JPH045566Y2 - - Google Patents

Info

Publication number
JPH045566Y2
JPH045566Y2 JP18655787U JP18655787U JPH045566Y2 JP H045566 Y2 JPH045566 Y2 JP H045566Y2 JP 18655787 U JP18655787 U JP 18655787U JP 18655787 U JP18655787 U JP 18655787U JP H045566 Y2 JPH045566 Y2 JP H045566Y2
Authority
JP
Japan
Prior art keywords
line
frame
bone
vertical
bone line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP18655787U
Other languages
Japanese (ja)
Other versions
JPH0193240U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP18655787U priority Critical patent/JPH045566Y2/ja
Publication of JPH0193240U publication Critical patent/JPH0193240U/ja
Application granted granted Critical
Publication of JPH045566Y2 publication Critical patent/JPH045566Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【考案の詳細な説明】 [産業上の利用分野] 本考案は、間伐材を使用した土留工事などに好
適に使用することのできる土留柵材に関するもの
である。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to an earth retaining fence material that can be suitably used for earth retaining construction using thinned wood.

[従来の技術] 近年、土地開発の増加と共に土留工事の需要が
急増している。かかる土留工事には、従来より蛇
籠が一般に使用され、該蛇籠内に栗石や石礫、土
砂等が充填されることによつてその設置が行われ
ていたが、上記栗石や石礫は枯渇の一途をたど
り、非常に高価になつてその入手も困難になつて
いる。そのため、現場の土砂をそのまま使用する
ケースが増えているが、単に蛇籠内に土砂を充填
するだけでは、該土砂の流出が激しく、有効な土
留効果を発揮させることができない。
[Prior Art] In recent years, with the increase in land development, the demand for earth retaining construction has rapidly increased. Conventionally, gabions have been generally used for such earth retaining work, and the gabions were installed by filling them with chestnut stones, gravel, earth and sand, etc. It has become extremely expensive and difficult to obtain. For this reason, there are an increasing number of cases in which earth and sand from the site are used as is, but simply filling the gabions with earth and sand causes the earth and sand to flow out rapidly, making it impossible to achieve an effective earth retention effect.

また、近年、上記土留工事などにおいて、森林
保全、林業振興のために間伐材を有効利用するこ
とが強く要望されており、さらに、林道事業や治
山事業、一般道路や土地の造成などを行う場合に
も、その資材として上記間伐材のような有機物素
材を使用し、緑化を促進して活力ある森林造りを
行うことが要請されている。
In addition, in recent years, there has been a strong demand for the effective use of thinned wood for forest conservation and forestry promotion in the above-mentioned earth retaining works, etc., and in addition, when carrying out forest road projects, mountain conservation projects, general roads and land development, etc. However, there is a need to use organic materials such as the thinned wood mentioned above to promote greening and create a vibrant forest.

一方、間伐材の有効利用と土砂の流出防止とを
同時に図ることができる土留工法として、例えば
第5図に示すように、所定の間隔で打ち込んだ留
杭1に当接させて軸線が斜面の幅方向を向く横木
2を配設し、この横木2の上にそれと交差する控
木3と横木4とを交互に重積すると共に、これら
の控木3と横木4とを金具5により互いに連結固
定し、それらの隙間内に土砂や石礫などを充填す
るようにした丸太積土留工や、第6図に示すよう
に、一定間隔で打ち込んだ杭7の背部に複数の横
丸太8を鉄線9で縛るなどして重積し、該横丸太
の背部に土砂等を充填する丸太柵工など、間伐材
を使用した土留工法が多く実施されている。
On the other hand, as an earth retaining method that can simultaneously make effective use of thinned wood and prevent earth and sand from flowing out, for example, as shown in Fig. A crossbar 2 facing in the width direction is arranged, and restraints 3 and crossbars 4 intersecting with the crossbar 2 are stacked alternately on top of the crossbar 2, and these restraints 3 and crossbars 4 are connected to each other by metal fittings 5. There is a log piling earth retaining structure in which the logs are fixed and the gaps are filled with earth, sand, gravel, etc., and as shown in Figure 6, a plurality of horizontal logs 8 are installed on the backs of piles 7 driven at regular intervals using iron wire. Many earth retaining methods are being implemented using thinned wood, such as log fencing, in which horizontal logs are piled up by tying them together with ropes, etc., and the backs of the horizontal logs are filled with earth and sand.

