JPH0523666Y2 - - Google Patents
Info
- Publication number
- JPH0523666Y2 JPH0523666Y2 JP10021289U JP10021289U JPH0523666Y2 JP H0523666 Y2 JPH0523666 Y2 JP H0523666Y2 JP 10021289 U JP10021289 U JP 10021289U JP 10021289 U JP10021289 U JP 10021289U JP H0523666 Y2 JPH0523666 Y2 JP H0523666Y2
- Authority
- JP
- Japan
- Prior art keywords
- waterway
- prismatic
- cover
- lid
- view
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 description 9
- 238000009415 formwork Methods 0.000 description 8
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000007689 inspection Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 241000282693 Cercopithecidae Species 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011796 hollow space material Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Landscapes
- Sewage (AREA)
Description
【考案の詳細な説明】
(産業上の利用分野)
本考案は、プレハブ式の角柱状水路蓋構成体の
改良に関する。[Detailed Description of the Invention] (Industrial Application Field) The present invention relates to an improvement of a prefabricated prismatic channel cover structure.
(従来技術とその問題点)
従来、水路2などの上部空間を有効利用する場
合には、第9〜11図に示すように、水路2の開
口上に円柱状水路蓋構成体bを多数配列させ、次
いで配筋10を敷設し、最後に生コンクリート1
1を打設して水路蓋Bを完成していたが、この場
合では工事中の支保工設置及びコンクリート養生
期間が必要であり、手間が掛かるだけでなく工事
期間が長くなると言う問題点があつた。(Prior art and its problems) Conventionally, in order to effectively utilize the upper space of the waterway 2, etc., a large number of cylindrical waterway cover structures b are arranged over the opening of the waterway 2, as shown in FIGS. 9 to 11. Then, the reinforcement 10 is laid, and finally the ready-mixed concrete 1 is laid.
1 was poured to complete the canal cover B, but in this case, it was necessary to install shoring during the construction and concrete curing period, which not only took time but also lengthened the construction period. Ta.
その他、PC版による蓋施工方法もあるが、こ
の場合にはPC版を敷設する際に施工現場におい
てトラツクやクレーンなどの重機を必要とし、こ
れら重機の搬入が不可能な地点での工事は人手を
頼る以外に方法がなく、工事の進行が滞るという
問題点があつた。 There is also a method of constructing the lid using a PC board, but in this case, heavy equipment such as trucks and cranes is required at the construction site to lay the PC board, and work is carried out manually at locations where it is impossible to bring in these heavy machines. There was a problem in that the construction progress was delayed because there was no other option but to rely on them.
(本考案の目的)
本考案は係る従来例に鑑みて為されたもので、
その目的とするところは、重機の搬入が不可能な
地点でも簡単に水路蓋の施工が出来る角柱状水路
蓋構成体を提供するにある。(Purpose of the present invention) The present invention has been made in view of the conventional example,
The purpose is to provide a prismatic waterway cover structure that allows easy construction of the waterway cover even in locations where heavy machinery cannot be brought in.
(問題点を解決するための手段)
本考案は前記目的を達成するために、
角柱状水路蓋本体1の両端から水路2の開口
縁3に載置する円柱状支持部4を突設する。(Means for Solving the Problems) In order to achieve the above object, the present invention protrudes from both ends of the prismatic waterway cover body 1 with cylindrical support portions 4 placed on the opening edge 3 of the waterway 2.
;と言う技術的手段を採用している。; adopts technical means.
(作用)
施工対象の水路2の開口縁3上に移送して来
た角柱状水路蓋構成体aの円柱状支持部4を載
置し、続いて開口縁3上を所定の場所まで転動
さる。(Function) The cylindrical support portion 4 of the prismatic channel cover structure a that has been transferred is placed on the opening edge 3 of the waterway 2 to be constructed, and then rolled on the opening edge 3 to a predetermined location. Monkey.
その位置で角柱状水路蓋本体1の一面が水平
になるように配設する。 It is arranged so that one surface of the prismatic channel cover main body 1 becomes horizontal at that position.
同様に転動させて来た次の角柱状水路蓋構成
体aを必要ならば若干水平移動させつつ前記第
1の角柱状水路蓋構成体aに添わせて配置す
る。 The next prismatic waterway lid structure a that has been rolled in the same manner is placed along with the first prismatic waterway lid structure a, moving it slightly horizontally if necessary.
以上の操作を繰り返し多数本の角柱状水路蓋
構成体aを水路2上に密に敷設する。 The above operations are repeated to densely lay a large number of prismatic waterway cover structures a on the waterway 2.
