JPH0457423A - Data transmission network having clock topology revision function - Google Patents

Data transmission network having clock topology revision function

Info

Publication number
JPH0457423A
JPH0457423A JP2168903A JP16890390A JPH0457423A JP H0457423 A JPH0457423 A JP H0457423A JP 2168903 A JP2168903 A JP 2168903A JP 16890390 A JP16890390 A JP 16890390A JP H0457423 A JPH0457423 A JP H0457423A
Authority
JP
Japan
Prior art keywords
clock
monitored
reference clock
transmission
monitored device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2168903A
Other languages
Japanese (ja)
Inventor
Toshiyuki Yada
俊之 矢田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2168903A priority Critical patent/JPH0457423A/en
Publication of JPH0457423A publication Critical patent/JPH0457423A/en
Pending legal-status Critical Current

Links

Landscapes

  • Use Of Switch Circuits For Exchanges And Methods Of Control Of Multiplex Exchanges (AREA)
  • Synchronisation In Digital Transmission Systems (AREA)

Abstract

PURPOSE:To attain quick restoration of synchronization of a monitored equipment unable to receive a reference clock by revising a clock topology automatically. CONSTITUTION:After the receipt of a signal representing reference clock interruption from a monitored equipment 23, a monitor 20 retrieves a transmission line 33 having no reference clock and a monitor 23 in a slave mode in monitored equipments 22, 23 connecting to the transmission line by using a data table 3, retrieves all transmission lines 31, 33 connecting to the monitored equipment 23 in the slave mode by using the data table 3 so as to discriminate the relation between the relative master mode and slave mode between the monitored equipments 23, 22 connecting to both ends of the transmission line 31 through which the reference clock is normally sent. When the monitored equipment 23 unable to receive the reference clock is set to the master mode, a clock topology processing section 2 revises the clock topology.

Description

【発明の詳細な説明】 [概要] 本発明は、基準クロックにより同期のとれた伝送ネット
ワークにおいて、基準クロック断を復旧できるデータ伝
送ネットワーク及びそのためのクロックトポロジー変更
方法に関し、 基準クロックを受信できなくなった被監視装置の同期を
、クロックトポロジーを自動的に変更することにより速
やかに復旧させることを目的とし、被監視装置からの、
基準クロック断を伝えるアラームによりクロックに関す
る障害を認識し、クロックトポロジーに関する情報を収
めたデータテーブルを用いて前記被監視装置に再びクロ
ックを送信するための経路を選択し、該経路における前
記被監視装置のクロック送受信モードを判別するクロッ
クトポロジー検索部と、前記被監視装置とそれに対向す
る被監視装置のクロック送受信上ドを逆転せしめるクロ
ックトポロジー処理部とを有することを特徴とする。
[Detailed Description of the Invention] [Summary] The present invention relates to a data transmission network that can recover from a loss of the reference clock in a transmission network synchronized by a reference clock, and a method for changing the clock topology for that purpose. The purpose is to quickly restore the synchronization of the monitored device by automatically changing the clock topology.
A clock-related failure is recognized by an alarm that indicates reference clock disconnection, a route for transmitting the clock again to the monitored device is selected using a data table containing information regarding clock topology, and the monitored device on the route is selected. The present invention is characterized in that it includes a clock topology search unit that determines the clock transmission/reception mode of the monitored device, and a clock topology processing unit that reverses the clock transmission/reception modes of the monitored device and the monitored device facing the monitored device.

[産業上の利用分野] 本発明は、基準クロックにより同期のとれた伝送ネット
ワークにおいて、基準クロック断を復旧できるデータ伝
送ネットワーク及びそのためのクロックトポロジー変更
方法に関する。
[Field of Industrial Application] The present invention relates to a data transmission network that can recover from reference clock interruption in a transmission network synchronized by a reference clock, and a clock topology changing method therefor.

多重化されたデータの送受信を行なう複数の装置を有す
る伝送ネットワークにおいては、相互に正しいデータの
やりとりを行うために各装置間で同期をとる必要がある
。そのときに、クロックを発生するための発振装置を備
えた被監視装置の任意の一つを基準クロックを発生する
クロックマスターとして、その基準クロックをネットワ
ークの全装置に対して送信することによりネットワーク
の同期をとる。
In a transmission network having a plurality of devices that transmit and receive multiplexed data, it is necessary to synchronize the devices in order to exchange data correctly with each other. At that time, any one of the monitored devices equipped with an oscillation device for generating a clock is designated as a clock master that generates a reference clock, and the reference clock is transmitted to all devices in the network to control the network. Synchronize.

この基準クロックをネットワーク内の各装置に供給する
には、様々な経路、方向をとりうる。ネットワーク全体
への基準クロック供給の経路、方向について規定したも
のをクロックトポロジーと呼ぶ。
Various routes and directions can be taken to supply this reference clock to each device in the network. What defines the route and direction for supplying the reference clock to the entire network is called a clock topology.

ここで、ある−本の伝送路により接続された2つの装置
間では、相対的に基準クロックを送信する装置と、基準
クロックを受信する装置とが存在することになる。この
とき相対的に基準クロックを送信する装置をマスターモ
ード装置、相対的に基準クロックを受信する装置をスレ
ーブモート装置と呼ぶ。
Here, between two devices connected by a certain number of transmission paths, there is a device that relatively transmits the reference clock and a device that receives the reference clock. In this case, a device that relatively transmits the reference clock is called a master mode device, and a device that relatively receives the reference clock is called a slave mote device.

このようなネットワークでは、基準クロックが途切れる
と、その装置はふットワークの他の装置と同期がとれな
くなくなってしまう。伝送路障害の発生による基準クロ
ックの断などがその例である。
In such a network, if the reference clock is interrupted, the device loses synchronization with other devices in the footwork. An example of this is disconnection of the reference clock due to the occurrence of a transmission path failure.

