JPH05231000A - Reinforcement method of wall reinforcing bars - Google Patents

Reinforcement method of wall reinforcing bars

Info

Publication number
JPH05231000A
JPH05231000A JP6976392A JP6976392A JPH05231000A JP H05231000 A JPH05231000 A JP H05231000A JP 6976392 A JP6976392 A JP 6976392A JP 6976392 A JP6976392 A JP 6976392A JP H05231000 A JPH05231000 A JP H05231000A
Authority
JP
Japan
Prior art keywords
reinforcement
wall
vertical
bar
structural part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6976392A
Other languages
Japanese (ja)
Inventor
Masayuki Shin
正幸 親
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP6976392A priority Critical patent/JPH05231000A/en
Publication of JPH05231000A publication Critical patent/JPH05231000A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To speed up reinforcement work by preventing vertical reinforcement bars from being tangled with a drop prevention net when placing reinforcement. CONSTITUTION:Wall reinforcement is placed in a wall structural part (b) with vertical reinforcement 1 and horizontal reinforcement 2 bridged from the wall structural part (b) to a beam structural part (a). When slab reinforcement is finished on an upper floor, virtually V-shaped hook bars 3a, which are bent so as to allow each of lower part open ends 3a to enter the beam structural part (a), are placed on the beam structural part (a) for reinforcement.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄骨鉄筋コンクリート
造の建築工事における壁の配筋方法、特に縦方向に渡す
鉄筋の配筋方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for arranging walls in a steel frame reinforced concrete construction work, and more particularly to a method for arranging rebars to be passed in the vertical direction.

【0002】[0002]

【従来の技術】従来、鉄骨鉄筋コンクリート造の建築工
事において壁を構築する際には、打設完了したコンクリ
ートスラブ上にて壁の縦筋と横筋とにより配筋を行い、
この壁構築個所と上方の鉄骨梁回りに梁配筋を行ってな
る梁構築個所とを型枠にて覆い、スラブ型枠の形成、ス
ラブ筋の配筋を行っている。そしてこののち、コンクリ
ートを打設することによって、壁、梁、スラブが一体と
なった状態で形成されている。
2. Description of the Related Art Conventionally, when constructing a wall in a steel-framed reinforced concrete construction work, on the concrete slab that has been cast, the reinforcement is carried out by the vertical and horizontal bars of the wall,
This wall construction point and the beam construction point where beam reinforcement is performed around the upper steel beam are covered with a formwork to form a slab formwork and arrange the slab reinforcement. After that, by pouring concrete, the wall, the beam, and the slab are integrated.

【0003】上記の壁の構築に際して用いられる縦筋
は、上階の壁との一体性を確保するために、梁構築個所
から上方に突出する長さとしており、図5に示すよう
に、縦筋1は梁構築個所aを通してその先端1aが上方
に突出するようにして配筋されていて、その配筋作業は
例えば図6に示すように、梁構築個所a上から作業員が
縦筋1を壁構築個所bに並べ、これを下方にて作業者が
横筋2に結束するものであった。
The vertical streak used in the construction of the above wall has a length projecting upward from the beam construction portion in order to ensure the integrity with the wall of the upper floor, and as shown in FIG. The bar 1 is laid out so that the tip 1a thereof projects upward through the beam construction point a. For example, as shown in FIG. Was arranged at the wall construction site b, and the worker tied it down to the lateral streak 2 below.

【0004】[0004]

【発明が解決しようとする課題】ところで、壁の上記縦
筋はその上端が上階のスラブコンクリート打設後におい
ても突出した状態となることから、上階スラブ上での各
種の作業に支障を来すことになる。そこで図7に示すよ
うに縦筋1の先端1aを鈎状にフック加工して、墜落時
や転倒時などにこの突出した縦筋先端で作業員が怪我を
しないように安全策が講じられていた。しかしながら、
この長尺である縦筋を取り扱う際に、図6に示すよう
に、その先端1aが、上階のクロスハンガーの落下防止
用ネットcに絡まり易く、このため配筋作業が手際よく
行えないという問題がある。
By the way, since the upper end of the vertical bar of the wall is projected even after the slab concrete is placed on the upper floor, various work on the upper slab is hindered. Will come. Therefore, as shown in FIG. 7, the tip 1a of the vertical bar 1 is hooked into a hook shape, and a safety measure is taken so that an operator is not injured by the protruding vertical bar at the time of a fall or a fall. It was However,
When handling this long vertical bar, as shown in FIG. 6, its tip 1a is easily entangled with the fall prevention net c of the cross hanger on the upper floor, which makes it difficult to perform bar work effectively. There's a problem.

