Prior art keywords
order
predicted
delivery date
day before
date
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3143756A
Other languages
Japanese (ja)
Inventor
Seiji Notomi
誠治 納富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SYST DESIGN KK
Original Assignee
NIPPON SYST DESIGN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SYST DESIGN KK filed Critical NIPPON SYST DESIGN KK
Priority to JP3143756A priority Critical patent/JPH04342064A/en
Publication of JPH04342064A publication Critical patent/JPH04342064A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To provide an automatic optimum ordering system for the commodity management of commodities except perishable foods, etc. CONSTITUTION:A minimum stock predictive number and a predictive stock number on the previous day of the delivery of this-time order are compared from the delivery day of this-time order commodities, and the predictive stock number on the previous day of the delivery for next-time order and necessary irreducible minimum exhibition number are compared. When the minimum stock predictive number is larger than the predictive stock number on the previous day of the delivery of this-time order or when the minimum exhibition number is larger than the predictive stock number on the previous day of the delivery for the next-time order, an order command is issued. Difference between the maximum stock predictive number from the delivery day of this-time order commodities and the predictive stock number on the previous day of the delivery of this-time order is calculated and the larger one of these conclusions is selected. The difference between the maximum exhibition number and the predictive stock number on the previous day of the delivery for this-time order is calculated and the order command is issued by setting the value on condition that it does not exceed the conclusion as an order quantity.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は自動商品発注システム及
び自動商品発注装置に関するものであり、特に、生鮮食
料品等を除いた商品の商品管理に最適な自動発注システ
ムに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an automatic product ordering system and an automatic product ordering device, and more particularly to an automatic ordering system that is optimal for product management of products other than fresh foods and the like.

【0002】0002

【従来の技術】スーパーマーケット等では取り扱う商品
が極めて多く、また補充発注が頻繁に行われている。こ
れらの補充発注に対して、POSシステムを導入するこ
とにより、販売情報を早期かつ的確に行う努力がなされ
ていた。
2. Description of the Related Art Supermarkets and the like handle an extremely large number of products, and replenishment orders are frequently placed. Efforts have been made to promptly and accurately provide sales information for these replenishment orders by introducing a POS system.

【0003】0003

【発明が解決しようとする課題】しかしながら従来のP
OSシステムは、販売情報の収集することにその重点が
置かれているため、膨大な単品データを具体的なマーチ
ャンダイジングのアクションに物理的に充分活用するこ
とができないという問題点があった。即ち、単なる商品
情報の提供のみでは、実際に商品在庫コントロールであ
る補充発注を行うことができず、売上の機会損失や不良
在庫を大量に発生させるという問題点があった。
[Problem to be solved by the invention] However, the conventional P
Since the OS system focuses on collecting sales information, there is a problem in that it is not possible to fully physically utilize the huge amount of single item data for specific merchandising actions. That is, by simply providing product information, it is not possible to actually place replenishment orders, which is product inventory control, resulting in lost sales opportunities and a large amount of defective inventory.

【0004】そこで単なるPOSシステムによる業務レ
ベルの省力化・効率化にとどまることなく、補充発注を
売上の変動を考慮して自動的に行うことのできる自動商
品発注システム及び自動商品発注装置の開発が強く望ま
れていた。
[0004] Therefore, it is necessary to develop an automatic product ordering system and an automatic product ordering device that can not only save labor and improve efficiency at the operational level through a simple POS system, but also automatically place replenishment orders in consideration of fluctuations in sales. It was strongly desired.

【0005】[0005]

【課題を解決するための手段】本発明は上記課題に鑑み
案出されたもので、今回発注の商品の納品日からの最小
在庫予測数と、今回発注の納品日前日の予測在庫数とを
比較する第1工程と、次回の発注分の納品日前日の予測
在庫数と、必要な最小陳列数とを比較する第2工程と、
第1工程で比較された結論と第2工程で比較された結論
に基づき、発注の指令を行う第3工程とからなっており
、第3工程は、前記第1工程の結論が、最小在庫予測数
が今回発注の納品日前日の予測在庫数より大きいか、又
は、第2工程の結論が、最小陳列数が次回の発注分の納
品日前日の予測在庫数より大きい場合に、発注指令を行
うことを特徴としている。
[Means for Solving the Problems] The present invention has been devised in view of the above-mentioned problems, and it is possible to calculate the minimum predicted stock quantity from the delivery date of the product ordered this time and the predicted stock quantity on the day before the delivery date of the currently ordered product. A first step of comparing, a second step of comparing the predicted stock quantity on the day before the delivery date for the next order and the required minimum display quantity;
The process consists of a third process in which orders are issued based on the conclusions compared in the first process and the conclusions compared in the second process. If the number is greater than the predicted inventory on the day before the delivery date of the current order, or if the conclusion of the second process is that the minimum display quantity is greater than the predicted inventory on the day before the delivery date for the next order, issue an ordering command. It is characterized by

【0006】また本発明は、今回発注の商品の納品日か
らの最大在庫予測数と、今回発注の納品日前日の予測在
庫数との差を演算する第1工程と、最小陳列数と、次回
の発注分の納品日前日の予測在庫数との差を演算する第
2工程と、第1工程の結論と、第2工程の結論の内、大
きい方の値を選択する第3工程と、最大陳列数と、今回
の発注分の納品日前日の予測在庫数との差を演算する第
4工程と、第4工程の結論の値を越えない条件で、第3
工程の値を発注量として発注指令を行う第5工程とから
なることを特徴としている。
[0006] The present invention also includes a first step of calculating the difference between the predicted maximum stock quantity from the delivery date of the currently ordered product and the predicted stock quantity on the day before the delivery date of the currently ordered product; a second process that calculates the difference between the predicted inventory quantity on the day before the delivery date for the ordered quantity; a third process that selects the larger value of the conclusion of the first process and the conclusion of the second process; The fourth step is to calculate the difference between the number of items on display and the predicted stock amount on the day before the delivery date for the current order, and the third step is to
It is characterized by comprising a fifth step of issuing an ordering command using the value of the process as the order quantity.

【0007】更に本発明は、今回発注の商品の納品日前
日からの最小在庫予測数と、今回発注の納品日前日の予
測在庫数とを比較する第1工程と、次回の発注分の納品
日前日の予測在庫数と、必要な最小陳列数とを比較する
第2工程と、第1工程で比較された結論と第2工程で比
較された結論に基づき、発注の指令を行う第3工程とを
有し、第3工程は、前記第1工程の結論が、最小在庫予
測数が今回発注の納品日前日の予測在庫数より大きいか
、又は、第2工程の結論が、最小陳列数が次回の発注分
の納品日前日の予測在庫数より大きい場合に、発注指令
を行う様になっており、第3工程の発注指令に基づき、
今回発注の商品の納品日前日からの最大在庫予測数と、
今回発注の納品日前日の予測在庫数との差を演算する第
4工程と、最小陳列数と、次回の発注分の納品日前日の
予測在庫数との差を演算する第5工程と、第4工程の結
論と、第5工程の結論の内、大きい方の値を選択する第
6工程と、最大陳列数と、今回の発注分の納品日前日の
予測在庫数との差を演算する第7工程と、第7工程の結
論の値を越えない条件で、第6工程の値を発注量として
指令を行う第8工程とからなることを特徴としている。
[0007]Furthermore, the present invention includes a first step of comparing the predicted minimum inventory quantity from the day before the delivery date of the product ordered this time with the predicted inventory quantity from the day before the delivery date of the current order; A second process that compares the predicted stock quantity for the day and the required minimum display quantity, and a third process that issues an order order based on the results compared in the first process and the second process. In the third step, the conclusion of the first step is that the minimum predicted inventory quantity is greater than the predicted inventory quantity on the day before the delivery date of the current order, or the conclusion of the second step is that the minimum display quantity will be higher next time. If the number of items in stock is larger than the predicted inventory on the day before the delivery date for the ordered item, an ordering command will be issued, and based on the ordering command in the third process,
The predicted maximum inventory quantity from the day before the delivery date of the product ordered this time,
A fourth step of calculating the difference between the predicted stock quantity on the day before the delivery date of the current order, a fifth process of calculating the difference between the minimum display quantity and the predicted stock quantity on the day before the delivery date of the next order, and The 6th process selects the larger value of the conclusions of the 4th process and the 5th process, and the 6th process calculates the difference between the maximum display quantity and the predicted stock quantity on the day before the delivery date for the current order. It is characterized by consisting of 7 steps and an 8th step in which the order amount is issued using the value of the 6th step under the condition that the value of the conclusion of the 7th step is not exceeded.

【0008】更に、自動商品発注システムの第8工程が
、発注量の指令に先立ち、発注量を表示し、使用者の確
認の後、発注量の指令を行う構成にすることもできる。
Furthermore, the eighth step of the automatic product ordering system may be configured to display the order amount prior to instructing the order amount, and to issue the order amount after confirmation by the user.

【0009】また、自動商品発注システムの第8工程が
、発注量の指令に先立ち、発注量を表示し、使用者の確
認の後、或は、使用者の確認がない場合に、発注量の指
令を行う構成にすることもできる。
[0009] Furthermore, in the eighth step of the automatic product ordering system, the order quantity is displayed before the order quantity is instructed, and the order quantity is displayed after the user's confirmation or in the absence of the user's confirmation. It can also be configured to issue commands.

【0010】そして本発明は、次回の発注分の納品日前
日の予測在庫数が、今回発注日の前日の在庫数と、納品
予定数とを加え、この加算値から、発注日から次回発注
納品日前日までの累積予測売上数を差し引いて演算して
求めてもよい。
[0010] According to the present invention, the predicted stock quantity on the day before the delivery date for the next order is calculated by adding the stock quantity on the previous day of the current order date and the scheduled delivery quantity, and from this added value, calculates the predicted stock quantity on the day before the delivery date for the next order from the order date. It may also be calculated by subtracting the cumulative predicted sales numbers up to the day before.

【0011】また本発明の売上予測システムは、発注日
から今回発注の納品日前日までの日数に対して、最大在
庫日数を加えた第1期間と、発注日から次回発注納品日
までの期間の第2期間を比較し、長い期間を選択する第
1工程と、第1工程で選択された期間に対して、各曜日
を設定する第2工程と、比較的最近の該当商品の売上実
績を読み込む第3工程と、前記該当商品を含む分類の、
年間売上傾向の指数を演算する第4工程と、第4工程の
指数に基づき、前記該当商品の予測売上数を演算する第
5工程とから構成されている。
[0011] Furthermore, the sales forecasting system of the present invention calculates the first period, which is the maximum number of inventory days added to the number of days from the order date to the day before the delivery date of the current order, and the period from the order date to the delivery date of the next order. The first step is to compare the second period and select a longer period, the second step is to set each day of the week for the period selected in the first step, and the relatively recent sales performance of the corresponding product is read. The third step and the classification including the applicable product,
It consists of a fourth step of calculating an index of annual sales trends, and a fifth step of calculating the predicted sales number of the corresponding product based on the index of the fourth step.

