JPH05195531A - Drawing work of reinforcing pile with cut in sheathing wall - Google Patents

Drawing work of reinforcing pile with cut in sheathing wall

Info

Publication number
JPH05195531A
JPH05195531A JP784592A JP784592A JPH05195531A JP H05195531 A JPH05195531 A JP H05195531A JP 784592 A JP784592 A JP 784592A JP 784592 A JP784592 A JP 784592A JP H05195531 A JPH05195531 A JP H05195531A
Authority
JP
Japan
Prior art keywords
reinforcing material
notched
pile
retaining wall
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP784592A
Other languages
Japanese (ja)
Inventor
Fusao Sakano
房夫 坂野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP784592A priority Critical patent/JPH05195531A/en
Publication of JPH05195531A publication Critical patent/JPH05195531A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To raise the efficiency of construction by a method in which an impact is applied to the top of a reinforcing pile exposed to release the close adhesion with the sheathing wall, and the reinforcing pile is drawn out. CONSTITUTION:In pulling out a reinforcing pile 1 having a cut in its intermediate part corresponding to a removing length, the sheathing wall 31 around the pile 1 is chipped to form a recessed part 5 around the pile 1. An impact such as striking and vibration is applied to the top of the pile 1 by an impacting means 8 to release close adhesion between the pile 1 and the wall 31. The reinforcing pile above the cut portion is drawn out by using a drawing machine, and the hole formed after drawing is packed with sand and soil and tamped. The reinforcing pile can thus be quickly, simply, and safely drawn out at low cost while preventing damage such as bending to the reinforcing part.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、土留め壁(主としてソ
イルセメント壁、以下、ソイルセメント壁で説明す
る。)内の切込入り補強材(主として、H型鋼の芯材で
ある。)を引き抜く(打ち抜き、又は撤去)工法に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention provides a notched reinforcing material (mainly an H-shaped steel core material) in an earth retaining wall (mainly a soil cement wall, hereinafter referred to as a soil cement wall). It is related to the method of pulling out (punching out or removing).

【0002】[0002]

【従来の技術】従来、例えば、図1に示す高速道路等の
構造物用の基礎工事に先立って構築された、ソイルセメ
ント壁内に挿設されている切込入り補強材は、通常工事
が終了後において、引き抜くことが、義務付けられてい
る(他に、例えば、不要となった切込入り補強材等を、
引き抜くことが、要求される場合も有り得る。しかし、
その説明は、割愛する。)。
2. Description of the Related Art Conventionally, for example, a notched reinforcing material inserted into a soil cement wall, which was constructed prior to foundation work for a structure such as a highway shown in FIG. It is obliged to pull it out after the end (in addition to this, for example, the notched reinforcing material that became unnecessary,
In some cases, withdrawal may be required. But,
I will omit the explanation. ).

【0003】そして、前記切込入り補強材を、引き抜く
(撤去)工法としては、次のような工法が考えられてい
る。
The following construction method is considered as a construction method for pulling out (removing) the above-mentioned notched reinforcing material.

【0004】即ち、図2に略示するが如く、切込入り補
強材が挿入されていない部位のソイルセメント壁を切
断、又は破壊し(アで示す。)、切込入り補強材が挿入
されたソイルセメント壁を、分離、独立させる。
That is, as schematically shown in FIG. 2, the soil cement wall at a portion where the notched reinforcing material is not inserted is cut or destroyed (shown by A), and the notched reinforcing material is inserted. Separated and separated soil cement walls.

【0005】その後、前記分離、独立されたソイルセメ
ント壁の一方側周辺を掘削し(イで示す。)、当該三方
側がフリーとなったソイルセメント壁に、引張り荷重を
かけ、当該ソイルセメント壁内にクラック(亀裂)を生
成する。
After that, one side of the separated and separated soil cement wall is excavated (shown by a), and a tensile load is applied to the soil cement wall which has become free on the three sides, and the inside of the soil cement wall is cut. To generate a crack.

【0006】これにより、切込入り補強材とソイルセメ
ント壁素材との密着性を解き、その後、切込入り補強材
をクレーン等の引き抜き作業機械を介して引き抜く。
As a result, the adhesion between the notched reinforcing material and the soil cement wall material is released, and then the notched reinforcing material is pulled out through a pulling work machine such as a crane.