【0005】そこで本発明は上記した事情に鑑み、縦筋
の配筋作業時にこの縦筋が落下防止用ネットに絡まない
ようにすることを課題とし、配筋作業のスピードアップ
を図ることを目的とする。
In view of the above circumstances, it is an object of the present invention to prevent the vertical bar from being entangled with the fall prevention net during the bar bar arranging work, and to speed up the bar bar arranging work. And

【0006】[0006]

【課題を解決するための手段】本発明は上記した課題を
考慮してなされたもので、壁構築個所に、該壁構築個所
から上方の梁構築個所に渡る縦筋を配して壁配筋を行
い、上階スラブ配筋の完了後、下部開放端側それぞれが
前記梁構築個所に入り込むように曲成された略U字状の
フック筋を該梁構築個所上に配筋することにより、上記
した課題を解消するものである。
DISCLOSURE OF THE INVENTION The present invention has been made in consideration of the above-mentioned problems, and a wall reinforcement is provided at a wall construction site by arranging a vertical bar extending from the wall construction site to an upper beam construction site. After the completion of the upper floor slab reinforcement, by arranging a substantially U-shaped hook bar bent on the lower open end side so as to enter the beam construction point on the beam construction point, The problems described above are solved.

【0007】[0007]

【作用】本発明においては、縦筋が壁構築個所から上方
の梁構築個所に渡る長さであり、この縦筋の先端が上階
に突出しないようになる。そして、梁構築個所に配筋さ
れるフック筋は梁構築個所上に突出した部分が上階での
壁部との連結部となるとともに、その上端は連続して鉄
筋端部が上方に突出しないようになる。
In the present invention, the vertical streak has a length extending from the wall construction point to the upper beam construction point, and the tip of the vertical streak does not project to the upper floor. And, the hook bar arranged at the beam construction site has the part projecting above the beam construction site as the connecting part with the wall on the upper floor, and its upper end does not continuously project the reinforcing bar end upward. Like

【0008】[0008]

【実施例】つぎに本発明を図1から図4に示す一実施例
に基づいて詳細に説明する。壁を構築するに際して、縦
筋1は図1に示すように壁構築個所bから上方の梁構築
個所aに渡る長さに設けられていて、その上端1aは梁
構築個所aから上方に突出することが無く鉄骨梁dを回
り込むように曲成されている。この縦筋1と横筋2とに
より壁構築個所bの配筋が行われ、縦筋1の上端1aが
フック状に曲げられていないことから上述した落下防止
用ネットに絡まることが無い。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to an embodiment shown in FIGS. When constructing a wall, the vertical streaks 1 are provided in a length extending from the wall building location b to the upper beam building location a as shown in FIG. 1, and the upper end 1a thereof projects upward from the beam building location a. It is bent so as to wrap around the steel beam d without any problem. The vertical stirrup 1 and the horizontal stirrer 2 arrange the wall construction portion b, and since the upper end 1a of the vertical streak 1 is not bent in a hook shape, it does not get entangled with the above-mentioned fall prevention net.

