JPH0517913A - Form timbering for arch concrete depositing - Google Patents

Form timbering for arch concrete depositing

Info

Publication number
JPH0517913A
JPH0517913A JP19343991A JP19343991A JPH0517913A JP H0517913 A JPH0517913 A JP H0517913A JP 19343991 A JP19343991 A JP 19343991A JP 19343991 A JP19343991 A JP 19343991A JP H0517913 A JPH0517913 A JP H0517913A
Authority
JP
Japan
Prior art keywords
arch
truss
arch concrete
support
trusses
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19343991A
Other languages
Japanese (ja)
Other versions
JP2858176B2 (en
Inventor
Nobuyuki Matsugashita
信之 松ケ下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okabe Co Ltd
Original Assignee
Okabe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okabe Co Ltd filed Critical Okabe Co Ltd
Priority to JP19343991A priority Critical patent/JP2858176B2/en
Publication of JPH0517913A publication Critical patent/JPH0517913A/en
Application granted granted Critical
Publication of JP2858176B2 publication Critical patent/JP2858176B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To form a form timbering in an arch-shaped truss structure suited to the depositing of arch concrete which has a long span or is flat. CONSTITUTION:A pair of semiarch-shaped divided trusses 3 being so long as the length of the bisected span of an arch concrete 2 are formed, and the each lower end of the divided truss 3 is joined to an abutment 1, and the upper ends of the divided trusses 3 are mutually adjoined, and supported by posts 6 risingly provided on the ground 5 for forming a form timbering having truss structure wholly formed in an arch-shape.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、アーチ橋等におけるア
ーチコンクリートの施工に適用する型枠支保工に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a form support method applied to the construction of arch concrete in arch bridges and the like.

【0002】[0002]

【従来の技術】アーチ橋におけるようなアーチコンクリ
ートの施工に適用する型枠支保工については、例えば特
開昭63−272861号公報に記載されているような、橋台
(橋脚)間にアーチ形のトラスを架構することが行われ
るようになり、施工性及び経済性が著しく向上されるこ
とになった。
2. Description of the Related Art Formwork support applied to the construction of arch concrete, such as in arch bridges, is described in, for example, Japanese Patent Laid-Open No. 63-272861. The construction of trusses has come to be carried out, and the workability and economic efficiency have been significantly improved.

【0003】しかし、上記方式の型枠支保工でも、長大
なスパンのものにそのまま適用するとなると、大規模な
構造物となって、その利点が失われることになる。そこ
で、特開平 2−240311号公報に記載されているような、
分割して形成したトラスと支柱との組合せによる型枠支
保工が開発され、長大スパン或は扁平なアーチコンクリ
ートの施工に適用できるようになった。
However, even if the above-mentioned form supporting work is applied to a long span as it is, it will become a large-scale structure and its advantages will be lost. Therefore, as described in JP-A-2-240311,
Formwork supporting work has been developed by combining trusses and pillars formed by dividing, and it can be applied to construction of long span or flat arch concrete.

【0004】[0004]

【発明が解決しようとする課題】ところが、上記の分割
トラスを支持する支柱は、それが岩盤のように強固で沈
下するおそれのない地盤に立設される場合には、トラス
と支柱との荷重分担がほぼ設計通りに行われることにな
り、問題はない。
However, when the pillar supporting the above-mentioned divided truss is erected on the ground which is strong like rock and has no possibility of sinking, the load between the truss and the pillar is increased. Allocation will be done almost as designed, so there is no problem.

【0005】しかし、支柱は常に強固な地盤に立設でき
るとは限らず、地盤の状態や施工上の都合で、コンクリ
ートを打設した際、支柱が若干沈下することもある。そ
うした場合、トラスには設計値を越えた過大な荷重がか
かることになる。
However, the pillars cannot always be erected on a solid ground, and the pillars may sometimes sink a little when concrete is placed due to the condition of the ground and the convenience of construction. In that case, the truss will be overloaded, exceeding the design value.

【0006】それを防ぐには、沈下した支柱を元の高さ
に修正して、支柱への荷重分担を設計値に戻してやる必
要があるが、そのような支柱の高さ調節は非常に面倒で
あるばかりでなく、支保工への荷重配分も均等になりに
くいことになる。
In order to prevent this, it is necessary to correct the sunken column to the original height and restore the load sharing to the column to the design value, but such height adjustment of the column is very troublesome. Not only that, but it also makes it difficult to evenly distribute the load to the support work.

