioned problems, and the purpose of the invention is to incorporate the legs of steel columns as reinforcing steel frames for pile heads. It is to provide a method for constructing cast-in-place piles that greatly simplifies the process, saves labor, shortens the construction period, and improves construction reliability and earthquake resistance.

【0005】[0005]

【課題を解決するための手段】本発明は、地中の削孔内
に籠状鉄筋を挿入して建て込み、籠状鉄筋の少なくとも
上部内に鉄骨柱の脚部を挿入して配置し、削孔内の籠状
鉄筋の建込部分にコンクリートを打設して、鉄骨柱の脚
部をコンクリートで補強された鉄骨コンクリート造の杭
頭部を有する杭に構築することにより、杭頭部を大幅に
補強して鉄筋の節減を可能にするとともに、柱の同時連
結を可能にしている。
According to the present invention, a cage-shaped reinforcing bar is inserted and built in a hole drilled in the ground, and a leg portion of a steel column is inserted and arranged in at least an upper portion of the cage-shaped reinforcing bar. By placing concrete in the built-in portion of the cage-shaped reinforcing bar in the drilled hole and constructing the legs of the steel column into a pile with a concrete-reinforced steel-reinforced concrete pile head, It is significantly reinforced to enable the reduction of reinforcing bars and the simultaneous connection of columns.

【0006】[0006]

【作用】地中の削孔内に籠状鉄筋を挿入して建て込み、
籠状鉄筋の少なくとも上部内に鉄骨柱の脚部を挿入して
配置し、削孔内の籠状鉄筋の建込部分にコンクリートを
打設して、鉄骨柱の脚部をコンクリートで補強された鉄
骨コンクリート造の杭頭部を有する場所打ち杭に構築さ
れ、簡単な工程で杭構築が容易、迅速に遂行されるとと
もに、杭上部への柱の連結、建て込みが同時に行われて
一体に連設され、杭頭部の配筋が大幅に節減可能とな
り、杭頭部及び柱接合部が大幅に補強されて優れた耐震
性を有し、施工信頼性が得られる。
[Function] Insert a cage-shaped rebar into the drilled hole in the ground and build it,
The legs of the steel column were inserted and placed in at least the upper part of the cage-shaped reinforcing bar, and the concrete was laid in the hole of the cage-shaped reinforcing bar in the drilled hole, and the legs of the steel column were reinforced with concrete. Constructed into cast-in-place piles with steel-framed concrete pile heads, pile construction can be performed easily and quickly with a simple process, and pillars can be connected and built at the top of the piles at the same time. The pile heads can be rebarred significantly, and the pile heads and column joints are greatly reinforced to provide excellent earthquake resistance and construction reliability.

【0007】[0007]

【実施例】図1に本発明の一実施例を示し、図中1は場
所打ち杭、1aは場所打ち杭1の上部に形成されたフー
チング部、1bはSRC造の杭頭部、2は多数本の杭主
筋3、帯筋4で組み立てられた籠状鉄筋、5は鉄骨柱、
5aは鉄骨柱5の脚部、10は削孔であつて、図示のよ
うに地中に深く掘削された削孔10内に籠状鉄筋2を挿
入して建て込み、籠状鉄筋2の少なくとも上部内に鉄骨
柱5の脚部5aを挿入して配置し、削孔10内の籠状鉄
筋2の建込部分にコンクリート6を打設して、鉄骨柱5
の脚部5aをコンクリート6で補強された鉄骨コンクリ
ート造の杭頭部1bを有する杭に構築する場所打ち杭1
の築造方法になつている。
1 shows an embodiment of the present invention, in which 1 is a cast-in-place pile, 1a is a footing portion formed on the upper portion of the cast-in-place pile 1, 1b is a pile head made of SRC, and 2 is a Cage-shaped rebars assembled from a large number of pile main bars 3 and stirrups 4 are steel columns,
Reference numeral 5a is a leg portion of the steel frame column 5 and 10 is a drilling hole, and the cage-shaped reinforcing bar 2 is inserted and built into the drilled hole 10 deeply drilled in the ground as shown in the drawing. The leg portion 5a of the steel column 5 is inserted and arranged in the upper portion, and the concrete 6 is placed in the built-in portion of the cage-shaped reinforcing bar 2 in the drilled hole 10 to form the steel column 5
Cast-in-place pile 1 for constructing a leg portion 5a of a pile into a pile having a steel-reinforced concrete pile head portion 1b reinforced with concrete 6.
It has become a building method.