【0009】梁回りの配筋および上述の壁配筋を行った
後、壁、梁、柱の型枠を建て込むとともに上階のスラブ
型枠が建て込まれる。そしてスラブ配筋が終了した後
に、フック筋3が梁構築個所aに例えば縦筋1の配筋ピ
ッチで上方から差し入れられ結束固定される(図2参
照)。このフック筋3は下部が開いた略U字状に形成さ
れていて、下部開放端3a側それぞれが前記梁構築個所
aに入り込むように曲成されている(図3参照)。この
フック筋3それぞれの上部3bは、梁構築個所aから上
方に突出した状態で立ち並び、スラブコンクリートの打
設完了後においても突出していてこれがこのスラブ上の
壁部との連続部分となる(図4参照)。
After the reinforcement around the beam and the above-mentioned reinforcement of walls, the formwork of the wall, the beam and the pillar is built and the slab formwork of the upper floor is built. After the slab reinforcement is completed, the hook reinforcements 3 are inserted into the beam construction points a from above, for example, at the reinforcement arrangement pitch of the vertical reinforcements 1 and are fixedly bound (see FIG. 2). The hook streak 3 is formed in a substantially U shape with an open lower part, and is bent so that the lower open end 3a side enters the beam building portion a (see FIG. 3). The upper portions 3b of the hook streaks 3 stand side by side in a state of projecting upward from the beam construction point a and projecting even after the completion of the pouring of the slab concrete, which is a continuous portion with the wall portion on the slab (see 4).

【0010】[0010]

【発明の効果】以上説明したように、本発明は、壁構築
個所に、該壁構築個所から上方の梁構築個所に渡る縦筋
を配して壁配筋を行い、上階スラブ配筋の完了後、下部
開放端側それぞれが前記梁構築個所に入り込むように曲
成された略U字状のフック筋を該梁構築個所上に配筋し
たことを特徴とするものである。これによって、縦筋を
取り扱うに際して従来のような落下防止用ネットとの絡
まり無くなり、配筋作業か頗る効率よく行えるようにな
る。またフック筋の上部は逆U字状に連続したものとな
り、作業員の転倒時や落下時の突き刺しを防止でき、作
業服の引っ掛けを無くなる。このため従来行われていた
縦筋上端のフック加工やキャップの取付が不要になるな
ど、実用性に優れた効果を奏するものである。
As described above, according to the present invention, the vertical bar extending from the wall building point to the upper beam building point is arranged in the wall building point to perform the wall reinforcing, and the upper floor slab reinforcing bar After the completion, the substantially U-shaped hook bar, which is bent so that each of the lower open end sides enters the beam building point, is arranged on the beam building point. This eliminates the entanglement with the conventional fall prevention net when handling the vertical streaks, and enables efficient work for bar arrangement work. Further, the upper part of the hook muscle is continuous in an inverted U shape, so that it is possible to prevent the worker from being stabbed when the worker falls or falls, and the work clothes are not caught. For this reason, the hooking of the upper end of the vertical streak and the attachment of the cap, which have been conventionally performed, become unnecessary, and the effect of excellent practicability is achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る壁鉄筋の配筋方法の一実施例にお
ける縦筋の配筋状態を示す説明図である。
FIG. 1 is an explanatory diagram showing a reinforcing bar arrangement state in an embodiment of a wall reinforcing bar reinforcing method according to the present invention.

【図2】一実施例におけるフック筋の取付を示す説明図
である。
FIG. 2 is an explanatory diagram showing attachment of hook muscles in one embodiment.

【図3】フック筋を取り付けた梁構築個所を示す説明図
である。
FIG. 3 is an explanatory view showing a beam construction portion to which a hook bar is attached.

【図4】コンクリート打設後のフック筋の突出状態を示
す説明図である。
FIG. 4 is an explanatory diagram showing a protruding state of hook bars after placing concrete.

【図5】従来における壁構築個所の配筋状態を示す説明
図である。
FIG. 5 is an explanatory view showing a conventional bar arrangement state at a wall construction portion.

【図6】縦筋の配筋作業を示す説明図である。FIG. 6 is an explanatory diagram showing a work of arranging vertical lines.

【図7】縦筋の突出状態を示す説明図である。FIG. 7 is an explanatory diagram showing a protruding state of a vertical stripe.