【0007】以上のようにして引き抜かれた切込入り補
強材の跡に、土砂を充填し、次の切込入り補強材の引き
抜き作業にかかる。
The traces of the notched reinforcing material extracted as described above are filled with earth and sand, and the next notched reinforcing material is taken out.

【0008】次の切込入り補強材の引き抜き作業は、前
述とほぼ同様に行われる。
The subsequent work of pulling out the notched reinforcing material is performed in substantially the same manner as described above.

【0009】[0009]

【発明が解決しようとする課題】以上で説明した引き抜
き工法は、確実に引き抜き作業が行える反面、三方向の
掘削と、引張り荷重の付与という操作、又は手順を要す
る。
Although the pulling-out method described above can surely perform the pulling-out work, it requires an operation or procedure of excavating in three directions and applying a tensile load.

【0010】それがため、作業機械の移動、又は手配、
各種の作業を、繰り返してなすこと等を要し、作業性が
極めて悪いこと、人的ロスがあること、また三方側の掘
削、及び引張り等の作業を要し、殊のほか大変であり、
大幅の作業時間の延長、及び作業コストの上昇を招来す
ること等の課題が考えられる。
Because of that, the movement or arrangement of the working machine,
It is necessary to repeat various operations, etc., workability is extremely poor, there is human loss, and work such as excavation and pulling on three sides is required, which is especially difficult,
Issues such as a significant extension of work time and an increase in work cost can be considered.

【0011】[0011]

【課題を解決するための手段】そこで、本発明は、作業
時間の大幅な短縮、及び作業工程の大幅な省略を図るこ
と、又は作業の容易化、低コスト化を図ること、等を目
的として、下記の構成を採用する。
SUMMARY OF THE INVENTION Therefore, the present invention has an object to drastically shorten the working time and to drastically omit the working process, or to facilitate the working and reduce the cost. , Adopt the following configuration.

【0012】即ち、本発明の土留め壁内の切込入り補強
材を引き抜く工法は、土留め壁内の切込入り補強材の頭
出しをなした後、この切込入り補強材の頭部等に打撃衝
撃、振動衝撃等の衝撃手段を加え、土留め壁素材と前記
切込入り補強材との密着性を解き、その後、前記切込入
り補強材を、引き抜くように構成した工法である。
That is, according to the method of extracting the notched reinforcing material in the earth retaining wall of the present invention, after the notched reinforcing material in the earth retaining wall is cued, the head of the notched reinforcing material is removed. Is a construction method in which impact means such as impact shock and vibration impact are added to the adhesive to break the adhesion between the earth retaining wall material and the cut-in reinforcement material, and then the cut-in reinforcement material is pulled out. ..

【0013】[0013]

【作用】次に、本発明の作用(撤去方法)を説明する。Next, the operation (removal method) of the present invention will be described.

【0014】先ず、図示しない、はっり機械又ははっり
工具を利用して、ソイルセメント壁素材を少しはっり、
図2の如く、切込入り補強材の周辺の凹部を形成し、切
込入り補強材の頭出しをする。
First, using a scraping machine or a scraping tool (not shown), scrape the soil cement wall material a little,
As shown in FIG. 2, a concave portion around the notched reinforcing material is formed, and the notched reinforcing material is cued.

【0015】尚頭出しは、ドロップハンマーによる打撃
手段を採用する場合は、すくなくするこしがよいが、振
動等による打撃手段を採用する場合は、やや多くするこ
とが、それぞれ理想と思われる。
When the hitting means by the drop hammer is adopted, it is preferable to reduce the cueing, but when the hitting means by vibration or the like is adopted, it is considered to be ideal to increase it slightly.

【0016】以上のようにして、一本の頭出し、又は連
続的な頭出しが、終了したならば、打撃作業重機を移動
し、そのドロップハンマーを、切込入り補強材の上方
で、適宜位置に配備する。
When one cue or continuous cueing is completed as described above, the percussion work heavy machine is moved, and the drop hammer is appropriately above the notched reinforcing material. Deploy in position.

【0017】つづいて、ドロップハンマーを落下する。
この落下は、通常は一回であるが、場合により数回繰り
返される。
Then, the drop hammer is dropped.
This drop is usually once, but may be repeated several times.

