JPH05196366A - Reforming method for existing pusher type heating furnace - Google Patents

Reforming method for existing pusher type heating furnace

Info

Publication number
JPH05196366A
JPH05196366A JP844892A JP844892A JPH05196366A JP H05196366 A JPH05196366 A JP H05196366A JP 844892 A JP844892 A JP 844892A JP 844892 A JP844892 A JP 844892A JP H05196366 A JPH05196366 A JP H05196366A
Authority
JP
Japan
Prior art keywords
furnace
type heating
heating furnace
hearth
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP844892A
Other languages
Japanese (ja)
Other versions
JPH0752067B2 (en
Inventor
Ryozo Tamura
量三 田村
Kazuya Okinaka
和也 沖中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugai Ro Co Ltd
Original Assignee
Chugai Ro Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugai Ro Co Ltd filed Critical Chugai Ro Co Ltd
Priority to JP844892A priority Critical patent/JPH0752067B2/en
Publication of JPH05196366A publication Critical patent/JPH05196366A/en
Publication of JPH0752067B2 publication Critical patent/JPH0752067B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Heat Treatments In General, Especially Conveying And Cooling (AREA)
  • Tunnel Furnaces (AREA)

Abstract

PURPOSE:To shorten a term of works by a method wherein a side wall, occupying most of a furnace body, a preheat zone, and a heating zone are used, dismantling and removal of parts in a furnace and input of new parts are carried out by means of a moving truck temporarily built in a furnace. CONSTITUTION:Charge parts, such as a entry rail 14, a skid 9a on the charge side, a charge front plate 17, and a part of stays 8, a furnace floor metal, such as a piping 15, e.g. gas pipes, and dismantled a ceiling part 4c of a heat uniforming zone 3, such as the pipings of a ceiling part, ceiling metals, and roof burners 7, are for removal. Rails 20 are installed along two side walls 4b in a furnace and two gantry moving trucks 21 each having a lifting device 22, such as a chain block, are installed on the rails 20. By using the moving trucks 21, the rest of a skid rail 9 is dismantled to convey it to the outside of a furnace. A cooling pump 10 cut above a furnace floor refractory 4a and in a position in the vicinity of the side wall 4b is conveyed to the outside of a furnace. Further, in this case, scaffoldings 21a over which the gantry moving truck 21 is moved are framed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、既設プッシャ式加熱炉
の改造方法、詳しくは、既設プッシャ式加熱炉をウォー
キングビーム式加熱炉に改造する改造方法に関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for modifying an existing pusher type heating furnace, and more particularly to a method for modifying an existing pusher type heating furnace into a walking beam type heating furnace.

【0002】[0002]

【従来の技術と発明が解決しようとする課題】従来、既
設プッシャ式加熱炉をウォーキングビーム式加熱炉に改
造する場合、既設炉を全て解体し、その後、基礎改修を
行ない、全て新規な部材でウォーキングビーム式加熱炉
を構築していた。したがって、この改造は工期が長く
(約10ケ月)なるばかりか、改造費が大巾に高くなる
という課題を有していた。本発明は、既設プッシャ式加
熱炉をウォーキングビーム式加熱炉に改造するにあた
り、改造前の加熱炉の本体部分および基礎部分の一部が
利用できることに着目し、これらを最大限利用すること
により、工期を短くし、かつ、それだけ安価な改造方法
を提供することを目的とする。
2. Description of the Related Art Conventionally, when an existing pusher type heating furnace is modified into a walking beam type heating furnace, all the existing furnaces are dismantled, and then basic repairs are carried out, all with new members. I was building a walking beam heating furnace. Therefore, this modification has a problem that not only the construction period is long (about 10 months), but also the modification cost is significantly increased. The present invention, in modifying the existing pusher type heating furnace to a walking beam type heating furnace, paying attention to the fact that a part of the main body part and the basic part of the heating furnace before the modification can be used, and by making the maximum use of these, It is an object of the present invention to shorten the construction period and provide a cheaper modification method.