【符号の説明】[Explanation of symbols]

1…縦筋 1a…先端 2…横筋 3…フック筋 3a…下部開放端 3b…上部 a…梁構築個所 b…壁構築個所 1 ... Longitudinal line 1a ... Tip 2 ... Horizontal line 3 ... Hook line 3a ... Lower open end 3b ... Upper part a ... Beam building part b ... Wall building part

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】壁構築個所に、該壁構築個所から上方の梁
構築個所に渡る縦筋を配して壁配筋を行い、 上階スラブ配筋の完了後、下部開放端側それぞれが前記
梁構築個所に入り込むように曲成された略U字状のフッ
ク筋を該梁構築個所上に配筋したことを特徴とする壁鉄
筋の配筋方法。
1. A wall reinforcement is performed at a wall construction location by arranging a vertical reinforcement extending from the wall construction location to an upper beam construction location, and after the completion of the upper slab reinforcement, each of the lower open end sides is the above-mentioned. A reinforcing method for a wall reinforcing bar, wherein a substantially U-shaped hook bar bent so as to enter a beam construction point is arranged on the beam construction point.
JP6976392A 1992-02-19 1992-02-19 Reinforcement method of wall reinforcing bars Pending JPH05231000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6976392A JPH05231000A (en) 1992-02-19 1992-02-19 Reinforcement method of wall reinforcing bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6976392A JPH05231000A (en) 1992-02-19 1992-02-19 Reinforcement method of wall reinforcing bars

Publications (1)

Publication Number Publication Date
JPH05231000A true JPH05231000A (en) 1993-09-07

Family

ID=13412172

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6976392A Pending JPH05231000A (en) 1992-02-19 1992-02-19 Reinforcement method of wall reinforcing bars

Country Status (1)

Country Link
JP (1) JPH05231000A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248237A (en) * 2000-03-06 2001-09-14 Haseko Corp Structure of building
CN102720367A (en) * 2012-05-18 2012-10-10 山西省第二建筑工程公司 Shear wall main reinforcement variable-spacing construction method
CN104314313A (en) * 2014-11-06 2015-01-28 中国海洋石油总公司 Concrete external wall prestress system establishment method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248237A (en) * 2000-03-06 2001-09-14 Haseko Corp Structure of building
CN102720367A (en) * 2012-05-18 2012-10-10 山西省第二建筑工程公司 Shear wall main reinforcement variable-spacing construction method
CN102720367B (en) * 2012-05-18 2014-08-06 山西省第二建筑工程公司 Shear wall main reinforcement variable-spacing construction method
CN104314313A (en) * 2014-11-06 2015-01-28 中国海洋石油总公司 Concrete external wall prestress system establishment method

Similar Documents

Publication Publication Date Title
JPH05231000A (en) Reinforcement method of wall reinforcing bars
JP2952462B2 (en) Slope formwork device using crimped wire mesh structure
JP2648937B2 (en) Reinforcing bar for long span beams
CN215054555U (en) Same-span variable-cross-section beam structure
JP2769437B2 (en) Side plate of slope protection construction molding frame
CN211312204U (en) External hanging type operating platform for penetrating and bundling transverse prestressed steel strands of concrete box girder
JPH0632996Y2 (en) Stirrup muscle
JP3014028U (en) Reed set
JP2847046B2 (en) Pre-assembly method of reinforced concrete small beam rebar
JP2912563B2 (en) Reinforcing method of reinforcing bar of underground outer wall frame
JPS6233961A (en) Pc beam
JPS6039401Y2 (en) joint reinforcing bars
JP3071966U (en) Formwork members in slope reinforcement method
JP2736224B2 (en) Enforcement method for formwork, mortar, concrete, etc.
JP3011664B2 (en) Formwork for slope protection construction
JPS6039835B2 (en) Reinforced steel construction method
JPH0738390Y2 (en) Formwork for legal form
JPH10109880A (en) Vertical suspending and moving method
JPH0643237Y2 (en) Formwork for legal form
KR200174283Y1 (en) Fixation structure of pipe
JPH074044A (en) Joint bar construction method and joint bar unit adopted in this method
JPS5910650A (en) Iron skeletal assembling method of slab upper end iron wire
JPH0741793Y2 (en) Slab leveling muscle
JPH0547791Y2 (en)
JPH05171742A (en) Hook fitting and concrete construction method using this hook fitting