JPH0514971A - Data collection device - Google Patents

Data collection device

Info

Publication number
JPH0514971A
JPH0514971A JP15930091A JP15930091A JPH0514971A JP H0514971 A JPH0514971 A JP H0514971A JP 15930091 A JP15930091 A JP 15930091A JP 15930091 A JP15930091 A JP 15930091A JP H0514971 A JPH0514971 A JP H0514971A
Authority
JP
Japan
Prior art keywords
data
processing unit
measurement data
central office
cycle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15930091A
Other languages
Japanese (ja)
Inventor
Takayuki Kawano
高由樹 川野
Takashi Yura
隆 由良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP15930091A priority Critical patent/JPH0514971A/en
Publication of JPH0514971A publication Critical patent/JPH0514971A/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

PURPOSE:To reduce the load on a transmission line and a central office processor in a data collection device composed of the central office and plural terminal offices inputting and collecting data. CONSTITUTION:Measured data is periodically collected in an analog data input processing part 1 and is stored in a storage processing part 2, and the measured data is checked by the judgment and check conditions set preliminarily in a data check processing part 5 and outputs a transmission command to a data transmission gate part 3 when the data is judged that it is necessary to transmit to a central office. The data transmission gate part 3 outputs the measured data stored in a storage processing part 2 for a period when it received the transmission command to a data transmission processing part 4 and the measured data for this period is transmitted to the central office with longer cycle than the said collection cycle from the data transmission processing part 4.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、複数の端末局で収集
した計測データを自動的に中央局へ伝送するデータ収集
装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a data collecting device for automatically transmitting measurement data collected by a plurality of terminal stations to a central station.

【0002】[0002]

【従来の技術】図3は例えば発明協会発行の公開技報番
号90−15468号に示された従来のデータ収集装置
に於ける端末局側の処理を示すブロック図である。図に
おいて1は計測データとしてのアナログ値を周期的に入
力収集するアナログデータ入力処理部、2はアナログデ
ータ入力処理部1により入力された計測データを一時的
に蓄積しておく記憶処理部、4は記憶処理部2に蓄積さ
れた計測データを上記入力周期よりも長い周期で周期的
に中央局に送信するデータ送信処理部である。
2. Description of the Related Art FIG. 3 is a block diagram showing the processing on the terminal station side in a conventional data collecting apparatus disclosed in, for example, the public technical report No. 90-15468 issued by the Institute of Invention and Innovation. In the figure, 1 is an analog data input processing unit for periodically inputting and collecting analog values as measurement data, 2 is a storage processing unit for temporarily storing the measurement data input by the analog data input processing unit 4, 4 Is a data transmission processing unit that periodically transmits the measurement data accumulated in the storage processing unit 2 to the central office at a cycle longer than the input cycle.

【0003】次に動作について説明する。アナログデー
タ入力処理部1によって比較的短い周期で入力され収集
された計測データを、記憶処理部2に一時的に保持した
後、データ送信処理部4で上記収集周期よりも長い周期
で中央局(図示せず)へ送信する。
Next, the operation will be described. After the measurement data input and collected by the analog data input processing unit 1 in a relatively short cycle is temporarily held in the storage processing unit 2, the data transmission processing unit 4 stores the measurement data in a central station (cycle) longer than the collection cycle. (Not shown).

【0004】[0004]

【発明が解決しようとする課題】従来のデータ収集装置
は以上のように構成されており、収集された計測データ
を周期的に常時中央局へ伝送しているので、端末局の数
および一端末局当りの計測データ量が増加すると、伝送
路および中央局の処理装置にかなりの負荷がかかるとい
う課題があった。
The conventional data collecting apparatus is constructed as described above, and since the collected measurement data is constantly transmitted to the central station periodically, the number of terminal stations and one terminal When the amount of measured data per station increases, there is a problem that a considerable load is applied to the transmission line and the processing device of the central station.

【0005】この発明は上記のような課題を解決するた
めになされたものであり、最低限必要な計測データのみ
を、必要な際にのみ中央局へ送信することで、伝送路お
よび中央局の処理装置の負荷を最小にできるデータ収集
装置を得ることを目的としている。
The present invention has been made in order to solve the above problems, and by transmitting only the minimum necessary measurement data to the central office only when necessary, the transmission line and the central office It is an object of the present invention to obtain a data collection device that can minimize the load on the processing device.

