CN111119180A - Underground pile foundation clearing construction method in complex environment - Google Patents

Underground pile foundation clearing construction method in complex environment Download PDF

Info

Publication number
CN111119180A
CN111119180A CN201911360470.8A CN201911360470A CN111119180A CN 111119180 A CN111119180 A CN 111119180A CN 201911360470 A CN201911360470 A CN 201911360470A CN 111119180 A CN111119180 A CN 111119180A
Authority
CN
China
Prior art keywords
pile
casing
pile foundation
hole
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911360470.8A
Other languages
Chinese (zh)
Inventor
严石友
陈勇光
陈强
蒋巧
苗宇滔
胡斌
谭斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju Co Ltd
Original Assignee
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN201911360470.8A priority Critical patent/CN111119180A/en
Publication of CN111119180A publication Critical patent/CN111119180A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0021Mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a construction method for removing an underground pile foundation in a complex environment, which comprises the following steps of carrying out pile foundation bearing platform breaking, removing a pile head, and measuring the center position of a pile hole according to the pile head; installing a drilling machine above the pile hole, and aligning a drill bit of the drilling machine with the center position of the pile hole in the step 1; pressing the pile casing into the pile foundation, starting a drilling machine to break the pile foundation concrete, wherein the breaking depth does not exceed the pressing depth of the pile casing; cleaning pile foundation reinforcing steel bars and slag blocks remained in the pile casing; measuring the depth of the pile hole after cleaning; and placing a guide pipe with corresponding depth in the pile hole according to the measured depth of the pile hole, pouring mortar in the guide pipe, simultaneously pulling out the pile casing and the guide pipe in the pile hole in the pouring process, and enabling the lower ends of the pile casing and the guide pipe to be positioned below a pouring surface in the pulling-out process. The surrounding structure buildings are not affected in the pile foundation breaking process, and the pile hole structure after backfilling is stable.

Description

Underground pile foundation clearing construction method in complex environment
Technical Field
The invention relates to the technical field of building construction, in particular to a construction method for removing an underground pile foundation in a complex environment.
Background
With the rapid development of domestic economy, projects such as subway tunnels, underground structures, old city reconstruction, bridge reconstruction and extension projects are continuously increased, old pile foundations are often required to be removed, and most pile foundations are difficult to remove due to the fact that the distance between the pile foundations and important underground building structures is short.
The currently commonly adopted pile foundation removing method comprises the following steps: 1. pressing the sleeve into the ground by adopting a full-circle rotary drill, sleeving the pile body, inserting a steel wedge hammer to tightly clamp the pile body and the inner side of the sleeve, starting the rotary drill to rotate the sleeve, and hanging out the pile body after the pile body is twisted off; 2. adopting an impact hammer to carry out impact pile breaking treatment; 3. and adopting manual hole digging to break. The methods can not meet the construction requirements under the conditions of large diameter of the pile body, thick reinforcing steel bars of the pile body, large burial depth, being positioned in a viscous or sandy stratum and being close to an important underground building in a complex environment, and easily cause the collapse of the surrounding building in the process of removing the pile foundation.
In summary, there is a need for a technical solution to solve the technical problem that the prior art is limited by complex environmental conditions during the process of removing the pile foundation, which is likely to cause the collapse of the building around the pile body.
Disclosure of Invention
The invention aims to: aiming at the technical problem that the prior art is limited by complex environmental conditions in the process of clearing the pile foundation, which easily causes the collapse of the building structure around the pile body, the underground pile foundation clearing construction method under the complex environment is provided.
In order to achieve the purpose, the invention adopts the technical scheme that:
a construction method for removing underground pile foundation in complex environment includes such steps as,
step 1, pile hole positioning, pile foundation bearing platform breaking, pile head cleaning, and pile hole center position measuring according to the pile head, so as to accurately break the pile foundation.
Step 2, installing a drilling machine, and installing the drilling machine above the pile hole to enable a drill bit of the drilling machine to be aligned with the center position of the pile hole in the step 1;
step 3, breaking the pile foundation, namely pressing the pile casing into the pile foundation, and starting a drilling machine to break the pile foundation concrete, wherein the breaking depth does not exceed the pressing depth of the pile casing;
step 4, cleaning the pile casing, and cleaning pile foundation reinforcing steel bars and slag blocks remained in the pile casing;
step 5, measuring pile holes, and measuring the depth of the pile holes after cleaning;
and 6, backfilling the pile hole, namely putting a guide pipe with corresponding depth in the pile hole according to the depth of the pile hole measured in the step 5, pouring mortar in the guide pipe, simultaneously pulling out the pile casing and the guide pipe in the pile hole in the pouring process, and enabling the lower ends of the pile casing and the guide pipe to be positioned below a pouring surface in the pulling-out process.
The invention relates to a construction method for removing an underground pile foundation in a complex environment, which is characterized in that in the construction process of the method, the breaking of the pile foundation and the backfilling of a pile hole are always carried out under the protection of a pile casing, the influence on a peripheral soil body is small, the peripheral building is not influenced in the process of breaking the pile foundation, a guide pipe is arranged in the pile hole in the process of backfilling the pile hole, mortar is poured, the pile casing and the guide pipe are synchronously pulled out, the pile pulling and backfilling work is completed, the phenomenon that the solidification effect of the mortar is influenced due to the fact that the mortar is mixed with a large amount of water in the soil body is avoided, and the structure.
As a preferable scheme of the invention, the step 2 further comprises a step 2.1 of installing a positioning steel plate, installing the positioning steel plate on the road base plate around the pile hole before installing a drilling machine, and installing the drilling machine on the positioning steel plate. Before the drilling machine is installed, positioning steel plates for reinforcing the stability of the structure of the surrounding soil body are arranged around the pile hole, so that the installation stability of the drilling machine is enhanced, and the safety guarantee is improved for subsequent operations such as pile foundation breaking, pile hole backfilling and the like.
In a preferred embodiment of the present invention, in step 3, the pile foundation is removed by using drill bits with at least two diameters. The drill bit that uses minor diameter earlier breaks for the first time in to the pile foundation, uses major diameter again to carry out the second time to remaining pile foundation and breaks, avoids once only breaking to bring the too big and influence the stable problem of soil body of effort.
As a preferable scheme of the present invention, in the step 4, a grab bucket is adopted to remove pile head reinforcing steel bars and slag blocks remaining in the pile casing.
In a preferred embodiment of the present invention, in the step 5, during the process of pulling out the casing and the guide pipe, the lower end of the casing is located at least 1m below the mortar casting surface, and the lower end of the guide pipe is located at least 50cm below the mortar casting surface.
As a preferred embodiment of the present invention, in step 1, the central position of the pile hole is determined by adopting a line-laying positioning manner. Straightening two non-coincident positioning lines in the diameter direction of the pile hole, and determining the center position of the pile hole according to the intersection point of the two positioning lines.
In a preferred embodiment of the present invention, in step 3, the casing and the pile foundation are coaxially provided.
In a preferred embodiment of the present invention, a gap is provided between the casing and the pile foundation.
As a preferable scheme of the invention, the casing and the conduit are of a sectional structure.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
1. the invention relates to a construction method for removing an underground pile foundation in a complex environment, which is characterized in that in the construction process of the method, the breaking of the pile foundation and the backfilling of a pile hole are always carried out under the protection of a pile casing, the influence on a peripheral soil body is small, the influence on the peripheral building in the process of breaking the pile foundation is ensured to be not influenced, a guide pipe is arranged in the pile hole in the process of backfilling the pile hole, mortar is poured, the pile casing and the guide pipe are synchronously pulled out, the pile pulling and backfilling work is completed, the phenomenon that the solidification effect of the mortar is influenced due to the large amount of mixing of the mortar and water in the soil body is avoided;
2. before the drilling machine is installed, positioning steel plates for reinforcing the stability of the surrounding soil body structure are arranged around the pile holes, so that the installation stability of the drilling machine is enhanced, and the safety guarantee is improved for subsequent operations such as pile foundation breaking, pile hole backfilling and the like;
3. the drill bit that uses minor diameter earlier breaks for the first time in to the pile foundation, uses major diameter again to carry out the second time to remaining pile foundation and breaks, avoids once only breaking to bring the too big and influence the stable problem of soil body of effort.
Drawings
FIG. 1 is a process flow diagram of the construction method for removing underground pile foundation in complex environment;
FIG. 2 is a construction schematic diagram of the underground pile foundation clearing construction method under a complex environment of the invention;
the labels in the figure are: 1-pile foundation, 2-pile casing and 3-drilling machine.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings.
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
As shown in fig. 1 and 2, the invention relates to a method for removing underground pile foundation in complex environment, which comprises the following steps,
step 1, pile hole positioning, pile foundation 1 bearing platform breaking, pile head cleaning, and pile hole center position measuring according to the pile head, so as to accurately break the pile foundation 1.
Step 2, installing a drilling machine 3, and installing the drilling machine 3 above the pile hole to enable a drill bit of the drilling machine 3 to be aligned with the center position of the pile hole in the step 1, wherein the drilling machine 3 adopts a rotary drilling rig;
step 3, breaking the pile foundation 1, pressing the pile casing 2 into the pile foundation 1, starting a drilling machine 3 to break the concrete of the pile foundation 1, wherein the breaking depth does not exceed the pressing depth of the pile casing 2, the pile casing 2 and the pile foundation 1 are coaxially arranged, the pile casing 2 is guaranteed to support a building around the whole pile foundation 1, and a gap is reserved between the pile casing 2 and the pile foundation 1;
step 4, cleaning the pile casing, namely cleaning the pile foundation 1 steel bars and the slag blocks remained in the pile casing 2, and cleaning the pile head steel bars and the slag blocks remained in the pile casing 2 by adopting a grab bucket;
step 5, measuring pile holes, and measuring the depth of the pile holes after cleaning;
and 6, backfilling the pile hole, namely placing a guide pipe with a corresponding depth in the pile hole according to the depth of the pile hole measured in the step 5, pouring mortar in the guide pipe, simultaneously pulling out the pile casing 2 and the guide pipe in the pile hole in the pouring process, enabling the lower ends of the pile casing 2 and the guide pipe to be located below a pouring surface in the pulling-out process, wherein the model of the mortar is M5 in the pouring process, in the pulling-out process of the pile casing 2 and the guide pipe, the lower end of the pile casing 2 is located at least 1M below the mortar pouring surface, and the lower end of the guide pipe is located at least 50cm below the mortar pouring surface.
In the step 1, the central position of the pile hole is determined by adopting a paying-off positioning mode, two non-coincident positioning lines are straightened in the diameter direction of the pile hole, and the central position of the pile hole is determined according to the intersection point of the two positioning lines.
Further, step 2 still includes step 2.1, the installation location steel sheet, before 3 installations of rig, installs the location steel sheet on the road bed board around the stake hole, rig 3 installs on the location steel sheet, before installation rig 3, sets up around the stake hole and is used for strengthening the location steel sheet of soil body stable in structure around, has strengthened rig 3 installation stability, has improved the safety guarantee for operations such as subsequent pile foundation 1 breaks away, stake hole backfill.
Furthermore, in the step 3, at least two kinds of drill bits with different diameters are adopted to respectively remove the pile foundation 1, the drill bit with the smaller diameter is firstly used for carrying out primary removal on the pile foundation 1, and then the drill bit with the larger diameter is used for carrying out secondary removal on the residual pile foundation 1, so that the problems that the acting force is too large and the soil stability is influenced due to the primary removal are solved; specifically, when the diameter of pile hole is 1200mm, in step 3, the diameter of casing 2 is 1600mm, adopts the drill bit that the diameter is 600mm and 1000mm to clear away pile foundation 1 respectively.
In conclusion, in the construction process of the method, the pile foundation 1 is broken and the pile hole is backfilled all the time under the protection of the pile casing 2, the influence on the surrounding soil body is small, the surrounding buildings are not affected in the process of breaking the pile foundation 1, the guide pipe is arranged in the pile hole in the process of backfilling the pile hole, mortar is poured, the pile casing 2 and the guide pipe are synchronously pulled out, pile pulling and backfilling are completed, the mortar solidification effect is prevented from being affected due to the fact that a large amount of water in the mortar and the soil body is mixed, and the structure of the backfilled pile hole is stable.
Example 2
In the embodiment, the difference from embodiment 1 is that the casing 2 and the guide pipe both adopt a sectional structure, and when the buried depth of the pile foundation 1 is large, the casing 2 and the guide pipe of a single-section structure cannot meet the support around the pile foundation 1, and the depth of the pile foundation 1 and the lengths of the casing 2 and the guide pipe determine the number of sections of the casing 2 and the guide pipe which need to be run in.
In the step 3 and the step 4, the pile foundation 1 is broken and the pile casing 2 is cleaned, the first section of pile casing 2 is pressed into the pile foundation 1, the second end casing 2 is pressed into the first section of pile casing 2 after the pile foundation 1 in the first section of pile casing 2 is broken and cleaned, the second section of pile casing 2 is broken and cleaned, and the number of the sections of the pile casing 2 to be pressed is determined according to the depth of the pile foundation 1 and the length of the pile casing 2; and 6, backfilling the pile hole, and pulling out the pile casing section by section from the upper end according to the height of the pouring surface.
And 6, determining the number of sections of the inner conduit which is inserted into the pile hole according to the depth of the pile hole and the length of the conduit which are measured in the step 5, and extracting the conduit according to the height of the pouring surface in the extracting process.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (9)

1. A construction method for removing underground pile foundation in complex environment is characterized by comprising the following steps,
step 1, positioning a pile hole, carrying out pile cap breaking on a pile foundation, cleaning a pile head, and measuring the center position of the pile hole according to the pile head;
step 2, installing a drilling machine, and installing the drilling machine above the pile hole to enable a drill bit of the drilling machine to be aligned with the center position of the pile hole in the step 1;
step 3, breaking the pile foundation (1), pressing the pile casing (2) on the pile foundation (1), starting a drilling machine (3) to break the concrete of the pile foundation (1), wherein the breaking depth is not more than the pressing-in depth of the pile casing (2);
step 4, cleaning the pile casing (2), and cleaning the residual reinforcing steel bars and slag blocks of the pile foundation (1) in the pile casing (2);
step 5, measuring pile holes, and measuring the depth of the pile holes after cleaning;
and 6, backfilling the pile hole, namely putting a guide pipe with corresponding depth in the pile hole according to the depth of the pile hole measured in the step 5, pouring mortar in the guide pipe, simultaneously pulling out the pile casing (2) and the guide pipe in the pile hole in the pouring process, and enabling the lower ends of the pile casing (2) and the guide pipe to be positioned below a pouring surface in the pulling-out process.
2. A complex environment underground pile foundation clearing construction method according to claim 1, characterized in that the step 2 further comprises the step 2.1 of installing a positioning steel plate, installing the positioning steel plate on the road base plate around the pile hole before installing the drilling machine (3), and installing the drilling machine (3) on the positioning steel plate.
3. The method for removing underground pile foundations in complex environments as claimed in claim 1, wherein in the step 3, the pile foundations (1) are removed by using drill bits with at least two diameters respectively.
4. The method for removing the underground pile foundation in the complex environment according to claim 1, wherein in the step 4, a grab bucket is used for removing pile head reinforcing steel bars and slag blocks remained in the pile casing (2).
5. The complex environment underground pile foundation clearing construction method according to claim 1, wherein in the step 5, during the process of pulling out the casing (2) and the guide pipe, the lower end of the casing (2) is located at least 1m below a mortar pouring surface, and the lower end of the guide pipe is located at least 50cm below the mortar pouring surface.
6. The method for removing underground pile foundations in the complex environment as claimed in claim 1, wherein in the step 1, the center position of the pile hole is determined by adopting a line-laying positioning mode.
7. A method for removing underground pile foundation in complex environment according to claim 1, wherein in step 3, the casing (2) and the pile foundation (1) are coaxially arranged.
8. A complex environment underground pile foundation clearing construction method according to claim 7, characterized in that a gap is arranged between the casing (2) and the pile foundation (1).
9. A method for removing underground pile foundations in complex environments according to any one of claims 1 to 8, wherein the casing (2) and the conduit are of a segmented structure.
CN201911360470.8A 2019-12-25 2019-12-25 Underground pile foundation clearing construction method in complex environment Pending CN111119180A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911360470.8A CN111119180A (en) 2019-12-25 2019-12-25 Underground pile foundation clearing construction method in complex environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911360470.8A CN111119180A (en) 2019-12-25 2019-12-25 Underground pile foundation clearing construction method in complex environment

Publications (1)

Publication Number Publication Date
CN111119180A true CN111119180A (en) 2020-05-08

Family

ID=70502478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911360470.8A Pending CN111119180A (en) 2019-12-25 2019-12-25 Underground pile foundation clearing construction method in complex environment

Country Status (1)

Country Link
CN (1) CN111119180A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877344A (en) * 2020-06-24 2020-11-03 中煤江南建设发展有限公司 Old pipe pile breaking method
CN112962603A (en) * 2021-02-05 2021-06-15 广州市第一市政工程有限公司 Dismantling construction process for reinforced concrete cast-in-place pile
CN113417287A (en) * 2021-05-26 2021-09-21 中交二航局第三工程有限公司 Construction method for removing underground secant pile by full-casing full-slewing drilling machine
CN113653052A (en) * 2021-09-02 2021-11-16 上海建工四建集团有限公司 Obstacle clearing construction method for large-diameter underground steel-concrete composite structure
WO2023061141A1 (en) * 2021-10-13 2023-04-20 上海建工七建集团有限公司 Pile pulling device capable of reducing soil disturbance, and method for using same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5252511B2 (en) * 2010-04-21 2013-07-31 株式会社アルファシビルエンジニアリング Equipment for crushing and discharging existing concrete piles
CN104532842A (en) * 2015-01-29 2015-04-22 浙江省一建建设集团有限公司 Sleeve rotating friction type breaking pile-extracting construction method
CN104746519A (en) * 2015-02-04 2015-07-01 邵阳学院 Obstacle clearing construction method
CN105649083A (en) * 2016-03-18 2016-06-08 宁波鸿晨建设有限公司 All-casing one-time rotary cutting type pile removing device and pile removing method thereof
CN105970962A (en) * 2016-06-28 2016-09-28 宁波鸿晨建设有限公司 Double full casing pipe one-time rotary-cutting pile removing device and pile removing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5252511B2 (en) * 2010-04-21 2013-07-31 株式会社アルファシビルエンジニアリング Equipment for crushing and discharging existing concrete piles
CN104532842A (en) * 2015-01-29 2015-04-22 浙江省一建建设集团有限公司 Sleeve rotating friction type breaking pile-extracting construction method
CN104746519A (en) * 2015-02-04 2015-07-01 邵阳学院 Obstacle clearing construction method
CN105649083A (en) * 2016-03-18 2016-06-08 宁波鸿晨建设有限公司 All-casing one-time rotary cutting type pile removing device and pile removing method thereof
CN105970962A (en) * 2016-06-28 2016-09-28 宁波鸿晨建设有限公司 Double full casing pipe one-time rotary-cutting pile removing device and pile removing method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
上海隧道工程股份有限公司: "《上海轨道交通4号线(董家渡)修复工程》", 31 December 2008, 同济大学出版社 *
郭传新: "中国桩工机械现状及发展趋势", 《建筑机械化》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877344A (en) * 2020-06-24 2020-11-03 中煤江南建设发展有限公司 Old pipe pile breaking method
CN112962603A (en) * 2021-02-05 2021-06-15 广州市第一市政工程有限公司 Dismantling construction process for reinforced concrete cast-in-place pile
CN113417287A (en) * 2021-05-26 2021-09-21 中交二航局第三工程有限公司 Construction method for removing underground secant pile by full-casing full-slewing drilling machine
CN113653052A (en) * 2021-09-02 2021-11-16 上海建工四建集团有限公司 Obstacle clearing construction method for large-diameter underground steel-concrete composite structure
WO2023061141A1 (en) * 2021-10-13 2023-04-20 上海建工七建集团有限公司 Pile pulling device capable of reducing soil disturbance, and method for using same

Similar Documents

Publication Publication Date Title
CN111119180A (en) Underground pile foundation clearing construction method in complex environment
US11143027B2 (en) Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof
CN106065577B (en) A kind of structure and method of new pile foundation underpinning
CN102146672B (en) Method for constructing pile foundation in karst area
CN101328712A (en) Construction method of interlocking pile for soft soil and soil layer with obstacle
CN109667985B (en) Method for butting pipe pushing jack and receiving well steel sleeve in pipe pushing construction
CN110485468B (en) Permanent circular working well with water-rich stratum preset jacking pipe door opening and construction method thereof
CN108570983A (en) The pile base construction method and its casing of non-filler large size solution cavity
CN104294819A (en) Construction method of cast-in-place pile
CN104746519A (en) Obstacle clearing construction method
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN101550693B (en) Method for reinforcing base with bored pile in the underground structure of high groundwater level
CN110206071A (en) A kind of diaphram wall seam reinforcement means and device
CN110318401A (en) Suitable for the construction method to open cut area large size pipeline in-situ conservation and pattern foundation pit supporting structure
KR100984762B1 (en) Pressing apparatus of casing of retaining well construction and the constructing method thereof
CN202925575U (en) Pre-buried structure for core-drilling detection of foundation pile
CN209066508U (en) Cross the existing electric power piping lane protection structure of tunnel foundation pit
CN108677939B (en) Pile end post-grouting failure handling method and device
CN206916746U (en) High-pressure jet, jetting type are removed obstacles immersed tube
CN115075249A (en) Pile foundation clearing device and pile foundation clearing process
CN104727305B (en) Boring high-pressure slip-casting uplift pile construction method
CN110485465B (en) Circular working well with water-rich stratum with preset pipe jacking door opening and construction method of circular working well
CN114687345A (en) Method for repairing surface subsidence or deformation of underground pipe outside foundation pit enclosure wall
CN211113598U (en) Karst cave handling system for deep foundation pit pile foundation construction in karst area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200508