敷設された角柱状水路蓋構成体aは隣接せる
角柱状水路蓋構成体aの側面に接しているので
拘束されて回転する事がなくこれより水路2の
開口を覆う水路蓋Aが形成される。 Since the installed prismatic waterway cover structure a is in contact with the side surface of the adjacent prismatic waterway cover structure a, it is restrained and does not rotate, thereby forming the waterway cover A that covers the opening of the waterway 2. .
(実施例)
以下、本考案を図示実施例に従つて詳述する。
本考案の角柱状水路蓋構成体aは第1図から分か
るように中空の角柱状水路蓋本体1の両端から中
空の円柱状支持部4を突設したものである。内部
にはほぼ全長にわたつて鉄筋かご5がインサート
されており、引つ張り強度を付与している。角柱
状水路蓋本体1の長さは水路2の開口幅にほぼ一
致する。角柱状水路蓋本体1の断面は図示実施例
ではほぼ正方形であり、その一辺の長さと円柱状
支持部4の直径はほぼ等しい。勿論、角柱状水路
蓋本体1の断面は正方形に限られず、角柱状水路
蓋構成体aを接して配列した場合に角柱状水路蓋
本体1の側面同士が接して上面に凹凸を作らない
ようなものは当然包含される。又、表面形状は平
滑面でもよいが、周囲の環境に合わせてその表面
に樹木の肌に似せて細かい凹凸を形成し、擬木状
としてもよいし、塗料を混入してカラー化したり
幾何学模様を施してもよい。又、円柱状支持部4
の端面には吊フツク6が突設されている。(Example) Hereinafter, the present invention will be described in detail according to the illustrated example.
As can be seen from FIG. 1, the prismatic waterway lid structure a of the present invention has hollow cylindrical support portions 4 protruding from both ends of a hollow prismatic waterway lid body 1. A reinforcing bar cage 5 is inserted inside over almost the entire length to provide tensile strength. The length of the prismatic waterway cover body 1 almost matches the opening width of the waterway 2. In the illustrated embodiment, the cross section of the prismatic channel cover main body 1 is approximately square, and the length of one side thereof and the diameter of the cylindrical support portion 4 are approximately equal. Of course, the cross section of the prismatic waterway lid main body 1 is not limited to a square, but may be such that when the prismatic waterway lid structures a are arranged in contact with each other, the side surfaces of the prismatic waterway lid main bodies 1 do not touch each other and create unevenness on the upper surface. Things are naturally included. In addition, the surface shape may be smooth, but depending on the surrounding environment, fine irregularities may be formed on the surface to resemble the skin of a tree to create a pseudo-wood-like shape, or paint may be mixed in to create a colored or geometric pattern. may be applied. Moreover, the cylindrical support part 4
A hanging hook 6 is provided protruding from the end face of.
第4、5図は角柱状水路蓋構成体aを形成する
ための遠心成形用の型枠7の外観斜視図とその断
面図で、型枠7内に円柱状に編んだ鉄筋かご5を
配設し、コンクリート11を型枠7内に流し込ん
だ後、支持ローラ8により型枠7を回転させる。
すると内部のコンクリート11は型枠7の遠心力
のために矩形断面の型枠7内面に張り付き、硬化
させた後取り出すと第2、3図のような内部に鉄
筋かご5のインサートされた中空の角柱状水路蓋
構成体aが出来上がる。このように角柱状水路蓋
構成体aは中空であるために軽量化を図る事が出
来る。 Figures 4 and 5 are an external perspective view and a cross-sectional view of a mold 7 for centrifugal molding to form a prismatic waterway cover structure a, in which a cylindrical woven reinforcing bar basket 5 is arranged inside the mold 7. After the concrete 11 is poured into the formwork 7, the formwork 7 is rotated by the support rollers 8.
Then, the concrete 11 inside sticks to the inner surface of the formwork 7, which has a rectangular cross section, due to the centrifugal force of the formwork 7, and when it is taken out after hardening, it becomes a hollow space with a reinforcing bar cage 5 inserted inside, as shown in Figures 2 and 3. A prismatic channel cover structure a is completed. In this way, since the prismatic channel cover structure a is hollow, it is possible to reduce the weight.