【0007】本発明は、上記の問題を解決するためにな
されたもので、支柱が若干沈下した場合に、支柱の高さ
を調節することなく、トラスと支柱との荷重配分の補
正、均等化が図れるようにした型枠支保工を提供しよう
とするものである。
The present invention has been made in order to solve the above problems, and when the prop is slightly submerged, the load distribution between the truss and the prop is corrected and equalized without adjusting the height of the prop. It is intended to provide a formwork support work that can be achieved.

【0008】[0008]

【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成について、実施例に対応する図面を参
照して説明すると、本発明は、アーチコンクリート2の
スパンを2分割した長さの分割トラス3,3を形成し、
それら各分割トラス3の下端部を橋台1に結合4すると
ともに、各分割トラス3の上端部を互いに隣接して、地
盤5に立設の支柱6により各別に支持7したことを特徴
とするものである。
The structure of the present invention for achieving the above object will be described with reference to the drawings corresponding to the embodiments. Sano split trusses 3 and 3 are formed,
The lower end of each of the divided trusses 3 is connected to the abutment 1, and the upper ends of the respective divided trusses 3 are adjacent to each other and are separately supported 7 by columns 6 standing on the ground 5. Is.

【0009】[0009]

【作用】分割トラス3の上端部を支柱6で支持する上記
型枠支保工では、支柱6が強固でない地盤に立設された
ような場合だとすると、コンクリートを打設した際、支
柱6が若干沈下することがある。この場合、分割トラス
3はその上端部が支柱6の沈下に追随して降下すること
になり、分割トラス3と支柱6との荷重配分はほぼ設計
通りの値に維持され、分割トラス3の方に過大な荷重の
かかるのを防止することができる。
In the formwork support work in which the upper ends of the split trusses 3 are supported by the support columns 6, assuming that the support columns 6 are erected on the ground that is not strong, when the concrete is placed, the support columns 6 slightly sink. I have something to do. In this case, the upper end of the split truss 3 follows the sinking of the support column 6 and descends, and the load distribution between the split truss 3 and the support column 6 is maintained at a value almost as designed. It is possible to prevent an excessive load from being applied to.

【0010】上記支柱の6の沈下は、通常、目立つほど
に大きなものではないから、それに追随する型枠8の変
形量も微細なものですみ、打設したアーチコンクリート
2に影響を及ぼすことは殆どない。
Since the subsidence of the pillar 6 is usually not noticeably large, the amount of deformation of the formwork 8 following it is also small, and it does not affect the placed arch concrete 2. Almost none.

【0011】[0011]

【実施例】図1は本発明支保工の1実施例の概要図で、
1はアーチコンクリート2を架設する橋台(橋脚であっ
てもよい)、3はアーチコンクリート2のスパンを約2
分割した長さに形成した分割トラスで、その上弦材はア
ーチコンクリート2の弧面に沿うように湾曲状に形成さ
れている。そして、分割トラス3はその2個がそれぞれ
下端部を橋台1,1に荷重受ピン4,4により回動自在
に支持され、上端部を互いに隣接して、地盤5に立設し
た支柱6,6の上端部と荷重受ピン7,7により回動自
在に連結、支持され、全体としてアーチ状の型枠支保工
全体が構成されるのである。この型枠支保工の上面には
アーチ状の型枠8が全体を通して設置されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a schematic view of one embodiment of the present invention,
1 is an abutment for erection of arch concrete 2 (may be a pier), 3 is span of arch concrete 2 of about 2
A divided truss formed into divided lengths, the upper chord of which is formed in a curved shape along the arc surface of the arch concrete 2. The two split trusses 3 are rotatably supported by the load receiving pins 4 and 4 at their lower ends on the abutments 1 and 1, respectively, and their upper ends are adjacent to each other. The upper end of 6 is rotatably connected and supported by the load receiving pins 7 and 7, and the whole arch-shaped form support is constructed as a whole. An arch-shaped frame 8 is installed throughout the upper surface of the frame support work.

【0012】分割トラス3は、図2に拡大して示すよう
に、湾曲した上弦材9と、上弦材9より短尺に形成され
た下弦材10とを多数の斜材11等により結合した構造とな
っており、その下端部は橋台1に固設した支持台12のブ
ラケット13に荷重受ピン4により枢支されている。他
方、上記分割トラス3,3を架設する橋台1,1間の中
央部の地盤5上には、支柱6,6が隣接して垂直状に立
設され、その上端部と各分割トラス3の上端部とが荷重
受ピン7により結合されており、この支柱6,6は、型
枠8を介して各分割トラス3,3にかかる鉛直荷重の1
部を分担することになる。
As shown in the enlarged view of FIG. 2, the split truss 3 has a structure in which a curved upper chord member 9 and a lower chord member 10 formed to be shorter than the upper chord member 9 are connected by a large number of diagonal members 11 or the like. The lower end portion is pivotally supported by a load receiving pin 4 on a bracket 13 of a support 12 fixed to the abutment 1. On the other hand, on the ground 5 at the center between the abutments 1 and 1 on which the above-mentioned divided trusses 3 and 3 are erected, pillars 6 and 6 are vertically erected adjacent to each other, and the upper end portion and The upper end is connected by a load receiving pin 7, and the columns 6 and 6 have a vertical load of 1 which is applied to each of the divided trusses 3 and 3 via the frame 8.
The division will be shared.

【0013】上記構成の型枠支保工は、施工するアーチ
コンクリートの奥行き方向に所要の間隔をおいて複数列
設し、互いに連結杆(図示を略す)を用いて結合する。
また、型枠8は、架構された上記型枠支保工の各上弦材
9,9に取付けたボルトやバタ材等の支持具14,14を介
して架設される。
The formwork supporting structure of the above construction is provided in a plurality of rows at a predetermined interval in the depth direction of the arch concrete to be constructed, and they are connected to each other using connecting rods (not shown).
Further, the mold 8 is erected via support tools 14 and 14 such as bolts and flaps attached to the upper chord members 9 and 9 of the above-described frame support of the frame.

【0014】なお、上記実施例においては、分割トラス
3はその上弦材9及び下弦材10を湾曲したものとしてい
るが、それら各材9,10は直状に形成することもでき
る。その場合、型枠8をアーチ形とするために、支持具
14を各支持個所において寸法の異るものにし、或は支持
具14による支持高さを変えてやるようにすればよい。
In the above embodiment, the split truss 3 has the upper chord member 9 and the lower chord member 10 which are curved, but the respective members 9 and 10 can be formed in a straight shape. In that case, in order to make the formwork 8 arch-shaped,
The size of the support 14 may be different at each support point, or the support height of the support tool 14 may be changed.

【0015】[0015]

【発明の効果】以上説明したように、本発明は、橋台間
に架設するアーチ形型枠支保工のトラスを2分割して、
その各分割トラスを橋台と支柱により各別に支持するよ
うにしたので、トラスの規模を特に大型とすることな
く、大スパンや扁平なアーチコンクリート用の支保工と
して適用することができ、支保工施設経費の節減と施工
能率の向上が期待できる。
As described above, according to the present invention, the truss of the arch-shaped frame supporting work installed between the abutments is divided into two,
Since each divided truss is individually supported by abutments and columns, it can be applied as a support work for large spans or flat arch concrete without increasing the size of the truss, and a support facility Expected to reduce costs and improve construction efficiency.

【0016】また、分割トラスを支持する支柱が地盤等
の状況で若干沈下することがあっても、分割トラスが各
別にその沈下に追随することになるので、ほぼ設計通り
の荷重配分が維持され、分割トラスへの過大な負荷の防
止が図れ、全体として支保工の経済性が良好になる等、
優れた効果を奏するものである。
Further, even if the pillars supporting the split trusses are slightly submerged in a situation such as the ground, the subdivision trusses follow the subdivisions separately, so that the load distribution is maintained almost as designed. , It is possible to prevent excessive load on the split truss, and the economical efficiency of supporting work is improved as a whole.
It has an excellent effect.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明支保工の1実施例を示す概要図である。FIG. 1 is a schematic view showing an embodiment of a support work of the present invention.

【図2】本発明支保工の略半部を示す拡大正面図であ
る。
FIG. 2 is an enlarged front view showing a substantially half part of the support work of the present invention.