【0006】[0006]

【課題を解決するための手段】この発明に係るデータ収
集装置は、所定の周期で入力収集された計測データを記
憶する記憶処理部、上記計測データをあらかじめ指定さ
れた所定の条件によりチェックし中央局へ送信するかを
判断するデータチェック処理部、このデータチェック処
理部で送信すると判断された期間の上記記憶処理部に記
憶された計測データを上記入力周期よりも長い周期で中
央局へ送信する送信手段を設けたものである。
A data collection device according to the present invention comprises a storage processing unit for storing measurement data input and collected at a predetermined cycle, and a central processing unit for checking the measurement data according to a predetermined condition designated in advance. A data check processing unit that determines whether the data is to be transmitted to the central office, and the measurement data stored in the storage processing unit during the period when the data check processing unit determines to transmit the data is transmitted to the central station at a cycle longer than the input cycle. The transmission means is provided.

【0007】[0007]

【作用】この発明におけるデータ収集装置は、所定の周
期で入力収集された計測データを記憶処理部に記憶する
と共に、データチェック処理部であらかじめ指定された
所定の条件によりチェックし、このチェックの結果中央
局へ送信すると判断された期間の計測データのみを、記
憶処理部から送信手段により上記入力周期よりも長い周
期で中央局へ送信する。
The data collecting device according to the present invention stores the measurement data input and collected in a predetermined cycle in the storage processing unit and checks the data according to a predetermined condition designated in advance by the data check processing unit. Only the measurement data of the period determined to be transmitted to the central station is transmitted from the storage processing section to the central station by the transmitting means in a cycle longer than the input cycle.

【0008】[0008]

【実施例】実施例1.以下、この発明の一実施例を図に
ついて説明する。図1において、1はアナログデータの
値を計測データとして周期的に入力収集するアナログデ
ータ入力処理部、2はアナログデータ入力処理部1によ
り入力された計測データを一時的に蓄積しておく記憶処
理部、3は指示された期間の計測データを記憶処理部2
から取り出すデータ送信ゲート部、4は記憶処理部2に
蓄積された計測データの内データ送信ゲート部3で取り
出された計測データを上記入力周期よりも長い周期で周
期的に中央局に送信するデータ送信処理部、5はアナロ
グデータ入力処理部1により入力された計測データを所
定の条件によりチェックし、中央局へ送信すべきかどう
かを判断してデータ送信ゲート部3に指示を与えるデー
タチェック処理部である。
EXAMPLES Example 1. An embodiment of the present invention will be described below with reference to the drawings. In FIG. 1, reference numeral 1 is an analog data input processing unit that periodically inputs and collects analog data values as measurement data, and 2 is a storage process that temporarily stores the measurement data input by the analog data input processing unit 1. Section 3, the storage processing section 2 stores the measurement data of the instructed period.
The data transmission gate unit 4 to be extracted from the data processing unit 4 is a data for periodically transmitting the measurement data extracted from the data transmission gate unit 3 of the measurement data stored in the storage processing unit 2 to the central station at a cycle longer than the input cycle. The transmission processing unit 5 checks the measurement data input by the analog data input processing unit 1 according to a predetermined condition, determines whether or not to transmit to the central office, and gives an instruction to the data transmission gate unit 3 Is.

【0009】次に動作について説明する。アナログデー
タ入力処理部1によって定周期的にアナログデータの値
を入力し収集した計測データを、記憶処理部2に一時的
に保持すると共に、データチェック処理部5に入力す
る。データチェック処理部5では、あらかじめ中央局か
ら設定された判断およびチェック条件によって計測デー
タのチェックを行う。この条件は、例えば計測データの
値の変化が急激に変わったとか、計測データの値が所定
の範囲を外れた等である。データチェック処理部5で中
央局へ計測データを送信すると判断した場合は、データ
送信ゲート部3に対して送信指令を出力する。データ送
信ゲート部3は、送信指令を受けている期間の記憶処理
部2に記憶された計測データをデータ送信処理部4に出
力し、データ送信処理部4では上記収集周期よりも長い
周期で、この期間の計測データを中央局(図示せず)へ
送信する。
Next, the operation will be described. The analog data input processing unit 1 periodically inputs analog data values and collects the measured data, which is temporarily stored in the storage processing unit 2 and also input to the data check processing unit 5. The data check processing unit 5 checks the measurement data according to the judgment and check conditions set in advance by the central office. This condition is, for example, that the value of the measurement data has changed suddenly or that the value of the measurement data is out of a predetermined range. When the data check processing unit 5 determines to transmit the measurement data to the central office, the data check processing unit 5 outputs a transmission command to the data transmission gate unit 3. The data transmission gate unit 3 outputs the measurement data stored in the storage processing unit 2 during the period in which the transmission command is received to the data transmission processing unit 4, and in the data transmission processing unit 4, at a cycle longer than the collection cycle, The measurement data of this period is transmitted to the central station (not shown).