次に、施工方法に付いて説明する。まず、施工
対象の水路2で、重機の搬入が可能な位置まで多
数の角柱状水路蓋構成体aを搬送し、1本づつ吊
下げて水路2上まで移送し、水路2の開口縁3上
に移送して来た角柱状水路蓋構成体aの円柱状支
持部4を載置し、続いて開口縁3上を所定の場所
まで転動させ、その位置で角柱状水路蓋本体1の
一面が水平になるように配設する。同様に転動さ
せて来た次の角柱状水路蓋構成体aを必要ならば
若干水平移動させつつ前記第1の角柱状水路蓋構
成体aに添わせて配置する。以上の操作を繰り返
し多数本の角柱状水路蓋構成体aを水路2上に密
に敷設する。敷設された角柱状水路蓋構成体aは
隣接せる角柱状水路蓋構成体aの側面に接してい
るので拘束されて回転する事がなくこれらにより
水路2の開口を覆う水路蓋Aが形成される。 Next, the construction method will be explained. First, in the waterway 2 to be constructed, a large number of prismatic waterway cover structures a are transported to a position where heavy machinery can be brought in, suspended one by one and transferred to the top of the waterway 2, and then placed over the opening edge 3 of the waterway 2. Place the cylindrical support part 4 of the prismatic waterway lid structure a that has been transferred to the holder, then roll it on the opening edge 3 to a predetermined position, and at that position, one side of the prismatic waterway lid body 1 is placed. Place it so that it is horizontal. The next prismatic waterway lid structure a that has been rolled in the same manner is placed along with the first prismatic waterway lid structure a, moving it slightly horizontally if necessary. The above operations are repeated to densely lay a large number of prismatic waterway cover structures a on the waterway 2. The installed prismatic waterway cover structure a is in contact with the side surface of the adjacent prismatic waterway cover structure a, so it is restrained and does not rotate, thereby forming the waterway cover A that covers the opening of the waterway 2. .
又、水路点検のために敷設された水路蓋Aを取
り除く必要が生じた場合には吊フツク6にロープ
をかけて1本づつ若干水平移動させ、然る後、前
記と逆の操作を行つて離れた場所に移動させ、前
記水路蓋Aの設置場所を開口させる。 In addition, if it becomes necessary to remove the waterway cover A that has been laid down for waterway inspection, hang a rope on the hanging hooks 6 and move them slightly horizontally one by one, and then perform the reverse operation to the above. Move it to a remote location and open the installation location of the water channel cover A.
尚、本考案の角柱状水路蓋構成体aは角柱状水
路蓋本体1の両端から水路2の開口縁3に載置す
る円柱状支持部4を突設してあるので、水路2の
開口縁3に円柱状支持部4を載置して転動させた
時、角柱状水路蓋構成体1の端面が水路2の開口
縁3に接してガイドとなり、単なる円柱状である
従来の円柱状水路蓋構成体9と違つて脱輪して水
路2内に落下する事が少ない。 The prismatic waterway lid structure a of the present invention has cylindrical support portions 4 protruding from both ends of the prismatic waterway lid body 1 to be placed on the opening edge 3 of the waterway 2. When the cylindrical support part 4 is placed on the cylindrical waterway 3 and rolled, the end surface of the prismatic waterway cover structure 1 comes into contact with the opening edge 3 of the waterway 2 and becomes a guide. Unlike the lid structure 9, it is less likely to fall off the wheel and fall into the waterway 2.
(効果)
本考案は叙上のように、角柱状水路蓋本体の両
端から水路の開口縁に載置する円柱状支持部を突
設してあるので、第1に水路の開口縁に円柱状支
持部を載置して転動させて行く事が出来、クレー
ンのような重機の入らないような場所でも簡単に
水路蓋の施工が出来ると言う利点がある。この事
はガイドレールを敷設しておけば型枠から出来上
がつた角柱状水路蓋構成体を取り出す場合や別の
場所に移送する場合にも応用する事が出来るもの
である。第2に並べて敷設された多数の角柱状水
路蓋構成体は総て面一になり、水路上に並べてや
るだけで特別な表面舗装工事を必要とせず、施工
費用の大幅低減と工期の短縮が実現出来るだけで
なく、水路点検などの必要が生じた時でも簡単に
角柱状水路蓋構成体を別の場所に移動させる事が
出来ると言う保守点検上の利点もある。第3に本
体部分は、角柱状であるから段積みしても転がる
心配がなく、安定した置き場管理が出来ると言う
利点がある。(Effects) As described above, the present invention has columnar supports that are placed on the opening edge of the waterway protruding from both ends of the prismatic waterway cover body. The advantage is that the support part can be placed and rolled, and the canal cover can be easily constructed even in places where heavy machinery such as cranes cannot enter. This can be applied to the case where the completed prismatic channel cover structure is taken out from the formwork or transferred to another location if a guide rail is installed. Second, the large number of prismatic canal cover structures laid side by side are all flush, and no special surface paving work is required just by arranging them on the waterway, significantly reducing construction costs and shortening the construction period. Not only can this be realized, but it also has the advantage of being able to easily move the prismatic waterway cover structure to another location when it becomes necessary to inspect the waterway, in terms of maintenance and inspection. Thirdly, since the main body part is prismatic, there is no risk of it rolling over even when stacked, and there is an advantage that stable storage management is possible.
