JPH05163839A - Method and device for conveying provisionally equipped material of building under construction to upper floor - Google Patents

Method and device for conveying provisionally equipped material of building under construction to upper floor

Info

Publication number
JPH05163839A
JPH05163839A JP35217091A JP35217091A JPH05163839A JP H05163839 A JPH05163839 A JP H05163839A JP 35217091 A JP35217091 A JP 35217091A JP 35217091 A JP35217091 A JP 35217091A JP H05163839 A JPH05163839 A JP H05163839A
Authority
JP
Japan
Prior art keywords
slab
floor
pillar
under construction
building under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP35217091A
Other languages
Japanese (ja)
Other versions
JP2696284B2 (en
Inventor
Yoshinori Fujita
藤田義則
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nikko Co Ltd
Nikko KK
Original Assignee
Nikko Co Ltd
Nikko KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikko Co Ltd, Nikko KK filed Critical Nikko Co Ltd
Priority to JP35217091A priority Critical patent/JP2696284B2/en
Publication of JPH05163839A publication Critical patent/JPH05163839A/en
Application granted granted Critical
Publication of JP2696284B2 publication Critical patent/JP2696284B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To mechanize the operation in a building under construction for conveying a dismantled pipe support of a floor, whose slab construction is completed, to an over-situated floor, and thereby accomplish effective operations. CONSTITUTION:A base frame 7 is installed in a place right under a slab opening 3 in the floor surface whose works with slab installation are completed. A plurality of unitary pipes 4a, 4b, 4c are spliced on this base frame 7 to erect a prop 6 stretching over three floors. An elevating/sinking winch 18 is installed on the top of the prop 6, and a table 14 for conveyance is hung by this winch 18 with capability of elevating and sinking, and a pipe support A is placed on the table 14 and conveyed to over-floor.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建築中のビルのスラブに
設けたスラブ開口を利用して仮設機材を上層階に搬送す
る方法及び装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for transporting temporary equipment to an upper floor by utilizing a slab opening provided in a slab of a building under construction.

【0002】[0002]

【従来の技術】小規模なマンションやビル工事等では各
階のスラブを施工をする場合、コンクリート型枠用パネ
ル(以下「コンパネ」という)により形成した型枠を下
方からパイプサポートにより支持し、その型枠内に生コ
ンクリートを流し込んで床面を形成することが多く、こ
のスラブの施工は下層階から上層階へと順次工事を進め
ていく。このスラブの施工は、先ず一階及び二階の天井
部にあたるスラブを施工する。そして三階のスラブを施
工する段階では一階のスラブの施工が完了しているので
このスラブを支持するパイプサポートとコンパネを解体
し、これらを三階まで持ち上げるようにしている。図3
はその作業状況を示す図であり、一階の作業員が解体し
たパイプサポートAを持ち上げ、一階のスラブBに予め
設けてあるスラブ開口部Cと呼ばれる比較的小さな開口
を通して二階に待機する作業員に手渡す。更に二階の作
業員は受け取ったパイプサポートAを持ち上げて二階の
スラブ開口部より三階のの作業員に手渡している。この
ように3名の作業員の連繋作業によりパイプサポートを
上層階に搬送している。
2. Description of the Related Art When constructing a slab on each floor in a small-scale condominium or building construction, a formwork formed by a concrete formwork panel (hereinafter referred to as "control panel") is supported by a pipe support from below, In many cases, ready-mixed concrete is poured into the formwork to form the floor surface, and the construction of this slab will proceed sequentially from the lower floors to the upper floors. As for the construction of this slab, first, the slab corresponding to the ceiling of the first and second floors is constructed. At the stage of constructing the slab on the third floor, the construction of the slab on the first floor has been completed, so the pipe support and control panel that support this slab are dismantled and they are lifted to the third floor. Figure 3
Is a diagram showing the work situation, in which a worker on the first floor lifts the disassembled pipe support A and waits on the second floor through a relatively small opening called a slab opening C provided in advance on the slab B on the first floor. Hand over to a member. Further, the worker on the second floor lifts the received pipe support A and hands it to the worker on the third floor through the slab opening on the second floor. In this way, the pipe support is transported to the upper floors by the work of connecting three workers.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記の
ようにパイプサポートなどの仮設機材を手渡しによって
上層階に持ち上げる作業は、大変労力を要するきつい作
業であった。
However, as described above, the work of manually lifting temporary equipment such as pipe supports to the upper floors is a labor-intensive work.