【0010】実施例2.図2はこの発明の実施例2の処
理を示すブロック図であり、6は中央局(図示せず)か
らの指令信号を受信し、データ送信ゲート部3にデータ
送信指令を指示する指令受信処理部である。計測データ
の収集および記憶については上記実施例1と同一であ
る。ここで指令受信処理部6が中央局からデータ送信要
求を受けたとき、データ送信ゲート部3に送信指令を出
力する。送信指令を受けたデータ送信ゲート部3は、記
憶処理部2に記憶された計測データをデータ送信処理部
4に出力し、データ送信処理部4では上記収集周期より
も長い周期で、計測データを中央局(図示せず)へ送信
する。また、指令受信処理部6が中央局からデータ送信
停止要求を受けたとき、データ送信ゲート部3にデータ
送信停止指令を出力し、計測データの送信を停止する。
このように、上記実施例1では、端末局内部での判断お
よびチェックにより計測データを中央局へ送信していた
が、本実施例2では、中央局からのデータ送信要求指令
により計測データを送信し、データ送信停止要求により
計測データの送信を停止するため、中央局の処理装置の
負荷の状況に柔軟に対処できる。
Embodiment 2. FIG. 2 is a block diagram showing a process of the second embodiment of the present invention, and 6 is a command receiving process for receiving a command signal from a central office (not shown) and instructing the data transmission gate section 3 to issue a data transmission command. It is a department. The collection and storage of measurement data is the same as in the first embodiment. Here, when the command reception processing unit 6 receives a data transmission request from the central office, it outputs a transmission command to the data transmission gate unit 3. Upon receiving the transmission command, the data transmission gate unit 3 outputs the measurement data stored in the storage processing unit 2 to the data transmission processing unit 4, and the data transmission processing unit 4 outputs the measurement data in a cycle longer than the collection cycle. Send to central office (not shown). When the command reception processing unit 6 receives a data transmission stop request from the central office, it outputs a data transmission stop command to the data transmission gate unit 3 to stop the transmission of measurement data.
As described above, in the first embodiment, the measurement data is transmitted to the central station by the judgment and check inside the terminal station, but in the second embodiment, the measurement data is transmitted by the data transmission request command from the central station. However, since the transmission of the measurement data is stopped by the data transmission stop request, it is possible to flexibly deal with the load situation of the processing device of the central office.

【0011】[0011]

【発明の効果】以上のように、この発明によれば、必要
な計測データのみを必要なときに中央局へ送信するよう
に構成したので、伝送路および中央局の処理装置の負荷
を軽減することが可能なものが得られる効果がある。
As described above, according to the present invention, since only the necessary measurement data is transmitted to the central office when necessary, the load on the transmission line and the processing equipment of the central office is reduced. There is an effect that can be obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例1によるデータ収集装置を示
すブロック図である。
FIG. 1 is a block diagram showing a data collection device according to a first embodiment of the present invention.

【図2】この発明の実施例2によるデータ収集装置を示
すブロック図である。
FIG. 2 is a block diagram showing a data collection device according to a second embodiment of the present invention.

【図3】従来のデータ収集装置を示すブロック図であ
る。
FIG. 3 is a block diagram showing a conventional data collection device.