しかしながら、このように間伐材のみを使用し
た土留工法では、該間伐材の腐朽が数年と早いた
めに十分な表土造りと植生とを行うことが困難で
あり、斜面の移動や崩壊等による土砂災害を招く
おそれがあつた。
However, with this earth retaining method that uses only thinned wood, it is difficult to create sufficient topsoil and vegetation because the thinned wood rots quickly, taking several years. There was a risk of a disaster.

そこで、鋭意研究の結果、間伐材の丸太と金属
線材からなる支持枠とを組合わせることにより、
土砂や石礫等を充填物として使用した場合でもそ
れを確実且つ安定的に支持することができ、しか
も、棒材の腐朽によつても直ちに土留効果を消失
することがなく、長期にわたつて優れた土留機能
を維持することができる土留柵を開発した(実開
昭64−651号)。
Therefore, as a result of intensive research, by combining thinned logs with a support frame made of metal wire,
Even when earth, sand, gravel, etc. are used as filler, it can be supported reliably and stably, and even if the rods rot, the earth retaining effect will not immediately disappear, and it will last for a long time. We developed an earth retaining fence that can maintain excellent earth retaining function (Utility Model Application No. 64-651).

ところが、かかる土留柵は、通常、遠隔地の足
場の悪い場所に設置されることが多いため、資
材、特に立体的形状を有する支持枠の梱包や輸
送、現場での組み立て等に多くの手数や時間を必
要とし、コストも高くなるという問題を有してお
り、従つて、これらの問題を解消するためには、
上記支持枠が、同時に多数のものを梱包及び輸送
することができ、しかも現場で簡単に組み立てら
れるようになつていることが必要であり、これら
の点について更に改良を施す必要があつた。
However, such earth-retaining fences are usually installed in remote locations with poor footing, so it takes a lot of time and effort to pack and transport materials, especially support frames with three-dimensional shapes, and assemble them on site. It has the problems of requiring time and increasing costs. Therefore, in order to solve these problems,
It is necessary for the above-mentioned support frame to be able to package and transport a large number of items at the same time, and to be able to be easily assembled on site, and there is a need for further improvements in these respects.

[考案が解決しようとする問題点] 本考案の課題は、上記改良型の土留柵における
支持枠を、梱包及び輸送が容易であると共に、現
場での組み立てを簡単且つ短時間に行ない得るよ
うに構成することにある。
[Problems to be solved by the invention] The problem of the invention is to make the supporting frame of the above-mentioned improved earth retaining fence easy to pack and transport, and to be able to assemble it on site easily and in a short time. It consists in composing.

[問題点を解決するための手段] 上記課題を解決するため、本考案は、丸太を支
持する上記支持枠を、所定の間隔で配置した複数
の横線及び縦線からなり、少なくとも横線の両端
に連結用の環を備えた前面網と、該前面網におけ
る縦線に連結され、該縦線と協同して底辺に丸太
横設用の設置部を備えた骨枠を構成する中間部枠
骨線と、前面網における横線の端部の環に挿通さ
れ、該前面網の端部において縦線の代用をすると
共に支持枠同士を連結する際の連結骨線を兼用す
る端部縦骨線と、該端部縦骨線に連結され、該縦
骨線と協同して支持枠端部の骨枠を構成する端部
枠骨線と、を備えたものとして構成している。
[Means for Solving the Problems] In order to solve the above problems, the present invention provides that the support frame for supporting the log is made up of a plurality of horizontal lines and vertical lines arranged at predetermined intervals, and that at least both ends of the horizontal lines are a front mesh provided with a connecting ring; and an intermediate frame bone line that is connected to a vertical line in the front mesh and that cooperates with the vertical line to form a frame that has an installation part for horizontally laying logs on the bottom side. and an end vertical bone line that is inserted into the ring at the end of the horizontal line in the front mesh, and serves as a substitute for the vertical line at the end of the front mesh, and also serves as a connecting bone line when connecting the support frames, An end frame bone line is connected to the end longitudinal bone line and cooperates with the longitudinal bone line to constitute a bone frame at the end of the support frame.