【0004】本発明は上記の点に鑑み、スラブ施工の完
了に伴って解体したパイプサポートなどの仮設機材を上
層階に搬送する作業を極力機械化して効率良く行なうよ
うにすることを目的とする。
In view of the above points, an object of the present invention is to mechanically and efficiently carry out the work of transporting temporary equipment, such as pipe supports, dismantled after the completion of slab construction, to the upper floors as much as possible. ..

【0005】[0005]

【課題を解決するための手段】本発明は上記の目的を達
成するために、複数個の単管を連結してビルの三階層の
高さとなる支柱と、該支柱の基礎台となるベースフレー
ムと、前記支柱の頂上部に取り付ける昇降用ウインチ
と、該昇降用ウインチにより吊り下げて前記支柱に沿っ
て建築中のビルのスラブ開口部を昇降する搬送用荷台と
よりなる仮設機材搬送装置をスラブ開口部に組み立て、
この搬送装置を利用してパイプサポートを上層階に搬送
するものである。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention is to support a pillar that connects a plurality of single pipes and has a height of three levels of a building, and a base frame that serves as a base of the pillar. A slab for temporary equipment transporting equipment, including a lifting winch attached to the top of the pillar, and a carrier bed that is hung by the lifting winch and lifts and lowers a slab opening of a building under construction along the pillar. Assemble in the opening,
This transport device is used to transport the pipe support to the upper floors.

【0006】[0006]

【作用】本発明によれば、解体したパイプサポートやコ
ンパネなどの仮設機材を下層階から上層階に搬送する場
合、先ずスラブ施工の完了した階の床面上のスラブ開口
部真下に位置する所にベースフレームを設置し、このベ
ースフレーム上に複数個の単管を垂直に立てて連結して
三階層の高さに達する支柱を組み上げる。そしてこの支
柱を補強材を使用しながら安定して自立させ、該支柱の
頂上部に昇降用ウインチを取り付ける。次に昇降用ウイ
ンチによって昇降する搬送用荷台を前記支柱に沿って昇
降自在に取り付け、仮設機材を搬送するための装置をス
ラブ開口部に組み立てる。
According to the present invention, when temporary equipment such as dismantled pipe supports and control panels is transported from the lower floors to the upper floors, first, it is located directly below the slab opening on the floor of the floor where slab construction has been completed. A base frame is installed on the base frame, and a plurality of single pipes are vertically erected on the base frame and connected to each other to assemble columns that reach three levels of height. Then, this pillar is stably made to stand by itself using a reinforcing material, and a lifting winch is attached to the top of the pillar. Next, a carrier for lifting and lowering by means of a lifting winch is attached so as to be able to move up and down along the pillar, and a device for transferring temporary equipment is assembled in the slab opening.

【0007】そして一階層目と三階層目に作業員を配置
し、一階層目の作業員がスラブ施工の完了に伴って解体
したパイプサポートを仮設機材搬送装置の搬送用荷台に
乗せ、昇降用ウインチの操作ボタンを操作して三階層に
持ち上げる。そして三階層に待機した作業員がこのパイ
プサポートを降ろす。このようにして解体したパイプサ
ポートを上層階に次々搬送していくのである。
Workers are arranged in the first and third layers, and the pipe support dismantled by the worker in the first layer is disassembled when the slab construction is completed, and is placed on the carrier bed of the temporary equipment carrier for lifting. Operate the operation button on the winch and lift it up to three levels. Then, the worker who waits on the third floor lowers this pipe support. The pipe supports dismantled in this way are conveyed to the upper floors one after another.

【0008】[0008]

【実施例】以下本発明の実施例を図1、図2に基づいて
説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of the present invention will be described below with reference to FIGS.

【0009】1は建築中のビルのスラブ2に設けたスラ
ブ開口部3に組み立てた仮設機材搬送装置であって、ビ
ルの三階層に渡って組み上げている。
Reference numeral 1 denotes a temporary equipment conveying device assembled in a slab opening 3 provided in a slab 2 of a building under construction, which is assembled over three levels of the building.