【0003】[0003]

【課題を解決するための手段】本発明にかかる既設プッ
シャ式加熱炉の改造方法は、前記目的を達成するため
に、既設プッシャ式加熱炉をウォーキングビーム式加熱
炉に改造するに際し、既設炉の装入部分、装入部の炉下
金物および均熱帯天井部を解体撤去する工程と、既設炉
内に、吊上げ装置を備えた移動台車を設置する工程と、
固定スキッド、耐火物および炉床金物を解体して前記移
動台車を利用して解体物を炉外へ搬出する工程と、前記
移動台車により偏心輪を炉内の所定位置に設置する工程
と、ウォーキングビームの移動フレームを炉の装入側か
ら順次設置して組立てる工程と、前記移動台車によりウ
ォーキングビームの固定フレームおよび炉床金物を炉の
装入側より順次設置する工程と、炉内スキッドを組立て
るとともに、均熱帯天井部および炉床等の耐火物を構築
する工程と、前記移動台車を炉内から搬出する工程と、
から構成したものである。
In order to achieve the above-mentioned object, a method for modifying an existing pusher type heating furnace according to the present invention is a method of modifying an existing pusher type heating furnace into a walking beam type heating furnace. A step of dismantling and removing the charging part, the under-furnace metallurgy of the charging part and the soaking ceiling, and a step of installing a moving carriage equipped with a lifting device in the existing furnace,
A step of disassembling a fixed skid, a refractory and a hearth metal product and carrying out the dismantled article to the outside of the furnace by using the moving carriage; a step of setting an eccentric wheel at a predetermined position in the furnace by the moving carriage; Assembling the moving frame of the beam by sequentially installing from the charging side of the furnace, assembling the stationary frame of the walking beam and the hearth metal by the moving carriage from the charging side of the furnace, and assembling the in-furnace skid Along with, a step of constructing a refractory material such as a soaking zone ceiling and a hearth, a step of unloading the movable carriage from the furnace,
It is composed of

【0004】[0004]

【実施例】つぎに、本発明の一実施例を図面にしたがっ
て説明する。図1は、改造前のプッシャ式加熱炉を示
し、1は予熱帯、2は加熱帯、3は均熱帯で、予熱帯1
と加熱帯2には軸流バーナ5,5が、均熱帯3にはルー
フバーナ7を有する。炉床4は支柱8に支持され、炉床
耐火物4aにはクロスパイプ10aを支持する水冷ポス
ト10が立設され、前記クロスパイプ10a上にスキッ
ドレール9が敷設されている。なお、11aは装入口に
設けた装入扉で、該装入扉11aの前方には、装入ロー
ラテーブル12によって搬送されてきた処理材をプッシ
ャ13で前記スキッドレール9上に移載するエントリレ
ール14を備えている。その他、15はガスあるいは熱
風の配管、16は煙道、17は装入前板で、11bは抽
出扉である。
An embodiment of the present invention will be described below with reference to the drawings. Fig. 1 shows a pusher type heating furnace before modification, where 1 is a pretropical zone, 2 is a heating zone, 3 is a soaking zone, and 1 is a pretropical zone.
The heating zone 2 has axial burners 5 and 5, and the soaking zone 3 has a roof burner 7. The hearth 4 is supported by columns 8, a water cooling post 10 supporting a cross pipe 10a is erected on the hearth refractory 4a, and a skid rail 9 is laid on the cross pipe 10a. Reference numeral 11a denotes a charging door provided at the charging entrance, and an entry for transferring the processing material conveyed by the charging roller table 12 onto the skid rail 9 by the pusher 13 in front of the charging door 11a. The rail 14 is provided. In addition, 15 is a pipe for gas or hot air, 16 is a flue, 17 is a front plate for charging, and 11b is an extraction door.

【0005】前記プッシャ式加熱炉を改造するには、ま
ず、図1に斜線で示すように、エントリーレール14,
装入側スキッド9a,装入前板17、および一部の支柱
8等の装入部分と、ガス管等の配管15等の炉床金物
と、天井部の配管,天井金物およびルーフバーナ7等の
均熱帯3の天井部4cとを解体除去する(図2参照)。
In order to modify the pusher type heating furnace, first, as shown by hatching in FIG.
The charging side skid 9a, the charging front plate 17, and some charging portions such as the columns 8 and the like, the hearth hardware such as the pipe 15 such as a gas pipe, the ceiling piping, the ceiling metal and the roof burner 7 and the like. The ceiling part 4c of the soaking zone 3 is dismantled and removed (see FIG. 2).