【0018】前述のようにして、ドロップハンマーによ
り、切込入り補強材に打撃を与えると、当該切込入り補
強材とソイルセメント壁素材との密着性が解かれる(両
者の物性の相違を利用する。)。
As described above, when the notched reinforcing material is hit with a drop hammer, the adhesion between the notched reinforcing material and the soil cement wall material is released (the difference between the physical properties of the two is utilized. Yes.).

【0019】そこで続いて、他の切込入り補強材への打
撃作業にかかるが、その操作、又は手順は、前述と同じ
方法でなされる。
Then, subsequently, the operation of striking another notched reinforcing material is performed, but the operation or procedure is performed in the same manner as described above.

【0020】前述のようにして、一本又は数本の切込入
り補強材とソイルセメント壁素材との密着性が解かれた
後は、当該一本又は数本の切込入り補強材の引き抜きに
かかり、図示しない引き抜き作業機械による引き抜く具
によるチャッキング、及び引く抜きを介して、当該一本
又は数本の切込入り補強材が、順次引き抜かれる。
After the adhesiveness between the one or several notched reinforcing materials and the soil cement wall material is released as described above, the one or several notched reinforcing materials are pulled out. Then, the one or several notched reinforcing members are sequentially pulled out through chucking by a pulling tool by a pulling work machine (not shown) and pulling out.

【0021】そして、前記引き抜かれた跡には、土砂が
充填され、場合により築き固め(打ち固め)られると、
ここに、すべての作業が終了する。
The extracted traces are filled with earth and sand and, if necessary, built up (compacted),
Here, all the work is completed.

【0022】前記頭出し、打撃手段、又は土砂の充填作
業をなす順次、又は操作、及び手順は、一例であり、前
述の例に限定されない。
The sequence, operation, and procedure of the cueing, striking means, or earth and sand filling work are merely examples, and the present invention is not limited to the above examples.

【0023】[0023]

【実施例】以下、本発明の一実施例を、図面を参照とし
て説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0024】本発明の引き抜き対象となる切込入り補強
材1(H型鋼芯材)は、高速道路、鉄筋構造物、超高層
ビル等の基礎2の近傍に構築されたソイルセメント壁3
(いわゆる土留め壁、山止め壁等の壁を云う。)内に挿
設されており、当該切込入り補強材1には、工事終了後
の引き抜き(撤去)を考慮して、当該切込入り補強材1
が設けられている地中には、はっり作業によるはっり4
が、また切込入り補強材1の撤去長さ下部位には、切込
部1aが形成されている。
The notched reinforcing material 1 (H-shaped steel core material) to be pulled out according to the present invention is a soil cement wall 3 constructed in the vicinity of a foundation 2 such as a highway, a reinforcing bar structure or a skyscraper.
(It is called a wall such as a so-called earth retaining wall or a mountain retaining wall.) It is installed inside, and the cut-in reinforcing material 1 is taken into consideration in consideration of pulling out (removal) after the completion of construction. Reinforcement material 1
In the ground where is installed, it is 4
However, a cut portion 1a is formed at a portion below the removal length of the cut reinforcement material 1.

【0025】通常、本発明では、前記切込部1aより上
方の切込入り補強材1を、引き抜き対象とする。
Generally, in the present invention, the notched reinforcing material 1 above the notched portion 1a is to be pulled out.

【0026】そこで、具体的な引き抜き手順を、以下に
説明すると、はっり作業を介して、切込入り補強材1の
周辺のソイルセメント壁素材31をはっり(掘削作業を
併用する場合も有り得る。以下同じ)、当該切込入り補
強材1の周辺に凹部5を形成する。
Therefore, the concrete pulling procedure will be explained below. Peeling the soil cement wall material 31 around the notched reinforcing material 1 through the peeling work (when excavating work is also used). The same applies to the following), and the recess 5 is formed around the cut reinforcing material 1.

【0027】この凹部5の形成による頭出し6の作業
は、原則として、単独又は連続的等になすが、その操作
又は手順等は、現場の状況に対応して選択する。
As a general rule, the work for the cueing 6 by forming the recess 5 is carried out individually or continuously, but the operation or procedure is selected according to the situation at the site.