【0010】この仮設機材搬送装置1は、ほぼ一階層の
高さに相当する長さを有する単管4a、4b、4cをジ
ョイント部材5にて連結して三階層に達する高さの支柱
6とし、これを所定間隔を隔てて垂直に二本組み上げて
おり、その二本の支柱6は基礎台となるベースフレーム
7に立設した支持管8に形成したジョイント部9に嵌入
して固定される。
In this temporary equipment carrier 1, a single-pipe 4a, 4b, 4c having a length corresponding to the height of one floor is connected by a joint member 5 to form a column 6 having a height reaching three floors. , Two of them are vertically assembled at a predetermined interval, and the two pillars 6 are fixed by fitting into a joint portion 9 formed on a support pipe 8 standing on a base frame 7 serving as a base. ..

【0011】そして二本の支柱6の途中には間隔保持の
ための間隔保持具10を取り付けており、また支柱6の
揺れ防止のために揺れ防止具11を単管4a、4bに嵌
め込んでその両端部をスラブ2の開口縁部に係止させて
いる。更に支柱6の頂上部にはジョイント部を両端部に
形成した横パイプ12を嵌め込み、この横パイプ12に
支柱6の垂直安定のために固定用ワイヤ13を取り付け
てその先端部をスラブ2に固定している。
A space holding tool 10 for holding a space is attached in the middle of the two columns 6, and a shaking prevention tool 11 is fitted into the single pipes 4a and 4b to prevent the columns 6 from shaking. Both ends thereof are locked to the opening edge of the slab 2. Further, a horizontal pipe 12 having joints formed at both ends is fitted on the top of the pillar 6, and a fixing wire 13 is attached to the horizontal pipe 12 for vertically stabilizing the pillar 6, and the tip end thereof is fixed to the slab 2. is doing.

【0012】14は仮設機材を搭載して上層階へ搬送す
る搬送用荷台であって、該搬送用荷台14は支柱6に沿
って昇降するように支柱6に面する両側の適宜位置にガ
イドローラ15を取り付けている。搬送用荷台14はパ
イプサポートAを積み込める大きさの箱型形状としてあ
り、またパイプサポートAを立てた状態で安定して搬送
できるようにパイプサポートを掴むクランプ金具を適宜
備えるようにすると良く、更にコンパネを搬送する時に
はコンパネを搭載できるようなアタッチメントを適宜備
えるようにすると良い。
Reference numeral 14 denotes a carrier bed for carrying temporary equipment and carrying it to the upper floors. The carrier bed 14 is guided along appropriate positions on both sides of the pillar 6 so as to move up and down along the pillar 6. 15 is attached. The carrier bed 14 has a box shape having a size capable of loading the pipe support A, and may be appropriately provided with a clamp metal fitting for grasping the pipe support so that the pipe support A can be stably transported in a standing state. Further, when the control panel is transported, it is preferable to appropriately provide an attachment for mounting the control panel.

【0013】前記支柱6の頂上部の横パイプ12には吊
り下げ金具16を具備した吊り部材17が固着してあ
り、該吊り下げ金具16に昇降用ウインチ18を吊り下
げ、該昇降用ウインチ18のワイヤ19の吊りフックを
前記搬送用荷台14の吊り金具に引っ掛けている。そし
て一階層と三階層に相当する位置に昇降用ウインチ18
を操作するスイッチボックス20、21を垂らし、一階
層と三階層に待機する作業員がスイッチボックス20ま
たは21を操作して搬送用荷台14を自在に昇降できる
ようになっている。
A suspending member 17 having a suspending metal fitting 16 is fixedly attached to the horizontal pipe 12 at the top of the support column 6, and an elevating winch 18 is suspended from the suspending metal fitting 16 and the elevating winch 18 is lifted. The hanging hook of the wire 19 is hooked on the hanging metal fitting of the carrier bed 14. And the winch 18 for raising and lowering at the position corresponding to the first and third floors.
The switch boxes 20 and 21 for operating the switch are hung down, and an operator standing by in the first and third layers can operate the switch boxes 20 and 21 to freely move the carrier bed 14 up and down.

【0014】次に、前記仮設機材搬送装置1により仮設
機材を上層階に搬送する方法について説明する。
Next, a method of transporting the temporary equipment to the upper floor by the temporary equipment transporting device 1 will be described.