そこでこのような場合でも、正しいデータのやりとりを
速やかに再開することができるクロックトポロジーの変
更方式が望まれている。
Therefore, even in such a case, there is a need for a clock topology changing method that can quickly resume correct data exchange.

[従来の技術] 第9図に従来の構成図を示す。図において、40は監視
装置、41,42.43.44は被監視装置でそのうち
41はクロックマスターである。
[Prior Art] FIG. 9 shows a conventional configuration diagram. In the figure, 40 is a monitoring device, 41, 42, 43, and 44 are monitored devices, of which 41 is a clock master.

30.51,52,53,54.55は基準クロックを
送信するための伝送路であり、このうち実線により描か
れた51,52.53はこの時点で実際に基準クロック
の送信に用いられている伝送路、点線により描かれた5
4.55は予備の基準クロック送信伝送路である。
30.51, 52, 53, 54.55 are transmission lines for transmitting the reference clock, and of these, 51, 52.53 drawn by solid lines are actually used for transmitting the reference clock at this point. transmission line, 5 drawn by a dotted line.
4.55 is a backup reference clock transmission transmission line.

前記監視装置40は、前記各被監視装置よりの状態情報
を受信して、前記各被監視装置に対して各種のコマンド
を発する。
The monitoring device 40 receives status information from each of the monitored devices and issues various commands to each of the monitored devices.

第9図において、矢印の向きは基準クロックの送信され
る方向を示しており、矢印の始点にあるのがマスターモ
ート′装置、終点にあるのがスレーモード装置となって
いる。
In FIG. 9, the direction of the arrow indicates the direction in which the reference clock is transmitted, with the starting point of the arrow being the master mote' device and the ending point being the slew mode device.

ここで伝送路52に障害が発生したと仮定する。Here, it is assumed that a failure has occurred in the transmission line 52.

以下に述べることは当然のことながら、他の要因による
基準クロック断が発生した場合にも適用することが可能
である。
Of course, what will be described below can also be applied to cases where the reference clock is interrupted due to other factors.

従来は、前記伝送路52の障害による基準クロック断を
、被監視装置42が検出し、それを知らせるアラームを
監視装置40に対して発する。前記監視装置40は、前
記アラームを装置内に有するアラーム抽出部4において
受信することにより、表示部17において異常発生の表
示がなされていた。
Conventionally, the monitored device 42 detects the interruption of the reference clock due to a failure in the transmission line 52, and issues an alarm to the monitoring device 40 to notify it. The monitoring device 40 displays the occurrence of an abnormality on the display section 17 by receiving the alarm in the alarm extraction section 4 included in the device.

ところが障害を発生した伝送路を特定する手段を持たず
、クロックトポロジーを変更させることができなかった
。このため前記伝送路52を迂回して前記被監視装置4
2に対して基準クロックを送信してやることができず、
前記被監視装置42の同期をとるには、伝送路52の障
害を復旧するか、装置まで出向き手動によってクロック
トポロジーを変更しなければならなかった。
However, there was no way to identify the transmission path where the failure occurred, and it was not possible to change the clock topology. Therefore, the transmission line 52 is bypassed and the monitored device 4
It is not possible to send the reference clock to 2,
In order to synchronize the monitored device 42, it was necessary to recover from a fault in the transmission line 52 or to go to the device and manually change the clock topology.

し発明が解決しようとする問題点コ 従って、基準クロックの受信ができなくなった被監視装
置42は長い時間にわたってネットワークから孤立して
しまい、タイミング情報を得ることができなくなるため
にデータの正確な伝送を行うことに支障をきたしていた
Problems to be Solved by the Invention Therefore, the monitored device 42 that is no longer able to receive the reference clock is isolated from the network for a long time, and cannot obtain timing information, making it difficult to accurately transmit data. It was hindering my ability to do so.

この場合にクロックトポロジーを自動的に変更する手段
を持つことにより、長い時間をかけることなしに被監視
装置を復旧させることができる。
In this case, by having means for automatically changing the clock topology, the monitored device can be restored without taking a long time.

本発明は、基準クロックを受信できなくなった被監視装
置の同期を、クロックトポロジーを自動的に変更するこ
とにより速やかに復旧させることを目的とする。
An object of the present invention is to quickly restore the synchronization of a monitored device that has become unable to receive a reference clock by automatically changing the clock topology.

[課題を解決するための手段] 第1図Aは、本発明における監視装置20の原理説明図
である。第1図Aにおいて、1はクロックトポロジー検
索部、2はクロックトポロジー処理部、3はクロックト
ポロジーに関する情報が収められているデータテーブル
、4は被監視装置よりのアラームを受け、基準クロック
に関するアラムを抽出するアラーム抽出部である。
[Means for Solving the Problems] FIG. 1A is a diagram explaining the principle of a monitoring device 20 according to the present invention. In FIG. 1A, 1 is a clock topology search unit, 2 is a clock topology processing unit, 3 is a data table containing information regarding the clock topology, and 4 is an alarm that receives an alarm from a monitored device and generates an column regarding the reference clock. This is an alarm extraction unit that extracts alarms.

監視装置20内には、基準クロックの障害発生を検出す
るクロックトポロジー検索部1と、クロックトポロジー
変更をおこなうクロックトポロジ処理部2とを設けであ
る。
The monitoring device 20 is provided with a clock topology search unit 1 that detects the occurrence of a failure in the reference clock, and a clock topology processing unit 2 that changes the clock topology.

第1図Bは本発明におけるネットワークの原理説明図で
ある。
FIG. 1B is a diagram explaining the principle of the network in the present invention.

以下第1図A、Bを用いて説明を行なう。The explanation will be given below using FIGS. 1A and 1B.

前記監視装置20では、被監視装置23からの基準クロ
ック断を伝える信号を受けた後に、基準クロックが送信
されなくなった伝送路23と、前記伝送路33に接続さ
れた被監視装置21.23のうちスレーブモードにある
装置23を前記ブタテーブル3を用いて検索する。
In the monitoring device 20, after receiving a signal from the monitored device 23 that indicates the disconnection of the reference clock, the monitoring device 20 detects the transmission path 23 where the reference clock is no longer transmitted and the monitored devices 21 and 23 connected to the transmission path 33. Among them, the device 23 in slave mode is searched using the pig table 3.

