JPH05228512A - Manufacture of long size tube - Google Patents
Manufacture of long size tubeInfo
- Publication number
- JPH05228512A JPH05228512A JP15724391A JP15724391A JPH05228512A JP H05228512 A JPH05228512 A JP H05228512A JP 15724391 A JP15724391 A JP 15724391A JP 15724391 A JP15724391 A JP 15724391A JP H05228512 A JPH05228512 A JP H05228512A
- Authority
- JP
- Japan
- Prior art keywords
- tube
- diameter
- casting
- long size
- reduced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Heat Treatment Of Steel (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は遠心鋳造と圧延ロールに
よる絞り加工を併用して長尺管を製造する方法に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for producing a long tube by using centrifugal casting and drawing with a rolling roll.
【0002】[0002]
【従来の技術及び問題点】遠心鋳造による管体の形成
は、管体に継ぎ目が存在しないこと、内層と外層の特性
が異なる二層管を簡単に形成できること、加工性の悪い
耐熱鋼であっても容易に管体を形成できる等の利点があ
る。2. Description of the Related Art The formation of a tubular body by centrifugal casting is a heat-resistant steel that has no seams in the tubular body, can easily form a two-layer pipe having different inner and outer layer characteristics, and has poor workability. However, there is an advantage that the tubular body can be easily formed.
【0003】ところが、遠心鋳造では小径の長尺管の鋳
造は極めて困難であった。この理由は、高速回転鋳型の
端部より溶湯を流し込むのに、その注湯口が小さくな
り、注湯することが技術的に困難であり、又、この様な
小さな注湯口より注湯しながら鋳型を高速回転させるこ
とは安全性に問題がある。更に、長尺鋳型の内面に均一
に溶湯が行き渡るまでに凝固が終了するため、均一肉厚
の健全な製品を得ることは望めないからである。However, it has been extremely difficult to cast a long tube having a small diameter by centrifugal casting. The reason for this is that when the molten metal is poured from the end of the high-speed rotary mold, its pouring port becomes small, and it is technically difficult to pour it. Also, while pouring the molten metal from such a small pouring port, the mold There is a problem in safety when rotating at high speed. Furthermore, since the solidification is completed before the molten metal is evenly spread on the inner surface of the long mold, it is not possible to obtain a sound product having a uniform thickness.
【0004】例えば外径50mm、内径38mmのエチレン
用クラッキングチューブの場合、1本のチューブの必要
長さは10〜12mであるが、この様な小径の長尺チュ
ーブは遠心鋳造にて製造出来ず、遠心鋳造可能な2.5
〜3m程度の管を4〜5本溶接接合して1本のチューブ
を形成しなければならない。溶接箇所の多いことは、溶
接に起因する種々の問題が危惧され、クラッキングチュ
ーブの様な苛酷な使用条件では管の寿命が縮まると共に
製作上のコストアップの要因となり好ましくない。引抜
き加工或は押出し加工にて小径の長尺管を形成すること
ができるが、耐熱鋼の場合にその加工性が問題となる。
即ち、耐熱鋼はクリープ強度を確保するためにCの含有
量が0.4%程度は必要であるが、引抜き加工或は押出し
加工可能なCの含有量は0.2%程度までであり、それ以
上の含有量では加工性が著しく低下する。For example, in the case of an ethylene cracking tube having an outer diameter of 50 mm and an inner diameter of 38 mm, the required length of one tube is 10 to 12 m, but such a small diameter long tube cannot be manufactured by centrifugal casting. , Centrifugal casting 2.5
It is necessary to weld and join 4 to 5 tubes of about 3 m to form one tube. Since there are many welding points, various problems caused by welding are feared, and under severe operating conditions such as a cracking tube, the life of the tube is shortened and the manufacturing cost is increased, which is not preferable. Although a long tube having a small diameter can be formed by drawing or extruding, the workability of heat-resistant steel becomes a problem.
That is, the heat-resistant steel needs to have a C content of about 0.4% in order to secure the creep strength, but the content of C that can be drawn or extruded is up to about 0.2%, and the content of C or more is higher. When the amount is large, the workability is significantly reduced.
【0005】本発明は、遠心鋳造時の熱エネルギーを有
効に利用して小径の長尺管を容易に形成できる方法を明
らかにするものである。The present invention clarifies a method capable of easily forming a long tube having a small diameter by effectively utilizing thermal energy during centrifugal casting.
【0006】[0006]
【課題を解決する手段】本発明は、遠心鋳造にて管体
(1)を鋳造し、鋳造後、直ちに脱型し、該管体が高温状
態のうちに圧延ロール(2)に通して縮径することにより
長尺管を製造する。DISCLOSURE OF THE INVENTION The present invention provides a tubular body by centrifugal casting.
(1) is cast, and after casting, it is immediately demolded, and while the tube is in a high temperature state, the tube is passed through a rolling roll (2) to reduce its diameter to produce a long tube.
【0007】[0007]
【作用及び効果】遠心鋳造にて、遠心鋳造に無理のない
口径及び長さの管体(1)を形成し、次工程の絞り加工に
て管体を所望の直径に縮径して長尺化するため、遠心鋳
造の利点を損うことがない。[Operation and effect] In the centrifugal casting, a tubular body (1) having a diameter and a length that is not difficult for the centrifugal casting is formed, and the tubular body is reduced in diameter to a desired diameter by the drawing process in the next step to be long. Therefore, the advantages of centrifugal casting are not impaired.
【0008】鋳造直後の高温状態の管体を圧延ロール
(2)によって絞って縮径するため、30〜40%程度の
縮径加工が可能となり、加工性の悪い耐熱鋼でも900
°Cの高温状態ではその程度の縮径加工は可能であり、
鋳造直後の管体は1000゜C以上であるから、再加熱
の必要はない。Rolling rolls are used to roll a tube in a high temperature state immediately after casting
Since the diameter is reduced by reducing it by (2), it is possible to reduce the diameter by 30-40%, and even heat-resistant steel with poor workability is 900
In the high temperature condition of ° C, it is possible to reduce the diameter.
Since the temperature of the pipe immediately after casting is 1000 ° C or higher, reheating is not necessary.
【0009】管体を圧延ロール(2)に通すだけであるか
ら、ダイスで引き抜く場合とは違って、遠心鋳造による
外面鋳肌の凹凸は問題とはならない。Since the tubular body is simply passed through the rolling roll (2), the unevenness of the outer surface casting surface caused by centrifugal casting does not pose a problem, unlike the case where the tubular body is pulled out by a die.
【0010】遠心鋳造直後の高温エネルギーを有効に利
用し、エネルギー効率を高め、低コストで製造できる。High-temperature energy immediately after centrifugal casting is effectively used, energy efficiency is improved, and manufacturing can be performed at low cost.
【0011】管の長尺化により、必要長さに溶接接合す
る場合でも、溶接箇所を減らすことができ、クラッキン
グチューブの様な苛酷な使用条件下でも、管の寿命を向
上できる。By lengthening the pipe, the number of welded portions can be reduced even when welding and joining to a required length, and the life of the pipe can be improved even under severe operating conditions such as cracking tubes.
【0012】[0012]
【実施例】遠心鋳造管体(1)は耐熱鋼管であって、 成分(wt%) C 0.41、Si 1.48、Mn 0.95、Cr 25.2、Ni 35.
3、Mo 1.2 外径 72mm 内径 51mm 全長 3.5mである。EXAMPLES Centrifugal casting pipe body (1) is a heat-resistant steel pipe, and contains (wt%) C 0.41, Si 1.48, Mn 0.95, Cr 25.2, Ni 35.
3, Mo 1.2 outer diameter 72 mm, inner diameter 51 mm, total length 3.5 m.
【0013】上記管を遠心鋳造後直ちに脱型し、100
0゜C以上の高温状態のまま、単段或は数段の圧延ロー
ル(2)に通し、管の外面を軸心に向けて押圧し、管径を
絞る。外径が50mm程度になるまで絞る(約30%の縮
径)と、長さは約4.6mとなる。Immediately after centrifugal casting, the above pipe was demolded to 100
While keeping the temperature at 0 ° C or higher, it is passed through a single-stage or several-stage rolling roll (2), the outer surface of the pipe is pressed toward the axial center, and the pipe diameter is reduced. If the outer diameter is reduced to about 50 mm (reduction of about 30%), the length will be about 4.6 m.