【0015】先ず、仮設機材搬送装置1のベースフレー
ム7をスラブ施工が完了して仮設機材を搬出しようとす
る階の床面上のスラブ開口部3真下に位置する所に設置
する。このベースフレーム7上に搬送用荷台14を自立
させてから一段目の二本の単管4aを支持管8のジョイ
ント部9に挿入して搬送用荷台14のガイドローラ15
を挟み込みながら垂直に立てる。次に一段目の単管4a
の上に二段目、三段目の単管4b、4cをジョイント部
材5を介して連結して3階層の高さに達する二本の支柱
6を組み上げる。そして支柱6の頂上部に横パイプ12
を嵌め込むと共に間隔保持具10を取り付け、更に支柱
6に嵌着した揺れ防止具11をスラブ2の開口縁部に係
止すると共に固定用ワイヤ13を張設して支柱6を安定
して自立させる。
First, the base frame 7 of the temporary equipment transporting device 1 is installed at a position just below the slab opening 3 on the floor of the floor where the slab construction is completed and the temporary equipment is to be carried out. After the carrier bed 14 is self-supporting on the base frame 7, the two single pipes 4a of the first stage are inserted into the joint portion 9 of the support tube 8 to guide the carrier rollers 14 of the carrier bed 14.
Stand vertically while sandwiching. Next, the first stage single tube 4a
The second and third stage single pipes 4b and 4c are connected to each other via a joint member 5 to assemble two columns 6 reaching a height of three layers. And at the top of the pillar 6, a horizontal pipe 12
And the space holder 10 is attached, and further, the shaking prevention tool 11 fitted to the support 6 is locked to the opening edge of the slab 2 and the fixing wire 13 is stretched to stably support the support 6 independently. Let

【0016】続いて、支柱6の頂上部の吊り下げ金具1
6に昇降用ウインチ18を吊り下げ、昇降用ウインチ1
8のワイヤ19の吊りフックを搬送用荷台14に引っ掛
ける。そして昇降用ウインチ18の駆動用のスイッチボ
ックス20を三階層目に、更にもう一つのスイッチボッ
クス21を一階層目に垂らして作業員が操作できるよう
にする。これで仮設機材搬送装置1の組み立てが完了す
る。
Subsequently, the hanging metal fitting 1 on the top of the column 6
6. Lifting winch 18 for lifting and lowering winch 1
The hanging hook of the wire 19 of No. 8 is hooked on the carrier bed 14. The switch box 20 for driving the lifting winch 18 is hung on the third layer, and the other switch box 21 is hung on the first layer so that the operator can operate. This completes the assembly of the temporary equipment carrier 1.

【0017】そして、一階層目と三階層目に作業員を配
置し、一階層目の作業員がスラブ施工に伴って解体した
パイプサポートAを適宜数個づつ搬送用荷台14に積み
込んで倒れないように固定した後、スイッチボックス2
1を操作して三階層目まで搬送する。そして三階層目に
待機する作業員がこのパイプサポートAを降ろし、その
後スイッチボックス20を操作して搬送用荷台14を階
下に降下させる。このような作業の繰り返しによりスラ
ブ施工の完了した下層階の仮設機材を上層階に搬送する
のである。
Workers are arranged in the first and third layers, and the pipe support A disassembled by the worker in the first layer is appropriately stacked on the carrier bed 14 for every several pieces and cannot fall. Switch box 2 after fixing
Operate 1 to convey to the third layer. Then, a worker standing by on the third floor lowers the pipe support A, and then operates the switch box 20 to lower the carrying platform 14 downstairs. By repeating such work, the temporary equipment on the lower floor, for which the slab construction has been completed, is transported to the upper floor.

【0018】なお、本実施例では支柱6の頂上部の吊り
金具16に昇降用ウインチ18を取り付けるようにした
が、昇降用ウインチ18が重量物で取り付けにくい時に
は三階層目のスラブに昇降用ウインチを設置し、該昇降
用ウインチのワイヤを支柱6頂上部に取り付ける滑車に
巻き回して搬送用荷台14を吊り下げるようにしても良
い。また、本実施例ではほぼ一階層の高さに相当する長
さを有する単管4a、4b、4cを連結して三階層に達
する高さの支柱6を組み上げるようにしたが、単管の長
さは、組み立て、解体、及び持ち運びにおいて取り扱い
やすい適宜な長さであれば良く、要は単管を連結して三
階層の高さにほぼ相当する長さとなれば良い。
In this embodiment, the lifting winch 18 is attached to the hanging metal fitting 16 at the top of the support column 6. However, when the lifting winch 18 is heavy and difficult to attach, the lifting winch is attached to the slab of the third layer. May be installed, and the wire of the lifting winch may be wound around a pulley attached to the top of the column 6 to suspend the carrier bed 14. Further, in the present embodiment, the single pipes 4a, 4b, 4c having a length corresponding to the height of almost one layer are connected to assemble the support column 6 having a height reaching three layers. The length may be an appropriate length that is easy to handle during assembly, disassembly, and transportation, and the point is that the single pipes are connected to each other and the length is approximately equivalent to the height of three layers.