[作用] 支持枠が複数の重積可能な部品に分割されてい
るから、これらの部品をそれぞれ多数枚重積して
梱包することにより、同時に多数の柵材を現場に
輸送することができ、梱包及び輸送にかかる手数
と経費とが軽減される。
[Function] Since the support frame is divided into multiple stackable parts, by stacking and packing a large number of these parts, it is possible to transport a large number of fence materials to the site at the same time. The effort and expense required for packaging and transportation are reduced.

また、支持枠がある程度組み立てられた状態の
部品に分割されているから、これらの部品を連結
することにより、現場での組み立て作業が非常に
容易である。
Furthermore, since the support frame is divided into parts that are assembled to some extent, assembly work on site is very easy by connecting these parts.

[実施例] 以下、本考案の実施例を図面に基づいて詳細に
説明する。
[Example] Hereinafter, an example of the present invention will be described in detail based on the drawings.

第1図に示す全体斜視図と第2図及び第3図に
示す使用状態の断面図とから分るように、土留柵
は、鉄筋や針金などの金属線材からなる支持枠1
1と、該支持枠11の前面内側に横向きにして重
積された土留用の丸太12と、支持枠11の後部
に配設された固定用の丸太13とで構成されてい
る。
As can be seen from the overall perspective view shown in Fig. 1 and the sectional view of the used state shown in Figs.
1, logs 12 for earth retention stacked horizontally inside the front surface of the support frame 11, and logs 13 for fixing arranged at the rear of the support frame 11.

上記支持枠11は、第4図に示すように、前面
網15と、中間部枠骨線16、端部縦骨線17、
端部枠骨線18、上下の連結用横骨線19,2
0、及び丸太支持用の補助骨線21によつて構成
されている。
As shown in FIG. 4, the support frame 11 includes a front mesh 15, an intermediate frame bone line 16, an end longitudinal bone line 17,
End frame bone line 18, upper and lower connecting horizontal bone lines 19, 2
0, and an auxiliary bone line 21 for supporting the log.

前面網15は、所定の間隔で配置した複数の横
線24と縦線25とを溶接一体化したもので、縦
線25の下端部には、それを構成に向けて円弧状
に湾曲させることにより上記土留用の丸太を横設
するための設置部26が形成され、各横線24及
び縦線25の両端には、それぞれ連結用の環24
a,24a及び25a,25bが形成されてい
る。上記設置部26は、後述する中間部枠骨線1
6の底辺よりも下方に膨出することがないように
形成され、これによつて、その設置部26に対応
する溝を地面に掘る必要をなくし、支持枠11の
設置を容易にしている。なお、上記横線24と縦
線25とを溶接する場合、それらの交差部におい
て、少なくとも一方の線に他方の線が嵌合する窪
みを形成してもよい。
The front mesh 15 is made by welding together a plurality of horizontal lines 24 and vertical lines 25 arranged at predetermined intervals. An installation part 26 is formed for horizontally installing the earth retaining logs, and connecting rings 24 are provided at both ends of each horizontal line 24 and vertical line 25, respectively.
a, 24a and 25a, 25b are formed. The above-mentioned installation part 26 is an intermediate frame frame line 1 which will be described later.
The support frame 11 is formed so as not to bulge out below the bottom side of the support frame 11, thereby eliminating the need to dig a groove in the ground corresponding to the installation part 26 and facilitating the installation of the support frame 11. In addition, when welding the horizontal line 24 and the vertical line 25, at least one line may be formed with a recess into which the other line fits, at the intersection thereof.

また、中間部枠骨線16は、上端部がやや下向
きに折り曲げられたL字形をなし、その両端部に
連結用の環16a,16bを有すると共に、底辺
の後部寄りの位置に固定用の丸太の設置部27を
区画する環16cを有しており、その両端を上端
前面網15における縦線25の両端に連結するこ
とにより、該縦線25と協同して、底辺の前後端
部に丸太用の設置部26,27を揃えた略三角形
状の骨枠を構成するものである。この中間部枠骨
線16は、縦線25と協同して閉じた骨枠を構成
し得るものであれば、上記以外の形状であつても
よい。
The intermediate frame frame line 16 has an L-shape with its upper end bent slightly downward, and has coupling rings 16a and 16b at both ends thereof, and a fixing log at a position near the rear of the bottom. By connecting both ends of the ring 16c to both ends of the vertical line 25 in the upper end front screen 15, logs are attached to the front and rear ends of the bottom in cooperation with the vertical line 25. It constitutes a substantially triangular bone frame in which installation parts 26 and 27 for use are aligned. The intermediate frame bone line 16 may have a shape other than the above as long as it can cooperate with the vertical line 25 to form a closed bone frame.