【0006】つぎに、図3に示すように、炉内両側壁4
bに沿ってレール20を敷設し、このレール20上に、
各々チェーンブロック等の吊上げ装置22を備えた2台
の門型移動台車21を設置し、この移動台車21を使用
して、まず、前記スキッドレール9の残りを解体して炉
外に搬出し、つづいて炉床耐火物4aから上方および側
壁4b近傍で切断した冷却ポスト10を炉外に搬出す
る。なお、21aは前記門型移動台車21を移動させる
足場である。その後、図4に示すように、炉床4の耐火
物4a上にパワーショベル23を前記均熱帯3の天井部
開口3aから入れ、耐火物4aを解体するとともに、残
りの炉床金物6および支柱8を移動台車21を使用して
炉外に搬出する(図5参照)。また、軸流バーナ5を撤
去する。
Next, as shown in FIG.
The rail 20 is laid along b, and on this rail 20,
Two gate-type movable carriages 21 each equipped with a lifting device 22 such as a chain block are installed. Using these movable carriages 21, first, the rest of the skid rail 9 is disassembled and carried out of the furnace, Subsequently, the cooling post 10 cut from the hearth refractory 4a above and near the side wall 4b is carried out of the furnace. In addition, 21a is a scaffold for moving the gate-type movable carriage 21. After that, as shown in FIG. 4, the power shovel 23 is put on the refractory material 4a of the hearth 4 through the ceiling opening 3a of the soaking zone 3 to dismantle the refractory material 4a, and the remaining hearth metal fittings 6 and columns. 8 is carried out of the furnace using the moving carriage 21 (see FIG. 5). Further, the axial flow burner 5 is removed.

【0007】前記のようにして、不必要な炉内部材をす
べて除去したのち、炉内ピットに仮設ステージ23を設
置し、天井クレーン24にて均熱帯3の天井部開口3a
から偏心輪ブロック25を前記仮設ステージ23上に一
旦載置したのち、前記移動台車21のチェーンブロック
22を利用して偏心輪ブロック25およびウォーム減速
機26(図7参照)を所定位置に据え付ける(図6参
照)。なお、30a,30bおよび30cは新設基礎
で、均熱帯3の天井部4cの解体と平行して施工され
る。ついで、炉床支柱27を立設して、ポストパイプ3
0、ウォータトラフ31等を備えた分割ウォーキングビ
ームの移動フレーム29を、前記支柱27上に敷設した
引込レール28上に、コロ手段32を介して載置し、図
示しないウインチにより炉の装入口側に順次引込み、ジ
ャッキアップして仮受支柱33上に載置して、適宜連結
して組立てる(図7〜9参照)。
After removing all unnecessary in-furnace members as described above, the temporary stage 23 is installed in the in-reactor pit, and the ceiling crane 24 opens the ceiling 3a of the soaking zone 3a.
After the eccentric wheel block 25 is once placed on the temporary stage 23, the eccentric wheel block 25 and the worm speed reducer 26 (see FIG. 7) are installed at predetermined positions using the chain block 22 of the movable carriage 21 ( (See FIG. 6). In addition, 30a, 30b and 30c are new foundations, which are constructed in parallel with the dismantling of the ceiling portion 4c of the soaking zone 3. Then, the hearth support post 27 is erected, and the post pipe 3
A moving frame 29 of a split walking beam equipped with 0, a water trough 31 and the like is placed on a pull-in rail 28 laid on the column 27 via a roller means 32, and a winch (not shown) is used to insert a furnace into the furnace. Are sequentially pulled in, jacked up, placed on the temporary support column 33, and appropriately connected and assembled (see FIGS. 7 to 9).