【0019】[0019]

【発明の効果】以上のように本発明によれば、仮設機材
を上層階に搬送する時に、スラブ2に開口したスラブ開
口部3に複数個の単管4a、4b、4cを垂直に立てて
連結して三階層の高さに達する支柱6を組み上げ、該支
柱6の頂上部に昇降用ウインチ18を取り付け、該昇降
用ウインチ18によって仮設機材搬送用荷台14を昇降
自在に吊り下げて仮設機材を搬送するための装置を組み
立て、この組み立てた仮設機材搬送装置1にて仮設機材
を上層階に搬送するようにしたので、従来3人の作業員
で行なっていた搬送作業を2人の作業員で行なうことが
でき、また機械化により作業の効率化が図れると共に作
業員の負担も軽減することができる。
As described above, according to the present invention, a plurality of single pipes 4a, 4b, 4c are erected vertically in the slab opening 3 opened in the slab 2 when the temporary equipment is transported to the upper floor. Assemble the columns 6 connected to reach the height of three levels, attach a lifting winch 18 to the top of the columns 6, and use the lifting winch 18 to suspend the temporary equipment carrier platform 14 so that it can be raised and lowered. Since the apparatus for transporting the temporary equipment is assembled and the temporary equipment transporting device 1 thus assembled is used to transport the temporary equipment to the upper floors, the transportation work which was conventionally performed by three workers is performed by two workers. In addition, the work efficiency can be improved by mechanization and the burden on the worker can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の仮設機材搬送装置の一部省略正面図で
ある。
FIG. 1 is a partially omitted front view of a temporary equipment transporting device of the present invention.

【図2】同上の側面図である。FIG. 2 is a side view of the above.

【図3】従来の搬送作業を説明する図である。FIG. 3 is a diagram illustrating a conventional transfer operation.

【符号の説明】[Explanation of symbols]

1…仮設機材搬送装置 2…スラブ 3…スラブ開口部 4a、4b、4
c…単管 6…支柱 7…ベースフレ
ーム 14…搬送用荷台 15…ガイドロ
ーラ 18…昇降用ウインチ 20、21…ス
イッチボックス
DESCRIPTION OF SYMBOLS 1 ... Temporary equipment conveyance device 2 ... Slab 3 ... Slab opening 4a, 4b, 4
c ... Single pipe 6 ... Strut 7 ... Base frame 14 ... Transport bed 15 ... Guide roller 18 ... Elevating winch 20, 21 ... Switch box

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】建築中ビルのスラブに設けているスラブ開
口部に複数個の単管を垂直に立てて連結して三階層の高
さに達する支柱を組み上げ、該支柱の頂上部に昇降用ウ
インチを取り付けると共に、該昇降用ウインチによって
昇降する搬送用荷台を前記支柱に沿って昇降自在に取り
付け、スラブ施工の完了に伴って解体した仮設機材を前
記搬送用荷台に搭載し、昇降用ウインチを作動して次の
スラブ施工準備を行なう上層階まで持ち上げるようにし
たことを特徴とする建築中ビルの仮設機材の上層階への
搬送方法。
1. A plurality of single pipes are vertically erected and connected to a slab opening provided in a slab of a building under construction to assemble a column that reaches a height of three levels, and to elevate to the top of the column. A winch is attached, and a carrier bed that moves up and down by the lifting winch is attached to the pillar so that it can be lifted and lowered. A method for transporting temporary equipment of a building under construction to the upper floors, which is characterized in that it is lifted up to the upper floors to operate and prepare for the next slab construction.
【請求項2】複数個の単管を連結してビルの三階層の高
さとなる支柱と、該支柱の基礎台となるベースフレーム
と、前記支柱の頂上部に取り付ける昇降用ウインチと、
該昇降用ウインチにより吊り下げて前記支柱に沿って建
築中のビルのスラブ開口部を昇降する搬送用荷台とより
なることを特徴とする建築中ビルの仮設機材の上層階へ
の搬送装置。
2. A pillar that connects a plurality of single pipes and has a height of three levels of a building, a base frame that serves as a base of the pillar, and a lifting winch attached to the top of the pillar.
A transport device for transporting a temporary material of a building under construction to an upper floor of a building under construction, which is hung by the lifting winch and lifted up and down the slab opening of the building under construction along the pillar.
JP35217091A 1991-12-13 1991-12-13 Method and apparatus for transporting temporary equipment of a building under construction to upper floors Expired - Fee Related JP2696284B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35217091A JP2696284B2 (en) 1991-12-13 1991-12-13 Method and apparatus for transporting temporary equipment of a building under construction to upper floors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35217091A JP2696284B2 (en) 1991-12-13 1991-12-13 Method and apparatus for transporting temporary equipment of a building under construction to upper floors

