JPH04312666A - Construction method for stair - Google Patents

Construction method for stair

Info

Publication number
JPH04312666A
JPH04312666A JP3106832A JP10683291A JPH04312666A JP H04312666 A JPH04312666 A JP H04312666A JP 3106832 A JP3106832 A JP 3106832A JP 10683291 A JP10683291 A JP 10683291A JP H04312666 A JPH04312666 A JP H04312666A
Authority
JP
Japan
Prior art keywords
stair
staircase
wall
main body
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3106832A
Other languages
Japanese (ja)
Other versions
JPH07107308B2 (en
Inventor
Nobuo Nezuka
根塚 信夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP3106832A priority Critical patent/JPH07107308B2/en
Publication of JPH04312666A publication Critical patent/JPH04312666A/en
Publication of JPH07107308B2 publication Critical patent/JPH07107308B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

PURPOSE:To promote execution efficiency by mounting a stair locking machine at a specific angle of inclination to a wall panel opposed to the other wall panel, adjusting a position of the stair locking machine, and fixing it after a prefabricated stair body is temporarily placed thereto. CONSTITUTION:A wall 12 is erected in opposition to the other wall, and an interval between the walls is set to the same width as that of a stair. After that, stair locking machines 20 are respectively mounted to the wall 12 and the opposed wall, and its angle is set to the same as the angle of inclination of the stair. Then, a stair body 18 prefabricated in a factory is temporarily placed on the machines 20. The stair body 18 is slidingly moved on the machines 20, and it is fixed to both wall surfaces with nails, etc., after fine adjustment is made in an accurate position. In addition, a riser, a facing plate, a lower side bearing member, etc., are provided. According to the constitution, they can be accurately provided and, at the same time, execution can be simply and speedily made.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は、パネル工法において、
階段本体が両側に設置された壁部に挟まれたかたちで形
成される階段部の構築方法の改良に関する。
[Industrial Field of Application] The present invention is applicable to panel construction methods.
This invention relates to an improvement in a method of constructing a staircase section in which the main body of the staircase is sandwiched between walls installed on both sides.

【0002】0002

【従来の技術】住居などの建築物の建築工程の簡略化並
びに迅速化を図り、かつ高い構造強度を得るための建築
工法の1つとしてパネル工法が用いられている。
2. Description of the Related Art A panel construction method is used as one of the construction methods for simplifying and speeding up the construction process of buildings such as residences and obtaining high structural strength.

【0003】このようなパネル工法においては、建築物
の各部を複数のパネルを組み合せることによって構成し
ており、例えば床パネル、壁パネルさらに屋根パネルな
どの種々のパネルを結合することにより各部を構築して
いる。
[0003] In such panel construction methods, each part of a building is constructed by combining a plurality of panels. For example, each part is constructed by combining various panels such as floor panels, wall panels, and even roof panels. is building.

【0004】このようなパネル工法において、階段部は
、図5に示したように複数の壁パネルを立設することに
より構成した両側の壁部10、12の間に、階段、すな
わち2つのササラ桁14の間に複数の段板(踏み板)1
6を取り付けてなる階段本体18を設置することによっ
て構成している。
[0004] In such a panel construction method, the staircase part is constructed by installing a plurality of wall panels upright, as shown in FIG. A plurality of steps (treads) 1 between the girders 14
It is constructed by installing a stair main body 18 formed by attaching a stairway 6.

【0005】このような階段部の構築は、建築現場にお
いて、まず複数の壁パネルを結合することによって壁部
10、12を立設し、その後階段本体18を所定の傾斜
をもって、かつ一階及び二階の床面相互間に掛け渡すこ
とによって行われている。
[0005] To construct such a staircase, at a construction site, the walls 10 and 12 are first erected by joining a plurality of wall panels, and then the staircase main body 18 is erected at a predetermined slope, and the first and second floors are erected. This is done by spanning the floors between the two floors.

【0006】[0006]

【発明が解決しようとする課題】上記従来の階段部の構
築方法では、階段本体18を建築現場において、所定の
傾斜角及び所定の位置に設置する作業を行わなければな
らず、その階段本体18を設置する位置を正確に設定す
る必要がある。すなわち、壁パネルにて形成された壁部
10及び12に対する墨出し作業などを行う必要がある
[Problems to be Solved by the Invention] In the conventional method for constructing a staircase section, it is necessary to install the staircase main body 18 at a predetermined angle of inclination and at a predetermined position at a construction site. It is necessary to set the location accurately. That is, it is necessary to perform marking work on the wall portions 10 and 12 formed of wall panels.

【0007】また、このような位置設定作業を行った後
に、階段本体18をその位置に正確に取り付け固定する
必要がある。しかし、この作業は、先ずササラ桁14,
14の下端部及び上端部がそれぞれ一階床面及び二階床
面に正確に合致するように行わなければならず、さらに
その後段板16を一枚ずつ取り付け固定しなければなら
ない。従って、この作業を正確に行うためには、熟練し
た技術を要し、また煩雑な作業を行わなければならない
ので、現場での作業時間の短縮化が図れないという問題
があった。
[0007] Furthermore, after performing such position setting work, it is necessary to accurately mount and fix the stair main body 18 in that position. However, this work must first be carried out on the Sasara girder 14,
This must be done so that the lower and upper ends of the tiers 14 accurately match the first and second floor floors, respectively, and then the tier boards 16 must be attached and fixed one by one. Therefore, in order to perform this work accurately, a skilled technique is required and a complicated work must be performed, so there is a problem that the work time on site cannot be shortened.