【0028】以上のようにして、切込入り補強材1の頭
出し6が、終了した時点で、当該一本の切込入り補強材
1を単独、又は数本連続的に次の他の切込入り補強材1
11、112等に対して、ドロップハンマー7による打
撃による衝撃手段8を施して、当該切込入り補強材1、
他の切込入り補強材111、112等と、ソイルセメン
ト壁素材31との密着性9を解く。
As described above, when the cueing 6 of the notched reinforcing material 1 is completed, the one notched reinforcing material 1 is used alone or several of the other notched reinforcing materials 1 are continuously cut. Reinforcement material 1
11, 112, etc. are provided with impact means 8 by hitting with a drop hammer 7 to reinforce the cut-in reinforcing material 1,
The adhesiveness 9 between the other reinforcing materials 111, 112 with cuts and the soil cement wall material 31 is released.

【0029】勿論一回の打撃により密着性9を解くこと
が、不十分の場合は、前記ドロップハンマー7による打
撃を、数回繰り返す作業をすることも有り得る。
Of course, if it is insufficient to release the adhesion 9 by one hit, it is possible to repeat the hit with the drop hammer 7 several times.

【0030】そして、前記密着性9の解除を、利便性等
を考慮して一本単独て、又は数本連続的になし、引き抜
き可能な一本の切込入り補強材1、又は引き抜き可能な
数本の他の切込入り補強材111、112等を形成す
る。
In consideration of convenience and the like, the adhesiveness 9 is released individually or continuously, and one withdrawable reinforcing member 1 with a notch or one withdrawable. Several other notched reinforcements 111, 112 etc. are formed.

【0031】前述のようにして、引き抜き可能な一本の
切込入り補強材1、又は引き抜き可能な数本の他の切込
入り補強材111、112が形成されたならば、引き抜
き作業機械(図示せず)の引き抜き具14を介して、例
えば、前記切込入り補強材1、他の切込入り補強材11
1、112等の順次で、引き抜くが、その際、前述の如
く、切込入り補強材1、他の切込入り補強材111、1
12等には、それぞれ切込部1aが設けられていること
から、容易かつ迅速に、引き抜き作業ができるものであ
る。
As described above, if one of the notched reinforcing members 1 that can be pulled out, or several other notched reinforcing members 111 and 112 that can be pulled out is formed, the pulling work machine ( Through the pulling tool 14 (not shown), for example, the notched reinforcing material 1 and another notched reinforcing material 11
1, 112, etc. are sequentially pulled out, but at that time, as described above, the notched reinforcing member 1, the other notched reinforcing members 111, 1
Since the notch 12a is provided in each of 12 and the like, the pulling out work can be performed easily and quickly.

【0032】そして、引き抜き跡10には、土砂が充填
され、通常は前述の如く、築き固められる。
Then, the extraction marks 10 are filled with earth and sand and are usually built and solidified as described above.

【0033】図中11は打撃作業重機、12はリーダ
ー、13は前記ドロップハンマー7を昇降させるロープ
を示す。
In the figure, 11 is a percussion work heavy machine, 12 is a leader, and 13 is a rope for raising and lowering the drop hammer 7.

【0034】尚前記衝撃手段8には、その他振動、電気
的衝撃等を含む。
The impact means 8 includes other vibrations, electric impacts, and the like.

【0035】[0035]

【発明の効果】本発明は、以上で説明したように、切込
入り補強材の頭出しをした後、当該頭部等に衝撃を与
え、切込入り補強材とソイルセメント壁素材との密着性
を解き、その後、切込入り補強材を引き抜く工法であ
り、下記の効果を有する。
As described above, according to the present invention, after the incised reinforcing material is squeezed out, the impact is applied to the head or the like to bring the incised reinforcing material and the soil cement wall material into close contact with each other. It is a construction method that removes the property and then pulls out the notched reinforcing material, and has the following effects.

【0036】(1)切込入り補強材を、簡易かつ作業性
よく、引き抜くことができる。
(1) The notched reinforcing material can be pulled out easily and with good workability.