【0012】更に予測在庫数又は累積予測売上数を上記
の売上予測システムで演算することもできる。
[0012] Furthermore, the predicted inventory quantity or cumulative predicted sales quantity can also be calculated using the above sales forecasting system.

【0013】そして本発明の自動商品発注装置は、発注
日、納品日、最小陳列数、最大陳列数、発注日の前日の
在庫数、納品予定数を入力するための入力手段と、今回
発注の商品の納品日からの最小在庫予測数と、今回発注
の納品日前日の予測在庫数とを比較するための第1演算
処理手段と、次回の発注分の納品日前日の予測在庫数と
、必要な最小陳列数とを比較するための第2演算処理手
段と、第1演算処理手段と第2演算処理手段の結論に基
づき、発注の指令を行う制御手段とを有し、制御手段は
、前記第1演算処理手段の結論が、最小在庫予測数が今
回発注の納品日前日の予測在庫数より大きいか、又は、
第2演算処理手段の結論が、最小陳列数が次回の発注分
の納品日前日の予測在庫数より大きい場合に、発注指令
を行う様になっており、制御手段の発注指令に基づき、
今回発注の商品の納品日からの最大在庫予測数と、今回
発注の納品日前日の予測在庫数との差を演算する第3演
算処理手段と、最小陳列数と、次回の発注分の納品日前
日の予測在庫数との差を演算する第4演算処理手段とを
備え、制御手段が、第3演算処理手段の結論と第4演算
処理手段の結論の内、大きい方の値を選択する様になっ
ており、最大陳列数と、今回の発注分の納品日前日の予
測在庫数との差を演算する第5演算処理手段の結論の値
を越えない条件で、制御手段が選択された値を発注量と
して指令出力を行うことを特徴としている。
[0013] The automatic product ordering device of the present invention includes an input means for inputting the order date, delivery date, minimum number of displayed items, maximum number of displayed items, the number of items in stock on the previous day of the order date, and the number of scheduled items to be delivered. A first calculation processing means for comparing the predicted minimum stock quantity from the delivery date of the product with the predicted stock quantity on the day before the delivery date of the current order, and the predicted stock quantity on the day before the delivery date for the next order, and the necessary and a control means for instructing order placement based on the conclusions of the first arithmetic processing means and the second arithmetic processing means. The conclusion of the first arithmetic processing means is that the minimum predicted inventory quantity is greater than the predicted inventory quantity on the day before the delivery date of the current order, or
If the conclusion of the second arithmetic processing means is that the minimum display quantity is greater than the predicted stock quantity on the day before the delivery date for the next order, an ordering command is issued, and based on the ordering command of the control means,
A third calculation processing means for calculating the difference between the predicted maximum inventory quantity from the delivery date of the product ordered this time and the predicted inventory quantity from the day before the delivery date of the current order, and the minimum display quantity and the delivery date for the next order. and a fourth arithmetic processing means for calculating the difference between the predicted inventory quantity for the day, and the control means selects the larger value of the conclusion of the third arithmetic processing means and the conclusion of the fourth arithmetic processing means. , and the value selected by the control means under the condition that the value does not exceed the conclusion of the fifth calculation processing means that calculates the difference between the maximum display quantity and the predicted stock quantity on the day before the delivery date for the current order. It is characterized by outputting a command as the order quantity.

【0014】更に本発明は、制御手段には、発注量を表
示するための表示装置と、指示入力手段とが接続されて
おり、使用者が発注量を確認した後、前記指示入力手段
から信号を入力することにより、制御手段が発注量指令
を出力する構成にすることができる。
Further, in the present invention, a display device for displaying the order quantity and an instruction input means are connected to the control means, and after the user confirms the order quantity, a signal is sent from the instruction input means. By inputting , the control means can be configured to output an order amount command.

【0015】[0015]

【作用】以上の様に構成された本発明は、今回発注の商
品の納品日からの最小在庫予測数と、今回発注の納品日
前日の予測在庫数とを比較し、次回の発注分の納品日前
日の予測在庫数と、必要な最小陳列数とを比較し、これ
らの比較の結論に基づき、発注の指令を行う様になって
おり、最小在庫予測数が今回発注の納品日前日の予測在
庫数より大きいか、又は、最小陳列数が次回の発注分の
納品日前日の予測在庫数より大きい場合に、発注指令を
行うことを特徴としている。
[Operation] The present invention configured as described above compares the predicted minimum inventory quantity from the delivery date of the product ordered this time with the predicted inventory quantity on the day before the delivery date of the current order, and then The system compares the predicted stock quantity from the previous day with the required minimum display quantity, and orders are issued based on the conclusion of these comparisons. The system is characterized in that an ordering command is issued when the quantity is larger than the stock quantity or when the minimum display quantity is larger than the predicted stock quantity on the day before the delivery date for the next order.

【0016】また本発明は、今回発注の商品の納品日か
らの最大在庫予測数と、今回発注の納品日前日の予測在
庫数との差を演算し、最小陳列数と、次回の発注分の納
品日前日の予測在庫数との差を演算し、これらの演算の
結論の内、大きい方の値を選択すると共に、最大陳列数
と、今回の発注分の納品日前日の予測在庫数との差を演
算し、この結論の値を越えない条件で、選択された値を
発注量として発注指令を行う様になっている。
[0016] Furthermore, the present invention calculates the difference between the predicted maximum stock quantity from the delivery date of the product ordered this time and the predicted stock quantity on the day before the delivery date of the current order, and calculates the minimum display quantity and the quantity for the next order. Calculate the difference between the predicted stock quantity on the day before the delivery date and select the larger value from the conclusions of these calculations. The difference is calculated, and an order is issued with the selected value as the order amount, provided that the resulting value is not exceeded.

【0017】更に、自動商品発注システムが、発注量の
指令に先立ち、発注量を表示し、使用者の確認の後、発
注量の指令を行うこともできる。
Furthermore, the automatic product ordering system can display the order amount prior to instructing the order amount, and issue the order amount after confirmation by the user.

【0018】また、自動商品発注システムが、発注量の
指令に先立ち、発注量を表示し、使用者の確認の後、或
は、使用者の確認がない場合に、発注量の指令を行うこ
ともできる。
[0018] Furthermore, the automatic product ordering system may display the order amount prior to instructing the order amount, and issue the order amount after the user's confirmation or in the absence of the user's confirmation. You can also do it.

【0019】そして本発明は、次回の発注分の納品日前
日の予測在庫数が、今回発注日の前日の在庫数と、納品
予定数とを加え、この加算値から、発注日から次回発注
納品日前日までの累積予測売上数を差し引いて演算する
ことができる。
[0019] In the present invention, the predicted stock quantity on the day before the delivery date for the next order is calculated by adding the stock quantity on the previous day of the current order date and the scheduled delivery quantity, and from this added value, the predicted stock quantity on the day before the delivery date for the next order is calculated from the order date. It can be calculated by subtracting the cumulative predicted sales numbers up to the previous day.

【0020】また本発明の売上予測システムは、発注日
から今回発注の納品日前日までの日数に対して、最大在
庫日数を加えた第1期間と、発注日から次回発注納品日
までの期間の第2期間を比較し、長い期間を選択し、選
択された期間に対して、各曜日を設定し、比較的最近の
該当商品の売上実績を読み込むと共に、該当商品を含む
分類の、年間売上傾向の指数を演算し、この指数に基づ
き、該当商品の予測売上数を演算する様になっている。
[0020] Furthermore, the sales forecasting system of the present invention calculates the first period by adding the maximum inventory days to the number of days from the order date to the day before the delivery date of the current order, and the period from the order date to the delivery date of the next order. Compare the second period, select a longer period, set each day of the week for the selected period, load relatively recent sales results for the relevant product, and annual sales trends for the category that includes the relevant product. The index is calculated, and based on this index, the predicted sales volume of the corresponding product is calculated.

【0021】更に予測在庫数又は累積予測売上数を上記
の売上予測システムで演算することもできる。
[0021] Furthermore, the predicted inventory quantity or cumulative predicted sales quantity can also be calculated using the above sales forecasting system.

【0022】そして本発明の自動商品発注装置は、入力
手段が、発注日、納品日、最小陳列数、最大陳列数、発
注日の前日の在庫数、納品予定数を入力し、第1演算処
理手段が、今回発注の商品の納品日からの最小在庫予測
数と、今回発注の納品日前日の予測在庫数とを比較し、
第2演算処理手段が、次回の発注分の納品日前日の予測
在庫数と、必要な最小陳列数とを比較し、制御手段が、
第1演算処理手段と第2演算処理手段の結論に基づき、
発注の指令を行う様になっており、制御手段は、前記第
1演算処理手段の結論が、最小在庫予測数が今回発注の
納品日前日の予測在庫数より大きいか、又は、第2演算
処理手段の結論が、最小陳列数が次回の発注分の納品日
前日の予測在庫数より大きい場合に、発注指令を行う様
になっており、第3演算手段が、制御手段の発注指令に
基づき、今回発注の商品の納品日からの最大在庫予測数
と、今回発注の納品日前日の予測在庫数との差を演算し
、第4演算手段が、最小陳列数と、次回の発注分の納品
日前日の予測在庫数との差を演算し、制御手段が、第3
演算処理手段の結論と第4演算処理手段の結論の内、大
きい方の値を選択する様になっており、最大陳列数と、
今回の発注分の納品日前日の予測在庫数との差を演算す
る第5演算処理手段の結論の値を越えない条件で、制御
手段が選択された値を発注量として指令出力を行う様に
なっている。
[0022] In the automatic product ordering device of the present invention, the input means inputs the order date, the delivery date, the minimum number of displays, the maximum number of displays, the number of stocks on the day before the order date, and the number of scheduled deliveries, and performs the first calculation process. The means compares the minimum predicted stock quantity from the delivery date of the product ordered this time with the predicted stock quantity on the day before the delivery date of the current order,
The second arithmetic processing means compares the predicted stock quantity on the day before the delivery date for the next order with the required minimum display quantity, and the control means:
Based on the conclusions of the first arithmetic processing means and the second arithmetic processing means,
The control means is configured to issue an ordering command, and the control means determines whether the conclusion of the first arithmetic processing means is that the minimum predicted stock quantity is greater than the predicted stock quantity on the day before the delivery date of the current order, or the second arithmetic processing means If the conclusion of the means is that the minimum display quantity is greater than the predicted stock quantity on the day before the delivery date for the next order, an ordering command is issued, and the third calculation means, based on the ordering command of the control means, The fourth calculation means calculates the difference between the predicted maximum inventory quantity from the delivery date of the product ordered this time and the predicted inventory quantity from the day before the delivery date of the current order, and calculates the minimum display quantity and the delivery date for the next order. The control means calculates the difference between the predicted inventory quantity for the day and
The larger value is selected between the conclusion of the arithmetic processing means and the conclusion of the fourth arithmetic processing means, and the maximum number of displays and
The control means outputs a command with the selected value as the order quantity under the condition that the result of the fifth calculation processing means that calculates the difference between the predicted stock quantity on the day before the delivery date for the current order is not exceeded. It has become.