次に、前記スレーブモード装置23に接続されている全
ての伝送路31.33を前記データテーブル3を用いて
検索し、そのなかで正常に基準クロックの送信が行える
伝送路31を認識する。
Next, all the transmission lines 31 and 33 connected to the slave mode device 23 are searched using the data table 3, and among them, the transmission line 31 that can normally transmit the reference clock is recognized.

更に認識された伝送路31について、その両端に接続さ
れている被監視装置23.22間での相対的なマスター
モードとスレーブモードの関係を判別する。
Furthermore, regarding the recognized transmission line 31, the relative relationship between the master mode and slave mode between the monitored devices 23 and 22 connected to both ends thereof is determined.

もし基準クロックを受信出来なくなった被監視装置23
が、対向する被監視装置22に対してマスターモードに
ある場合には、前記クロックトポロジー処理部2におい
てクロックトポロジーを変更する。
If the monitored device 23 becomes unable to receive the reference clock,
is in master mode with respect to the opposing monitored device 22, the clock topology is changed in the clock topology processing section 2.

尚、前記データテーブル3は、各伝送路に接続されてい
る二つの被監視装置相互間における相対的なマスターモ
ードとスレーブモードの関係に関する情報が収められて
いる第一のテーブルと、どの被監視装置がクロックマス
ター装置、またはスレーブモード装置であるかに関する
情報と、各スレーブモード装置が基準クロックを受信す
るのに用いている伝送路に関する情報とが収められてい
る第二のテーブルと、伝送路の現在の状態が正常である
か異常であるかということに関する情報が収められてい
る第三のテーブルと、各被監視装置につながれている伝
送路がどの伝送路であるかの情報が収められている第四
のテーブルとを有する。
The data table 3 includes a first table containing information regarding the relative master mode and slave mode relationship between two monitored devices connected to each transmission path, and a a second table containing information regarding whether the device is a clock master device or a slave mode device, and information regarding the transmission path used by each slave mode device to receive the reference clock; A third table contains information regarding whether the current status of the monitored device is normal or abnormal, and information about which transmission path is connected to each monitored device. and has a fourth table.

「作用] 基準クロック断となると、それを伝えるアラムが被監視
装置23から発せられる。送信されてくる前記アラーム
を、監視装置20内のアラーム抽出部4において抽出す
る。アラームが基準クロックに関するものであった場合
は、基準クロックの送信が止まってしまった伝送路33
を検索し、前記伝送路33に接続されている被監視装置
のうち、スレーブモードにある装置23を検索する。
"Function" When the reference clock is cut off, an alarm reporting this is emitted from the monitored device 23.The transmitted alarm is extracted by the alarm extraction section 4 in the monitoring device 20.If the alarm is related to the reference clock, If so, the transmission line 33 where the reference clock transmission has stopped
, and among the monitored devices connected to the transmission line 33, the device 23 in slave mode is searched.

これにより、前記スレーブモード装置23が基準クロッ
クを受信するために用いていた伝送路33を認識するこ
とができる。
Thereby, the transmission line 33 used by the slave mode device 23 to receive the reference clock can be recognized.

次いで、前記被監視装置23に接続されている伝送路3
3.31を検索し、そのうち正常に基準クロック送信を
行える伝送路31を識別する。
Next, the transmission line 3 connected to the monitored device 23
3.31, and identify the transmission line 31 that can normally transmit the reference clock.

このときに前記伝送路31において、基準クロックの受
信ができなくなった被監視装置23と、それに対向する
被監視装置22との間において、マスターモードとスレ
ーブモードの関係が相対的にどのような状態にあるかを
判別する。
At this time, in the transmission path 31, what is the relative state of the relationship between the master mode and the slave mode between the monitored device 23 that has become unable to receive the reference clock and the monitored device 22 that opposes it? Determine whether it is present.

ここまでの過程は、クロックトポロジー検索部1におい
て行われる。
The processes up to this point are performed in the clock topology search section 1.

もし前記被監視装置23がマスターモードにある場合に
は、この装置は基準クロックを受信することができない
。そこで、マスターモードとスレブモードの関係を逆転
するように両波監視装置22.23に指令を出す。
If the monitored device 23 is in master mode, it cannot receive the reference clock. Therefore, a command is issued to both wave monitoring devices 22 and 23 to reverse the relationship between master mode and slave mode.

この過程は、クロックトポロジー処理部2において行わ
れる。
This process is performed in the clock topology processing section 2.

以上記された、検索、認識、識別、判別といった動作は
、全てデータテーブル3をもちいてなされる。
The operations described above, such as search, recognition, identification, and discrimination, are all performed using the data table 3.

以上の作用によりクロックトポロジーを変更し、基準ク
ロックの受信が不可能となっていた被監視装置23に対
し、基準クロックを再び供給することが可能となる。
Through the above-described operation, it is possible to change the clock topology and supply the reference clock again to the monitored device 23 which has been unable to receive the reference clock.

[実施例1 第2図には一実施例における監視装置20の構成図が示
されている。第2図において、1はクロックトポロジー
検索部、2はクロックトポロジ処理部、3はデータテー
ブル、4はアラーム抽出部、5は受信部、6は送信部で
ある。
Embodiment 1 FIG. 2 shows a configuration diagram of a monitoring device 20 in an embodiment. In FIG. 2, 1 is a clock topology search section, 2 is a clock topology processing section, 3 is a data table, 4 is an alarm extraction section, 5 is a reception section, and 6 is a transmission section.

前記データテーブル3は、このネットワークにおけるク
ロックトポロジーに関する情報が収められている。
The data table 3 contains information regarding the clock topology in this network.

