JPH0466979B2 - - Google Patents

Info

Publication number
JPH0466979B2
JPH0466979B2 JP59200192A JP20019284A JPH0466979B2 JP H0466979 B2 JPH0466979 B2 JP H0466979B2 JP 59200192 A JP59200192 A JP 59200192A JP 20019284 A JP20019284 A JP 20019284A JP H0466979 B2 JPH0466979 B2 JP H0466979B2
Authority
JP
Japan
Prior art keywords
column
formwork
locking means
fixing wedge
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP59200192A
Other languages
Japanese (ja)
Other versions
JPS6178958A (en
Inventor
Kenjiro Furuya
Tatsuya Furuta
Koichi Nitsuta
Tadashi Kimoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP59200192A priority Critical patent/JPS6178958A/en
Publication of JPS6178958A publication Critical patent/JPS6178958A/en
Publication of JPH0466979B2 publication Critical patent/JPH0466979B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/486Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、支柱とビームと框パネルとをセツト
にして型枠を構成するとともに、支柱を残してビ
ームと框パネルとを取り外し可能にしたコンクリ
ート・スラブの型枠支保工及び支保工法に関する
ものである。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention comprises a formwork made up of a set of supports, beams, and stile panels, and the beams and stile panels are made removable while leaving the supports. This article concerns formwork shoring and shoring methods for concrete slabs.

〔従来の技術〕[Conventional technology]

第6図に従来の型枠、ねだ及び支保工を用いた
場合の施工図、第7図は従来のパーマネント・サ
ポートの例を示す図である。図において、4は支
柱、10はコンクリート・スラブ、19と30は
大引、20と29は根太、21と28は合板ベニ
ヤ、23はトツプ・プレート、24は受け羽根、
25と26はハンドル、27は支柱、31はパイ
プ・サポートをそれぞれ示している。
FIG. 6 is a construction drawing using conventional formwork, scaffolding and shoring, and FIG. 7 is a diagram showing an example of conventional permanent support. In the figure, 4 is a column, 10 is a concrete slab, 19 and 30 are large drawers, 20 and 29 are joists, 21 and 28 are plywood veneers, 23 is a top plate, 24 is a wing,
25 and 26 are handles, 27 is a column, and 31 is a pipe support, respectively.

従来、型枠、根太及び支保工を用いた場合の施
工では、第6図図示の如く、根太20を大引19
で受けて、この大引19を支柱4で受けている。
このようにコンクリート・スラブ(床板)の施工
は、従来一般に支保工(根太、大引)の上にせき
板(通常は合板ベニヤ)を載せ、大引を支柱にて
支持している。
Conventionally, in construction using formwork, joists, and shoring, the joists 20 are pulled out by 19 as shown in Figure 6.
This Ohiki 19 is received by the pillar 4.
In this way, the conventional method of constructing a concrete slab (floor board) is to place a weir (usually plywood veneer) on top of the shoring (joist, joist) and support the shoring with pillars.