【0008】その後、炉内に支柱34を立設した後、前
記ウォーキングビームの移動フレーム29の正規駆動に
よるポストパイプ30の移動を許容する貫通孔36を有
するとともに、前記ウォータトラフ31内に位置して前
記貫通孔36をシールするシールボックス37を備えた
固定炉床金物35を、前記移動台車21のチェーンブロ
ック22で吊下げ移動し、その縦梁38を前記支柱34
の頂部に溶接等にて固定する(図10参照)。そして、
前記固定炉床金物35上に耐火物39を張設する(図1
1参照)。
Then, after the pillars 34 are erected in the furnace, there is a through hole 36 which allows the post pipe 30 to move by the normal drive of the moving frame 29 of the walking beam, and the post 34 is located in the water trough 31. A fixed hearth hardware 35 having a seal box 37 for sealing the through hole 36 is hung and moved by the chain block 22 of the movable carriage 21, and the vertical beam 38 thereof is attached to the pillar 34.
It is fixed to the top of by welding or the like (see FIG. 10). And
A refractory material 39 is stretched on the fixed hearth hardware 35 (Fig. 1).
1).

【0009】ついで、前記ポストパイプ30および固定
炉床金物35に、先端にスキッドパイプ40a,41a
を備えた移動ポスト40および固定ポスト41を、前記
移動台車21を利用して取り付ける(図11,12参
照)。その後、前記改造にあたって取り外した均熱帯3
の天井部6を元の状態に復元したうえで、移動台車2
1、レール20を撤去して改造工事を終了する。
Next, the skid pipes 40a and 41a are attached to the tip ends of the post pipe 30 and the fixed hearth hardware 35.
The movable post 40 and the fixed post 41 having the above are attached using the movable carriage 21 (see FIGS. 11 and 12). After that, the soaking zone 3 removed during the modification
After restoring the ceiling part 6 of the vehicle to its original state, the moving carriage 2
1. Remove the rail 20 and finish the remodeling work.

【0010】[0010]

【発明の効果】以上の説明で明らかなように、本発明に
おいては、プッシャ式加熱炉の炉本体の大部分を占める
側壁、予熱帯および加熱帯を流用し、しかも、炉内部品
の解体、撤去および新部品の取り込みを、炉内に仮設し
た移動台車で行なうため、工期は、従来約10ケ月必要
であったものが、約4ケ月と短縮でき、かつ、資材も改
造前の炉本体の一部を流用するため建設費もそれだけ安
価にすることが可能となった。
As is apparent from the above description, in the present invention, the side wall, the pre-tropical zone and the heating zone which occupy most of the furnace body of the pusher type heating furnace are diverted, and the parts inside the furnace are disassembled, The removal of new parts and the loading of new parts are performed by a moving trolley temporarily installed in the furnace. Therefore, the construction period could be reduced from about 10 months to about 4 months, and the materials of the furnace body before modification can be shortened. Since some of them will be diverted, the construction cost can be reduced accordingly.

【図面の簡単な説明】[Brief description of drawings]

【図1】 改造前の既設プッシャ式加熱炉のの断面図で
ある。
FIG. 1 is a cross-sectional view of an existing pusher type heating furnace before modification.

【図2】 図1における装入部分、装入部の炉下金物お
よび均熱帯天井部を解体撤去した状態を示す断面図であ
る。
FIG. 2 is a cross-sectional view showing a state in which a charging portion, an under furnace metal of the charging portion, and a soaking zone in FIG. 1 are dismantled and removed.

【図3】 冷却ポストを切断して炉外に搬出する工程を
示す断面図である。
FIG. 3 is a cross-sectional view showing a step of cutting the cooling post and carrying it out of the furnace.

【図4】 図3における炉床耐火物を解体する工程を示
す断面図である。
4 is a cross-sectional view showing a step of disassembling the hearth refractory material in FIG.

【図5】 残りの炉床金物および支柱を移動台車により
炉外に搬出する工程を示す断面図である。
FIG. 5 is a cross-sectional view showing a step of unloading the remaining hearth metal fittings and struts to the outside of the furnace by a moving carriage.

【図6】 偏心輪ブロック,ウォーム減速機の据え付け
工程を示す断面図である。
FIG. 6 is a cross-sectional view showing an installation process of an eccentric wheel block and a worm speed reducer.

【図7】 分割ウォーキングビームの移動フレームを支
柱に載置する工程を示す断面図である。
FIG. 7 is a cross-sectional view showing a step of placing the moving frame of the split walking beam on a column.