【0008】上記場所打ち杭1は、図示のように少なく
とも杭頭部1bの籠状鉄筋2内に鉄骨柱5の脚部5aが
所望長さ挿入、配置されて補強されたSRC造(鉄骨鉄
筋コンクリート造)の杭頭部1bを有し、その杭頭部1
bは、籠状鉄筋2内に挿入、配置されている鉄骨柱5の
脚部5aで曲げ強度及び剪断強度が大幅に高められて、
図示のように杭頭部1bの鉄筋の増設が不要となり、杭
全長にわたつて杭主筋3、帯筋4を同数に均等に配筋し
た籠状鉄筋2に構成され、配筋工程が簡素化され容易、
迅速に配筋される。さらに、鉄骨柱5は杭構築と同時に
杭頭部1b内に組み込まれ一体に連結されて建て込ま
れ、柱の連結工程が不要となり、大幅に工程が簡素化、
省力化されて工期が著しく短縮されるとともに、鉄骨柱
5の場所打ち杭1内への挿入長さの調節により、場所打
ち杭1の曲げ強度、剪断強度が容易、自在に調整される
とともに、柱連結部の施工精度のバラツキがなくなり、
優れた施工精度、信頼性が得られ、耐震性能が著しく向
上される。
As shown in the figure, the cast-in-place pile 1 is an SRC structure (steel reinforced concrete) in which at least a leg portion 5a of a steel column 5 is inserted and arranged in a basket-shaped rebar 2 of a pile head 1b for a desired length. (Build) pile head 1b, and the pile head 1
b is the leg portion 5a of the steel column 5 inserted and arranged in the cage-shaped reinforcing bar 2 so that the bending strength and the shear strength are significantly increased,
As shown in the figure, there is no need to add additional reinforcing bars to the pile heads 1b, and the cage is composed of cage-shaped reinforcing bars 2 in which the same number of main pile reinforcing bars 3 and band reinforcing bars 4 are evenly distributed over the entire length of the pile, simplifying the reinforcing bar process. Easy,
Arranged quickly. Further, the steel frame column 5 is built into the pile head portion 1b at the same time as the pile is constructed and is integrally connected and built, so that the column connecting step is not required and the process is greatly simplified.
The labor is saved and the construction period is significantly shortened, and the bending strength and shear strength of the cast-in-place pile 1 are easily and freely adjusted by adjusting the insertion length of the steel column 5 into the cast-in-place pile 1. There is no variation in the construction accuracy of the column connection part,
Excellent construction accuracy and reliability are obtained, and seismic performance is significantly improved.

【0009】図1のように場所打ち杭1が地中深く築造
されると、そのフーチング部1aまで掘削されてコンク
リート建造物の基礎が施工され、コンクリート建造物が
地下3Fフロアから順次に構築される。鉄骨柱5には図
示例のほか各種型鋼が適用される。また、場所打ち杭1
はフーチング部の位置まで構築して、フーチング1aを
省略することも可能である。
When the cast-in-place pile 1 is built deeply in the ground as shown in FIG. 1, the footing portion 1a is excavated and the foundation of the concrete structure is constructed, and the concrete structure is sequentially constructed from the 3rd floor under the ground. It In addition to the illustrated example, various types of steel are applied to the steel column 5. Also, cast-in-place pile 1
It is also possible to construct up to the position of the footing portion and omit the footing 1a.

【0010】[0010]

【発明の効果】本発明は、前述のような構成からなり、
地中の削孔内に籠状鉄筋を挿入して建て込み、籠状鉄筋
の少なくとも上部内に鉄骨柱の下脚部を挿入して配置
し、削孔内の籠状鉄筋の建込部分にコンクリートを打設
して、鉄骨柱の脚部をコンクリートで補強された鉄骨コ
ンクリート造の杭頭部を有する場所打ち杭に構築され、
簡単な工程で容易、迅速に杭が構築されるとともに、杭
上部への柱の連結、建て込みが同時に行なわれて一体に
連設され、杭頭部の配筋が大幅に節減可能となり、省力
化され大幅に工期が短縮されるとともに、施工信頼性が
高められ杭頭部及び柱連結部が大幅に補強されて優れた
耐震性が得られる。
The present invention has the above-mentioned structure.
A cage-shaped rebar is inserted into the drilled hole in the ground to build it, and the lower leg of the steel column is inserted and placed in at least the upper part of the cage-shaped reinforcing bar. Is cast into a cast-in-place pile having steel-reinforced concrete pile heads where the legs of the steel columns are reinforced with concrete,
The piles can be built easily and quickly by a simple process, and the pillars can be connected to the top of the piles and built up at the same time so that the piles can be installed in one piece. The construction period will be shortened significantly, and the construction reliability will be improved and the pile heads and column connections will be greatly reinforced, resulting in excellent earthquake resistance.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す全体の縦断面図(A)
と同図の要部拡大断面図(B)及び矢示Xc −Xc 断面
図(C)
FIG. 1 is an overall vertical sectional view showing an embodiment of the present invention (A).
And an enlarged sectional view (B) of the main part of the same figure and a sectional view (C) taken along the line Xc-Xc.