【0023】更に本発明は制御手段に接続された表示装
置が、発注量を表示し、使用者が発注量を確認した後、
使用者の指示入力手段から信号入力に基づき、制御手段
が発注量指令を出力する様になっている。
Furthermore, in the present invention, the display device connected to the control means displays the order amount, and after the user confirms the order amount,
The control means outputs an order quantity command based on a signal input from the user's instruction input means.

【0024】[0024]

【売上予測数の演算】[Calculation of sales forecast]

【0025】ここで、売上予測数の演算について説明す
る。
[0025] Here, the calculation of the predicted number of sales will be explained.

【0026】まず、今回発注日から今回発注の納品日前
日までの日数と、最大在庫日数とを加え合わせ、第1期
間日数と定義する。そして、今回発注日から、次回発注
の納品日までを第2期間日数と定義する。この第1期間
日数と第2期間日数とを比較し、大きい方を期間日数と
し、各曜日を求める。
First, the number of days from the current order date to the day before the delivery date of the current order and the maximum inventory days are added together to define the number of days in the first period. Then, the number of days from the current order date to the delivery date of the next order is defined as the number of days in the second period. The number of days in the first period and the number of days in the second period are compared, the larger one is taken as the number of days in the period, and each day of the week is determined.

【0027】次に曜日別の売上数データにより、次回発
注の納品日までの間に入る曜日の売上数を予測する。即
ち、過去56週ごとのデータにより、全社・カテゴリー
小分類レベルの売上金額により指数化して予測数を求め
るものである。この予測方法を具体例を基に詳細に説明
することにする。
Next, based on the data on the number of sales for each day of the week, the number of sales for the days of the week until the delivery date of the next order is predicted. That is, the predicted number is calculated by indexing the sales amount at the company-wide/category level based on data for each of the past 56 weeks. This prediction method will be explained in detail based on a specific example.

【0028】第5図に示す様に、直近の一週間の予測対
象となる商品(各、単品商品ごと)の売上を調査する。 次に、年間データから小分類ごとに売上の傾向を演算す
る。ここで小分類とは、予測対象商品を含んだカテゴリ
ー小分類である。本実施例では、対応する第52週前と
第53週前では、1.80から1.92まで売上が上昇
している。この売上の傾向を演算すれば、(1.92/
1.80=1.067)となり、指数は、1.067と
なる。そこで、直近の一週間の各曜日の売上に対して、
この指数を掛け合わせ、各曜日の売上を予測する。例え
ば、直近の月曜日の売上は、10であるから、この10
に指数1.067を掛ければ、10.67となり、この
値を四捨五入することにより、月曜日の予想売上数は1
1となる。この方法により各曜日の予想売上を計算すれ
ば、第1図に示す様になる。
As shown in FIG. 5, the sales of the products to be predicted (for each individual product) for the most recent week are investigated. Next, sales trends are calculated for each subcategory from the annual data. Here, the subclassification is a category subclassification that includes the prediction target product. In this example, the sales increase from 1.80 to 1.92 for the corresponding 52nd week before and 53rd week before. If we calculate this sales trend, we get (1.92/
1.80=1.067), and the index is 1.067. Therefore, for the sales for each day of the week in the most recent week,
Multiply this index to predict sales for each day of the week. For example, the sales on the most recent Monday is 10, so this 10
Multiplying by the index 1.067 gives 10.67, and by rounding this value, the expected number of sales for Monday is 1.
It becomes 1. If the expected sales for each day of the week are calculated using this method, the result will be as shown in FIG.

【0029】この予測計算で注意すべきことは、[0029] What should be noted in this prediction calculation is:

【00
30】(1)予測対象日が、振替休日である場合、又は
予測対象日が月曜日から金曜日であるが、祭日である場
合には、前週の実績は日曜日とする。これは振替休日及
び祭日は休日であるため、極端に売上の傾向が異なり、
日曜日の売上に基づくべきだからである。
00
30] (1) If the prediction target day is a substitute holiday, or if the prediction target day is Monday to Friday but is a public holiday, the previous week's actual result is set to Sunday. This is because substitute holidays and holidays are holidays, so sales trends are extremely different.
This is because it should be based on Sunday sales.

【0031】(2)予測対象日が、月曜日から金曜日で
あって、前週の実績が振替休日又は祭日である場合には
、更に前の週を前週実績とし、傾向値もその週により求
める。同様に平日の場合には、休日のデータを使用すべ
きでないからである。
(2) If the prediction target days are from Monday to Friday and the previous week's performance is a substitute holiday or holiday, the previous week is taken as the previous week's performance, and the trend value is also determined from that week. Similarly, data for holidays should not be used for weekdays.

【0032】(3)予測対象日が、店休日である場合に
は予測値はゼロとする。
(3) If the prediction target day is a store holiday, the predicted value is set to zero.

【0033】(4)前週の実績が店休日の場合には、更
にその前週の実績を使用し、傾向値もその週により求め
る。
(4) If the previous week's performance is a store holiday, the previous week's performance is further used, and the trend value is also determined based on that week.

【0034】(5)前週実績が特売日の場合には、更に
その前週の実績を使用し、傾向値もその週により求める
。特売日の場合には、売上傾向が大きく異なるためであ
る。
(5) If the previous week's performance is a sale day, the previous week's performance is further used, and the trend value is also determined based on that week. This is because sales trends vary greatly on sale days.

【0035】(6)前週実績が特異日の場合には、更に
その前週の実績を使用し、傾向値もその週により求める
。ここで特異日とは、台風等で売上が異常に変動した場
合である。特異日は、店別に担当者が設定することもで
きる。
(6) If the previous week's performance is a unique day, the previous week's performance is further used, and the trend value is also determined based on that week. Here, an unusual day is a case where sales fluctuate abnormally due to a typhoon or the like. Special days can also be set by the person in charge for each store.

【0036】「新店及び廃店が生じた場合の取扱」0036 “Handling of new stores and closed stores”

【0
036】(1)新店が発生した場合
0
(1) When a new store opens

【0037】(イ)
新店が発生した週は、以下の様に実績を補正する必要が
ある。
(a)
For the week in which a new store occurs, it is necessary to correct the actual results as follows.

【0038】補正実績=(全店売上ー新店売上)×(既
存店小カテゴリー構成比/100) ここで、全店売上は全店・全カテゴリーの合計であり、
新店売上は新店の全カテゴリーの合計である。また既存
店小カテゴリー構成比は、過去56週で実績が全て有る
店だけの全カテゴリー売上に対する構成比を示すもので
ある。
[0038] Corrected performance = (all store sales - new store sales) x (existing store small category composition ratio/100) Here, all store sales are the sum of all stores and all categories,
New store sales are the total of all categories at new stores. In addition, the existing store small category composition ratio indicates the composition ratio of all category sales only for stores that have had a track record in the past 56 weeks.

【0039】(ロ)新店が発生した翌週は、以下の様に
実績を補正する。
(b) For the week following the opening of a new store, the actual results are corrected as follows.

【0040】補正実績=(全店売上ー新店売上)×(全
店小カテゴリー構成比/100) とする。
[0040] Corrected performance = (all stores sales - new store sales) x (all stores small category composition ratio/100).

【0041】(2)廃店が発生した場合(2) When a store closes down

【0042】補
正実績=全店売上×((廃店前の月の全店売上ー廃店前
の月の廃店売上)/廃店前の月の全店売上)×(全店小
カテゴリー構成比/100)とする。
[0042] Corrected performance = Total store sales x ((Total store sales in the month before store closures – Closing store sales in the month before store closures) / Total store sales in the month before store closures) × (All store small category composition ratio/100) shall be.

【0043】[0043]

【実施例】本発明の実施例を説明する。[Example] An example of the present invention will be explained.

【0044】まず、店別商品別に最小在庫日数、最大在
庫日数、最小陳列基準、最大陳列基準を登録する。但し
、最小陳列基準、最大陳列基準は、補正用であって必ず
しも設定するものではなく、一般的に最大陳列基準は設
定しない。
First, the minimum number of days in stock, the maximum number of days in stock, the minimum display standard, and the maximum display standard are registered for each store and product. However, the minimum display standard and the maximum display standard are for correction purposes and are not necessarily set, and the maximum display standard is generally not set.

【0045】次に前述の売上予測計算を行い、発注量を
計算する。
Next, the sales forecast calculation described above is performed and the order amount is calculated.

【0046】発注量計算の前に、発注を行うか否かの判
断を行う。
Before calculating the order amount, it is determined whether or not to place an order.

【0047】「発注条件」0047 “Ordering conditions”

【0048】(a)今回発注の納品日前日からの最小在
庫予測数>今回発注の納品日前日の予測在庫数である。     (第1式)
(a) Minimum predicted inventory quantity from the day before the delivery date of the current order>Predicted inventory quantity from the day before the delivery date of the current order. (1st formula)

【0049】(b)最小陳列数>(今回発注日の前日の
在庫数+納品予定数ー今回発注日より次回発注の納品日
前日までの累積売上予測数)      (第2式)
(b) Minimum display number > (Inventory quantity on the day before the current order date + Scheduled delivery quantity - Cumulative sales forecast from the current order date to the day before the delivery date of the next order) (2nd formula)


0050】を演算し、(a)又は(b)の条件が満足し
た場合に、発注条件が成立する。
[
##EQU1## If the condition (a) or (b) is satisfied, the ordering condition is satisfied.

【0051】なお(a)の最小在庫予測数は、算出基準
日より各々の日数分の日々の売上予測数を加算して計算
する。そして小数点以下は、最後の予測日の売上予測数
に小数点以下の値を掛けて演算する。(a)の条件は納
品日前日において、予測在庫数が最小在庫数より少なく
なった場合であり、(b)の条件は、次回の発注分の納
品日前日の予測在庫数が、最小陳列数より少なくなる場
合である。
Note that the predicted minimum inventory quantity in (a) is calculated by adding the predicted daily sales quantity for each number of days from the calculation reference date. The numbers below the decimal point are calculated by multiplying the predicted number of sales on the last forecast day by the value below the decimal point. Condition (a) is when the predicted stock quantity is less than the minimum stock quantity on the day before the delivery date, and condition (b) is when the forecast stock quantity on the day before the delivery date for the next order is less than the minimum display quantity. This is the case when the amount becomes smaller.

【0052】「発注量計算」0052 “Order quantity calculation”

【0053】上記発注条件が整った場合には、発注量を
計算する。
[0053] When the above ordering conditions are met, the order amount is calculated.

【0054】(c)今回発注の商品の納品日からの最大
在庫予測数ー今回発注の納品日前日の予測在庫数   
       (第3式)
(c) Maximum predicted stock quantity from the delivery date of the product ordered this time - predicted stock quantity on the day before the delivery date of the current order
(3rd formula)

【0055】(d)最小陳列数ー(今回発注日の前日の
在庫数+納品予定数ー今回発注日より次回発注納品日前
日までの累積売上予測数)       (第4式)
(d) Minimum display number - (Inventory quantity on the day before the current order date + Expected delivery quantity - Cumulative sales forecast from the current order date to the day before the next order delivery date) (Formula 4)


0056】(e)上記(c)及び(d)を計算し、その
何れか大きい方を選択し、この値が、
[
(e) Calculate (c) and (d) above, select the larger one, and this value is

【0057】最大
陳列数ー(今回発注日の前日の在庫数+納品予定数ー今
回発注日より今回発注納品日前日までの累積売上予測数
)の値を越えない様にして発注量を演算する。
[0057] The order quantity is calculated so as not to exceed the value of maximum display number - (inventory quantity on the day before the current order date + scheduled delivery quantity - cumulative sales forecast from the current order date to the day before the current order delivery date). .

【0058】即ち、原則として(c)又は(d)の内、
大きい方を発注量とし、最大陳列数ー(今回発注日の前
日在庫数+納品予定数ー今回発注日より今回発注納品日
前日までの累積売上予測数)の値を越えた場合には、こ
の値を限界値として発注量とする。
[0058] That is, in principle, of (c) or (d),
The order quantity is the larger one, and if it exceeds the value of maximum display quantity - (inventory quantity on the day before the current order date + expected delivery quantity - cumulative sales forecast from the current order date to the day before the current order delivery date), The value is taken as the limit value and the order quantity.

【0059】ここで、(今回発注日の前日の在庫数+納
品予定数ー今回発注日より今回発注納品日前日よりの累
積売上予測数)とは、今回の発注分の納品日前日の予測
在庫数である。また(c)の、今回発注の商品の納品日
までの最大在庫予測数は、算出基準日より各々の日数分
の日々の売上予測数を加算して計算する。そして小数点
以下は、最後の予測日の売上予測数に小数点以下の値を
掛けて演算する。
[0059] Here, (inventory quantity on the day before the current order date + expected delivery quantity - predicted cumulative sales from the current order date to the day before the current order delivery date) is the predicted inventory on the day before the delivery date for the current order. It is a number. Further, in (c), the predicted maximum inventory quantity until the delivery date of the currently ordered product is calculated by adding the predicted daily sales quantity for each number of days from the calculation reference date. The numbers below the decimal point are calculated by multiplying the predicted number of sales on the last forecast day by the value below the decimal point.

【0060】次に、本実施例の具体的演算を図面に基づ
いて説明する。第1図は、発注量を計算するために前提
となる条件である。この実施例では、■、■、■の3つ
の商品について、発注日、納品日、最小在庫日数、最大
在庫日数、最小陳列数、最大陳列数、今回発注日前日の
在庫数、納品予定が定められる。
Next, specific calculations of this embodiment will be explained based on the drawings. Figure 1 shows the prerequisite conditions for calculating the order quantity. In this example, for the three products ■, ■, and ■, the order date, delivery date, minimum number of stock days, maximum number of stock days, minimum number of displays, maximum number of displays, number of stocks on the day before the current order date, and delivery schedule are determined. It will be done.

【0061】第1図の商品について、前述の売上予測数
計算を行った結果が、第2図となる。更に、今回発注納
品日よりの最小在庫数と、今回発注納品日よりの最大在
庫数を計算する。なお■商品は、便宜的に月曜日発注と
して計算する。
FIG. 2 shows the results of the above-mentioned predicted sales calculation for the product shown in FIG. Furthermore, the minimum stock quantity from the current order delivery date and the maximum stock quantity from the current order delivery date are calculated. For convenience, ■products are calculated as if they were ordered on Monday.

【0062】「今回発注納品日からの最小在庫予測数」
0062 “Minimum predicted inventory quantity from the current order delivery date”

【0063】まず、今回発注納品日からの最小在庫予測
数を計算する。
First, the predicted minimum stock quantity from the current order delivery date is calculated.

【0064】■の商品は、納品日が水曜日と土曜日であ
るから、4日分を加算し、第2図に示す水曜日から土曜
日までの予測売上数を合計すると、14+16+11+
21で62となる。
[0064] Since the delivery dates for the item (■) are Wednesday and Saturday, adding up the four days and totaling the predicted sales from Wednesday to Saturday shown in Figure 2 is 14+16+11+
21 becomes 62.

【0065】従って、今回発注納品日からの最小在庫予
測数は62となる。
[0065] Therefore, the minimum predicted inventory quantity from the current order delivery date is 62.

【0066】次に、■の商品の予測在庫数を計算する。 予測在庫数は、[0066] Next, the predicted stock quantity of the item (2) is calculated. The predicted inventory quantity is

【0067】予測在庫数=(今回発注日の前日の在庫数
+納品予定数)−(今回発注日から今回発注納品日前日
までの売上予測)        (第5式)
[0067] Forecast inventory quantity = (Inventory quantity on the day before the current order date + Scheduled delivery quantity) - (Sales forecast from the current order date to the day before the current order delivery date) (Formula 5)

【006
8】となり、第1図から前日在庫数及び納品予定数を読
み込み、更に、■商品の発注日は月曜日であり、納品日
の前日は火曜日であるから、この売上予測を第2図から
読んで、
006
8], read the previous day's stock quantity and scheduled delivery quantity from Figure 1, and read this sales forecast from Figure 2, as ■The order date for the product is Monday and the day before the delivery date is Tuesday. ,

【0069】予測在庫数=(80+5)ー(11+13
)=61となる。
[0069] Forecast inventory quantity = (80 + 5) - (11 + 13
)=61.

【0070】従って、今回発注納品日よりの最小在庫数
(62)>予測在庫数(61)となる。
Therefore, the minimum inventory quantity (62) from the current order delivery date is greater than the predicted inventory quantity (61).

【0071】同様に、■と■の商品についても計算すれ
ば、
[0071] Similarly, if we calculate for the products ■ and ■, we get

【0072】■商品は、今回発注納品日よりの最小在庫
数=(0+0)となり、予測在庫数=(5+3ー0)で
あり、今回発注納品日よりの最小在庫数(0)<予測在
庫数(8)となる。
■For the product, the minimum stock quantity from the current order delivery date = (0 + 0), the predicted stock quantity = (5 + 3 - 0), and the minimum stock quantity from the current order delivery date (0) < predicted stock quantity (8) becomes.

【0073】■商品は、今回発注納品日よりの最小在庫
数=(100+100)となり、予測在庫数=(5+3
ー0)であり、今回発注納品日よりの最小在庫数(20
0)<予測在庫数(0)となる。
■The minimum stock quantity for the product from the current order delivery date = (100 + 100), and the predicted stock quantity = (5 + 3).
-0), and the minimum stock quantity from the current order delivery date (20
0)<Predicted inventory quantity (0).

【0074】なお、今回発注日から今回発注納品日前日
までの売上予測が、今回発注日の前日の在庫数+納品予
定数より大きい場合には、今回発注日の前日の在庫数+
納品予定数を売上予測数とする。
[0074] Furthermore, if the sales forecast from the current order date to the day before the current order delivery date is greater than the inventory quantity on the day before the current order date + scheduled delivery quantity, the sales forecast from the current order date to the day before the current order delivery date is greater than the inventory quantity on the day before the current order date + scheduled delivery quantity.
The expected number of deliveries is the predicted number of sales.

【0075】「今回発注納品日からの最大在庫予測数」
0075 “Maximum predicted stock quantity from the current order delivery date”

【0076】次に■商品の今回発注納品日よりの最大在
庫数を演算する。第2図の売上予測を代入使用して計算
する。即ち、■商品の納品日は、水曜日と土曜日である
から、5日分を加算し、今回納品日からの最大在庫予測
数は、(14+16+11+21+32)となる。更に
予測在庫数は、第5式より(80+5−11−13)と
なるので、(今回発注の商品の納品日からの最大在庫予
測数ー今回発注の納品日前日の予測在庫数)=(14+
16+11+21+32)−(80+5−11−13)
=31となる。
Next, (1) calculate the maximum stock quantity of the product from the current order delivery date. Calculate by substituting the sales forecast in Figure 2. In other words, since the delivery dates of the product (■) are Wednesday and Saturday, adding 5 days' worth of items will result in the predicted maximum inventory quantity from the current delivery date to be (14+16+11+21+32). Furthermore, the predicted stock quantity is (80 + 5 - 11 - 13) from formula 5, so (maximum predicted stock quantity from the delivery date of the product ordered this time - predicted stock quantity on the day before the delivery date of the current order) = (14 +
16+11+21+32)-(80+5-11-13)
=31.

【0077】ここで、今回発注の商品の納品日からの最
大在庫予測数ー今回発注の納品日前日の予測在庫数=M
AX在庫基準と定義すれば、■の商品のMAX在庫基準
は、
[0077] Here, the maximum predicted stock quantity from the delivery date of the product ordered this time - the predicted stock quantity on the day before the delivery date of the current order = M
Defining the AX inventory standard, the MAX inventory standard for the product ■ is,

【0078】MAX在庫基準=(0+0+0)−(8−
0)=−8→→→0
MAX inventory standard=(0+0+0)-(8-
0)=-8→→→0

【0079】■の商品のMAX在庫基準は、[0079] The MAX inventory standard for the product ■ is as follows:

【0080
】MAX=(100+100+50)−(8−100)
=250 0とする
0080
]MAX=(100+100+50)-(8-100)
=250 0

【0081】となる。[0081]

【0082】「最小陳列基準」“Minimum display standards”

【0083】次に、最小陳列基準について説明する。ま
ず、今回発注日より今回発注の納品日までの累積売上予
測を求めることが必要となる。更に、今回発注納品日よ
り次回発注の納品日の前日までの累積売上予測を求めて
加算する必要がある。
Next, the minimum display standards will be explained. First, it is necessary to obtain a cumulative sales forecast from the current order date to the current order delivery date. Furthermore, it is necessary to obtain and add the cumulative sales forecast from the current order delivery date to the day before the next order delivery date.

【0084】今回発注日の前日の在庫数と納品予定数の
和が、売上予測数より小さい場合には、今回発注日より
今回発注の納品日の前日までの売上予測数を第1売上予
測数とする。
[0084] If the sum of the inventory quantity and the scheduled delivery quantity on the day before the current order date is smaller than the sales forecast number, the sales forecast from the current order date to the day before the delivery date of the current order is used as the first sales forecast number. shall be.

【0085】即ち、[0085] That is,

【0086】第1売上予測数=今回発注日より今回発注
の納品日の前日までの売上予測の累積とし、
[0086] First sales forecast number = cumulative sales forecast from the current order date to the day before the delivery date of the current order,

【0087
】第2売上予測数=今回発注納品日より次回発注の納品
日の前日までの売上予測の累積とする。
0087
]Second sales forecast number = Accumulation of sales forecasts from the current order delivery date to the day before the next order delivery date.

【0088】そして、売上予測を、[0088] Then, the sales forecast is

【0089】累積売上予測=第1売上予測+第2売上予
[0089] Cumulative sales forecast = 1st sales forecast + 2nd sales forecast

【0090】とし、最小陳列基準は、0090, and the minimum display standards are:

【0091】最小陳列基準=最小陳列数ー(今回発注日
の前日の在庫数+納品予定数−累積売上予測)    
                  (第7式)
[0091] Minimum display standard = Minimum number of displays - (Inventory quantity on the day before the current order date + Scheduled delivery quantity - Cumulative sales forecast)
(7th formula)

【0
092】と定義する。
0
092].

【0093】ここで、上記■、■、■の商品について、
具体的な演算を行うことにする。■の商品について、第
1売上予測は、発注日が月曜日であり、納品日の前日が
火曜日であるから、
[0093] Regarding the above products ■, ■, ■,
Let us perform some concrete calculations. Regarding the product ■, the first sales forecast is that the order date is Monday and the day before the delivery date is Tuesday.

【0094】第1売上予測=11+13=24[0094] First sales forecast = 11 + 13 = 24

【009
5】そして納品日が水曜日であり、次回発注の納品日の
前日が金曜日であるから、 第2売上予測=14+16+11=38
009
5] Since the delivery date is Wednesday and the day before the delivery date of the next order is Friday, the second sales forecast = 14 + 16 + 11 = 38

【0096】と
なる。従って、累積売上予測=24+38=62となる
[0096] Therefore, cumulative sales forecast=24+38=62.

【0097】最小陳列基準は、第7式より、[0097] From the seventh formula, the minimum display standard is

【0098
】最小陳列基準=10−(80+5−62)=−13 
 →→0
0098
]Minimum display standard=10-(80+5-62)=-13
→→0

【0099】となる。[0099]

【0100】同様にして、■商品の最小陳列基準を計算
すれば、
[0100] In the same way, ■ If you calculate the minimum display standards for the product,

【0101】最小陳列基準=10−(5+3−0)=2
[0101] Minimum display standard=10-(5+3-0)=2

【0102】となる。[0102]

【0103】更に■商品の最小陳列基準を計算すると、
この場合には、今回発注日の前日の在庫数と納品予定数
の和が8であり、売上予測数100より小さいので、第
1売上予測を8とし、第2売上予測を100とする。こ
の結果、累積売上予測は108となり、
[0103]Furthermore, ■Calculating the minimum display standards for the product:
In this case, the sum of the inventory quantity and the scheduled delivery quantity on the day before the current order date is 8, which is smaller than the sales forecast number 100, so the first sales forecast is set to 8 and the second sales forecast is set to 100. As a result, the cumulative sales forecast is 108,

【0104】最
小陳列基準=10−(5+3−108)=110となる
Minimum display standard=10-(5+3-108)=110.

【0105】「最大陳列基準」0105 “Maximum display standards”

【0106】次に、最大陳列基準について計算する。Next, calculate the maximum display criterion.

【0107】今回発注日より今回発注納品日前日までの
累積売上予測を求めて演算する。
[0107] The cumulative sales forecast from the current order date to the day before the current order delivery date is calculated.

【0108】即ち、[0108] That is,

【0109】最大陳列基準=最大陳列数ー(今回発注日
の前日の在庫数+納品予定数+今回発注日より今回発注
納品日前日までの累積売上予測)(第8式)
[0109] Maximum display standard = Maximum number of displays - (Inventory quantity on the day before the current order date + Scheduled delivery quantity + Cumulative sales forecast from the current order date to the day before the current order delivery date) (Formula 8)

【0110
】として演算する。なお、今回発注日の前日の在庫数+
納品予定数ー今回発注日より今回発注納品日前日までの
累積売上予測が、マイナスとなる場合にはゼロとする。
0110
] Calculate as. In addition, the number of items in stock on the day before the order date +
Scheduled delivery quantity - If the cumulative sales forecast from the current order date to the day before the current order delivery date is negative, it will be set to zero.

【0111】具体的に計算すると、■の商品については
、累積売上数=11+14=24となり、第8式に代入
すれば、
[0111] Specifically, for the product ■, the cumulative sales number = 11 + 14 = 24, and by substituting it into the 8th equation,

【0112】 最大陳列基準=200−(80+5−24)=139[0112] Maximum display standard = 200 - (80 + 5 - 24) = 139


0113】となる。
[
[0113]

【0114】同様に、■の商品は、[0114] Similarly, the product ■ is

【0115】最大陳列基準=20−(5+3−0)=1
[0115] Maximum display standard=20-(5+3-0)=1
2

【0116】更に■の商品は、[0116] Furthermore, the products marked with ■ are:

【0117】 最大陳列基準=20−(5+3−100)=20[0117] Maximum display standard = 20 - (5 + 3 - 100) = 20

【01
18】0となる。
01
18] becomes 0.

【0119】なお、今回発注日の前日の在庫数がマイナ
スの場合には、0として計算する。
[0119] If the inventory quantity on the day before the current order date is negative, it is calculated as 0.

【0120】「発注量計算」0120] “Order quantity calculation”

【0121】即ち第4式は、最小陳列基準に該当するの
で、発注量計算は、
[0121] In other words, the fourth formula corresponds to the minimum display standard, so the order quantity calculation is as follows:

【0122】(c)今回発注の商品の納品日までの最大
在庫予測数ー今回発注の納品日前日の予測在庫数=MA
X在庫基準   (第3式)
(c) Maximum predicted stock quantity until the delivery date of the product ordered this time - predicted stock quantity on the day before the delivery date of the current order = MA
X inventory standard (3rd formula)

【0123】 (d)最小陳列基準                
   (第4式)
(d) Minimum display standards
(4th formula)

【0124】(e)上記(c)及び(
d)を計算し、MAX在庫基準と最小陳列基準の何れか
大きい方を選択し、この値が最大陳列基準を越えない範
囲で、発注量を定めるものである。
(e) Above (c) and (
d) is calculated, the larger of the MAX inventory standard and the minimum display standard is selected, and the order quantity is determined within a range where this value does not exceed the maximum display standard.

【0125】従って、■商品の場合には、最大在庫予測
数が94であり、予測在庫数が61であるから第3式を
計算すると、MAX在庫基準=(94−61)=33で
あり、更に、最小陳列基準は0であるから、大きい方の
33を選択し、最大陳列基準である139を越えないの
で、発注数を33とする。
[0125] Therefore, in the case of the product (■), the predicted maximum inventory quantity is 94 and the predicted inventory quantity is 61, so when calculating the third formula, MAX inventory standard = (94-61) = 33, Furthermore, since the minimum display standard is 0, the larger 33 is selected, and since the maximum display standard of 139 is not exceeded, the number of orders is set to 33.

【0126】同様にして、■の商品のMAX在庫基準は
0であり、最小陳列基準は2であり、最大陳列基準は1
2であるから、発注量は2となる。
[0126] Similarly, the MAX inventory standard for the item ■ is 0, the minimum display standard is 2, and the maximum display standard is 1.
2, the order quantity is 2.

【0127】そして■商品のMAX在庫基準は250で
あり、最小陳列基準は110であり、最大陳列基準は2
0であるから、最大陳列基準の制限の結果、発注量は2
0となる。
[0127] And ■ The MAX inventory standard for the product is 250, the minimum display standard is 110, and the maximum display standard is 2.
0, the order amount is 2 as a result of the maximum display standard restriction.
It becomes 0.

【0128】なお、■の商品と■の商品は、第1式の発
注条件を満たしており、■の商品は第2式の発注条件を
満たしている。また計算の結論を取りまとめたものが、
第3図である。
Note that the products marked ■ and the products marked ■ satisfy the ordering conditions of the first formula, and the products marked ■ satisfy the ordering conditions of the second formula. In addition, the conclusion of the calculation is summarized as follows.
FIG.

【0129】次に、自動商品発注装置について第4図に
基づいて説明する。本実施例の自動商品発注装置は、入
力手段1と、第1演算処理手段2と、第2演算処理手段
3と、第3演算処理手段4と、第4演算処理手段5と、
第5演算処理手段6と、制御手段7と、表示手段8と、
指示入力手段9とからなっている。
Next, the automatic product ordering device will be explained based on FIG. 4. The automatic product ordering device of this embodiment includes an input means 1, a first arithmetic processing means 2, a second arithmetic processing means 3, a third arithmetic processing means 4, a fourth arithmetic processing means 5,
A fifth arithmetic processing means 6, a control means 7, a display means 8,
It consists of an instruction input means 9.

【0130】入力手段1は、発注日、納品日、最小在庫
日数、最大在庫日数、最小陳列数、最大陳列数、発注日
の前日の在庫数、納品予定数等を入力するためのもので
ある。第1の演算処理手段2は、今回発注の商品の納品
日からの最小在庫予測数と、今回発注の納品日前日の予
測在庫数とを比較するためのものである。第2の演算処
理手段3は、次回の発注分の納品日前日の予測在庫数と
、必要な最小陳列数とを比較するためものである。第3
の演算処理手段4は、今回発注の商品の納品日からの最
大在庫予測数と、今回発注の納品日前日の予測在庫数と
の差を演算するためのものである。第4の演算処理手段
5は、最小陳列数と、次回の発注分の納品日前日の予測
在庫数との差を演算するためのものである。第5の演算
処理手段6は、最大陳列数と、今回の発注分の納品日前
日の予測在庫数との差を演算するためのものである。 制御手段7は、第1演算処理手段2と第2演算処理手段
3の結論に基づき、発注の指令を行い、第1演算処理手
段2の結論が、最小在庫予測数が今回発注の納品日前日
の予測在庫数より大きいか、又は、第2演算処理手段3
の結論が、最小陳列数が次回の発注分の納品日前日の予
測在庫数より大きい場合に、発注指令を行うためのもの
であり、更に制御手段7は、第3演算処理手段4の結論
と第4演算処理手段5の結論の内、大きい方の値を選択
し、第5の演算処理手段6の結論の値を越えない条件で
、選択された値を発注量として指令出力するためのもの
である。また制御手段7には表示手段8が接続されてお
り、発注量等を表示可能になっている。そして、制御手
段7には指示入力手段9が接続されており、発注量を表
示手段8に表示した後、使用者の確認の意思である指示
入力手段9による入力により、発注量の指令を出力する
様になっている。これは、半自動補充発注動作であり、
定番性は高いが高額商品、新商品等で売行きの把握が困
難な商品に適している。更に、賞味期間が短いものや、
売れ残るとロスが大きい商品に最適である。また、指示
入力手段9の入力なしに、完全に自動的に発注量を出力
することも可能である。この自動発注補充動作は、定番
性が高く、安定して販売・供給可能な商品に適している
。そして発注量を使用者が確認した後、使用者がターン
・アラウンド入力しなければ、発注しない方式にするこ
ともできる。このマニュアル発注は、発注先に確認を取
らないと発注できない商品に向いている。また欠品で売
上0の場合には、自動又は半自動動作からマニュアル発
注に切り替え、警告を発する構成にすることもできる。 更に、半自動補充発注動作において、一定時間内に指示
入力手段9の入力がない場合には、自動的に発注を行う
構成にすることもできる。
[0130] Input means 1 is for inputting order date, delivery date, minimum number of days in stock, maximum number of days in stock, minimum number of display items, maximum number of display items, number of items in stock on the day before the order date, number of scheduled items to be delivered, etc. . The first arithmetic processing means 2 is for comparing the predicted minimum stock quantity from the delivery date of the currently ordered product with the predicted stock quantity on the day before the delivery date of the currently ordered product. The second arithmetic processing means 3 is for comparing the predicted stock quantity for the next order on the day before the delivery date with the required minimum display quantity. Third
The calculation processing means 4 is for calculating the difference between the predicted maximum stock quantity from the delivery date of the currently ordered product and the predicted stock quantity on the day before the delivery date of the currently ordered product. The fourth calculation processing means 5 is for calculating the difference between the minimum display quantity and the predicted stock quantity on the day before the delivery date for the next order. The fifth arithmetic processing means 6 is for calculating the difference between the maximum display quantity and the predicted stock quantity on the day before the delivery date for the current order. The control means 7 issues an order order based on the conclusions of the first arithmetic processing means 2 and the second arithmetic processing means 3, and the conclusion of the first arithmetic processing means 2 indicates that the minimum predicted inventory quantity is the day before the delivery date of the current order. is larger than the predicted stock quantity, or the second arithmetic processing means 3
This is for issuing an ordering instruction when the conclusion of This is for selecting the larger value among the conclusions of the fourth arithmetic processing means 5 and outputting the selected value as an order amount under the condition that it does not exceed the value of the conclusion of the fifth arithmetic processing means 6. It is. Further, a display means 8 is connected to the control means 7, and is capable of displaying the order amount and the like. An instruction input means 9 is connected to the control means 7, and after displaying the order amount on the display means 8, a command for the order amount is outputted based on an input by the instruction input means 9, which is the user's intention to confirm. It looks like it will. This is a semi-automatic replenishment ordering operation;
It is suitable for products that have a high standard but are expensive, new products, etc., and whose sales are difficult to grasp. In addition, items with a short shelf life,
Ideal for products that would result in large losses if unsold. Furthermore, it is also possible to output the order amount completely automatically without any input from the instruction input means 9. This automatic order replenishment operation is suitable for products that are highly standard and can be sold and supplied stably. After the user confirms the order amount, it is also possible to adopt a system in which the order is not placed unless the user inputs a turnaround. This manual ordering is suitable for products that cannot be ordered without confirmation from the supplier. Furthermore, in the case of 0 sales due to a stockout, the system can be configured to switch from automatic or semi-automatic operation to manual ordering and issue a warning. Furthermore, in the semi-automatic replenishment ordering operation, if there is no input from the instruction input means 9 within a certain period of time, an arrangement may be made in which the order is automatically placed.

【0131】なお、第1演算処理手段2と、第2演算処
理手段3と、第3演算処理手段4と、第4演算処理手段
5と、第5演算処理手段6と、制御手段7とは、それぞ
れ別個の演算処理手段から構成してもよいが、一つの電
子計算機で共用する構成にすることもできる。
Note that the first arithmetic processing means 2, the second arithmetic processing means 3, the third arithmetic processing means 4, the fourth arithmetic processing means 5, the fifth arithmetic processing means 6, and the control means 7 are , may be composed of separate arithmetic processing means, but it is also possible to have a structure in which they are shared by one electronic computer.

【0132】[0132]

【効果】以上の様に構成された本発明は、今回発注の商
品の納品日からの最小在庫予測数と、今回発注の納品日
前日の予測在庫数とを比較する第1工程と、次回の発注
分の納品日前日の予測在庫数と、必要な最小陳列数とを
比較する第2工程と、第1工程で比較された結論と第2
工程で比較された結論に基づき、発注の指令を行う第3
工程とからなっており、第3工程は、前記第1工程の結
論が、最小在庫予測数が今回発注の納品日前日の予測在
庫数より大きいか、又は、第2工程の結論が、最小陳列
数が次回の発注分の納品日前日の予測在庫数より大きい
場合に、発注指令を行う構成を有するので、補充発注が
必要な場合を自動的に判断することができるという効果
がある。
[Effects] The present invention configured as described above includes the first step of comparing the predicted minimum stock quantity from the delivery date of the currently ordered product with the predicted stock quantity on the day before the delivery date of the currently ordered product; The second step is to compare the predicted stock quantity on the day before the delivery date for the order and the required minimum display quantity, and the second step is to compare the results of the comparison in the first step and the second step.
The third step is to issue orders based on the results compared in the process.
The third step is whether the conclusion of the first step is that the minimum predicted stock quantity is greater than the predicted stock quantity on the day before the delivery date of the current order, or the conclusion of the second step is that the minimum display Since the system is configured to issue an ordering command when the number of items in stock is larger than the predicted stock quantity on the day before the delivery date for the next order, there is an effect that it is possible to automatically determine when a replenishment order is necessary.

【0133】また本発明は、今回発注の商品の納品日か
らの最大在庫予測数と、今回発注の納品日前日の予測在
庫数との差を演算する第1工程と、最小陳列数と、次回
の発注分の納品日前日の予測在庫数との差を演算する第
2工程と、第1工程の結論と、第2工程の結論の内、大
きい方の値を選択する第3工程と、最大陳列数と、今回
の発注分の納品日前日の予測在庫数との差を演算する第
4工程と、第4工程の結論の値を越えない条件で、第3
工程の値を発注量として発注指令を行う第5工程とから
なるので、最適な補充発注量を自動的に演算し、発注処
理を行うことができるという効果がある。
[0133] The present invention also includes a first step of calculating the difference between the predicted maximum stock quantity from the delivery date of the currently ordered product and the predicted stock quantity on the day before the delivery date of the currently ordered product, the minimum display quantity, and the next a second process that calculates the difference between the predicted inventory quantity on the day before the delivery date for the ordered quantity; a third process that selects the larger value of the conclusion of the first process and the conclusion of the second process; The fourth step is to calculate the difference between the number of items on display and the predicted stock amount on the day before the delivery date for the current order, and the third step is to
Since the process includes the fifth step of issuing an ordering command using the value of the process as the ordering amount, there is an effect that the optimum replenishment ordering amount can be automatically calculated and ordering processing can be performed.

【0134】更に、自動商品発注システムが、発注量の
指令に先立ち、発注量を表示し、使用者の確認の後、発
注量の指令を行う構成にすることもできるので、定番性
は高いが高額商品、新商品等で売行きの把握が困難な商
品にも柔軟に対応でき、賞味期間が短いものや、売れ残
るとロスが大きい商品に最適であるという効果がある。
[0134] Furthermore, the automatic product ordering system can be configured to display the order quantity before issuing the order quantity command, and then issue the order quantity command after the user's confirmation. It has the advantage of being able to flexibly deal with high-priced products, new products, etc. whose sales are difficult to grasp, and ideal for products with a short shelf life or products that would result in large losses if unsold.

【0135】また、自動商品発注システムの第8工程が
、発注量の指令に先立ち、発注量を表示し、使用者の確
認の後、或は、使用者の確認がない場合に、発注量の指
令を行う構成にすることもできるので、発注忘れを防止
でき、チャンスロスが少なくなるという効果がある。
[0135] Furthermore, in the eighth step of the automatic product ordering system, the order quantity is displayed before the order quantity is instructed, and the order quantity is displayed after the user's confirmation or in the absence of the user's confirmation. It is also possible to configure the system to issue commands, which has the effect of preventing forgetting to place orders and reducing chance losses.

【0136】また本発明の売上予測システムは、発注日
から今回発注の納品日前日までの日数に対して、最大在
庫日数を加えた第1期間と、発注日から次回発注納品日
までの期間の第2期間を比較し、長い期間を選択する第
1工程と、第1工程で選択された期間に対して、各曜日
を設定する第2工程と、比較的最近の該当商品の売上実
績を読み込む第3工程と、前記該当商品を含む分類の、
年間売上傾向の指数を演算する第4工程と、第4工程の
指数に基づき、前記該当商品の予測売上数を演算する第
5工程とから構成されているので、簡便な演算で売上予
測を行うことができる。
[0136] Furthermore, the sales forecasting system of the present invention calculates the first period by adding the maximum inventory days to the number of days from the order date to the day before the delivery date of the current order, and the period from the order date to the delivery date of the next order. The first step is to compare the second period and select a longer period, the second step is to set each day of the week for the period selected in the first step, and the relatively recent sales performance of the corresponding product is read. The third step and the classification including the applicable product,
It consists of a fourth step of calculating an index of annual sales trends, and a fifth step of calculating the predicted sales volume of the corresponding product based on the index of the fourth step, so sales can be predicted with simple calculations. be able to.

【0137】そして本発明の自動商品発注装置は、発注
日、納品日、最小陳列数、最大陳列数、発注日の前日の
在庫数、納品予定数を入力するための入力手段と、今回
発注の商品の納品日からの最小在庫予測数と、今回発注
の納品日前日の予測在庫数とを比較するための第1演算
処理手段と、次回の発注分の納品日前日の予測在庫数と
、必要な最小陳列数とを比較するための第2演算処理手
段と、第1演算処理手段と第2演算処理手段の結論に基
づき、発注の指令を行う制御手段とを有し、制御手段は
、前記第1演算処理手段の結論が、最小在庫予測数が今
回発注の納品日前日の予測在庫数より大きいか、又は、
第2演算処理手段の結論が、最小陳列数が次回の発注分
の納品日前日の予測在庫数より大きい場合に、発注指令
を行う様になっており、制御手段の発注指令に基づき、
今回発注の商品の納品日からの最大在庫予測数と、今回
発注の納品日前日の予測在庫数との差を演算する第3演
算処理手段と、最小陳列数と、次回の発注分の納品日前
日の予測在庫数との差を演算する第4演算処理手段とを
備え、制御手段が、第3演算処理手段の結論と第4演算
処理手段の結論の内、大きい方の値を選択する様になっ
ており、最大陳列数と、今回の発注分の納品日前日の予
測在庫数との差を演算する第5演算処理手段の結論の値
を越えない条件で、制御手段が選択された値を発注量と
して指令出力を行う様に構成されているので、発注量を
自動的に演算することができ、定番性が高く、安定して
販売・供給可能な商品に極めて効果的である。
[0137] The automatic product ordering device of the present invention includes an input means for inputting an order date, a delivery date, a minimum number of displayed items, a maximum number of displayed items, the number of items in stock on the previous day of the ordering date, and the number of scheduled items to be delivered. A first calculation processing means for comparing the predicted minimum stock quantity from the delivery date of the product with the predicted stock quantity on the day before the delivery date of the current order, and the predicted stock quantity on the day before the delivery date for the next order, and the necessary and a control means for instructing order placement based on the conclusions of the first arithmetic processing means and the second arithmetic processing means. The conclusion of the first arithmetic processing means is that the minimum predicted inventory quantity is greater than the predicted inventory quantity on the day before the delivery date of the current order, or
If the conclusion of the second arithmetic processing means is that the minimum display quantity is greater than the predicted stock quantity on the day before the delivery date for the next order, an ordering command is issued, and based on the ordering command of the control means,
A third calculation processing means for calculating the difference between the predicted maximum inventory quantity from the delivery date of the product ordered this time and the predicted inventory quantity from the day before the delivery date of the current order, and the minimum display quantity and the delivery date for the next order. and a fourth arithmetic processing means for calculating the difference between the predicted inventory quantity for the day, and the control means selects the larger value of the conclusion of the third arithmetic processing means and the conclusion of the fourth arithmetic processing means. , and the value selected by the control means under the condition that the value does not exceed the conclusion of the fifth calculation processing means that calculates the difference between the maximum display quantity and the predicted stock quantity on the day before the delivery date for the current order. Since the system is configured to output a command using the order amount as the order amount, the order amount can be automatically calculated, which is extremely effective for products that are highly standard and can be sold and supplied stably.

【0138】更に本発明は、制御手段には、発注量を表
示するための表示装置と、指示入力手段とが接続されて
おり、使用者が発注量を確認した後、前記指示入力手段
から信号を入力することにより、制御手段が発注量指令
を出力する様に構成されているので、売行きの把握が困
難な商品に対しても柔軟に対応することができるという
卓越した効果がある。
Further, in the present invention, a display device for displaying the order quantity and an instruction input means are connected to the control means, and after the user confirms the order quantity, a signal is sent from the instruction input means. Since the control means is configured to output an order quantity command by inputting , it has the outstanding effect of being able to respond flexibly even to products whose sales are difficult to grasp.

【0139】[0139]

【図面の簡単な説明】[Brief explanation of drawings]

【図1】補充発注計算の前提となる条件を示す図である
FIG. 1 is a diagram showing conditions that are prerequisites for replenishment order calculation.

【図2】売上予測を計算した結果を示す図である。FIG. 2 is a diagram showing the results of calculating sales forecasts.

【図3】補充発注計算を示す図である。FIG. 3 is a diagram showing replenishment order calculation.

【図4】自動商品発注装置の構成を示す図である。FIG. 4 is a diagram showing the configuration of an automatic product ordering device.

【図5】売上予測を説明する図である。FIG. 5 is a diagram illustrating sales forecasting.

【符号の説明】[Explanation of symbols]

1  入力手段 2  第1の演算処理手段 3  第2の演算処理手段 4  第3の演算処理手段 5  第4の演算処理手段 6  第5の演算処理手段 7  制御手段 8  表示手段 9  指示入力手段 1 Input means 2 First arithmetic processing means 3 Second arithmetic processing means 4 Third calculation processing means 5 Fourth arithmetic processing means 6 Fifth arithmetic processing means 7 Control means 8 Display means 9 Instruction input means

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】  今回発注の商品の納品日からの最小在
庫予測数と、今回発注の納品日前日の予測在庫数とを比
較する第1工程と、次回の発注分の納品日前日の予測在
庫数と、必要な最小陳列数とを比較する第2工程と、第
1工程で比較された結論と第2工程で比較された結論に
基づき、発注の指令を行う第3工程とからなっており、
第3工程は、前記第1工程の結論が、最小在庫予測数が
今回発注の納品日前日の予測在庫数より大きいか、又は
、第2工程の結論が、最小陳列数が次回の発注分の納品
日前日の予測在庫数より大きい場合に、発注指令を行う
ことを特徴とする自動商品発注システム。
[Claim 1] A first step of comparing the minimum predicted inventory quantity from the delivery date of the product ordered this time with the predicted inventory quantity the day before the delivery date of the current order, and the predicted inventory quantity the day before the delivery date of the next order. The process consists of a second process in which the number is compared with the required minimum display number, and a third process in which an order is issued based on the results compared in the first process and the second process. ,
In the third step, the conclusion of the first step is that the minimum predicted stock quantity is greater than the predicted stock quantity on the day before the delivery date of the current order, or the conclusion of the second step is that the minimum display quantity is the same as the next order. An automatic product ordering system that issues an ordering command when the number of stock is larger than the predicted stock quantity on the day before the delivery date.
【請求項2】  今回発注の商品の納品日からの最大在
庫予測数と、今回発注の納品日前日の予測在庫数との差
を演算する第1工程と、最小陳列数と、次回の発注分の
納品日前日の予測在庫数との差を演算する第2工程と、
第1工程の結論と、第2工程の結論の内、大きい方の値
を選択する第3工程と、最大陳列数と、今回の発注分の
納品日前日の予測在庫数との差を演算する第4工程と、
第4工程の結論の値を越えない条件で、第3工程の値を
発注量として発注指令を行う第5工程とからなることを
特徴とする自動商品発注システム。
[Claim 2] A first step of calculating the difference between the predicted maximum stock quantity from the delivery date of the currently ordered product and the predicted stock quantity on the day before the delivery date of the currently ordered product, the minimum display quantity, and the next order quantity. a second step of calculating the difference between the expected inventory quantity on the day before the delivery date;
The third step is to select the larger value between the conclusion of the first step and the conclusion of the second step, and the difference between the maximum display quantity and the predicted stock quantity on the day before the delivery date for the current order is calculated. The fourth step,
An automatic product ordering system comprising a fifth step of issuing an ordering command using the value of the third step as the order amount under conditions that the value of the conclusion of the fourth step is not exceeded.
【請求項3】  今回発注の商品の納品日前日からの予
測最小在庫数と、今回発注の納品日前日の予測在庫数と
を比較する第1工程と、次回の発注分の納品日前日の予
測在庫数と、必要な最小陳列数とを比較する第2工程と
、第1工程で比較された結論と第2工程で比較された結
論に基づき、発注の指令を行う第3工程とを有し、第3
工程は、前記第1工程の結論が、予測最小在庫数が今回
発注の納品日前日の予測在庫数より大きいか、又は、第
2工程の結論が、最小陳列数が次回の発注分の納品日前
日の予測在庫数より大きい場合に、発注指令を行う様に
なっており、第3工程の発注指令に基づき、今回発注の
商品の納品日前日からの予測最大在庫数と、今回発注の
納品日前日の予測在庫数との差を演算する第4工程と、
最小陳列数と、次回の発注分の納品日前日の予測在庫数
との差を演算する第5工程と、第4工程の結論と、第5
工程の結論の内、大きい方の値を選択する第6工程と、
最大陳列数と、今回の発注分の納品日前日の予測在庫数
との差を演算する第7工程と、第7工程の結論の値を越
えない条件で、第6工程の値を発注量として指令を行う
第8工程とからなることを特徴とする自動商品発注シス
テム。
[Claim 3] A first step of comparing the predicted minimum inventory quantity from the day before the delivery date of the product ordered this time with the predicted inventory quantity from the day before the delivery date of the current order, and a prediction from the day before the delivery date for the next order. It has a second process of comparing the inventory quantity and the required minimum display quantity, and a third process of issuing an order order based on the results compared in the first process and the conclusions compared in the second process. , 3rd
The process is that the conclusion of the first process is that the predicted minimum stock quantity is greater than the predicted stock quantity on the day before the delivery date of the current order, or the conclusion of the second process is that the minimum display quantity is before the delivery date of the next order. If it is larger than the predicted stock quantity for the current day, an ordering command will be issued.Based on the ordering command in the third process, the predicted maximum stock quantity from the day before the delivery date of the product ordered this time and the delivery date of the current order will be issued. a fourth step of calculating the difference between the predicted stock quantity for the day;
A fifth step of calculating the difference between the minimum display quantity and the predicted stock quantity on the day before the delivery date for the next order, the conclusion of the fourth step, and the fifth step.
a sixth step of selecting the larger value among the conclusions of the steps;
The 7th process calculates the difference between the maximum display quantity and the predicted stock quantity on the day before the delivery date for the current order, and the value of the 6th process is used as the order quantity under the condition that the value of the conclusion of the 7th process is not exceeded. An automatic product ordering system characterized by comprising an eighth step of issuing instructions.
【請求項4】請求項3の自動商品発注システムの第8工
程が、発注量の指令に先立ち、発注量を表示し、使用者
の確認の後、発注量の指令が行われる請求項3記載の自
動商品発注システム。
4. The eighth step of the automatic product ordering system according to claim 3, in which the order amount is displayed before the order amount is instructed, and the order amount is instructed after confirmation by the user. automatic product ordering system.
【請求項5】請求項3の自動商品発注システムの第8工
程が、発注量の指令に先立ち、発注量を表示し、使用者
の確認の後、或は、使用者の確認がない場合に、発注量
の指令が行われる請求項3記載の自動商品発注システム
[Claim 5] The eighth step of the automatic product ordering system according to claim 3 displays the order quantity prior to the instruction of the order quantity, and after the user's confirmation or in the absence of the user's confirmation. 4. The automatic product ordering system according to claim 3, wherein the order amount is instructed.
【請求項6】次回の発注分の納品日前日の予測在庫数が
、今回発注日の前日の在庫数と、納品予定数とを加え、
この加算値から、発注日から次回発注納品日前日までの
累積予測売上数を差し引いて演算される請求項1及び5
記載の自動商品発注システム。
[Claim 6] The predicted stock quantity on the day before the delivery date for the next order is calculated by adding the stock quantity on the day before the current order date and the scheduled delivery quantity,
Claims 1 and 5 calculated by subtracting the cumulative predicted sales volume from the order date to the day before the next order delivery date from this additional value.
Automatic product ordering system as described.
【請求項7】発注日から今回発注の納品日前日までの日
数に対して、最大在庫日数を加えた第1期間と、発注日
から次回発注納品日までの期間の第2期間を比較し、長
い期間を選択する第1工程と、第1工程で選択された期
間に対して、各曜日を設定する第2工程と、比較的最近
の該当商品の売上実績を読み込む第3工程と、前記該当
商品を含む分類の、年間売上傾向の指数を演算する第4
工程と、第4工程の指数に基づき、前記該当商品の予測
売上数を演算する第5工程とからなる売上予測システム
[Claim 7] Compare a first period, which is the number of days from the order date to the day before the delivery date of the current order, plus the maximum inventory days, and a second period, which is the period from the order date to the next order delivery date, The first step is to select a long period; the second step is to set each day of the week for the period selected in the first step; the third step is to read relatively recent sales results for the corresponding product; A fourth step that calculates an index of annual sales trends for categories that include products.
A sales prediction system comprising a step and a fifth step of calculating the predicted sales number of the corresponding product based on the index of the fourth step.
【請求項8】予測在庫数又は累積予測売上数を請求項7
の売上予測システムで演算する請求項1〜6記載の自動
商品発注システム。
[Claim 8] Claim 7 for the predicted inventory quantity or cumulative predicted sales quantity.
7. The automatic product ordering system according to claim 1, wherein the automatic product ordering system is operated using a sales forecasting system.
【請求項9】発注日、納品日、最小陳列数、最大陳列数
、発注日の前日の在庫数、納品予定数を入力するための
入力手段と、今回発注の商品の納品日からの最小在庫予
測数と、今回発注の納品日前日の予測在庫数とを比較す
るための第1演算処理手段と、次回の発注分の納品日前
日の予測在庫数と、必要な最小陳列数とを比較するため
の第2演算処理手段と、第1演算処理手段と第2演算処
理手段の結論に基づき、発注の指令を行う制御手段とを
有し、制御手段は、前記第1演算処理手段の結論が、最
小在庫予測数が今回発注の納品日前日の予測在庫数より
大きいか、又は、第2演算処理手段の結論が、最小陳列
数が次回の発注分の納品日前日の予測在庫数より大きい
場合に、発注指令を行う様になっており、制御手段の発
注指令に基づき、今回発注の商品の納品日からの最大在
庫予測数と、今回発注の納品日前日の予測在庫数との差
を演算する第3演算処理手段と、最小陳列数と、次回の
発注分の納品日前日の予測在庫数との差を演算する第4
演算処理手段とを備え、制御手段が、第3演算処理手段
の結論と第4演算処理手段の結論の内、大きい方の値を
選択する様になっており、最大陳列数と、今回の発注分
の納品日前日の予測在庫数との差を演算する第5演算処
理手段の結論の値を越えない条件で、制御手段が選択さ
れた値を発注量として指令出力を行うことを特徴とする
自動商品発注装置。
Claim 9: Input means for inputting order date, delivery date, minimum number of displays, maximum number of displays, inventory on the day before the order date, scheduled delivery quantity, and minimum inventory from the delivery date of the currently ordered product. A first arithmetic processing means for comparing the predicted quantity with the predicted stock quantity on the day before the delivery date of the current order, and the predicted stock quantity on the day before the delivery date of the next order with the required minimum display quantity. and a control means for instructing order placement based on the conclusions of the first arithmetic processing means and the second arithmetic processing means. , the minimum predicted stock quantity is greater than the predicted stock quantity on the day before the delivery date of the current order, or the conclusion of the second arithmetic processing means is that the minimum display quantity is greater than the predicted stock quantity on the day before the delivery date for the next order. Based on the ordering command of the control means, the system calculates the difference between the predicted maximum inventory quantity from the delivery date of the product ordered this time and the predicted inventory quantity the day before the delivery date of the current order. a third arithmetic processing means for calculating the difference between the minimum display quantity and the predicted stock quantity on the day before the delivery date for the next order;
the control means selects the larger value of the conclusion of the third arithmetic processing means and the conclusion of the fourth arithmetic processing means, and the control means selects the larger value of the conclusion of the third arithmetic processing means and the conclusion of the fourth arithmetic processing means, and determines the maximum number of displayed items and the current order. The control means outputs a command using the selected value as the order amount under conditions that the value does not exceed the conclusion of the fifth calculation processing means that calculates the difference between the predicted stock quantity and the predicted stock quantity on the day before the delivery date. Automatic product ordering device.
【請求項10】制御手段には、発注量を表示するための
表示装置と、指示入力手段とが接続されており、使用者
が発注量を確認した後、前記指示入力手段から信号を入
力することにより、制御手段が発注量指令を出力する請
求項9記載の自動商品発注装置。
10. A display device for displaying the order quantity and an instruction input means are connected to the control means, and after the user confirms the order quantity, a signal is input from the instruction input means. 10. The automatic product ordering device according to claim 9, wherein the control means outputs an order quantity command.
JP3143756A 1991-05-19 1991-05-19 System and device for automatically ordering commodity Pending JPH04342064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3143756A JPH04342064A (en) 1991-05-19 1991-05-19 System and device for automatically ordering commodity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3143756A JPH04342064A (en) 1991-05-19 1991-05-19 System and device for automatically ordering commodity

Publications (1)

Publication Number Publication Date
JPH04342064A true JPH04342064A (en) 1992-11-27

Family

ID=15346290

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3143756A Pending JPH04342064A (en) 1991-05-19 1991-05-19 System and device for automatically ordering commodity

Country Status (1)

Country Link
JP (1) JPH04342064A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001282906A (en) * 2000-04-03 2001-10-12 Nippon Syst Design Kk Processing system for calculating predicted value of number of sales and order quantity
US6668245B1 (en) * 1999-08-27 2003-12-23 Susumu Iida Method of determining reserving order number and final order number of merchandises
CN113592199A (en) * 2021-08-26 2021-11-02 南京希音电子商务有限公司 Wave-order planning method utilizing roadway concentration and minimized set coverage

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6668245B1 (en) * 1999-08-27 2003-12-23 Susumu Iida Method of determining reserving order number and final order number of merchandises
AU781665B2 (en) * 1999-08-27 2005-06-02 Ok Corporation Method of determining reserving order number and final order number of merchandises
JP2001282906A (en) * 2000-04-03 2001-10-12 Nippon Syst Design Kk Processing system for calculating predicted value of number of sales and order quantity
CN113592199A (en) * 2021-08-26 2021-11-02 南京希音电子商务有限公司 Wave-order planning method utilizing roadway concentration and minimized set coverage

Similar Documents

Publication Publication Date Title
JP2735213B2 (en) Automatic ordering system
US5459656A (en) Business demand projection system and method
JP6814302B2 (en) Ordering support system, ordering support program and ordering support method
JP2001282906A (en) Processing system for calculating predicted value of number of sales and order quantity
JP2003162619A (en) Sales prediction apparatus and method
WO2002003157A1 (en) Production planning method and system for production planning
JPH04342064A (en) System and device for automatically ordering commodity
JPH09198448A (en) System and device for automatically ordering commodity
JP2006018777A (en) Method and device for determining ordering quantity of article, and computer program
JPH04353970A (en) Optimum stocking prediction system
JPH0652191A (en) Device and method for analyzing commodity data
JP2500194B2 (en) Product ordering system
JP7387422B2 (en) Order recommendation system, order recommendation method, and program
JP7433892B2 (en) Demand forecasting device, demand forecasting method, and program
JP2022108172A (en) Commodity order support system
JP5093752B2 (en) Demand forecast device and computer program
JP2001253512A (en) Stock control system, its stock control method and recording medium with program for stock control recorded
JP2021192143A (en) Stock control system, stock control method, and program
JP2002240949A (en) Method and device for supporting storage/deivery and inventory control, storage medium and program
JP2002073752A (en) Order receipt forecast system, order receipt control system, and production control system
JP7374758B2 (en) Loss estimation system, loss estimation method, and program
JP7425596B2 (en) Loss estimation system, loss estimation method, and program
JPH09237265A (en) Sales prediction device and sales prediction method
WO2024048694A1 (en) Order assistance device, order assistance method, and order assistance program
JP2022108174A (en) Commodity order support system