JPH05208060A - Artificial ski site - Google Patents

Artificial ski site

Info

Publication number
JPH05208060A
JPH05208060A JP1514992A JP1514992A JPH05208060A JP H05208060 A JPH05208060 A JP H05208060A JP 1514992 A JP1514992 A JP 1514992A JP 1514992 A JP1514992 A JP 1514992A JP H05208060 A JPH05208060 A JP H05208060A
Authority
JP
Japan
Prior art keywords
slope
floor
frame
artificial ski
artificial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1514992A
Other languages
Japanese (ja)
Inventor
Yasuhiko Nunokawa
安彦 布川
Koji Yanagisawa
孝次 柳澤
Norio Taguchi
典生 田口
Tatsuya Kotake
達也 小竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP1514992A priority Critical patent/JPH05208060A/en
Publication of JPH05208060A publication Critical patent/JPH05208060A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To constitute an artificial ski site which can be used all the year round because of the all weather type and in which a columnless large space is formed in an under-floor part, the under-floor part can be utilized, and the multistoried formation of the ski slope is enabled. CONSTITUTION:One side lower part of a ski slope rack mechanism A consisting of a ski slope floor 3 and a ski slope roof 2 is fixed on a foundation 5, and the other side upper part is supported by stays 6, and the ski slope rack mechanism is suspended through cables 4 by the stays 1 erected on the ground.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は人工スキー場に係るもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an artificial ski resort.

【0002】[0002]

【従来の技術】従来の人工スキー場は傾斜滑走面を有す
るゲレンデ架構の下部を多数の支柱で支持する支柱方式
のものか、地上に鉛直に立設された主塔の頂部と同主塔
から距離をおいた地盤に固定されたアンカーとの間に斜
材を張架し、同斜材より吊材を介してゲレンデ床を懸吊
し、前記ゲレンデの上方と側方を膜材で被覆した吊り橋
方式のものが提案されている。
2. Description of the Related Art A conventional artificial ski resort is of a pillar type in which the lower part of a slope frame having an inclined sliding surface is supported by a large number of pillars, or from the top of the main tower vertically erected on the ground. A diagonal member was stretched between the anchor fixed to the ground at a distance, and the slope floor was suspended from the diagonal member through a suspending member, and the upper and side of the slope were covered with a membrane material. A suspension bridge system has been proposed.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、前者に
おいてはゲレンデ架構の下に多数の支柱が立つため、ゲ
レンデ下部を無柱にした有効利用ができない。また施設
完成後のコースの形状の変更が困難である。更に小規模
な屋内型スキー場では可能であっても、大規模なものに
なると複層化を行なうことができない。
However, in the former case, since a large number of columns stand under the slope frame, the lower part of the slope cannot be effectively used. In addition, it is difficult to change the shape of the course after the facility is completed. Even if it is possible in a small indoor ski area, it cannot be multilayered in a large-scale one.

【0004】後者においては主塔に横力がかかるのを少
なくするため、主塔を挟んでゲレンデと反対側にも斜材
を張設する必要がある。また同規模ゲレンデの複層化が
できない。本発明は前記従来技術の有する問題点に鑑み
て提案されたもので、その目的とする処は、床下部に無
柱大空間が形成され空間の有効利用が可能であり、ゲレ
ンデの複層化が可能で、且つ全天候型で通年使用が可能
な人工スキー場を提供する点にある。
In the latter case, in order to reduce a lateral force applied to the main tower, it is necessary to stretch a diagonal member on the opposite side of the slope from the slope. In addition, it is not possible to make multiple layers on the same scale. The present invention has been proposed in view of the above problems of the prior art, and the object thereof is to form a pillarless large space under the floor so that the space can be effectively used, and a multi-layered slope can be formed. It is possible to provide an artificial ski resort that can be used all year round in all weather conditions.