更に、端部縦骨線17は、前面網15における
各横線24の端部の環24aに挿通することによ
り、該前面網15の端部において縦線の代用をす
る共に、隣接する支持枠11,11における横線
24,24同士を連結する(第1図参照)際の連
結用骨線を兼用するものであり、該端部縦骨線1
7の上端には連結用の環17aが形成され、その
下端部には、該下端部を下方に向けて真直に延長
することにより、土中に埋設する脚29が形成さ
れている。この脚29は、土留柵の施工時(土石
の中詰め時)においては、支持枠11の位置を安
定させてその施工を容易にし、土留柵の設置後に
おいては、該柵の滑動を防止して土留効果を増大
させる。
Further, the end vertical rib lines 17 are inserted into the rings 24a at the ends of the respective horizontal lines 24 in the front mesh 15, thereby serving as a substitute for the vertical lines at the ends of the front mesh 15, and at the same time, are inserted into the rings 24a at the ends of the horizontal wires 24 in the front mesh 15. , 11 (see Fig. 1).
A connecting ring 17a is formed at the upper end of 7, and a leg 29 is formed at the lower end thereof to be buried in the soil by extending the lower end straight downward. These legs 29 stabilize the position of the support frame 11 to facilitate construction when constructing the retaining fence (filling with earth and stones), and prevent the fence from sliding after the retaining fence is installed. to increase the earth retaining effect.

また、端部枠骨線18は、上記中間部枠骨線1
6と同様に、上端部がやや下向きに折り曲げらた
L字形に形成され、上端部に連結用の環18a有
すると共に、底辺に固定用の丸太13の設置部2
8を区画する環18c及び下部連結用横骨線20
が挿通する環18bを有しているが、中間部枠骨
線16とは異なり、底辺の先端がそのまま前方に
向けて真直に延長され、その先端に上記端部縦骨
線17が挿通する連結用の環18dが形成されて
いる。而して該端部枠骨線18は、上記端部縦骨
線17に連結されることにより、該端部縦骨線1
7と協同して支持枠11の端部に三角形状の骨枠
を構成するものである。なお、この端部枠骨線1
8が上述した形状以外の形状であつてもよいこと
は、上記中間部枠骨線16の場合と同様である。
Further, the end frame bone line 18 is the intermediate frame bone line 1.
6, it is formed into an L-shape with the upper end bent slightly downward, has a connecting ring 18a at the upper end, and has an installation part 2 of a log 13 for fixing at the bottom.
Ring 18c that partitions 8 and transverse bone line 20 for lower connection
However, unlike the intermediate frame bone line 16, the end of the bottom extends straight forward, and the end vertical bone line 17 is inserted through the ring 18b. A ring 18d for use is formed. By being connected to the end longitudinal bone line 17, the end frame bone line 18 is connected to the end longitudinal bone line 1.
7 to form a triangular bone frame at the end of the support frame 11. In addition, this end frame bone line 1
8 may have a shape other than the shape described above, as in the case of the intermediate frame bone line 16 described above.

上下の連結用横骨線19,20は、前面網15
における縦線25と中間部枠骨線16、及び端部
縦骨線1と端部枠骨線18とを連結するもので、
上部連結用横骨線19が、縦線25の上部の環2
5aと中間部枠骨線16の上部の環16a、及び
端部縦骨線17の上部の環17aと端部枠骨線1
8の上部の環18aとに挿通され、下部連結用横
骨線20が、上記各線の下部に形成された環25
b,16b,18bに挿通される。これらの環に
挿通した各連結用横骨線19,20の端部は、適
宜折曲して支持枠11の端部の骨枠に係止させて
おけば良い。
The upper and lower connecting horizontal bone lines 19 and 20 are connected to the front mesh 15
It connects the vertical line 25 and the intermediate frame bone line 16, and the end vertical bone line 1 and the end frame bone line 18,
The upper connecting horizontal bone line 19 is connected to the upper ring 2 of the vertical line 25.
5a, an upper ring 16a of the intermediate frame bone line 16, and an upper ring 17a of the end longitudinal bone line 17 and the end frame bone line 1.
A ring 25 is inserted through the upper ring 18a of 8, and a lower connecting transverse bone line 20 is formed at the lower part of each line.
b, 16b, and 18b. The ends of the connecting horizontal bone lines 19 and 20 inserted through these rings may be bent as appropriate and locked to the bone frame at the end of the support frame 11.

さらに、丸太支持用の補助骨線21は、上端が
下方に向けて折り曲げられた逆J字形をなし、そ
の下端には連結用の環21aを備えており、該環
21aに下部連結用横骨線20を挿通することに
より、上記骨枠間の適宜位置に取り付けられてい
る。この補助骨線21は、土留用の丸太12を積
み重ねてその背後に土石を充填する際に、該丸太
12を傾斜する前面網15から離れないように保
持するためのもので、上端の折曲部分21bは上
部連結用横骨線19に係脱自在となつており、上
記丸太12を積み重ねる時には、該折曲部分21
bが上部連結用横骨線19から外されて重積の邪
魔にならないように補助骨線21が後方に傾けら
れ、積み重ねた丸太12を保持する時、即ち土石
を充填する時には、上記折曲部分21bが上部連
結用横骨線19に係止せしめられる。なお、上記
丸太の積み重ねと土石の充填とは、通常複数回に
分けて行われる。
Furthermore, the auxiliary bone line 21 for supporting the log has an inverted J shape with the upper end bent downward, and the lower end thereof is provided with a connecting ring 21a, and the lower connecting horizontal bone line 21 is attached to the lower end of the auxiliary bone line 21. By passing the wire 20 through, it is attached at an appropriate position between the bone frames. This auxiliary bone line 21 is used to hold the logs 12 so as not to separate from the inclined front net 15 when the logs 12 for earth retention are stacked and filled with earth and stones behind them. The portion 21b is removably connected to the upper connecting horizontal bone line 19, and when stacking the logs 12, the bent portion 21
b is removed from the upper connecting transverse bone line 19 and the auxiliary bone line 21 is tilted backward so that it does not interfere with the stacking. The portion 21b is locked to the upper connecting transverse bone line 19. Note that the above-mentioned stacking of logs and filling with soil and stones are usually performed in multiple steps.

上記土留用の丸太12は、その最下段に位置す
るものが前面網15における縦線25の下端に形
成された上記設置部26に嵌合せしめられてお
り、一方、固定用の丸太13は、中間部枠骨線1
6及び端部骨枠線18の底辺後端部に形成された
設置部27,28上に設置されている。
The logs 12 for retaining the earth are fitted at the lowest level into the installation part 26 formed at the lower end of the vertical line 25 in the front screen 15, while the logs 13 for fixing are Middle frame bone line 1
6 and the end bone frame line 18 are installed on installation portions 27 and 28 formed at the bottom rear end portions.

なお、支持枠11における縦線25の中間位置
と中間部枠骨線16との間、及び端部縦骨線17
の中間位置と端部枠骨線18との間に、ワイヤロ
ープ等からなる補強骨を適宜張設することができ
る。
Note that between the intermediate position of the vertical line 25 in the support frame 11 and the intermediate frame bone line 16, and between the end vertical bone line 17
A reinforcing bone made of wire rope or the like can be appropriately stretched between the intermediate position and the end frame bone line 18.

上記構成を有する土留柵は、支持枠11が第4
図に示す各部品に分解された状態で現場に輸送さ
れ、そこで第1図のように組み立てられたあと、
丸太積み及び土石の充填が行なわれ、所定の位置
に1段または複数段重積して設置される。
In the earth retaining fence having the above configuration, the support frame 11 is the fourth
After being disassembled into the parts shown in the figure and transported to the site, they are assembled as shown in Figure 1.
Logs are piled up and filled with earth and stones, and the logs are stacked in one or more layers at a predetermined location.

このとき、上記支持枠11が複数の重積可能な
部品に分割されているから、これらの部品をそれ
ぞれ多数枚重積して梱包することにより、同時に
多数の柵材を現場に輸送することができ、梱包及
び輸送にかかる手数と経費とが軽減される。
At this time, since the support frame 11 is divided into a plurality of stackable parts, by stacking and packing a large number of these parts, it is possible to transport a large number of fence materials to the site at the same time. This reduces the time and expense involved in packaging and transportation.

また、支持枠11がある程度組み立てられた状
態の部品に分割されており、しかも、各部品は、
それらに形成した環に上下の連結用横骨線19,
20を挿通させるだけで連結することができるよ
うになつているから、現場での組み立て作業が非
常に簡単であり、更に、第1図に示すように複数
の支持枠11,11を連結する場合には、これら
の支持枠における横線24の端部の環24aを互
いに重合させ、それに端部縦骨線17を挿通させ
るだけで良く、従つて、長尺の土留柵の設置も非
常に容易である。
Further, the support frame 11 is divided into parts that are assembled to some extent, and each part is
Horizontal bone lines 19 for connecting the upper and lower sides to the rings formed therein,
20 can be connected by simply inserting them, the assembly work on site is very simple. Furthermore, when connecting multiple support frames 11, 11 as shown in FIG. In order to do this, it is only necessary to overlap the rings 24a at the ends of the horizontal wires 24 in these support frames and insert the end vertical ribs 17 therethrough. Therefore, it is very easy to install a long earth retaining fence. be.

かくして設置された土留柵において、永年の使
用により丸太は徐々に腐朽していくが、支持枠1
1の前面が網面となつているため、腐朽した丸太
12が直ちに崩壊して脱落するようなことがな
く、該網面によつてそのまま定位置に保持され
る。従つて、土留機能は長期にわたつて維持さ
れ、その間に十分な表土造りと植生とが進行する
ことになる。
In the earth retaining fence thus installed, the logs gradually rot due to long-term use, but the support frame 1
Since the front surface of the log 1 is a mesh surface, the rotten log 12 does not immediately collapse and fall off, and is held in place by the mesh surface. Therefore, the earth retaining function will be maintained over a long period of time, during which time sufficient topsoil construction and vegetation will progress.

なお、上記支持枠11の前面網15の傾斜角度
は、一般に約73度前後が最も適しており、また、
丸太12,13としては、通常末口の直径が約10
cm程度の丸太が適しているが、これら前面網15
の傾斜角度や丸太の太さ、断面形状等は、土留柵
のサイズや現場の土質など、土留柵の設置条件に
応じて適宜決定することができる。
Note that the most suitable inclination angle of the front mesh 15 of the support frame 11 is generally about 73 degrees, and
Logs 12 and 13 usually have a diameter of about 10 mm at the end.
Logs of about cm are suitable, but these front nets are 15 cm long.
The inclination angle, the thickness of the log, the cross-sectional shape, etc. can be determined as appropriate depending on the installation conditions of the earth retaining fence, such as the size of the earth retaining fence and the soil quality of the site.

また、上記実施例では、骨枠が三角形状をなす
土留柵について説明したが、必ずしもこのような
形状に限定されるものではなく、その他の任意の
形状、例えば、台形状や四角形状などに形成する
こともできる。
Further, in the above embodiment, the earth retaining fence is explained in which the frame has a triangular shape, but the frame is not necessarily limited to this shape, and may be formed in any other shape, such as a trapezoid or a square shape. You can also.

[考案の効果] 上記構成を有する本考案によれば、支持枠を複
数の重積可能な部品に分割したので、これらの部
品をそれぞれ多数枚重積して梱包することによ
り、同時に多数の柵材を現場に輸送することがで
き、梱包及び輸送にかかる手数と経費とを軽減す
ることができる。
[Effect of the invention] According to the invention having the above configuration, the support frame is divided into a plurality of parts that can be stacked one on top of the other. Materials can be transported to the site, and the labor and expense involved in packaging and transport can be reduced.

しかも、支持枠をある程度組み立てられた状態
の部品に分割したので、現場での組み立て作業が
非常に簡単である。
Furthermore, since the support frame is divided into parts that are assembled to some extent, assembly work on site is extremely easy.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案に係る土留柵の斜視図、第2図
及び第3図はその異なる位置での断面図、第4図
は支持枠の分解斜視図、第5図及び第6図は従来
例の断面図である。 11……支持枠、12,13……丸太、15…
…前面網、16……中間部枠骨線、17……端部
縦骨線、18……端部枠骨線、24……横線、2
4a……環、25……縦線、26……設置部。
Figure 1 is a perspective view of the earth retaining fence according to the present invention, Figures 2 and 3 are sectional views at different positions, Figure 4 is an exploded perspective view of the support frame, and Figures 5 and 6 are conventional FIG. 3 is an example cross-sectional view. 11... Support frame, 12, 13... Log, 15...
...Front mesh, 16...Middle frame bone line, 17...End vertical bone line, 18...End frame bone line, 24...Horizontal line, 2
4a...ring, 25...vertical line, 26...installation part.

Claims (1)

【実用新案登録請求の範囲】 所定の間隔で配置した複数の横線及び縦線から
なり、少なくとも横線の両端に連結用の環を備え
た前面網と、 該前面網における縦線に連結され、該縦線と協
同して底辺に丸太を横設するための設置部を備え
た骨枠を構成する中間部枠骨線と、 前面網における横線の端部の環に挿通され、該
前面網の端部において縦線の代用をすると共に、
隣接する支持枠同士を連結する際の連結骨線を兼
用する端部縦骨線と、 該端部縦骨線に連結され、該縦骨線と協同して
支持枠端部の骨枠を構成する端部枠骨線と、 を備えたことを特徴とする丸太積土留工用支持
枠。
[Claims for Utility Model Registration] A front net consisting of a plurality of horizontal lines and vertical lines arranged at predetermined intervals and provided with connecting rings at least at both ends of the horizontal lines; a front net connected to the vertical lines of the front net; An intermediate frame bone line that cooperates with the vertical line and constitutes a frame with an installation part for laying a log horizontally on the bottom side; In addition to substituting vertical lines in the section,
an end vertical bone line that also serves as a connecting bone line when connecting adjacent support frames; A support frame for log piling earth retaining work, characterized in that it is equipped with an end frame frame line that is configured to
JP18655787U 1987-12-08 1987-12-08 Expired JPH045566Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18655787U JPH045566Y2 (en) 1987-12-08 1987-12-08

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18655787U JPH045566Y2 (en) 1987-12-08 1987-12-08

Publications (2)

Publication Number Publication Date
JPH0193240U JPH0193240U (en) 1989-06-19
JPH045566Y2 true JPH045566Y2 (en) 1992-02-17

Family

ID=31477781

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18655787U Expired JPH045566Y2 (en) 1987-12-08 1987-12-08

Country Status (1)

Country Link
JP (1) JPH045566Y2 (en)

Also Published As

Publication number Publication date
JPH0193240U (en) 1989-06-19

Similar Documents

Publication Publication Date Title
US4707962A (en) Cascade wall structure
JP2008101467A (en) Rockfall preventive fence
JP2001064937A (en) Gabion work for civil engineering work, protection work using the same, and filling method for filler
JPH045566Y2 (en)
KR102194293B1 (en) Breast wall structure
KR20100047485A (en) Slope reinforcement structure with reinforce frame of dividing
JP2006057442A (en) Anti-falling rock fence
JPH0354184Y2 (en)
JP3902036B2 (en) Structure with retaining walls on both sides
JPH0437968Y2 (en)
JPH0632995Y2 (en) Support frame for log pile earth retaining work
JP2002294713A (en) Wooden panel, earth-retaining members and wood fixing method
JP3495781B2 (en) Vegetation retaining structure
JP3537398B2 (en) Assembly fencer
JP3745990B2 (en) Go frame material, structure using the same, and construction method thereof
JP2000008383A (en) Earth retaining unit, earth retaining unit frame, and earth retaining wall construction method
KR20200034203A (en) Retaining wall construction method using waste concrete poles and waste concrete sleepers
JP2001226992A (en) Earth retaining block
JPH0348267Y2 (en)
KR102201947B1 (en) fence for sheathing wall
KR101149876B1 (en) Prefabricated Cover for Formation of Levee
JP3111278U (en) Reinforced earth retaining wall
JP3236830B2 (en) Reservoir and structural wall for retaining formed by it
JP2787188B2 (en) Earth retaining unit and construction method using the unit
JP2002070024A (en) Earth retaining frame and earth retaining method of slope or the like