【図8】 分割ウォーキングビームの移動フレームを装
入口側に順次引込んだ後、連結した状態の断面図であ
る。
FIG. 8 is a cross-sectional view of a state in which the moving frame of the split walking beam is sequentially pulled in toward the loading side and then connected.

【図9】 図8の一部拡大断面図である。9 is a partially enlarged sectional view of FIG.

【図10】 図9における移動フレームの上方に固定炉
床金物を設置する工程を示す断面図である。
FIG. 10 is a cross-sectional view showing a step of installing a fixed hearth metal product above the moving frame in FIG.

【図11】 図10におけるポストパイプおよび固定炉
床金物上に移動ポストおよび固定ポストを取り付ける工
程を示す断面図である。
11 is a cross-sectional view showing a step of attaching a moving post and a fixed post on the post pipe and the fixed hearth hardware shown in FIG.

【図12】 図11の長手方向断面図である。12 is a longitudinal sectional view of FIG.

【図13】 改造前のウォーキングビーム式加熱炉の断
面図である。
FIG. 13 is a cross-sectional view of a walking beam type heating furnace before modification.

【符号の説明】[Explanation of symbols]

1…予熱帯、2…加熱帯、3…均熱帯、3a…天井部開
口、4…炉床、4a…炉床耐火物、4c…天井部、6…
炉床金物、8…支柱、9…スキッドレール、10…水冷
ポスト、9a…装入側スキッド、17…装入前板、20
…レール、21…移動台車、22…吊上げ装置、23…
パワーショベル、24…天井クレーン、25…偏心輪ブ
ロック、26…ウォーム減速機、29…移動フレーム、
30…ポストパイプ、35…固定炉床金物、40…移動
ポスト、41…固定ポスト。
1 ... Pre-tropical zone, 2 ... Heating zone, 3 ... Uniform zone, 3a ... Ceiling opening, 4 ... Hearth floor, 4a ... Hearth refractory material, 4c ... Ceiling portion, 6 ...
Hearth hardware, 8 ... Posts, 9 ... Skid rails, 10 ... Water cooling posts, 9a ... Loading side skids, 17 ... Loading front plate, 20
… Rails, 21… Mobile carts, 22… Lifting devices, 23…
Power shovel, 24 ... Overhead crane, 25 ... Eccentric wheel block, 26 ... Worm reducer, 29 ... Moving frame,
30 ... Post pipe, 35 ... Fixed hearth hardware, 40 ... Moving post, 41 ... Fixed post.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 既設プッシャ式加熱炉をウォーキングビ
ーム式加熱炉に改造するに際し、 既設炉の装入部分、装入部の炉下金物および均熱帯天井
部を解体撤去する工程と、 既設炉内に、吊上げ装置を備えた移動台車を設置する工
程と、 固定スキッド、耐火物および炉床金物を解体して前記移
動台車を利用して解体物を炉外へ搬出する工程と、 前記移動台車により偏心輪を炉内の所定位置に設置する
工程と、 ウォーキングビームの移動フレームを炉の装入側から順
次設置して組立てる工程と、 前記移動台車によりウォーキングビームの固定フレーム
および炉床金物を炉の装入側より順次設置する工程と、 炉内スキッドを組立てるとともに、均熱帯天井部および
炉床等の耐火物を構築する工程と、 前記移動台車を炉内から搬出する工程と、 からなる既設プッシャ式加熱炉の改造方法。
1. A process of decomposing and removing the charging part of the existing furnace, the sub-furnace metallurgy of the charging part and the soaking zone ceiling when the existing pusher type heating furnace is modified into a walking beam type heating furnace, and the inside of the existing furnace. , A step of installing a movable carriage equipped with a lifting device, a step of disassembling a fixed skid, a refractory material and a hearth metalware and using the movable carriage to carry the dismantled material out of the furnace; and The step of installing the eccentric wheel at a predetermined position in the furnace, the step of sequentially installing the moving frame of the walking beam from the charging side of the furnace and the assembly, and the fixed frame of the walking beam and the hearth metal fittings of the furnace by the moving carriage. The steps of sequentially installing from the charging side, assembling the in-furnace skid and constructing refractory materials such as the soaking zone ceiling and the hearth floor, and the step of unloading the movable carriage from the furnace. A method of remodeling an existing pusher type heating furnace.
JP844892A 1992-01-21 1992-01-21 How to modify the existing pusher type heating furnace Expired - Lifetime JPH0752067B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP844892A JPH0752067B2 (en) 1992-01-21 1992-01-21 How to modify the existing pusher type heating furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP844892A JPH0752067B2 (en) 1992-01-21 1992-01-21 How to modify the existing pusher type heating furnace