【図2】従来例を示す場所打ち杭の縦断面図(A)と矢
示Yb −Yb 断面図(B)及び矢示Yc −Yc 断面図
(C)である。
FIG. 2 is a longitudinal sectional view (A), an arrow Yb-Yb sectional view (B) and an arrow Yc-Yc sectional view (C) of a cast-in-place pile showing a conventional example.

【符号の説明】[Explanation of symbols]

1 場所打ち杭 1b 杭頭部 2 籠状鉄筋 5 鉄骨柱 5a 鉄骨柱の脚部 6 コンクリート 10 削孔 1 Cast-in-place pile 1b Pile head 2 Basket-shaped rebar 5 Steel frame column 5a Steel frame leg 6 Concrete 10 Drilling hole

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 地中の削孔内に籠状鉄筋を挿入して建て
込み、同籠状鉄筋の少なくとも上部内に鉄骨柱の脚部を
挿入して配置し、前記削孔内の籠状鉄筋の建込部分にコ
ンクリートを打設して、前記鉄骨柱の脚部をコンクリー
トで補強された鉄骨コンクリート造の杭頭部を有する杭
に構築することを特徴とする場所打ち杭の築造方法。
1. A cage-shaped rebar is inserted and built in a hole drilled in the ground, a leg portion of a steel column is inserted and arranged in at least an upper portion of the cage-bar, and a cage-shaped bar is formed in the hole. A method for constructing a cast-in-place pile, comprising placing concrete in a built-in portion of a reinforcing bar, and constructing a leg portion of the steel column into a pile having a concrete-reinforced steel-reinforced concrete pile head.
JP13319491A 1991-05-10 1991-05-10 Construction method of cast-in-place concrete pile Pending JPH05247933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13319491A JPH05247933A (en) 1991-05-10 1991-05-10 Construction method of cast-in-place concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13319491A JPH05247933A (en) 1991-05-10 1991-05-10 Construction method of cast-in-place concrete pile

Publications (1)

Publication Number Publication Date
JPH05247933A true JPH05247933A (en) 1993-09-24

Family

ID=15098913

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13319491A Pending JPH05247933A (en) 1991-05-10 1991-05-10 Construction method of cast-in-place concrete pile

Country Status (1)

Country Link
JP (1) JPH05247933A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11172692A (en) * 1997-12-16 1999-06-29 Sato Benec Co Ltd Execution of column constitution member
CN1298938C (en) * 2004-12-08 2007-02-07 重庆交通科研设计院 Post stress method stake body prestressed antislid stake and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11172692A (en) * 1997-12-16 1999-06-29 Sato Benec Co Ltd Execution of column constitution member
CN1298938C (en) * 2004-12-08 2007-02-07 重庆交通科研设计院 Post stress method stake body prestressed antislid stake and construction method

Similar Documents

Publication Publication Date Title
JP3263727B2 (en) Construction method of pillar components
JP2004100157A (en) Retaining wall structure and its construction method
JPH05247933A (en) Construction method of cast-in-place concrete pile
JPH11343667A (en) Structure for fixing column base with underground beam made of reinforced concrete
JP3637530B2 (en) Column and pile connection structure
JPH05156654A (en) Top-down construction method
JP3161886B2 (en) Foundation for small buildings
JP3455864B2 (en) Building and its construction method
JP3595070B2 (en) Basic structure of simple building
JP2763488B2 (en) Prefabricated pillar and inverted ramen prefabricated construction method
JPH11181807A (en) Construction method for underground story
JP2537053B2 (en) Digging pillar pile method of building
JP3187618B2 (en) How to assemble beam reinforcement
JPH101957A (en) Underground construction method for building
JPH0657769A (en) Underground concrete structure and working method thereof
JP2603427B2 (en) Foundation structure of reinforced concrete building
JP3012215B2 (en) Building structures using piles as pillars
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JP2002061213A (en) Inverted construction method
JP2001020297A (en) Sc-structured footing beam method for building
JPH10183651A (en) Construction method for structure
JPS5869946A (en) Anchoring of leg part of iron pillar
JP3061934B2 (en) Retaining wall construction method
JPH0544219A (en) Base structure for steel-framed column and construction thereof
JPS62121249A (en) Construction of pillar/beam connection part