また、第7図図示のパーマネント・サポートの
例では、ハンドル26でトツプ・プレート23上
面の高さを決め、そのハンドル26の下側をパイ
プ・サポート(又は単管)31に差込み、ハンド
ル25で受け羽根24の高さを決めて大引30、
根太29、合板パネル28の高さを決めることに
より組立てを行つている。そして、解体時には、
ハンドル25を下げて受け羽根24に支えられて
いる大引30、根太29、合板パネル28を外し
ている。従つて、支柱29を盛り替えすることな
く、根太29を取り外しできるようになつてい
る。
Furthermore, in the example of the permanent support shown in FIG. Determine the height of the receiving blade 24 and make a large pull 30,
Assembly is carried out by determining the heights of the joists 29 and plywood panels 28. And when dismantling,
The handle 25 is lowered to remove the drawer 30 supported by the support blade 24, the joist 29, and the plywood panel 28. Therefore, the joists 29 can be removed without replacing the support columns 29.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかしながら従来のコンクリート・スラブ(床
版)の施工は、支保工の上にせき板を載せ、大
引を支柱にて支持するので、支柱の盛り替えに制
約があつた、梁、スラブの支保工の存置期間
は、17〜28日を必要とするので、型枠の転用回数
が少なく、型枠解体の時、せき板が釘で固定さ
れていたので、型枠の解体、片付け、補修などに
時間や費用がかかる、パーマネント・サポート
の先行例があるが、この例の場合にはトツププレ
ートの部分を型枠として適応させていないので、
根太にトツププレートを考慮した切欠き(第7図
b図示A)などの細工が必要である、という問題
があつた。
However, in the conventional construction of concrete slabs (floor slabs), a sheath board is placed on top of the shoring, and the main pull-up is supported by pillars, which limits the ability to replace the pillars. Since the shelf life of the formwork is 17 to 28 days, the number of times the formwork is reused is small.When the formwork was dismantled, the shedding boards were fixed with nails, so it was easy to dismantle, clean up, and repair the formwork. There are precedents for permanent support, which takes time and money, but in this case, the top plate part is not adapted as a formwork, so
There was a problem in that it was necessary to make a notch in the joist in consideration of the top plate (Fig. 7b, illustration A).

本発明は、上記の問題を解決するものであつ
て、型枠をビーム、パネル、支柱によるセツトで
構成し、その転用性を高めるとともに、熟練工で
なくても型枠の組立、解体が可能なコンクリー
ト・スラブの型枠支保工及び支保工法の提供を目
的とするものである。
The present invention solves the above problems by constructing formwork as a set of beams, panels, and supports, increasing its versatility, and making it possible for non-skilled workers to assemble and dismantle the formwork. The purpose is to provide formwork shoring and shoring methods for concrete slabs.

〔問題点を解決するための手段〕[Means for solving problems]

そのために本発明のコンクリート・スラブの型
枠支保工は、上端に取り付けた頭部プレートと上
下方向にスライドする支柱頭部受金物と該支柱頭
部受金物を保持し上下方向にスライドする固定用
楔と該固定用楔を係止する第1の係止手段と該第
1の係止手段による係止が外れた状態で第1の係
止手段より下方の位置に固定用楔を係止する第2
の係止手段とを頭部に有する支柱、該支柱の支柱
頭部受金物により支持されるビーム、及び該ビー
ムにより支持される框パネルを備え、第1の係止
手段により固定用楔を係止した状態で支柱の頭部
プレートとビームの上面と框パネルの上面とによ
り型枠を構成したことを特徴とするものであり、
支保工法は、第1の係止手段により固定用楔を係
止した状態で支柱の頭部プレートとビームの上面
と框パネルの上面とにより型枠を構成してコンク
リートの打設を行い、コンクリートの打設後は、
第1の係止手段による固定用楔の係止を外して第
2の係止手段により固定用楔を係止し、支柱を残
してビームと框パネルとを取り外すことを特徴と
するものである。
For this purpose, the concrete slab formwork support of the present invention includes a head plate attached to the upper end, a support for the support head that slides vertically, and a fixing support that holds the support for the support head and slides in the vertical direction. a first locking means for locking the wedge and the fixing wedge; and locking the fixing wedge at a position below the first locking means in a state in which the first locking means is released; Second
a column having a locking means on its head; a beam supported by a column head bracket of the column; and a stile panel supported by the beam; It is characterized by forming a formwork by the head plate of the column, the upper surface of the beam, and the upper surface of the stile panel in a stopped state,
In the shoring method, concrete is poured by constructing a formwork with the head plate of the support, the top surface of the beam, and the top surface of the stile panel while the fixing wedge is locked by the first locking means. After pouring the
The method is characterized in that the fixing wedge is unlatched by the first locking means, the fixing wedge is locked by the second locking means, and the beam and frame panel are removed, leaving the support column. .

〔作用〕[Effect]

本発明のコンクリート・スラブの型枠支保工及
び支保工法では、支柱の頭部プレートとビームの
上面と框パネルの上面とにより型枠が構成され、
コンクリートの打設を行つた後は支柱をそのまま
残してビームと框パネルとを解体して転用するこ
とができる。つまり、コンクリート・スラブの型
枠を組み立てる場合、まず、支柱の第1の係止手
段に固定用楔を係止せしめて支柱頭部受金物を固
定し、該支柱頭部受金物によりビームを支持す
る。そしてこのビームにより框パネルを支持す
る。このようにして型枠を組み立ててコンクリー
トの打設を行つた後は、支柱の固定用楔を第1の
係止手段による係止状態から外して落下させ、第
2の係止手段により係止せしめる。この状態で
は、支柱頭部受金物が第1の係止手段による係止
状態より下方の位置に保持されるので、ビームと
框パネルとはコンクリート・スラブの底面より下
方において取り外し、支柱を残して型枠を解体す
ることができる。
In the concrete slab formwork shoring and shoring method of the present invention, the formwork is constituted by the head plate of the support, the upper surface of the beam, and the upper surface of the stile panel,
After concrete is poured, the beams and stile panels can be disassembled and repurposed, leaving the supports intact. That is, when assembling formwork for a concrete slab, first, the fixing wedge is locked to the first locking means of the column to fix the column head bracket, and the beam is supported by the column head bracket. do. The frame panels are supported by this beam. After assembling the formwork and pouring concrete in this way, the fixing wedge of the support column is released from the locked state by the first locking means and allowed to fall, and then locked by the second locking means. urge In this state, the column head bracket is held in a position below the locked state by the first locking means, so the beam and stile panel are removed below the bottom of the concrete slab, leaving the column alone. Formwork can be dismantled.

〔実施例〕〔Example〕

以下、実施例を図面を参照しつつ説明する。 Examples will be described below with reference to the drawings.

第1図は本発明によるスラブ型枠支保工の分解
配置図、第2図は本発明によるスラブ型枠支保工
を適用した設置図、第3図は型枠とビーム及び支
保工頭部のコンクリートを打つ前の設置図、第4
図はモルタルを打つた後に型枠を取り除いた状態
図、第5図は本発明によるスラブ型枠支保工を梁
付スラブに適用した設置図である。図において、
1は支柱頭部受金物、2はビーム、3は框パネ
ル、4は支柱、5は支柱頭部プレート、6は取付
用フツク、7は框パネル差込み溝、8は孔、9は
支柱ジヨイント・プレート、10はコンクリー
ト・スラブ、11はコンクリート梁、12は梁側
型枠、13はセパレータ、14はビーム補強トラ
ス、15は固定用楔、16は下部ダボ、17は上
部ダボ、18は頭部支柱をそれぞれ示している。
Figure 1 is an exploded layout diagram of the slab formwork shoring according to the present invention, Figure 2 is an installation diagram to which the slab formwork shoring according to the present invention is applied, and Figure 3 is the concrete of the formwork, beams, and head of the shoring. Installation diagram before hitting, 4th
The figure shows the state in which the formwork has been removed after applying mortar, and Fig. 5 is an installation view in which the slab formwork support according to the present invention is applied to a slab with beams. In the figure,
1 is a column head bracket, 2 is a beam, 3 is a stile panel, 4 is a column, 5 is a column head plate, 6 is a mounting hook, 7 is a stile panel insertion groove, 8 is a hole, 9 is a column joint. Plate, 10 is a concrete slab, 11 is a concrete beam, 12 is a beam side formwork, 13 is a separator, 14 is a beam reinforcement truss, 15 is a fixing wedge, 16 is a lower dowel, 17 is an upper dowel, 18 is a head Each pillar is shown.

第1図において、支柱4は、支柱頭部受金物
1、支柱頭部プレート5、取付用フツク6、上部
ダボ17、下部ダボ16、固定用楔15、支柱ジ
ヨイント・プレート9、及び頭部支柱18により
頭部を構成するものであり、支柱頭部受金物1及
び固定用楔15は上下方向にスライドし、固定用
楔15は下部ダボ16の上に、或いは支柱ジヨイ
ント・プレート9の上に固定され、支柱頭部受金
物1を支持する。ビーム2は、補強のためのビー
ム補強トラス14、框パネル差込み溝7、及び孔
8を有し、この孔8に支柱頭部受金物1の取付用
フツク6を差し込むことによつて支持される。そ
して、框パネル3は、このビーム2の框パネル差
込み溝7に差し込むことにより支持され、支柱頭
部プレート5とビーム2と框パネル3とによるセ
ツトで型枠が構成される。
In FIG. 1, the strut 4 includes the strut head bracket 1, the strut head plate 5, the mounting hook 6, the upper dowel 17, the lower dowel 16, the fixing wedge 15, the strut joint plate 9, and the head strut. 18 constitutes the head, and the column head bracket 1 and the fixing wedge 15 slide in the vertical direction, and the fixing wedge 15 is placed on the lower dowel 16 or on the column joint plate 9. It is fixed and supports the column head bracket 1. The beam 2 has a beam reinforcing truss 14 for reinforcement, a stile panel insertion groove 7, and a hole 8, and is supported by inserting the mounting hook 6 of the column head support 1 into the hole 8. . The stile panel 3 is supported by being inserted into the stile panel insertion groove 7 of the beam 2, and the set of the column head plate 5, the beam 2, and the stile panel 3 constitutes a formwork.

第2図はコンクリート・スラブ受の使用例を示
したものである。コンクリート・スラブ10の底
を受けるステージは、第2図図示の如く、支柱頭
部受金物1、ビーム2、框パネル3、及び支柱4
を組み合わせることにより構成される。以下、そ
の組立、解体の詳細を第3図及び第4図を参照し
つつ説明する。
Figure 2 shows an example of the use of concrete slab receivers. The stage receiving the bottom of the concrete slab 10 includes a column head bracket 1, a beam 2, a stile panel 3, and a column 4, as shown in FIG.
It is constructed by combining. The details of its assembly and disassembly will be explained below with reference to FIGS. 3 and 4.

第3図aは組立状態をビームの横側からみた図
であり、第3図bは第3図aの状態を右側面から
みた図、第3図cは固定用楔の外観図である。第
3図において、固定用楔15は、上部ダボ17と
下部ダボ16とを利用して固定され、その固定用
楔15の上に支柱頭部受金物1が支持される。固
定用楔15は、例えば第3図c図示の如く、下部
ダボ16とのかかりが外れる凹部を有するもので
あり、第3図a,bでは、固定用楔15が下部ダ
ボ16により係止されている状態に示している。
この状態では、先に述べた如く、ビーム2の両端
にある孔8に支柱頭部受金物1の取付用フツク6
を差込んでビーム2を固定し、そのビーム2の差
込み溝7に框パネル3を差込んで框パネル3を固
定している。その結果、支柱頭部プレート5とビ
ーム2と框パネル3のそれぞれの上面は同一平面
の型枠を形成することになる。この状態からコン
クリートの打設を行い型枠を解体する場合には、
固定用楔15をたたくことにより凹部が下部ダボ
16の位置にくるように横に移動させる。そうす
ると、下部ダボ16のかかりがなくなり固定用楔
15は下に落ちる。この解体時の状態を示したの
が第4図である。
FIG. 3a is a view of the assembled state seen from the side of the beam, FIG. 3b is a view of the state of FIG. 3a seen from the right side, and FIG. 3c is an external view of the fixing wedge. In FIG. 3, the fixing wedge 15 is fixed using an upper dowel 17 and a lower dowel 16, and the column head holder 1 is supported on the fixing wedge 15. The fixing wedge 15 has a concave portion that can be disengaged from the lower dowel 16, as shown in FIG. 3c, for example, and in FIGS. The state shown is as follows.
In this state, as mentioned earlier, the mounting hooks 6 of the column head bracket 1 are inserted into the holes 8 at both ends of the beam 2.
is inserted to fix the beam 2, and the stile panel 3 is inserted into the insertion groove 7 of the beam 2 to fix the stile panel 3. As a result, the upper surfaces of the column head plate 5, beam 2, and stile panel 3 form a coplanar formwork. When pouring concrete and dismantling the formwork from this state,
By hitting the fixing wedge 15, it is moved laterally so that the concave portion is at the position of the lower dowel 16. Then, the lower dowel 16 is no longer engaged and the fixing wedge 15 falls down. FIG. 4 shows the state at the time of disassembly.

第4図aは解体時の状態をビームの横側からみ
た図であり、第4図bは第4図aの状態を右側面
からみた図である。第4図図示の如く、下部ダボ
16とのかかりがとれ下に落ちた固定用楔15は
支柱ジヨイント・プレート9にて係止され、その
結果、ビーム2と框パネル3は支柱4を残したま
まで取り外すことができる。
FIG. 4a is a view of the state at the time of disassembly, seen from the side of the beam, and FIG. 4b is a view of the state of FIG. 4a, seen from the right side. As shown in FIG. 4, the fixing wedge 15, which has fallen down due to its engagement with the lower dowel 16, is locked by the support joint plate 9, and as a result, the beam 2 and the stile panel 3 are moved with the support 4 remaining. It can be removed up to.

第5図は梁受の使用例を示したものである。コ
ンクリート梁11の梁底を受けるステージは支柱
頭部受金物1、ビーム2、框パネル3、及び支柱
4を組み合わせて作り、その上に梁側型枠12を
組み立てる。そして、梁側型枠12の上に框パネ
ル3を載せてコンクリート梁11の型枠を作る。
なお、梁幅を確保するには、セパレータ13を使
用することもある。
Figure 5 shows an example of how the beam support is used. A stage for receiving the beam bottom of a concrete beam 11 is made by combining a column head support 1, a beam 2, a stile panel 3, and a column 4, and a beam side formwork 12 is assembled thereon. Then, the stile panel 3 is placed on the beam side formwork 12 to form a formwork for the concrete beam 11.
Note that separators 13 may be used to ensure the beam width.

〔発明の効果〕〔Effect of the invention〕

以上の説明から明らかなように、本発明によれ
ば、せき板をパネル化してビームに差込んで固定
し、そのビームを支柱で支えることによつて、型
枠をビーム、パネル、支柱のセツトで構成したの
で、支柱を盛り替えることなく残したまませき
板、支保工を解体して転用することができ型枠の
転用性を高めることができるとともに、型枠作業
の単純化、省略化を図ることができ、型枠の組み
立てや解体が熟練工でなくても容易に施工するこ
とが可能となる。また、パーマネント・サポート
を使用する場合のように、パネルに切欠きなどの
特別の細工をする必要がなく、せき板を釘で固定
することもないので、型枠の解体、片付け、補修
に要する時間が手間、経費を削減することができ
る。
As is clear from the above description, according to the present invention, the formwork can be assembled into a set of beams, panels, and supports by forming shedding boards into panels, inserting and fixing them into beams, and supporting the beams with supports. Because it is constructed with This makes it possible to assemble and dismantle the formwork easily even if you are not a skilled worker. In addition, unlike when using permanent supports, there is no need to make special work such as cutouts in the panels, and there is no need to fix the shedding boards with nails, so it takes time to dismantle, clean up, and repair the formwork. You can save time, effort, and expense.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明によるスラブ型枠支保工の分解
配置図、第2図は本発明によるスラブ型枠支保工
を適用した設置図、第3図は型枠とビーム及び支
保工頭部のコンクリートを打つ前の設置図、第4
図はモルタルを打つた後に型枠を取り除いた状態
図、第5図は本発明によるスラブ型枠支保工を梁
付スラブに適用した設置図、第6図は従来の型
枠、ねだ及び支保工を用いた場合の施工図、第7
図は従来のパーマネント・サポートの例を示す図
である。 1……支柱頭部受金物、2……ビーム、3……
框パネル、4……支柱、5……支柱頭部プレー
ト、6……取付用フツク、7……框パネル差込み
溝、8……孔、9……支柱ジヨイント・プレー
ト、10……コンクリート・スラブ、11……コ
ンクリート梁、12……梁側型枠、13……セパ
レータ、14……ビーム補強トラス、15……固
定用楔、16……下部ダボ、17……上部ダボ、
18……頭部支柱、19と30……大引、20と
29……根太、21と28……合板ベニヤ、22
……ライト・ゲージ、23……トツプ・プレー
ト、24……受け羽根、25と26……ハンド
ル、27……支柱、31……パイプ・サポート。
Figure 1 is an exploded layout diagram of the slab formwork shoring according to the present invention, Figure 2 is an installation diagram to which the slab formwork shoring according to the present invention is applied, and Figure 3 is the concrete of the formwork, beams, and head of the shoring. Installation diagram before hitting, 4th
The figure shows the state in which the formwork has been removed after applying mortar, Figure 5 is an installation diagram of the slab formwork shoring system according to the present invention applied to a slab with beams, and Figure 6 shows the conventional formwork, sills and shoring. Construction drawing when using construction, No. 7
The figure shows an example of conventional permanent support. 1... Strut head bracket, 2... Beam, 3...
Frame panel, 4... Strut, 5... Strut head plate, 6... Mounting hook, 7... Stile panel insertion groove, 8... Hole, 9... Strut joint plate, 10... Concrete slab , 11... Concrete beam, 12... Beam side formwork, 13... Separator, 14... Beam reinforcement truss, 15... Fixing wedge, 16... Lower dowel, 17... Upper dowel,
18...Head support, 19 and 30...Obiki, 20 and 29...Joist, 21 and 28...Plywood veneer, 22
...Light gauge, 23...Top plate, 24...Blade, 25 and 26...Handle, 27...Strut, 31...Pipe support.

Claims (1)

【特許請求の範囲】 1 上端に取り付けた頭部プレートと上下方向に
スライドする支柱頭部受金物と該支柱頭部受金物
を保持し上下方向にスライドする固定用楔と該固
定用楔を係止する第1の係止手段と該第1の係止
手段による係止が外れた状態で第1の係止手段よ
り下方の位置に固定用楔を係止する第2の係止手
段とを頭部に有する支柱、該支柱の支柱頭部受金
物により支持されるビーム、及び該ビームにより
支持される框パネルを備え、第1の係止手段によ
り固定用楔を係止した状態で支柱の頭部プレート
とビームの上面と框パネルの上面とにより型枠を
構成したことを特徴とするコンクリート・スラブ
の型枠支保工。 2 上端に取り付けた頭部プレートと上下方向に
スライドする支柱頭部受金物と該支柱頭部受金物
を保持し上下方向にスライドする固定用楔と該固
定用楔を係止する第1の係止手段と該第1の係止
手段による係止が外れた状態で第1の係止手段よ
り下方の位置に固定用楔を係止する第2の係止手
段とを頭部に有する支柱、該支柱の支柱頭部受金
物により支持されるビーム、及び該ビームにより
支持される框パネルを備え、第1の係止手段によ
り固定用楔を係止した状態で支柱の頭部プレート
とビームの上面と框パネルの上面とにより型枠を
構成してコンクリートの打設を行い、コンクリー
トの打設後は、第1の係止手段による固定用楔の
係止を外して第2の係止手段により固定用楔を係
止し、支柱を残してビームと框パネルとを取り外
すことを特徴とするコンクリート・スラブの支保
工法。
[Scope of Claims] 1. A head plate attached to the upper end, a column head bracket that slides in the vertical direction, a fixing wedge that holds the column head bracket and slides in the vertical direction, and the fixing wedge is connected to each other. a first locking means for locking the fixing wedge; and a second locking means for locking the fixing wedge at a position below the first locking means when the first locking means is released. The column includes a column provided at the head, a beam supported by the column head bracket of the column, and a stile panel supported by the beam, and the column is mounted with the fixing wedge locked by the first locking means. Formwork support for concrete slabs, characterized in that the formwork is composed of a head plate, the top surface of a beam, and the top surface of a stile panel. 2. A head plate attached to the upper end, a prop head bracket that slides in the vertical direction, a fixing wedge that holds the prop head bracket and slides in the vertical direction, and a first lock that locks the fixing wedge. A strut having a stop means and a second locking means for locking the fixing wedge at a position below the first locking means when the first locking means is released; A beam supported by the column head bracket of the column, and a stile panel supported by the beam, and with the fixing wedge locked by the first locking means, the column head plate and the beam are connected. The upper surface and the upper surface of the stile panel constitute a formwork and concrete is poured. After the concrete is poured, the fixing wedge is unlatched by the first locking means and the second locking means is inserted. A concrete slab shoring method characterized by locking fixing wedges and removing the beam and stile panel, leaving the supports in place.
JP59200192A 1984-09-25 1984-09-25 Mold frame timbering of concrete slab and timbering construction method Granted JPS6178958A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59200192A JPS6178958A (en) 1984-09-25 1984-09-25 Mold frame timbering of concrete slab and timbering construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59200192A JPS6178958A (en) 1984-09-25 1984-09-25 Mold frame timbering of concrete slab and timbering construction method

Publications (2)

Publication Number Publication Date
JPS6178958A JPS6178958A (en) 1986-04-22
JPH0466979B2 true JPH0466979B2 (en) 1992-10-26

Family

ID=16420323

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59200192A Granted JPS6178958A (en) 1984-09-25 1984-09-25 Mold frame timbering of concrete slab and timbering construction method

Country Status (1)

Country Link
JP (1) JPS6178958A (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59167147U (en) * 1983-04-26 1984-11-09 株式会社 ケ−・エツチ・ケ− Support and release device for concrete pouring panels

Also Published As

Publication number Publication date
JPS6178958A (en) 1986-04-22

Similar Documents

Publication Publication Date Title
US3818083A (en) Building method
US3841597A (en) Floor form with connected truss supports
US3819143A (en) Formwork for concrete walls
JPH0466979B2 (en)
JPS63206569A (en) Mold frame timbering of slab concrete and timbering construction method
JP2964277B2 (en) Discarded formwork for columns and frame plate members used for each
RU2803440C2 (en) Large area floor slab panel formworking system
JPH0380946B2 (en)
JPS6212028Y2 (en)
JPH0754480A (en) Prefabricated scaffolding and assembling and disassembling method thereof
JPH084196A (en) Panel for building
JPH0125152Y2 (en)
JPH06346471A (en) Construction of reinforced concrete retaining wall by use of large size precast slab
JPS6046219B2 (en) Construction method of concrete retaining wall
JPH07207934A (en) Concrete mold
JPS61196035A (en) Construction of concrete building
JPH04315659A (en) Driving mold construction method using framed sheathing board
JPH04124375A (en) Sleeper holder
JPS638260B2 (en)
JPH038740Y2 (en)
JPS6349773B2 (en)
JPS634146A (en) Slab execution method
JPH024972Y2 (en)
JPS615132A (en) Construction of wall floor
JPH08333893A (en) Construction of concrete structure with form, and girder support structure and bracket supporting girder bottom form therefor