【符号の説明】[Explanation of symbols]

1 アナログデータ入力処理部 2 記憶処理部 3 データ送信ゲート部 4 データ送信処理部 5 データチェック処理部 6 指令受信処理部 1 Analog data input processing unit 2 Memory processing unit 3 Data transmission gate 4 Data transmission processing unit 5 Data check processing section 6 Command reception processing unit

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 所定の周期で入力収集された計測データ
を記憶する記憶処理部、上記計測データをあらかじめ指
定された所定の条件によりチェックし中央局へ送信する
かを判断するデータチェック処理部、このデータチェッ
ク処理部で送信すると判断された期間の上記記憶処理部
に記憶された計測データを上記入力周期よりも長い周期
で中央局へ送信する送信手段を備えたデータ収集装置。
1. A storage processing unit for storing measurement data input and collected at a predetermined cycle, a data check processing unit for checking the measurement data according to a predetermined condition designated in advance and determining whether or not to transmit the measurement data to a central office. A data collection device comprising a transmission means for transmitting the measurement data stored in the storage processing unit during a period determined to be transmitted by the data check processing unit to the central office at a cycle longer than the input cycle.
【請求項2】 所定の周期で入力収集された計測データ
を記憶する記憶処理部、この記憶処理部に記憶された計
測データを中央局から送信要求があった期間のみ上記入
力周期よりも長い周期で中央局へ送信する送信手段を備
えたデータ収集装置。
2. A storage processing unit for storing measurement data input and collected at a predetermined cycle, and a cycle longer than the input cycle only during a period when a request for transmission of the measurement data stored in the storage processing unit is made from the central station. Data collection device equipped with transmission means for transmitting to the central office.
JP15930091A 1991-07-01 1991-07-01 Data collection device Pending JPH0514971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15930091A JPH0514971A (en) 1991-07-01 1991-07-01 Data collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15930091A JPH0514971A (en) 1991-07-01 1991-07-01 Data collection device

Publications (1)

Publication Number Publication Date
JPH0514971A true JPH0514971A (en) 1993-01-22

Family

ID=15690788

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15930091A Pending JPH0514971A (en) 1991-07-01 1991-07-01 Data collection device

Country Status (1)

Country Link
JP (1) JPH0514971A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010131635A1 (en) * 2009-05-11 2010-11-18 パナソニック電工株式会社 In-home unit monitoring system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01220999A (en) * 1988-02-29 1989-09-04 Toshiba Corp Telemetering device
JPH01286600A (en) * 1988-05-12 1989-11-17 Toshiba Corp Data collecting system
JPH02123895A (en) * 1988-11-02 1990-05-11 Seikosha Co Ltd Consumption data transmitter, receiver and metering device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01220999A (en) * 1988-02-29 1989-09-04 Toshiba Corp Telemetering device
JPH01286600A (en) * 1988-05-12 1989-11-17 Toshiba Corp Data collecting system
JPH02123895A (en) * 1988-11-02 1990-05-11 Seikosha Co Ltd Consumption data transmitter, receiver and metering device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010131635A1 (en) * 2009-05-11 2010-11-18 パナソニック電工株式会社 In-home unit monitoring system
CN102461144A (en) * 2009-05-11 2012-05-16 松下电器产业株式会社 In-home unit monitoring system
JP5498487B2 (en) * 2009-05-11 2014-05-21 パナソニック株式会社 Home equipment monitoring system
US9094228B2 (en) 2009-05-11 2015-07-28 Panasonic Intellectual Property Management Co., Ltd. Home appliance monitoring system

Similar Documents

Publication Publication Date Title
US4642760A (en) Status-change data gathering apparatus
JPH0514971A (en) Data collection device
US4112416A (en) Control method for a remote supervisory control system
JPS5914092A (en) Centralized abnormal monitor system
JPS5823783B2 (en) Communication control method between mobile radio stations
JPH01134700A (en) Total calling telemeter system
JP2843382B2 (en) Line monitoring method
JPH0418738B2 (en)
JP2504478B2 (en) Facsimile storage and switching equipment
KR960013275B1 (en) P.c.b. testing apparatus
JPS603097A (en) Information processor
JPS5823025B2 (en) Subscriber congestion detection device
JPS61281699A (en) Tele-meter central station device
JPH04144446A (en) Device for collecting alarm information
JP2520303B2 (en) Data buffer management method
JP3415991B2 (en) Line aggregation device
JPS60149251A (en) Fault detector for terminal control processor of electronic exchange
JPH01303836A (en) Data transmitting system
JPH0546889A (en) Alarm cllecting system for monitoring system
JPS63215242A (en) Data collecting system
JPS60240247A (en) Transmitter
JPS58108843A (en) Data transmission controlling system
JPS58104535A (en) Transmission system with priority
JPS6084043A (en) Communication control equipment
JPH08223197A (en) Terminal equipment, supervisory unit and communication equipment