【符号の説明】[Explanation of symbols]

1 脚台 2 アーチコンクリート 3 分割トラス 4 荷重受ピン 5 地盤 6 支柱 7 荷重受ピン 8 型枠 9 上弦材 10 下弦材 11 斜材 12 支持台 13 ブラケット 1 Leg stand 2 Arch concrete 3 Dividing truss 4 Load receiving pin 5 Ground 6 Pillar 7 Load receiving pin 8 Formwork 9 Upper chord member 10 Lower chord member 11 Diagonal member 12 Supporting base 13 Bracket

Claims (1)

【特許請求の範囲】 アーチコンクリートのスパンを2分割した長さの分割ト
ラスを形成し、それら各分割トラスの下端部を橋台に結
合するとともに、各分割トラスの上端部を互に隣接し
て、地盤に立設の支柱により各別に支持したことを特徴
とする、アーチコンクリート施工用の型枠支保工。
What is claimed is: 1. A split truss having a length obtained by dividing the span of arch concrete into two is formed, the lower ends of the split trusses are connected to an abutment, and the upper ends of the split trusses are adjacent to each other. Form support for arch concrete construction, which is supported separately by upright columns on the ground.
JP19343991A 1991-07-08 1991-07-08 Formwork support for construction of art concrete Expired - Lifetime JP2858176B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19343991A JP2858176B2 (en) 1991-07-08 1991-07-08 Formwork support for construction of art concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19343991A JP2858176B2 (en) 1991-07-08 1991-07-08 Formwork support for construction of art concrete

Publications (2)

Publication Number Publication Date
JPH0517913A true JPH0517913A (en) 1993-01-26
JP2858176B2 JP2858176B2 (en) 1999-02-17

Family

ID=16308010

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19343991A Expired - Lifetime JP2858176B2 (en) 1991-07-08 1991-07-08 Formwork support for construction of art concrete

Country Status (1)

Country Link
JP (1) JP2858176B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778000A (en) * 2019-11-27 2020-02-11 中冶京诚工程技术有限公司 Arch truss structure for sealing material warehouse
CN113981824A (en) * 2021-10-15 2022-01-28 中建桥梁有限公司 Ground counter-force prepressing device for arch truss

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778000A (en) * 2019-11-27 2020-02-11 中冶京诚工程技术有限公司 Arch truss structure for sealing material warehouse
CN113981824A (en) * 2021-10-15 2022-01-28 中建桥梁有限公司 Ground counter-force prepressing device for arch truss

Also Published As

Publication number Publication date
JP2858176B2 (en) 1999-02-17

Similar Documents

Publication Publication Date Title
CN107190647A (en) A kind of alignment control apparatus and method suitable for the special-shaped tower of steel construction
CN209428971U (en) The Y structure construction bracket structure of battered leg stress can be adjusted in real time
JPH0517913A (en) Form timbering for arch concrete depositing
CN115680181B (en) Material-saving and wind-resistant cable-membrane structure building and construction method thereof
JPH09217321A (en) Arch concrete work execution method
CN109537470A (en) The Y structure construction bracket structure of battered leg stress can be adjusted in real time
CN103015304B (en) Prestressed concrete variable-cross-section box girder bridge with internal tilted-leg rigid frame and construction method of prestressed concrete variable-cross-section box girder bridge
JP2691260B2 (en) Form support for arch concrete construction
CN111877126B (en) Method for installing arch ring of arch bridge
US20210254337A1 (en) Extended roof truss with outboard purlins having load supporting k-trusses at extensions
JPH09250110A (en) Construction method of arch concrete
JP2700163B2 (en) Formwork support for arch concrete construction
JP2977270B2 (en) Formwork support for arch concrete construction
JP2553357B2 (en) Support device for formwork support for arch concrete construction
JP2977273B2 (en) Formwork support for arch concrete construction
CN218059930U (en) Steel pipe concrete arch bridge arch rib vertical splicing hydraulic jig frame
JP2516358B2 (en) Form support for arch concrete construction
JPH09217320A (en) Arch concrete work execution method
JP2977272B2 (en) Formwork support for arch concrete construction
CN210712577U (en) Temporary support for mounting of arch continuous steel box girder
JPH08312160A (en) Reinforcing structure of sill frame in moving building
JP2977271B2 (en) Formwork support for arch concrete construction
JPH10183998A (en) Form timbering for building arched concrete body
JP2516357B2 (en) Form support for arch concrete construction
JP2691262B2 (en) Facility method of arch form support