第1図……本考案の一実施例の外観斜視図、第
2図……本考案の一実施例の正半断面図第3図…
…第2図の側面図第4図……本考案にかかる角柱
状水路蓋構成体を製造するための遠心型枠の外観
斜視図第5図……第4図の型枠の断面図第6図…
…本考案にかかる角柱状水路蓋構成体の敷設状態
を示す斜視図第7図……従来例の円柱状水路蓋の
正半断面図、第8図……第7図の側面図第9〜1
1図……従来例の施工手順を示す斜視図。
A……本考案にかかる水路蓋、B……従来例の
水路蓋、1……角柱状水路蓋本体、2……水路、
3……開口縁、4……円柱状支持部、5……鉄筋
かご、6……吊フツク、7……型枠、8……支持
ローラ、9……円柱状水路蓋構成体、10……配
筋、11……生コンクリート。
Fig. 1...An external perspective view of an embodiment of the present invention, Fig. 2...A positive half cross-sectional view of an embodiment of the present invention...Fig. 3...
...Side view of Fig. 2 Fig. 4... External perspective view of the centrifugal formwork for manufacturing the prismatic waterway lid structure according to the present invention Fig. 5... Cross-sectional view of the formwork of Fig. 4 Fig. 6 figure…
...Perspective view showing the installation state of the prismatic waterway lid structure according to the present invention.FIG. 7. A half sectional view of the conventional cylindrical waterway lid.FIG. 8.Side view of FIG. 7.FIG. 9. 1
Figure 1: A perspective view showing the construction procedure of a conventional example. A... Channel cover according to the present invention, B... Conventional channel cover, 1... Prismatic channel cover body, 2... Channel,
3...Opening edge, 4...Cylindrical support part, 5...Reinforced cage, 6...Hanging hook, 7...Formwork, 8...Support roller, 9...Cylindrical waterway cover structure, 10... ...Reinforcement arrangement, 11...Ready-mixed concrete.
Claims (1)
置する円柱状支持部を突設して成る事を特徴とす
る角柱状水路蓋構成体。 1. A prismatic waterway lid structure comprising cylindrical support parts protruding from both ends of a prismatic waterway lid body to be placed on the opening edge of a waterway.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10021289U JPH0523666Y2 (en) | 1989-08-28 | 1989-08-28 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10021289U JPH0523666Y2 (en) | 1989-08-28 | 1989-08-28 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0340383U JPH0340383U (en) | 1991-04-18 |
JPH0523666Y2 true JPH0523666Y2 (en) | 1993-06-16 |
Family
ID=31649231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10021289U Expired - Lifetime JPH0523666Y2 (en) | 1989-08-28 | 1989-08-28 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0523666Y2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6716807B1 (en) * | 2019-10-01 | 2020-07-01 | 一般社団法人Surface Builder | Floor material as roadbed material |
-
1989
- 1989-08-28 JP JP10021289U patent/JPH0523666Y2/ja not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0340383U (en) | 1991-04-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8888481B2 (en) | Machine for manufacturing concrete U-wall type construction blocks by molding each concrete U-wall construction block from concrete poured about a block cage made from reinforcing material while said block cage is loaded within said machine | |
US3879914A (en) | Method of making a platform structure | |
CN111074950A (en) | Pre-closed advanced water stop post-cast strip for basement outer wall and construction method | |
JPH0523666Y2 (en) | ||
CN207633547U (en) | A kind of garage post-pouring belt of outer wall closed cover | |
GB2085502A (en) | Building units for forming permanent formwork | |
JPH0571159A (en) | Concrete block installing method | |
EA009928B1 (en) | Method of constructing strip foundations with longitudinal groove, a foundation element and holding/leveling device provided therefor | |
CN209637071U (en) | A kind of laminated floor slab and assembled connecting node | |
US2810287A (en) | Wall of pre-cast slabs | |
US20080149808A1 (en) | Method and apparatus for producing concrete structures | |
JPH01256636A (en) | Construction method of building | |
JP2000320142A (en) | Device and method for reinforcement assembly in construction work | |
CN112012473A (en) | Integrated steel formwork for wall body of cantilever rib type of sewage pool | |
US3352529A (en) | Mold apparatus for hollow building elements | |
US20150091207A1 (en) | Center insulated concrete form | |
JPH04108921A (en) | Mat foundation panel | |
JPH02311639A (en) | Construction of composite floor | |
JP6522217B1 (en) | Rebar arrangement method for wall rebar, lifting aid device for reinforcing bar material and lifting device | |
EP1233123A2 (en) | A bricklaying method and an arrangement for the implementation thereof | |
DE1584637A1 (en) | Base plate for the production of a large format building board | |
CN2454478Y (en) | Wall mould of prefabricated steel reinforced concrete integral room | |
CN205712643U (en) | A kind of building prefabrication floor plates | |
JPH0139330Y2 (en) | ||
US3855375A (en) | Floor building system |