【0037】(2)切込入り補強材の引き抜き作業の迅
速化、容易化が達成されることと、大幅な低コスト化が
図られる。
(2) The pulling out work of the notched reinforcing material can be speeded up and facilitated, and the cost can be remarkably reduced.

【0038】(3)切込入り補強材の引き抜き作業が、
安全に行える。
(3) The work of pulling out the notched reinforcing material is
You can do it safely.

【0039】また本発明では、前記の如く、僅か頭出し
をなした後、衝撃手段を施す工法であり、下記の効果を
有する。
Further, in the present invention, as described above, the method is one in which the impacting means is performed after the head is slightly moved, and has the following effects.

【0040】(4)切込入り補強材に損傷を与えずに、
引き抜くことができる。
(4) Without damaging the notched reinforcing material,
Can be pulled out.

【0041】(5)殊に、打撃衝撃(打撃手段)の際に
おける衝撃曲りの発生がなくなる。
(5) In particular, the occurrence of impact bending at the time of impact impact (striking means) is eliminated.

【図面の簡単な説明】[Brief description of drawings]

【図1】引く抜き対象の切込入り補強材の構築状況を説
明する模式図である。
FIG. 1 is a schematic diagram for explaining a construction situation of a notched reinforcing material to be pulled out.

【図2】切込入り補強材の引き抜き手順を説明する平面
模式図である。
FIG. 2 is a schematic plan view illustrating a procedure for pulling out a notched reinforcing material.

【図3】切込入り補強材の頭出しを説明する模式図であ
る。
FIG. 3 is a schematic diagram for explaining the cueing of a notched reinforcing material.

【図4】ドロップハンマーによる打撃を示す模式図であ
る。
FIG. 4 is a schematic diagram showing striking with a drop hammer.

【図5】切込入り補強材とソイルセメント壁素材との密
着性の関係を示す要部模式図である。
FIG. 5 is a schematic view of a main part showing a relationship of adhesion between a notched reinforcing material and a soil cement wall material.

【図6】切込入り補強材の引き抜き状況を説明する要部
模式図である。
FIG. 6 is a schematic view of a main part for explaining a situation of pulling out a notched reinforcing material.

【図7】切込入り補強材の引き抜き跡に、土砂を充填す
る状況を示す要部模式図である。
FIG. 7 is a schematic view of a main part showing a situation where earth and sand are filled in a trace of pulling out a notched reinforcing material.

【符合の説明】[Explanation of sign]

1 切込入り補強材 1a 切込部 2 基礎 3 ソイルセメント壁 31 ソイルセメント壁素材 4 はっり 5 凹部 6 頭出し 7 ドロップハンマー 8 衝撃手段 9 密着性 10 跡 11 打撃作業重機 12 リーダー 13 ロープ 14 引き抜き具 111 他の切込入り補強材 112 他の切込入り補強材 1 Reinforcing Material with Cut 1a Cut 2 Foundation 3 Soil Cement Wall 31 Soil Cement Wall Material 4 Peel 5 Recess 6 Heading out 7 Drop Hammer 8 Impact Means 9 Adhesion 10 Trace 11 Impact Heavy Machine 12 Leader 13 Rope 14 Pulling out tool 111 Other notched reinforcing material 112 Other notched reinforcing material

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 土留め壁内の切込入り補強材の頭出しを
なした後、 この切込入り補強材の頭部等に打撃衝撃、振動衝撃等の
衝撃手段を加え、土留め壁素材と前記切込入り補強材と
の密着性を解き、 その後、前記切込入り補強材を、引き抜くように構成し
た土留め壁内の切込入り補強材を引き抜く工法。
1. The earth retaining wall material is formed by locating the notched reinforcing material in the earth retaining wall and then adding impact means such as impact impact or vibration impact to the head of the notched reinforcing material. And a method of removing the indented reinforcing material in the earth retaining wall configured to pull out the indented reinforcing material.
【請求項2】 請求項1の土留め壁が、ソイルセメント
壁である請求項1の土留め壁内の切込入り補強材を引き
抜く工法。
2. The method for extracting the notched reinforcing material in the earth retaining wall according to claim 1, wherein the earth retaining wall according to claim 1 is a soil cement wall.
【請求項3】 請求項1の頭出しを、土留め壁であっ
て、その内少なくとも切込入り補強材の周囲の土砂を排
除して、当該周囲に凹部を形成し、前記少なくとも切込
入り補強材の周囲の頭部を、地中で露出する構成とした
請求項1の土留め壁内の切込入り補強材を引き抜く工
法。
3. The cue according to claim 1, wherein the earth retaining wall, at least the earth and sand around the cut-in reinforcing material is eliminated to form a recess in the periphery, and the at least cut-in is performed. The method for pulling out the notched reinforcing material in the earth retaining wall according to claim 1, wherein the head around the reinforcing material is exposed in the ground.
【請求項4】 請求項2の切込入り補強材の切込部近傍
の土砂、及びソイルセメント壁を、はっり作業を介して
はっりを形成した請求項2の土留め壁内の切込入り補強
材を引き抜く工法。
4. The earth retaining wall according to claim 2, wherein the earth and sand in the vicinity of the notch of the notched reinforcing material according to claim 2 and the soil cement wall are formed by means of an abrasion work. A construction method to pull out the notched reinforcement material.
【請求項5】 請求項1の切込入り補強材が、H型鋼で
ある請求項1の土留め壁内の切込入り補強材を引き抜く
工法。
5. The method for pulling out the notched reinforcing material in the earth retaining wall according to claim 1, wherein the notched reinforcing material of claim 1 is an H-shaped steel.
JP784592A 1992-01-20 1992-01-20 Drawing work of reinforcing pile with cut in sheathing wall Pending JPH05195531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP784592A JPH05195531A (en) 1992-01-20 1992-01-20 Drawing work of reinforcing pile with cut in sheathing wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP784592A JPH05195531A (en) 1992-01-20 1992-01-20 Drawing work of reinforcing pile with cut in sheathing wall

Publications (1)

Publication Number Publication Date
JPH05195531A true JPH05195531A (en) 1993-08-03

Family

ID=11676956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP784592A Pending JPH05195531A (en) 1992-01-20 1992-01-20 Drawing work of reinforcing pile with cut in sheathing wall

Country Status (1)

Country Link
JP (1) JPH05195531A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016148137A (en) * 2015-02-10 2016-08-18 大成建設株式会社 Method for removing earth retaining member

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5179913A (en) * 1975-01-08 1976-07-12 Nippon Kokan Kk Koyaitakabeno setsudankoho

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5179913A (en) * 1975-01-08 1976-07-12 Nippon Kokan Kk Koyaitakabeno setsudankoho

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016148137A (en) * 2015-02-10 2016-08-18 大成建設株式会社 Method for removing earth retaining member

Similar Documents

Publication Publication Date Title
US5056959A (en) Method and device for stripping from the concrete to which it adheres the header of a wall section cast in the ground
CN110820742A (en) Construction method for breaking underwater cast-in-place pile head
CN105696808A (en) Reinforced concrete supporting structure and dismantling method
CN111119180A (en) Underground pile foundation clearing construction method in complex environment
JP6936613B2 (en) Masonry reinforcement structure and reinforcement method
EP0887512B1 (en) Method for widening road, superhighway or railway tunnels, without interrupting the traffic
KR102333978B1 (en) Pileless-up wall demolition method
JPH05195531A (en) Drawing work of reinforcing pile with cut in sheathing wall
JPS6149473B2 (en)
CN209244585U (en) The device of steelframe connecting plate screw is protected in a kind of constructing tunnel
KR20210147140A (en) Multi casing perforation device
JPH06341154A (en) Construction of underground building frame
JP3930358B2 (en) How to build a tunnel
JPS603396A (en) Tunnel drilling method
JPS6229597B2 (en)
JP2000204574A (en) Reconstruction method for underground structure
JPH05287736A (en) Construction method for high strength cast-in-place concrete pile
AU623298B1 (en) Concrete shuttering element
JPS6019897A (en) Thin wall coating method and apparatus of tunnel
CN117702719A (en) Soil maintenance structure of pipe jacking working well by using Larson steel sheet piles and pipe jacking construction method thereof
JP4204504B2 (en) Raising the sabo dam
JPS59213891A (en) Bore drilling method
JPH0587612B2 (en)
JPH0696960B2 (en) Tunnel repair method
JP2023156891A (en) Construction method of cast-in-place concrete pile