Publications (2)

Publication Number Publication Date
JPH05163839A true JPH05163839A (en) 1993-06-29
JP2696284B2 JP2696284B2 (en) 1998-01-14

Family

ID=18422261

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35217091A Expired - Fee Related JP2696284B2 (en) 1991-12-13 1991-12-13 Method and apparatus for transporting temporary equipment of a building under construction to upper floors

Country Status (1)

Country Link
JP (1) JP2696284B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006241897A (en) * 2005-03-04 2006-09-14 Kyanpekkusu Kogyo Kk Material carrying lift device used for construction scaffolding
JP2013036267A (en) * 2011-08-10 2013-02-21 Sumitomo Mitsui Construction Co Ltd Method of constructing multi-story apartment house
CN104030190A (en) * 2014-06-23 2014-09-10 山东电力建设第一工程公司 Synchronous lifting platform for installation of vertical large-diameter pipelines

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006241897A (en) * 2005-03-04 2006-09-14 Kyanpekkusu Kogyo Kk Material carrying lift device used for construction scaffolding
JP4654055B2 (en) * 2005-03-04 2011-03-16 キャンペックス工業株式会社 Lifting device for material transportation used for building scaffolding
JP2013036267A (en) * 2011-08-10 2013-02-21 Sumitomo Mitsui Construction Co Ltd Method of constructing multi-story apartment house
CN104030190A (en) * 2014-06-23 2014-09-10 山东电力建设第一工程公司 Synchronous lifting platform for installation of vertical large-diameter pipelines
CN104030190B (en) * 2014-06-23 2016-03-23 山东电力建设第一工程公司 Synchronous lifting platform installed by vertical large diameter pipeline

Also Published As

Publication number Publication date
JP2696284B2 (en) 1998-01-14

Similar Documents

Publication Publication Date Title
JP2696284B2 (en) Method and apparatus for transporting temporary equipment of a building under construction to upper floors
JP2000145129A (en) Staging provided with load lifter
JP2001132274A (en) Method and apparatus for constructing steel tower
JP2913216B2 (en) Building construction method
JP3073384B2 (en) Exterior wall unit mounting device
JP3218523B2 (en) Dismantling method of frame of outer curing coating
JP4518982B2 (en) Brick arranging apparatus and method for converter
JPH05263531A (en) Automatic construction method and lifting-up device of structure
CN111005477A (en) Construction device for light partition board and use method thereof
JPH05113026A (en) Temporary scaffold structure
JP2712121B2 (en) Reinforcing bar mounting method, hanging jig used in the mounting method, and guide device
JP6718392B2 (en) How to suspend and remove concrete slabs
JP2000053375A (en) Vertical carrier system corresponding to slewing overhead crane
JPH08199854A (en) Method and device for building towerlike construction
JPH07324487A (en) Horizontal conveying system
JPH09125578A (en) Fitting device and fitting method for floor member
JPH09328289A (en) Vertical heavy-load lift of overhead crane and conveying method using it
JPH04237769A (en) Climb-up method and device for constructing building
JPH10131497A (en) Temporary placing method of long material and device thereof
JP5932678B2 (en) Molded sheet roof material forming and conveying system
JPS5855236Y2 (en) Converter bricklaying equipment
JPH08312149A (en) Temporary frame device for construction
JPH08312143A (en) Temporary frame device for construction
JPH05209451A (en) Roofing method for large building, and roof sheathing conveyor to be used for the method
JP2002030803A (en) Scaffold in boiler and installing method therefor

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees