JPH05179815A - Construction method for temporary roof - Google Patents

Construction method for temporary roof

Info

Publication number
JPH05179815A
JPH05179815A JP158292A JP158292A JPH05179815A JP H05179815 A JPH05179815 A JP H05179815A JP 158292 A JP158292 A JP 158292A JP 158292 A JP158292 A JP 158292A JP H05179815 A JPH05179815 A JP H05179815A
Authority
JP
Japan
Prior art keywords
crane
roof
building
cranes
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP158292A
Other languages
Japanese (ja)
Inventor
Yoshitaka Hijikata
敬宇 土方
Akira Miyama
晃 三山
Hiroshi Inoue
啓 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP158292A priority Critical patent/JPH05179815A/en
Publication of JPH05179815A publication Critical patent/JPH05179815A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To increase workability by putting a roof and curing surroundings for covering a building on the support head of a material lifting crane while replacing the crane supporting and climbing, and executing the work to the uppermost story. CONSTITUTION:Cranes A are set on a first floor, and a roof and curing surrounding 3 are supported by the support head of a crane support 1 to cover a building area to be constructed. Next, construction materials such as columns 4, beams 5, etc., are lifted by the cranes A, and the building is assembled from the lower floor in order. While the supports 1 are replaced and climbed, the cranes A, roof 2, and surroundings 3 are raised in order to construct the building up to the uppermost story. Thus the construction can be made without being affected by weather, the construction period can be reduced, the quality can be increased, and also the work environment can be improved.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建築工事等において、天
候に左右されることなく施工を行うことができる仮設屋
根の架設方法に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a temporary roof that can be used in construction work and the like without being affected by the weather.

【0002】[0002]

【従来の技術】従来の仮設屋根は屋根だけを支承する機
能を持った支柱によって支持されている。一方、従来の
揚重クレーンのポストは揚重クレーンの機能を満足させ
るだけの目的で設置されている。
2. Description of the Related Art A conventional temporary roof is supported by columns that support only the roof. On the other hand, the post of the conventional lifting crane is installed only for the purpose of satisfying the function of the lifting crane.

【0003】[0003]

【発明が解決しようとする課題】しかしながら仮設屋根
を支持するだけの支柱では仮設材として無駄が多い。本
発明は前記従来技術の有する問題点に鑑みて提案された
もので、その目的とする処は、揚重クレーンのポストに
仮設屋根支柱を兼用せしめることによって、天候の影響
を受けることなく建設工事が施工性よく行なわれる仮設
屋根の架設方法を提供する点にある。
However, a pillar that merely supports the temporary roof is wasteful as a temporary material. The present invention has been proposed in view of the above-mentioned problems of the prior art, and the purpose thereof is to make a post of a hoisting crane also serve as a temporary roof strut so that construction work can be performed without being affected by weather. Is to provide a method for constructing a temporary roof with good workability.

【0004】[0004]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係る仮設屋根の架設方法によれば、資材揚
重クレーンの支柱の柱頭部に、建物を覆う屋根及び養生
囲いを装架し、前記支柱の盛替え及びクライミングを行
なうことを特徴とするものである。
In order to achieve the above object, according to the method for constructing a temporary roof according to the present invention, the roof of a pillar of a material hoisting crane is provided with a roof and a curing enclosure for covering the building. It is characterized in that it is mounted, and the pillars are rearranged and climbing is performed.

【0005】[0005]

【作用】建物を下から構築していく場合、資材を揚重す
るクレーンを設置するが、同揚重クレーンの支柱の柱頭
に構築中の建物を覆う屋根と養生囲いを架設し、前記ク
レーンによって資材を揚重しながら下階から構築し、ク
レーン支柱のクライミングによって屋根及び養生囲いと
クレーンとを持ち上げ、クレーン支柱を盛り替えしなが
ら最上階まで天候の影響を受けることなく施工するもの
ある。
[Operation] When building a building from below, a crane for hoisting materials is installed, but a roof and a curing enclosure covering the building under construction are erected on the stigmas of the columns of the hoisting crane. It is constructed from the lower floor while hoisting materials, lifting the roof and curing enclosure and the crane by climbing the crane pillars, and reconstructing the crane pillars and constructing up to the top floor without being affected by the weather.

【0006】[0006]

【実施例】以下本発明を図示の実施例について説明す
る。図1に示すように1階床でクレーンAを設置する。
次いでクレーン支柱1の柱頭部を支点として構築すべき
建造物を覆う屋根2及び同屋根2の周辺より垂設された
養生囲い3を支持せしめる。(同2参照)次いで前記ク
レーンAによって建設資材を揚重、組立て、建物を下階
より構築していく。(図3参照)図中4は柱、5は梁で
ある。
The present invention will be described below with reference to the illustrated embodiments. As shown in FIG. 1, the crane A is installed on the first floor.
Next, a roof 2 covering a building to be constructed with the pillar head of the crane column 1 as a fulcrum, and a curing enclosure 3 suspended from the periphery of the roof 2 are supported. (See Id. 2) Then, the crane A hoists and assembles construction materials to build the building from the lower floor. (See FIG. 3) In the figure, 4 is a pillar and 5 is a beam.

【0007】次いでクレーン支柱1の増設を脚部で行
い、更にクレーン支柱1のクライミングによって屋根2
及び養生囲い3並にクレーンAを持ち上げ(図4参照)
クレーン支柱1を盛り替えながら最上階まで施工する。
(図5参照)図中クレーンAによって揚重される外壁材
である。なお前記クレーンAはコンピュータ制御によっ
てクレーン作業が自動化されるものである。
[0007] Next, the crane prop 1 is added to the legs, and the crane prop 1 is further climbed to form the roof 2
And lift the crane A to the side of the curing enclosure 3 (see Fig. 4)
Rebuild the crane column 1 and build up to the top floor.
(See FIG. 5) The outer wall material is lifted by the crane A in the figure. The crane A is a computer in which crane work is automated by computer control.

【0008】[0008]

【発明の効果】本発明によれば前記したように、建物の
構築作業において、建築資材等揚重クレーンの支柱の柱
頭部に、前記建物を覆う屋根及び養生囲いを装架して前
記建物を下から構築していくとき、前記支柱の盛替え、
クライミングを行なうことによって、建物躯体、仕上工
事の工程が天候の影響を受けることなく安定した状態で
行なわれ、工期の短縮が図られ、品質のよい建物が構築
され、作業員や施工機械に対する作業環境が改善される
ものである。
As described above, according to the present invention, in the construction work of a building, the roof of a pillar of a crane for hoisting building materials and the like and a curing enclosure for covering the building are mounted on the head of the pillar to construct the building. When building from below, re-arrangement of the pillars,
By climbing, the building frame and finishing process can be performed in a stable state without being affected by the weather, the construction period can be shortened, a high-quality building can be constructed, and work for workers and construction machines can be performed. The environment is improved.

【0009】また前記揚重クレーンを複数基使用し、自
動制御によって同時に作動せしめることによって施工性
を著しく向上しうるものである。
Further, it is possible to remarkably improve the workability by using a plurality of the lifting cranes and simultaneously operating them by automatic control.

【図面の簡単な説明】[Brief description of drawings]

【図1】1階床における揚重クレーン設置工程を示す正
面図である。
FIG. 1 is a front view showing a lifting crane installation process on a first floor.

【図2】クレーン支柱の柱頭部に屋根及び養生囲いを装
架する工程を示す正面図である。
FIG. 2 is a front view showing a process of mounting a roof and a curing enclosure on a pillar head of a crane column.

【図3】前記クレーンによって建物を下階より構築して
いく工程を示す正面図である。
FIG. 3 is a front view showing a process of constructing a building from the lower floor by the crane.

【図4】クレーン支柱のクライミングによる屋根とクレ
ーンの揚重工程を示す正面図である。
FIG. 4 is a front view showing a hoisting process of a roof and a crane by climbing a crane pillar.

【図5】クレーン支柱を盛り替えながら最上階まで施工
する工程を示す正面図である。
FIG. 5 is a front view showing a process of constructing up to the top floor while refilling the crane columns.

【図6】図5の平面図である。FIG. 6 is a plan view of FIG.

【符号の説明】[Explanation of symbols]

A クレーン 1 クレーン支柱 2 屋根 3 養生囲い 4 柱 5 梁 A Crane 1 Crane support 2 Roof 3 Curing enclosure 4 Pillar 5 Beam

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 資材揚重クレーンの支柱の柱頭部に、建
物を覆う屋根及び養生囲いを装架し、前記支柱の盛替え
及びクライミングを行なうことを特徴とする仮設屋根の
架設方法。
1. A method of erection of a temporary roof, characterized in that a roof and a curing enclosure for covering a building are mounted on a pillar head of a pillar of a material hoisting crane, and the pillar is rearranged and climbed.
JP158292A 1992-01-08 1992-01-08 Construction method for temporary roof Pending JPH05179815A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP158292A JPH05179815A (en) 1992-01-08 1992-01-08 Construction method for temporary roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP158292A JPH05179815A (en) 1992-01-08 1992-01-08 Construction method for temporary roof

Publications (1)

Publication Number Publication Date
JPH05179815A true JPH05179815A (en) 1993-07-20

Family

ID=11505517

Family Applications (1)

Application Number Title Priority Date Filing Date
JP158292A Pending JPH05179815A (en) 1992-01-08 1992-01-08 Construction method for temporary roof

Country Status (1)

Country Link
JP (1) JPH05179815A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG95686A1 (en) * 2001-01-15 2003-04-23 Penta Ocean Construction Sheltered building construction method
JP2011017230A (en) * 2009-07-10 2011-01-27 Kajima Corp Scattering prevention device
CN105525760A (en) * 2015-09-30 2016-04-27 中建四局第一建筑工程有限公司 Conventionalized protection method and device for horizontal hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG95686A1 (en) * 2001-01-15 2003-04-23 Penta Ocean Construction Sheltered building construction method
JP2011017230A (en) * 2009-07-10 2011-01-27 Kajima Corp Scattering prevention device
CN105525760A (en) * 2015-09-30 2016-04-27 中建四局第一建筑工程有限公司 Conventionalized protection method and device for horizontal hole

Similar Documents

Publication Publication Date Title
JP3218519B2 (en) Building demolition method
JPH05179815A (en) Construction method for temporary roof
KR100980806B1 (en) Temporary construction system for the automation of building projects and construction method using the same
JP2957328B2 (en) Peripheral holding self-elevating construction method
JPH06323503A (en) Assembling method for large size suspension type boiler
JPH04237764A (en) Method for constructing high-strorey building
JP2002235446A (en) Demolition method of building
JPH04161566A (en) Constructing apparatus for large space building
JPH10245994A (en) Temporary curing body
JPH06156982A (en) Crane device
JP4437364B2 (en) Construction method of tower-like steel structure
JPH09137506A (en) Construction method of building
CN211110728U (en) Material lifting device for building engineering
JP2592980B2 (en) Construction method of steel frame material for high-rise structure
JPH08105229A (en) Construction of building
JP2779258B2 (en) Roof lift-up method
JPH0833030B2 (en) Construction method
JP2671967B2 (en) High-rise building construction method and construction beam assembly equipment
JP3177726B2 (en) Dismantling method of temporary shed for building structures
JPH1046838A (en) Method of demolition construction of building
JPH0447072A (en) Construction method for multistory building and its device
JPH11303403A (en) Constructing method of building using temporary roof frame
JPH06185124A (en) Skeleton constructing method and structural frame for use in the same
JPH0718246B2 (en) How to build a frame
JPH07139042A (en) Construction method for building frame and construction work frame used therefor