第3図には一実施例における被監視装置の構成図が示さ
れている。第3図において、7は監視制御部、8は伝送
路インターフェイス部である。監視制御部7において、
9はコマンド受信部、1゜はコマンド発行部である。伝
送路インターフェイス部8において、11はコマンド受
信部1,12はクロックトポロジー変更部、13はクロ
ック異常判定部、14はアラーム発生部、15は送受信
部、16はデータテーブルである。
FIG. 3 shows a configuration diagram of a monitored device in one embodiment. In FIG. 3, 7 is a monitoring control section, and 8 is a transmission line interface section. In the monitoring control section 7,
9 is a command receiving section, and 1° is a command issuing section. In the transmission line interface section 8, 11 is a command receiving section 1, 12 is a clock topology changing section, 13 is a clock abnormality determining section, 14 is an alarm generating section, 15 is a transmitting/receiving section, and 16 is a data table.

第4図A、Bは、一実施例におけるネットワクの構成を
示している。このうち、第4図Aは伝送路障害発生時の
ネットワークを、第4図Bは被監視装置23の同期が復
旧した状態のネットワクをそれぞれ表している。第4図
において20は監視装置、21,22,23,24.2
5は被監視装置である。このうち、21はクロックマス
ターである。
FIGS. 4A and 4B show the configuration of a network in one embodiment. Of these, FIG. 4A shows the network when a transmission path failure occurs, and FIG. 4B shows the network in a state where the synchronization of the monitored device 23 has been restored. In Fig. 4, 20 is a monitoring device, 21, 22, 23, 24.2
5 is a monitored device. Of these, 21 are clock masters.

伝送路30は、監視装置20と被監視装置21とを接続
する伝送路、実線の矢印31,32,33.34は現時
点でのクロック送信用線路、点線の矢印35,36,3
7.38は予備のクロック送信用線路を示す。尚、前記
矢印は基準クロックが送信される方向を示し、データ送
信の方向を意味するものではない。データの送信は基準
クロックの送信される線路とは別の伝送路を用いて行な
うことも可能である。
The transmission line 30 is a transmission line connecting the monitoring device 20 and the monitored device 21, solid line arrows 31, 32, 33.34 are current clock transmission lines, and dotted line arrows 35, 36, 3.
7.38 indicates a spare clock transmission line. Note that the arrow indicates the direction in which the reference clock is transmitted, and does not mean the direction in which data is transmitted. It is also possible to transmit data using a transmission line different from the line through which the reference clock is transmitted.

このネットワークは、前記伝送路30及びブタ伝送路を
通して前記被監視装置からの状態信号並びに前記監視装
置20からのコマンドのやりとりが行われる。
In this network, status signals from the monitored device and commands from the monitoring device 20 are exchanged through the transmission path 30 and the pig transmission path.

第5図A、  B、  C,Dは監視装置20内にある
データテーブル3の内部である。第5図Aはクロックモ
ードテーブル、第5図Bはカレントクロックトポロジー
テーブル、第5図Cは伝送路カレント状態テーブル、第
5図りは被監視装置接続テーブルをそれぞれ表している
5A, B, C, and D show the inside of the data table 3 in the monitoring device 20. FIG. 5A shows a clock mode table, FIG. 5B shows a current clock topology table, FIG. 5C shows a transmission path current state table, and the fifth diagram shows a monitored device connection table.

各データテーブルについて説明すると、第5図Aクロン
クモートチープルは各伝送路に接続されている二つの被
監視装置相互間における相対的なマスターモードとスレ
ーブモードの関係に関する情報が収められている。
To explain each data table, the Cronk Mort Cheeple shown in FIG. 5A stores information regarding the relative relationship between master mode and slave mode between two monitored devices connected to each transmission line.

第5図Bカレントクロックトポロジーテーブルは、どの
被監視装置がクロックマスター装置であるかスレーブモ
ード装置であるかに関する情報と、各スレーブモード装
置が基準クロックを受信するのに用いている伝送路に関
する情報とが収められている。
Figure 5B Current Clock Topology Table provides information regarding which monitored devices are clock master devices or slave mode devices, and information regarding the transmission path used by each slave mode device to receive the reference clock. It contains.

第5図C伝送路カレントテーブルは、伝送路の現在の状
態が、正常であるか異常であるかということに関する情
報が収められている。
The transmission path current table shown in FIG. 5C stores information regarding whether the current state of the transmission path is normal or abnormal.

第5図り被監視装置接続テーブルは、各被監視装置につ
ながれている伝送路がどの伝送路であるかの情報が収め
られている。
The fifth monitored device connection table stores information on which transmission path is connected to each monitored device.

第6図は監視装置20内における処理流れ図、第7図は
伝送路インターフェイス部8内における基準クロック断
時の処理流れ図、第8図A及び第8図Bは被監視装置内
におけるクロックトポロジー変更時の処理流れ図である
FIG. 6 is a flowchart of processing within the monitoring device 20, FIG. 7 is a flowchart of processing within the transmission line interface unit 8 when the reference clock is disconnected, and FIGS. 8A and 8B are when the clock topology is changed within the monitored device. It is a processing flowchart.

以下、以上にあげた図を用いて説明を行なう。The explanation will be given below using the figures listed above.

いま、第4図Aに示すように、伝送路33に障害が発生
した場合について考える。
Now, consider a case where a failure occurs in the transmission line 33, as shown in FIG. 4A.

伝送路障害が発生し、前記伝送路33により送信されて
いた基準クロックが断たれると、第7図の流れ図に示す
手順により被監視装置23内のクロック異常判別部13
が動作する。即ち、基準クロック断になると前記クロッ
ク異常判別部13は、前記伝送路インターフェイス部8
が基準クロックを引き込み中であるかどうかを判別する
(第7図・SL)。もし引き込みがなされていないなら
ば、他に基準クロックを引き込み中の伝送路インクフェ
イス部が存在するかどうかを判別する(第7図・S2)
When a transmission path failure occurs and the reference clock transmitted through the transmission path 33 is cut off, the clock abnormality determination unit 13 in the monitored device 23 is detected by the procedure shown in the flowchart of FIG.
works. That is, when the reference clock is disconnected, the clock abnormality determination section 13 detects the transmission line interface section 8.
It is determined whether or not the reference clock is being pulled in (SL in FIG. 7). If the reference clock is not being pulled in, it is determined whether there is another transmission line ink face part that is pulling in the reference clock (Fig. 7, S2).
.

基準クロックを引き込んでいる伝送路インクフェイス部
が存在しない場合には、該伝送路インターフェイス部8
内にあるデータテーブル16の内容を引き込み中に変更
し、基準クロックの引き込みを開始する(第7図・S3
.S4)。続いて、基準クロックの引き込みが正常にな
されているがどうかを判別する(第7図・S5)。
If there is no transmission line ink face unit that pulls in the reference clock, the transmission line interface unit 8
The content of the data table 16 in
.. S4). Next, it is determined whether the reference clock is being pulled in normally (S5 in FIG. 7).

基準クロックの引き込みが正常になされていない場合に
は、前記クロック異常判別部13は障害が発生したと判
断し、前記監視装置2oに対してアラームが発せられる
(第7図・S6.S7)。
If the reference clock is not pulled in normally, the clock abnormality determining section 13 determines that a failure has occurred, and an alarm is issued to the monitoring device 2o (FIG. 7, S6 and S7).

前記監視装置20は前記アラームを受信部5において受
信し、基準クロックに関するアラームを、アラーム抽出
部4において抽出する(第6図・Sl)。
The monitoring device 20 receives the alarm at the receiving section 5, and extracts the alarm related to the reference clock at the alarm extracting section 4 (Sl in FIG. 6).

次に、クロックトポロジー検索部1では、基準クロック
の送信を行えなくなった伝送路を検索する。抽出された
アラームは基準クロックを受信していた被監視装置23
よりのものであるので、この場合には第5図Bカレント
クロックトポロジテーブルを用いて、前記被監視装置2
3が基準クロックの受信に用いていた伝送路33上にお
いて基準クロック送信の障害が発生したと判断する(第
6図・S2)。これは伝送路障害の発生を即意味するわ
けではないが、伝送路33を用いた基準クロックの送信
ができなくなったことが判断できれば充分である。
Next, the clock topology search unit 1 searches for a transmission path where it is no longer possible to transmit the reference clock. The extracted alarm is the monitored device 23 that was receiving the reference clock.
Therefore, in this case, using the current clock topology table in FIG. 5B, the monitored device 2
3 determines that a failure in transmitting the reference clock has occurred on the transmission line 33 that was used to receive the reference clock (S2 in FIG. 6). Although this does not immediately mean that a transmission line failure has occurred, it is sufficient to determine that it is no longer possible to transmit the reference clock using the transmission line 33.

続いて、第5図Aクロックモードテーブルを参照して、
前記伝送路33におけるスレーブモード装置が被監視装
置23であることを検索する(第6図・S3)。この検
索を行なうことにより、前記被監視装置23は、前記伝
送路33を用いて基準クロックを受信していたことを確
認することができる。
Next, referring to the clock mode table in Figure 5A,
It is searched that the slave mode device on the transmission path 33 is the monitored device 23 (FIG. 6, S3). By performing this search, it is possible to confirm that the monitored device 23 has received the reference clock using the transmission path 33.

次いで第5図り被監視装置接続テーブルを参照して、前
記被監視装置23に接続している伝送路が伝送路33,
36.38であることを検索しく第6図・S4)、各伝
送路について第5図C伝送路カレント状態テーブルを検
索し伝送路36゜38が正常であることを認識する(第
6図・S5)。
Next, with reference to the fifth monitored device connection table, it is determined whether the transmission path connected to the monitored device 23 is the transmission path 33,
36.38 (Fig. 6, S4), search the transmission line current state table in Fig. 5 C for each transmission line, and recognize that the transmission line 36°38 is normal (Fig. 6, S4). S5).

ここで再び第5図Aクロックモードテーブルを参照して
、前記被監視装置23は伝送路36,38上において相
対的にマスターモードにあることを認識する(第6図・
36)。この結果、監視装置20は被監視装置23が基
準クロックを受信できない状態にあると判断する。
Here, referring again to the clock mode table in FIG. 5A, it is recognized that the monitored device 23 is relatively in the master mode on the transmission lines 36 and 38 (see FIG. 6).
36). As a result, the monitoring device 20 determines that the monitored device 23 is unable to receive the reference clock.

この場合、クロックトポロジー処理部2は第5図Aクロ
ックモードテーブルを参照して、前記伝送路36.38
にそれぞれ接続された被監視装置24.25が前記被監
視装置23に対してスレブモードにあることを認識し、
任意の一つを選択する。前記クロックトポロジー処理部
2は伝送路38に接続さた前記被監視袋W23をスレー
ブモトに、それに対向する被監視装置25をマスクモー
ドに変更するように送信部6より指令を発する(第6図
・S7)。
In this case, the clock topology processing unit 2 refers to the clock mode table A in FIG.
recognizes that the monitored devices 24, 25 respectively connected to the monitored device 23 are in slave mode with respect to the monitored device 23;
Select any one. The clock topology processing section 2 issues a command from the transmitting section 6 to change the monitored bag W23 connected to the transmission line 38 to the slave mode and the monitored device 25 facing it to the mask mode (see FIG. 6). S7).

もし前記被監視装置23が伝送路36.38のいずれか
においてスレーブモードにある場合には、第6図・87
以下にあげるクロックトポロジー変更の過程は行われな
い(第6図・S9)。
If the monitored device 23 is in slave mode on any of the transmission lines 36, 38, then
The following clock topology change process is not performed (FIG. 6, S9).

一方、前記被監視装置23及び25内の監視制御部7で
は、前記監視装置20よりの指令を受けて第8図Aの処
理が行われる。以下前記被監視装置23における処理に
ついて述べる。
On the other hand, the monitoring control section 7 in the monitored devices 23 and 25 receives the command from the monitoring device 20 and performs the process shown in FIG. 8A. The processing in the monitored device 23 will be described below.

前記監視装置20より送信された指令を受けて、コマン
ド受信部9ではコマンド受信の対象となっている伝送路
インターフェイス部8が存在するかどうかを判別する(
第8図A−31)。
Upon receiving the command transmitted from the monitoring device 20, the command receiving section 9 determines whether or not there is a transmission line interface section 8 that is the target of receiving the command (
Figure 8 A-31).

もしコマンド受信の対象となっている伝送路インターフ
ェイス部8が存在する場合には、該当する伝送路インタ
ーフェイス部8に対しクロックトポロジーを変更するコ
マンドをコマンド発行部10より発する(第8図A−3
2)。
If there is a transmission line interface section 8 that is the target of command reception, the command issuing section 10 issues a command to change the clock topology to the corresponding transmission line interface section 8 (Fig. 8 A-3).
2).

続いて、伝送路インターフェイス部8において第8図B
の処理が行われる。前記伝送路インタフェイス部8内の
コマンド受信部11は前記コマンドを受信する(第8図
B−33)。もし前記コマンドがクロックトポロジー変
更に関するものであった場合には、クロックトポロジー
変更部12は送受信部15をマスターモードからスレー
ブモトへと変更する(第8図B−34.S5)。
Then, in the transmission path interface section 8,
processing is performed. The command receiving section 11 in the transmission line interface section 8 receives the command (FIG. 8B-33). If the command is related to changing the clock topology, the clock topology changing unit 12 changes the transmitting/receiving unit 15 from master mode to slave mode (FIG. 8B-34.S5).

最後に該被監視装置23におけるクロックトポロジーに
関する情報がおさめられているデータテーブル16の内
容を更新してクロックトポロジー変更の処理は終了する
(第8図B −36)。前記被監視装置25においても
同様な処理が行われ、伝送路38においてスレーブモー
ドからマスクモードへと変更される。
Finally, the contents of the data table 16 containing information regarding the clock topology of the monitored device 23 are updated, and the clock topology changing process is completed (FIG. 8B-36). Similar processing is performed in the monitored device 25, and the transmission line 38 is changed from slave mode to mask mode.

以上の手順によりクロックトポロジーを変更したのちに
、前記クロックトポロジー処理部2は、現時点のクロッ
クトポロジーの情報を前記データテーブル3に書き込み
、内容を更新する(第6図38)。
After changing the clock topology according to the above procedure, the clock topology processing section 2 writes information on the current clock topology to the data table 3 to update the contents (FIG. 6, 38).

この結果、第2図Bに示すとおり、前記被監視装置23
は伝送路38を通して基準クロックを受信できるように
なり、ネットワークに対して同期をとり、データの正常
な伝送が可能となる。
As a result, as shown in FIG. 2B, the monitored device 23
can now receive the reference clock through the transmission line 38, synchronize with the network, and enable normal data transmission.

(その他の実施例) 本実施例では、基準クロック断が伝送路障害によるもの
を想定しているが、これが被監視装置の障害による基準
クロック断である場合にも同様の手段により基準クロッ
ク断となった被監視装置の同期を復旧することが可能と
なる。
(Other Examples) In this example, it is assumed that the reference clock disconnection is due to a transmission path failure, but even if the reference clock disconnection is due to a failure in the monitored device, the reference clock disconnection can be detected by the same means. It becomes possible to restore the synchronization of the monitored device.

本実施例は基準クロックがデータとは別に各装置に対し
て送信されているが、データ列のなかに同期のためのタ
イミング情報がふくまれる場合でも同様にしてクロック
トポロジーの変更を行なうことができる。
In this embodiment, the reference clock is sent to each device separately from the data, but even if the data string includes timing information for synchronization, the clock topology can be changed in the same way. .

また本実施例では、監視装置からのコマンド並びに各被
監視装置からの状態信号はデータを送信する伝送路によ
り送受信されているが、前記コマンド並びに状態信号が
監視装置と各被監視装置との間を直結する専用線によっ
て送受信されている場合にも同様にしてクロックトポロ
ジーの変更が可能である。
Furthermore, in this embodiment, commands from the monitoring device and status signals from each monitored device are transmitted and received through a transmission path for transmitting data, but the commands and status signals are transmitted between the monitoring device and each monitored device. The clock topology can be changed in the same way even when data is transmitted and received via a dedicated line that directly connects the clock.

[発明の効果コ 以上説明してきたように、本発明を実施することにより
、基準クロックが絶たれた装置の同期を、自動的に、速
やかに復旧し、データの正常な伝送を行なうことができ
るようになる。
[Effects of the Invention] As explained above, by implementing the present invention, it is possible to automatically and quickly restore the synchronization of a device whose reference clock has been cut off, and to perform normal data transmission. It becomes like this.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図Aは本発明における監視装置20の原理説明図、 第1図Bは本発明におけるネットワークの原理説明図、 第2図は一実施例における監視装置20の構成図、第3
図は一実施例における被監視装置の構成図、第4図Aは
一実施例における伝送路障害発生時のネットワークの構
成図、 第4図Bは一実施例における被監視装置23の同期が復
旧した状態のネットワークの構成図、第5図Aはクロッ
クモードテーブル、 第5図Bはカレントクロックトポロジーテーブル、第5
図Cは伝送路カレント状態テーブル、第5図りは被監視
装置接続テーブル、 第6図は監視装置20内における処理流れ図、第7図は
伝送路インターフェイス部8内における基準クロック断
時の処理流れ図、 第8図Aは監視制御部7内におけるクロックトポロジー
変更時の処理流れ図、 第8図Bは伝送路インターフェイス部8内におけるクロ
ックトポロジー変更時の処理流れ図、第9図は従来技術
によるネットワークの構成図、である。 原理図において、 1はクロックトポロジー検索部、 2はクロックトポロジー処理部、 3はデータテーブル、 4はアラーム抽出部、 20は監視装置、 21.22.23は被監視装置、 30は監視装置20と被監視装置21とを接続する伝送
路、 32.33はクロックが送信されている伝送路、31は
予備の伝送路、 である。 本発明句1克較置の漏理富之明図 第 1 図A ネットワーク0原チ里畜先1引y 第 図 一突□2テ!、砂りコムは5□71焚監視襞’fL20
の2イ1〜.、ジ咬、磨第 2  図 り白来ゴ5fオ;テによろ4五人図 第 q 図 第 図 禎(2見装置23の同y脳′−を菓旧しLA大敗n半ッ
トフー2第 罠 クロラフ毛−F−J−プル 第 5  図 A 々送」谷カレノFxBテーフ゛Jし 第 図C 腎ネ地装置2012Vに者けろ&チ里3を水77第 図 71Lソト70.ソフトポロジ−チーアル第  5  
用 B 祈監ネ!L製1−惇到ヒテーブル 第 図 イ云迭路インターフェイス合間を二訊軽2Q・ソ2謔p
afqノ$r里流月り7第 図 第 図 第 肥
FIG. 1A is a diagram explaining the principle of the monitoring device 20 in the present invention, FIG. 1B is a diagram explaining the principle of the network in the present invention, FIG. 2 is a configuration diagram of the monitoring device 20 in one embodiment, and FIG.
The figure is a configuration diagram of a monitored device in one embodiment, FIG. 4A is a configuration diagram of a network when a transmission path failure occurs in one embodiment, and FIG. 4B is a synchronization recovery of the monitored device 23 in one embodiment. Figure 5A is a clock mode table, Figure 5B is a current clock topology table, and Figure 5B is a current clock topology table.
FIG. C is a transmission path current state table, the fifth diagram is a monitored device connection table, FIG. 6 is a flowchart of processing within the monitoring device 20, and FIG. FIG. 8A is a process flowchart when clock topology is changed within the supervisory control unit 7, FIG. 8B is a process flowchart when clock topology is changed within transmission line interface unit 8, and FIG. 9 is a diagram showing the configuration of a network according to the prior art. , is. In the principle diagram, 1 is a clock topology search unit, 2 is a clock topology processing unit, 3 is a data table, 4 is an alarm extraction unit, 20 is a monitoring device, 21, 22, 23 are monitored devices, and 30 is a monitoring device 20. A transmission line connecting the monitored device 21, 32 and 33 a transmission line through which a clock is transmitted, and 31 a backup transmission line. Phrase of the present invention 1 Comparison of location of leakage and wealth diagram 1 Figure A Network 0 original farm destination 1 draw y Figure 1 hit □ 2 Te! , Sunari com is 5□71 firing monitoring fold'fL20
2-1~. , Jibite, Mathematics 2nd plan White coming 5f; Chloraf hair - F-J-pull Fig. 5
For B Prayer supervisor! L-made 1-to-reach table figure I and the interface between two lines 2 Q and 2 Q p
afq no $r ri ryuzukiri 7th diagram fig.

Claims (1)

【特許請求の範囲】 1)伝送路(31、32、33)により相互に接続され
た複数の被監視装置(21、22、23)と、前記被監
視装置(21、22、23)のうち少なくとも一つと伝
送路(30)により接続され、前記被監視装置(21、
22、23)を監視する監視装置(20)とを有し、前
記被監視装置(21、22、23)の一つを基準クロッ
クを発生させるクロックマスター(21)とし、他の被
監視装置は前記基準クロックに同期されているネットワ
ークにおいて、前記監視装置(20)は、 被監視装置(23)からの、基準クロック断を伝えるア
ラームによりクロックに関する障害を認識し、クロック
トポロジーに関する情報を収めたデータテーブル(3)
を用いて前記被監視装置(23)に再びクロックを送信
するための経路を選択し、該経路における前記被監視装
置(23)のクロック送受信モードを判別するクロック
トポロジー検索部(1)と、 前記被監視装置(23)とそれに対向する被監視装置(
22)のクロック送受信モードを逆転せしめるクロック
トポロジー処理部(2)とを有することを特徴とする、 データ伝送ネットワーク。 2)前記データテーブル(3)は、 各伝送路に接続されている二つの被監視装置相互間にお
ける相対的なマスターモードとスレーブモードの関係に
関する情報が収められている第一のテーブルと、 どの被監視装置がクロックマスター装置、またはスレー
ブモード装置であるかに関する情報と、各スレーブモー
ド装置が基準クロックを受信するのに用いている伝送路
に関する情報とが収められている第二のテーブルと、 伝送路の現在の状態が正常であるか異常であるかという
ことに関する情報が収められている第三のテーブルと、 各被監視装置につながれている伝送路がどの伝送路であ
るかの情報が収められている第四のテーブルとを有する
ことを特徴とする、 請求項1記載のデータ伝送ネットワーク。 3)伝送路(31、32、33)により相互に接続され
た複数の被監視装置(21、22、23)と、前記被監
視装置(21、22、23)のうち少なくとも一つと伝
送路(30)により接続され、前記被監視装置(21、
22、23)を監視する監視装置(20)とを有し、前
記被監視装置(21、22、23)の一つを基準クロッ
クを発生させるクロックマスター(21)とし、他の被
監視装置は前記基準クロックに同期されているネットワ
ークにおいて、被監視装置(23)からの基準クロック
断を伝えるアラームを検出する第一の過程と、 前記アラームにより、基準クロックが送信されなくなっ
た伝送路(33)と、該伝送路(33)に接続された被
監視装置(21、23)のうち、スレーブモードにある
被監視装置(23)を検索する第二の過程と、前記スレ
ーブモード被監視装置(23)が接続された全ての伝送
路(31、33)を検索する第三の過程と、第三の過程
により検索された伝送路(31、33)のなかで正常に
基準クロックの送信が行える伝送路(31)を認識する
第四の過程と、 第四の過程により認識された伝送路(31)について、
前記スレーブモード被監視装置(23)と、それに対向
した被監視装置(22)との間に存在するマスターモー
ドとスレーブモードの相対的な関係を判別する第五の過
程と、 第五の過程により前記スレーブモード被監視装置(23
)が、それに対向する被監視装置(22)に対して相対
的にマスターモードにあると判別されたときには、マス
ターモードとスレーブモードの関係を逆転させる第六の
過程とを有することを特徴とする、 クロックトポロジー変更方法。
[Claims] 1) A plurality of monitored devices (21, 22, 23) interconnected by transmission paths (31, 32, 33), and one of the monitored devices (21, 22, 23). connected to at least one of the monitored devices (21,
22, 23), one of the monitored devices (21, 22, 23) is a clock master (21) that generates a reference clock, and the other monitored devices are In a network that is synchronized with the reference clock, the monitoring device (20) recognizes a clock-related failure by an alarm from the monitored device (23) that indicates disconnection of the reference clock, and transmits data containing information regarding the clock topology. Table (3)
a clock topology search unit (1) that selects a route for transmitting the clock again to the monitored device (23) using A monitored device (23) and a monitored device facing it (23)
22) A data transmission network comprising: a clock topology processing unit (2) that reverses the clock transmission/reception mode of the data transmission network. 2) The data table (3) includes a first table containing information regarding the relative relationship between master mode and slave mode between two monitored devices connected to each transmission path; a second table containing information regarding whether the monitored device is a clock master device or a slave mode device and information regarding the transmission path used by each slave mode device to receive the reference clock; A third table contains information on whether the current state of the transmission path is normal or abnormal, and information on which transmission path is connected to each monitored device. Data transmission network according to claim 1, characterized in that it has a fourth table stored therein. 3) A plurality of monitored devices (21, 22, 23) interconnected by transmission paths (31, 32, 33), and at least one of the monitored devices (21, 22, 23) and the transmission path ( 30), and the monitored device (21,
22, 23), one of the monitored devices (21, 22, 23) is a clock master (21) that generates a reference clock, and the other monitored devices are A first step of detecting an alarm indicating disconnection of the reference clock from the monitored device (23) in a network synchronized with the reference clock; and a transmission path (33) in which the reference clock is no longer transmitted due to the alarm. a second step of searching for the monitored device (23) in slave mode among the monitored devices (21, 23) connected to the transmission path (33); ) to search all transmission paths (31, 33) connected to the transmission path (31, 33), and transmission in which the reference clock can be transmitted normally among the transmission paths (31, 33) searched by the third step. Regarding the fourth process of recognizing the channel (31) and the transmission channel (31) recognized by the fourth process,
a fifth step of determining the relative relationship between master mode and slave mode existing between the slave mode monitored device (23) and the monitored device (22) opposite thereto; The slave mode monitored device (23
) is determined to be in master mode relative to the monitored device (22) facing it, a sixth step of reversing the relationship between master mode and slave mode. , How to change clock topology.
JP2168903A 1990-06-26 1990-06-26 Data transmission network having clock topology revision function Pending JPH0457423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2168903A JPH0457423A (en) 1990-06-26 1990-06-26 Data transmission network having clock topology revision function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2168903A JPH0457423A (en) 1990-06-26 1990-06-26 Data transmission network having clock topology revision function

Publications (1)

Publication Number Publication Date
JPH0457423A true JPH0457423A (en) 1992-02-25

Family

ID=15876702

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2168903A Pending JPH0457423A (en) 1990-06-26 1990-06-26 Data transmission network having clock topology revision function

Country Status (1)

Country Link
JP (1) JPH0457423A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180122688A (en) * 2016-03-18 2018-11-13 후아웨이 테크놀러지 컴퍼니 리미티드 CLAIMS 1. A method for updating a clock synchronization topology, a method for determining a clock synchronization path,

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180122688A (en) * 2016-03-18 2018-11-13 후아웨이 테크놀러지 컴퍼니 리미티드 CLAIMS 1. A method for updating a clock synchronization topology, a method for determining a clock synchronization path,
US10892884B2 (en) 2016-03-18 2021-01-12 Huawei Technologies Co., Ltd. Method for updating clock synchronization topology, method for determining clock synchronization path, and device
KR20210008940A (en) * 2016-03-18 2021-01-25 후아웨이 테크놀러지 컴퍼니 리미티드 Method of updating clock synchronization topology, method of determining clock synchronization path, and apparatus

Similar Documents

Publication Publication Date Title
JPS63206045A (en) Method for detecting faulty location in ring network
JP5169909B2 (en) Ring network system and ring network system recovery method
JPH0457423A (en) Data transmission network having clock topology revision function
JPH0650876B2 (en) Intermediate relay device
JP3402733B2 (en) Transmission equipment control system
JPS6111501B2 (en)
JP2001056890A (en) Alarm transmission system
JPS5868335A (en) Optical communicating method using data loop way and its controller
JPH0468449A (en) System monitoring device
JP4874873B2 (en) Digital controller
JPS622492B2 (en)
JPH0720121B2 (en) How to detect a fault in a ring network
JP2022053733A (en) Remote control system
KR20110030191A (en) Apparatus and method for robot control based network
JPS6040746B2 (en) fiber optic communication equipment
JP2734410B2 (en) Transmission line switching system
JP2005150959A (en) Data transmitting system and data transmitter
JPH02283145A (en) Fault restoration method
JPH0654915B2 (en) Transmission line restoration method
JPH01126042A (en) Transmission line monitoring system in ring communication system
JPH0442632A (en) System management system
JP4724171B2 (en) Node device and clock switching method
JP3223773B2 (en) Line communication system and line communication method
JP2854873B2 (en) Backup method of online dual processing system
JP2643114B2 (en) Line controller for loop transmission line