Publications (2)

Publication Number Publication Date
JPH05196366A true JPH05196366A (en) 1993-08-06
JPH0752067B2 JPH0752067B2 (en) 1995-06-05

Family

ID=11693411

Family Applications (1)

Application Number Title Priority Date Filing Date
JP844892A Expired - Lifetime JPH0752067B2 (en) 1992-01-21 1992-01-21 How to modify the existing pusher type heating furnace

Country Status (1)

Country Link
JP (1) JPH0752067B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012219324A (en) * 2011-04-08 2012-11-12 Chugai Ro Co Ltd Method for repairing and manufacturing walking-beam type heating furnace
JP2017166034A (en) * 2016-03-17 2017-09-21 Jfeプラントエンジ株式会社 Construction method for heating furnace
WO2017220848A1 (en) * 2016-06-23 2017-12-28 Outotec (Finland) Oy A gripping tool and a method for removing a heat exchanger plate from a furnace wall
CN117025925A (en) * 2023-10-07 2023-11-10 靖江市星华特种钢配件厂 Heat treatment furnace accessory tool for heat-resistant steel castings

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012219324A (en) * 2011-04-08 2012-11-12 Chugai Ro Co Ltd Method for repairing and manufacturing walking-beam type heating furnace
JP2017166034A (en) * 2016-03-17 2017-09-21 Jfeプラントエンジ株式会社 Construction method for heating furnace
WO2017220848A1 (en) * 2016-06-23 2017-12-28 Outotec (Finland) Oy A gripping tool and a method for removing a heat exchanger plate from a furnace wall
CN117025925A (en) * 2023-10-07 2023-11-10 靖江市星华特种钢配件厂 Heat treatment furnace accessory tool for heat-resistant steel castings
CN117025925B (en) * 2023-10-07 2023-12-15 靖江市星华特种钢配件厂 Heat treatment furnace accessory tool for heat-resistant steel castings

Also Published As

Publication number Publication date
JPH0752067B2 (en) 1995-06-05

Similar Documents

Publication Publication Date Title
KR100468106B1 (en) Method and apparatus for short-term relining or construction of blast furnace
CN101509049B (en) Construction method for internal cooling wall and furnace liner of blast furnace
JPH05196366A (en) Reforming method for existing pusher type heating furnace
CN109610800A (en) A kind of architectural engineering movable altitude faces side safety work device and application method
JP6611129B2 (en) How to replace the converter furnace body
JPS62202992A (en) Method and device for repairing lining of furnace body
US2933918A (en) Method of lining furnaces
JPH09143521A (en) Method for reconstructing and constructing blast furnace in short time
CN115354113A (en) Protective dismantling method for steelmaking converter body
JP4592860B2 (en) Blast furnace component installation method
JP2018076393A (en) On-oven carriage that conveys module block for use in repairing coke oven
JP2001262209A (en) Method for assembling blast furnace and assembling device
JPH09144303A (en) Inner surface inspection and repairing device of tank
JPH01168803A (en) Method and device for repairing blast furnace
JP3046552B2 (en) Blast furnace furnace construction method
JP2738983B2 (en) Installation of steel pipes larger than the entrance
JP2002180125A (en) Method for installing material carrying equipment in heating furnace
JP2005139482A (en) Method for reconstructing hot blast stove
US5094431A (en) Car bottom furnace system and method of operation thereof
JPH0421712A (en) Apparatus for repairing furnace in converter
JP6533546B2 (en) How to disassemble the chimney tube
JPH10140224A (en) Lance device
JPH0755240A (en) Duct device
JP3159371B2 (en) Method of integrated dismantling and restoration of work floor in blast furnace renovation
JPH11256212A (en) Method for reconstructing furnace body of blast furnace