【0014】更に、小径に加工する場合、管を再加熱し
て1200゜Cに高め、再び、圧延ロール(2)に通して
外径が35mm程度まで絞ると長さは約6mとなる。Further, in the case of processing to a small diameter, the tube is reheated to 1200 ° C., passed through the rolling roll (2) again, and the outer diameter is reduced to about 35 mm, the length becomes about 6 m.
【0015】上記の如く、遠心鋳造に無理のない口径の
管体を遠心鋳造し、次工程の絞り加工にて管体を所望の
直径に縮径して長尺化するため、遠心鋳造の利点を損う
ことがない。As described above, centrifugal casting is performed on a tubular body having a diameter suitable for centrifugal casting, and the tubular body is reduced in diameter to a desired diameter by a drawing process in the next step to increase the length. Will not damage.
【0016】鋳造直後の高温状態の管体を圧延ロール
(2)によって絞って縮径するため、30〜40%程度の
縮径加工は可能である。加工性の悪い耐熱鋼でも900
°C以上の高温状態であれば、その程度の縮径加工は可
能であり、鋳造直後の管体の温度は1000゜C以上で
あるから縮径加工に支障はない。Rolling rolls of hot pipe immediately after casting
Since the diameter is narrowed down by (2), it is possible to reduce the diameter by about 30 to 40%. 900 even for heat-resistant steel with poor workability
If it is in a high temperature state of ° C or higher, it is possible to perform the diameter reduction work to that extent, and since the temperature of the tubular body immediately after casting is 1000 ° C or higher, there is no problem in the diameter reduction work.
【0017】管体を圧延ロール(2)に通すだけであるか
ら、ダイスで引き抜く場合とは違って、遠心鋳造による
外面鋳肌の凹凸は問題とはならない。Since the tubular body is simply passed through the rolling roll (2), the unevenness of the outer surface casting surface by centrifugal casting does not pose a problem, unlike the case where the tubular body is pulled out by a die.
【0018】遠心鋳造直後の高温エネルギーを有効に利
用してエネルギー効率を高め、低コストで製造できる。The high temperature energy immediately after centrifugal casting can be effectively used to enhance energy efficiency, and manufacturing can be performed at low cost.
【0019】遠心鋳造の限界を越えた小口径の長尺管の
製造が可能となり、管の長尺化により、必要長さに溶接
接合する場合でも、溶接箇所を減らすことができ、クラ
ッキングチューブの様な苛酷な使用条件下でも、管の寿
命を向上できる。It is possible to manufacture a long pipe having a small diameter exceeding the limit of centrifugal casting, and by lengthening the pipe, it is possible to reduce the number of welded portions even when welding and joining to a required length, and it is possible to reduce cracking of the cracking tube. The life of the pipe can be improved even under such severe use conditions.
【0020】本発明の実施に際し、圧延ロール(2)(2)
間の円形空間が徐々に狭まる様に、ロール(2)(2)を多
段に配備して、管の口径を徐々に絞って小口径の管を製
造できるのは勿論である等、上記実施例の構成に限定さ
れることはなく、特許請求の範囲に記載の範囲で種々の
変形が可能である。In carrying out the present invention, the rolling rolls (2) (2)
As a matter of course, the rolls (2) and (2) may be arranged in multiple stages so that the circular space between them is gradually narrowed, and the pipe diameter can be gradually reduced to produce a small-diameter pipe. However, the present invention is not limited to the configuration described above, and various modifications can be made within the scope of the claims.
【図1】絞り状態の説明図である。FIG. 1 is an explanatory diagram of a diaphragm state.
(1) 管体 (2) 圧延ロール (1) Tubular body (2) Rolling roll
Claims (2)
後、直ちに脱型し、該管体が高温状態のうちに圧延ロー
ル(2)に通して縮径することにより長尺管を製造する方
法。1. A long body is obtained by casting a tubular body (1) by centrifugal casting, immediately after casting, demolding and passing the rolling body (2) through a rolling roll (2) to reduce the diameter while it is in a high temperature state. A method of manufacturing a tube.
後、直ちに脱型し、該管体が高温状態のうちに圧延ロー
ル(2)に通して縮径し、次に管体(1)を加熱し、加熱し
た管体を再び圧延ロール(2)に通して縮径し長尺管を製
造する方法。2. A tubular body (1) is cast by centrifugal casting, and immediately after casting, the die is demolded, and the tubular body is passed through a rolling roll (2) while the temperature is high to reduce the diameter. A method for producing a long tube by heating the body (1) and passing the heated tube again through a rolling roll (2) to reduce the diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15724391A JPH05228512A (en) | 1991-06-28 | 1991-06-28 | Manufacture of long size tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15724391A JPH05228512A (en) | 1991-06-28 | 1991-06-28 | Manufacture of long size tube |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH05228512A true JPH05228512A (en) | 1993-09-07 |
Family
ID=15645380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15724391A Withdrawn JPH05228512A (en) | 1991-06-28 | 1991-06-28 | Manufacture of long size tube |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH05228512A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6691397B2 (en) * | 2001-10-16 | 2004-02-17 | Chakravarti Management, Llc | Method of manufacturing same for production of clad piping and tubing |
CN103658580A (en) * | 2013-12-10 | 2014-03-26 | 江苏宏宝集团有限公司 | Alloy pipe production process |
JP2017185545A (en) * | 2016-04-01 | 2017-10-12 | エスエムエス グループ ゲーエムベーハー | Method and system for production of seamless hot-rolled tube as well as rolled centrifugally cast tube and use of hollow block produced by means of centrifugal casting |
-
1991
- 1991-06-28 JP JP15724391A patent/JPH05228512A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6691397B2 (en) * | 2001-10-16 | 2004-02-17 | Chakravarti Management, Llc | Method of manufacturing same for production of clad piping and tubing |
CN103658580A (en) * | 2013-12-10 | 2014-03-26 | 江苏宏宝集团有限公司 | Alloy pipe production process |
JP2017185545A (en) * | 2016-04-01 | 2017-10-12 | エスエムエス グループ ゲーエムベーハー | Method and system for production of seamless hot-rolled tube as well as rolled centrifugally cast tube and use of hollow block produced by means of centrifugal casting |
RU2724224C2 (en) * | 2016-04-01 | 2020-06-22 | Смс Груп Гмбх | Method and system for production of seamless hot-rolled pipe, centrifugal rolled tube and use of hollow block produced by centrifugal casting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105149372B (en) | A kind of asymmetric seamless hollow profile manufacturing process | |
CN104060203B (en) | A kind of production technique of alloy extrusion bar | |
CN102689151B (en) | Liquid die forging and rolling compound formation method for GH4033 high-temperature alloy irregular-section large ring piece | |
CN101704084A (en) | Centrifugal cast tube die and manufacturing technique thereof | |
JPH05228512A (en) | Manufacture of long size tube | |
CN108838634A (en) | A kind of diaphragm coupling and its pipe fitting part production method | |
CN1751826A (en) | Centrifugal casting method for mfg. double metal steel pipe or blank with fused layer | |
CN107282854A (en) | A kind of manufacturing process of nuclear power retaining ring | |
CN206747278U (en) | A kind of heater for molybdenum alloy tubing roll forming | |
JP5962206B2 (en) | Manufacturing method of round slab for pipe making of high Cr steel seamless steel pipe | |
JPH04200801A (en) | Production of high delta-fe austenitic stainless steel strip | |
JP2000005816A (en) | Multi-wound stainless steel pipe | |
JP2947098B2 (en) | Manufacturing method of continuous cast slab for seamless steel pipe material | |
JPH05228513A (en) | Manufacture of long size tube | |
CN206747279U (en) | A kind of heater for rolling molybdenum alloy pipe | |
CN104668910B (en) | The strain-induced formula of large ring twists and semisolid die forging combination process | |
CN210387210U (en) | Automobile muffler air inlet pipe ridge tool | |
JPH01180711A (en) | Plug for manufacturing seamless steel pipe | |
JPS5939444A (en) | Production of steel flange | |
JP4100767B2 (en) | Multi-winding stainless steel pipe | |
JPH10296493A (en) | Smoothing device for steel tube seam part | |
JPH08174051A (en) | Production of double pipe having excellent boundary joinability | |
JP4232920B2 (en) | Thick multi-walled metal tube | |
SU515545A1 (en) | Cylinder preform for pressing multilayer products | |
CN114210761A (en) | High-frequency induction seamless titanium welded pipe and production method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 19980903 |