【0005】[0005]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係る人工スキー場は、ゲレンデ床及びゲレ
ンデ屋根よりなるゲレンデ架構の一側下方部を基礎上に
固定し、他側上方部を支柱で支持し、地上に立設された
主柱よりケーブルを介して前記ゲレンデ架構を懸吊して
構成されている。
In order to achieve the above-mentioned object, an artificial ski resort according to the present invention has a lower part of one side of a slope structure consisting of a slope floor and a slope roof fixed on a foundation and an upper part on the other side. The section is supported by a pillar, and the slope structure is suspended from a main pillar standing on the ground via a cable.

【0006】[0006]

【作用】本発明によれば前記したようにゲレンデ架構の
一側下方部を基礎上に固定し、他側上方部を支柱で支持
し、地上に立設された主柱よりケーブルを介して前記ゲ
レンデを斜張橋式に懸吊したので、床下部に無柱大空間
が形成される。またゲレンデ架構がゲレンデ床と上部屋
根とが一体化されているので全天候型で通年使用可能な
ゲレンデが構成される。
According to the present invention, as described above, the lower part of one side of the slope frame is fixed on the foundation and the upper part of the other side is supported by the pillars, and the main pillars erected on the ground are connected via cables to Since the slopes are suspended in a cable-stayed bridge type, a pillarless large space is formed under the floor. In addition, since the slope frame and the upper roof of the slope structure are integrated, a slope that can be used all year round is constructed.

【0007】更にまた床面には人工雪が敷かれ滑走面が
形成され、人工雪も含めた吊床の荷重は主柱にかかる
が、構造体自体が釣合った状態にあるので、主柱に横力
が働かない。
Further, artificial snow is laid on the floor surface to form a gliding surface, and the load of the suspended floor including artificial snow is applied to the main pillar, but since the structure itself is in a balanced state, it is lateral to the main pillar. Power does not work.

【0008】[0008]

【実施例】以下本発明を図示の実施例について説明す
る。図1乃至図3は本発明の第1の実施例を示し、1は
地上に立設された主柱で、ゲレンデ屋根2とゲレンデ床
3とよりなるゲレンデ架構Aが同主柱1よりケーブル4
を介して斜張ケーブル式に懸吊され、前記ゲレンデ架構
の一側下方部が基礎5上に固定され、他側上方部が支柱
6で支持されている。図示の例では同支柱6はトラス架
構より構成されている。
The present invention will be described below with reference to the illustrated embodiments. 1 to 3 show a first embodiment of the present invention, in which 1 is a main pillar that is erected on the ground, and a slope frame A composed of a slope roof 2 and a slope floor 3 has a cable 4 from the main pillar 1.
It is suspended in a cable-stayed cable type via a cable, the lower part on one side of the slope frame is fixed on the foundation 5, and the upper part on the other side is supported by a column 6. In the illustrated example, the column 6 is composed of a truss frame.

【0009】図中7は昇降設備、8は壁、9はリフトで
ある。図示の実施例は前記したように構成されているの
で、ゲレンデ架構Aを構成するゲレンデ床3面上に人工
雪が敷かれて滑走面が形成されることによって、直線状
に長い距離を有するスキー場が形成される。而して人工
雪も含めた吊床の荷重は主柱にかかるが、構造体自体が
釣合った状態にあるので、主柱1には横力は働かない。
In the figure, 7 is a lifting facility, 8 is a wall, and 9 is a lift. Since the illustrated embodiment is constructed as described above, artificial snow is laid on the surface of the slope 3 constituting the slope frame A to form a running surface, so that the ski slope has a long distance in a straight line. Is formed. Thus, the load of the suspended floor including artificial snow is applied to the main pillar, but since the structure itself is in a balanced state, the lateral force does not act on the main pillar 1.

【0010】なお前記実施例においては、ゲレンデ床3
下部を支柱で支承しないので、床下部に無柱大空間が形
成され、空間の有効利用が可能となる。図4及び図5は
本発明の第2の実施例を示し、ゲレンデ架構Aが複層化
され、種々の傾斜の異なるスロープを有するゲレンデ架
構Aをつくることができる。図中、前記実施例と均等部
分には同一符号が付されている。
In the above embodiment, the slope floor 3
Since the lower part is not supported by columns, a pillarless large space is formed in the lower part of the floor, and the space can be effectively used. 4 and 5 show a second embodiment of the present invention, in which the slope frame A is multi-layered, and the slope frame A having various slopes with different slopes can be manufactured. In the figure, the same parts as those in the above embodiment are designated by the same reference numerals.

【0011】図6及び図7は本発明の第3の実施例を示
し、人工スキー場の中央部に立設された支柱6によって
ゲレンデAの中央部が支持されゲレンデ架構の中央部よ
り相反する左右両方向にスロープが形成される。図中前
記各実施例と均等部分には夫々同一符号が付されてい
る。
FIG. 6 and FIG. 7 show a third embodiment of the present invention, in which the center of the slope A is supported by a column 6 standing upright in the center of the artificial ski resort, and is opposite to the center of the slope frame. Slopes are formed in both left and right directions. In the figure, the same reference numerals are respectively attached to the equivalent parts to the respective embodiments.

【0012】[0012]

【発明の効果】本発明に係る人工スキー場は前記したよ
うに、ゲレンデ架構の一側下方部を基礎上に固定し、他
側上方部を支柱で支持し、地上に立設された主柱よりケ
ーブルを介して前記ゲレンデ架構を懸吊したので、ゲレ
ンデ架構の床下部には無柱の大空間が形成され、空間の
有効利用が可能となる。
As described above, in the artificial ski resort according to the present invention, the lower part of one side of the slope structure is fixed to the foundation and the upper part of the other side is supported by the pillar, and the main pillar is erected on the ground. Since the slope frame is suspended via the cable, a large pillarless space is formed in the lower floor of the slope frame, and the space can be effectively used.

【0013】また前記ゲレンデ架構はゲレンデ床及び上
部より構成されているので、このように上部を屋根で覆
われたゲレンデ架構は全天候型で通年使用が可能であ
る。更に前記ゲレンデ架構は吊橋型式によって支持され
ているので、施設完成後のコース形状の変更が容易であ
る。請求項2の発明はゲレンデ架構を複層化して利用す
ることができ、敷地の有効利用が可能となる。
Further, since the slope frame is composed of a slope floor and an upper part, the slope frame covered with a roof in this way is of all-weather type and can be used all year round. Further, since the slope structure is supported by the suspension bridge type, it is easy to change the course shape after the completion of the facility. In the invention of claim 2, the slope structure can be used in a multi-layer structure, and the site can be effectively used.

【0014】請求項3の発明は、前記ゲレンデ架構の中
央頂部より相反する2方向にスロープを設けたことによ
って、ゲレンデ架構の相反する2方向に滑走することが
できる。
According to the third aspect of the present invention, since slopes are provided in two opposite directions from the central top of the slope structure, the slope can be slid in two opposite directions.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る人工スキー場の第1の一実施例を
示す側面図で図2の矢視イ−イ図である。
FIG. 1 is a side view showing a first embodiment of an artificial ski resort according to the present invention, and is a view taken along the line EE in FIG.

【図2】前記人工スキー場の平面図で、図1の矢視ロ−
ロ図である。
2 is a plan view of the artificial ski resort shown in FIG.
It is a figure.

【図3】図1の背面側立面図である。FIG. 3 is a rear side elevational view of FIG.

【図4】本発明の第2の実施例の側面図である。FIG. 4 is a side view of the second embodiment of the present invention.

【図5】図4の平面図である。FIG. 5 is a plan view of FIG.

【図6】本発明の第3の実施例の側面図である。FIG. 6 is a side view of the third embodiment of the present invention.

【図7】図6の平面図である。FIG. 7 is a plan view of FIG.

【符号の説明】[Explanation of symbols]

A ゲレンデ架構 1 主柱 2 ゲレンデ屋根 3 ゲレンデ床 4 ケーブル 5 基礎 6 支柱 7 昇降設備 8 壁 9 リフト A Slope structure 1 Main pillar 2 Slope roof 3 Slope floor 4 Cable 5 Foundation 6 Support 7 Lifting equipment 8 Wall 9 Lift

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小竹 達也 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tatsuya Kotake 1-25-1 Nishishinjuku, Shinjuku-ku, Tokyo Taisei Corporation

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 ゲレンデ床及びゲレンデ屋根よりなるゲ
レンデ架構の一側下方部を基礎上に固定し、他側上方部
を支柱で支持し、地上に立設された主柱よりケーブルを
介して前記ゲレンデ架構を懸吊してなることを特徴とす
る人工スキー場。
1. A lower part of one side of a slope frame composed of a slope floor and a slope roof is fixed on a foundation, and an upper part on the other side is supported by a pillar, and a main pillar erected on the ground through a cable. An artificial ski resort characterized by suspension of a ski slope structure.
【請求項2】 前記ゲレンデ架構は上下に重層された傾
斜の異なる複層の架構よりなる請求項1記載の人工スキ
ー場。
2. The artificial ski resort according to claim 1, wherein the slope frame is a multi-layer frame structure in which upper and lower layers are laminated and different in inclination.
【請求項3】 前記ゲレンデ架構の中央頂部より相反す
る2方向にスロープを設けた人工スキー場。
3. An artificial ski resort in which slopes are provided in two opposite directions from the central top of the slope frame.
JP1514992A 1992-01-30 1992-01-30 Artificial ski site Pending JPH05208060A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1514992A JPH05208060A (en) 1992-01-30 1992-01-30 Artificial ski site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1514992A JPH05208060A (en) 1992-01-30 1992-01-30 Artificial ski site

Publications (1)

Publication Number Publication Date
JPH05208060A true JPH05208060A (en) 1993-08-20

Family

ID=11880750

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1514992A Pending JPH05208060A (en) 1992-01-30 1992-01-30 Artificial ski site

Country Status (1)

Country Link
JP (1) JPH05208060A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180083143A (en) * 2017-01-12 2018-07-20 조선형 Dry downhill place having integrated slope portions with different slope angles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180083143A (en) * 2017-01-12 2018-07-20 조선형 Dry downhill place having integrated slope portions with different slope angles

Similar Documents

Publication Publication Date Title
US4757650A (en) Cable dome system with main cables oriented along chords
CN111424535B (en) Single-column type bridge antidumping reinforcing apparatus
Hosozawa et al. The role of cables in large span spatial structures: introduction of recent space structures with cables in Japan
US4736553A (en) Roof structure
CN1038322A (en) Multi-story long-span double-arch-centering structure system
CN112281623A (en) Longitudinal V-shaped cable tower cable-stayed bridge
CA1234269A (en) Roof structure
JPH0474505B2 (en)
US3913285A (en) Building frame structure for hillsides
CN212835882U (en) Y-shaped steel structure upright column dome with two layers of galleries
US3195275A (en) Roof system for stadia and the like
JPH05208060A (en) Artificial ski site
CN107419806A (en) A kind of grid solid beam-string structure system across X-type greatly and its construction method
JP2932970B2 (en) Existing building seismic isolation structuring method
US6945003B2 (en) Monumental, stainless-steel cross with I-beam and cable structure
CN101709565A (en) Double-deck continuous steel girder bridge for rigid suspended cable stiffening
CN206091416U (en) Multi -functional assembled suspension fretwork platform of ecological environment -friendly
Göppert et al. A spoked wheel structure for the world’s largest convertible roof–the new commerzbank arena in Frankfurt, Germany
CN116556571B (en) Multifunctional irregular curvature comprehensive steel roof structure
CN219080943U (en) Dual unloading scaffold system
CN219241510U (en) Spiral landscape tower
CN212175448U (en) Connection structure of gallery bridge building structure and arch bridge structure
CN216041670U (en) Beamless viewing corridor
CN213233815U (en) View room
CN2247693Y (en) Removable suspension landscape structure