【0008】発明の目的  本発明は、上記問題点を解
決することを課題としてなされたものであり、その目的
はパネル工法における階段部の構築を、現場にて熟練を
要することなく、簡単かつ迅速に行うことのできる階段
部の構築方法を提供することにある。
OBJECT OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and its purpose is to easily and quickly construct stairs using the panel construction method on-site without requiring any skill. The object of the present invention is to provide a method of constructing a staircase section that can be carried out in a number of steps.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するため
、本発明に係る階段部の構築方法は、階段の両側面にそ
れぞれ複数の壁パネルにて形成された壁部が当接固定さ
れて形成される階段部の構築方法において、前記階段の
両側の壁部を立設する壁部立設工程と、該壁部立設工程
において立設された壁部のそれぞれの階段設置側面に、
床面に対して所定の階段傾斜角をもって、かつササラ桁
の底部の少なくとも一部を係止できるように階段係止用
桟を取り付ける桟取付工程と、該桟取付工程後に、少な
くとも両側のササラ桁間に段板を予め取り付けてなる階
段本体を、前記階段係止用桟にササラ桁底面を係止させ
ることによって仮設置する階段本体仮設置工程と、前記
仮設置された階段本体を両側壁部に固定する固定工程と
、を含むことを特徴とする。
[Means for Solving the Problems] In order to achieve the above object, a method for constructing a staircase section according to the present invention includes a method in which wall sections each formed of a plurality of wall panels are abutted and fixed on both sides of a staircase. In the method for constructing a staircase section, a wall section erecting step of erecting walls on both sides of the staircase, and a step installation side surface of each wall section erected in the wall section erecting step,
A step for attaching a stair locking crosspiece so that it has a predetermined slope inclination angle with respect to the floor surface and can lock at least a part of the bottom of the crossbeam, and after the step for attaching the stairway, attaching the steplock beam to the floor at a predetermined angle of inclination to the floor surface, A stair main body temporary installation step of temporarily installing a stair main body with a step board pre-attached therebetween by locking the bottom surface of the flat girder to the stair locking crosspiece; A fixing step of fixing to.

【0010】0010

【作用】上記構成の階段部の構築方法によれば、壁パネ
ルを組み合せて形成した壁部を立設する壁部立設工程と
階段本体を所定の位置に固定する固定工程との間に、階
段本体のササラ桁の底部を係止させることのできる階段
係止用桟を取り付ける桟取付工程を行っている。この階
段係止用桟は、床に対して適切な階段傾斜角をもって取
り付けられる。
[Operation] According to the method for constructing a staircase section having the above structure, between the wall section erection step of erecting the wall section formed by combining wall panels and the fixing step of fixing the staircase body at a predetermined position, A step installation process is being carried out to attach a stair locking crosspiece that can lock the bottom of the crossbeam of the stair body. This stair locking crosspiece is attached with an appropriate stair inclination angle with respect to the floor.

【0011】従って、階段本体のササラ桁底面部を上記
階段係止用桟に係止させることによって、階段本体は、
極めて簡単に適切な傾斜角をもって仮設置されたことと
なる。また、階段本体の一階及び二階の床面に対する位
置調整も、階段本体を階段係止用桟に係止させた状態で
移動調整を行うことができるので、その調整も極めて簡
単に行うことができる。
[0011] Therefore, by locking the bottom surface of the sill girder of the stair main body to the stair locking crosspiece, the stair main body can
It was extremely easy to temporarily install it at an appropriate angle of inclination. In addition, the position of the staircase main body relative to the floor surfaces of the first and second floors can be adjusted with the staircase main body locked to the stair locking bars, making it extremely easy to adjust the position. can.

【0012】このように、2つのササラ桁及び複数の段
板にて形成された階段本体よりも軽量な階段係止用桟を
、壁部に予め所定傾斜角をもって取り付けておくことに
よって、比較的重量のある階段本体の面倒な位置決め設
置作業を行う必要がなくなり、その作業を極めて簡単な
作業とすることができる。また、階段本体を工場等にて
組み立てておくことも可能となり、現場での作業時間を
短縮できる。
[0012] In this way, by attaching the stair locking crosspiece, which is lighter than the stair main body formed of two spanner girders and a plurality of steps, to the wall part in advance at a predetermined angle of inclination, the stairway is relatively There is no need to perform troublesome positioning and installation work for the heavy staircase body, and the work can be made extremely simple. Furthermore, it is also possible to assemble the main body of the staircase in a factory or the like, thereby reducing on-site work time.

【0013】また、上記階段係止用桟は、階段部完成時
において、階段本体の下面側に当接された状態で固定さ
れているので、階段本体に対する設置状態の補強機能も
奏する。さらに、壁部は、複数の壁パネルにて形成され
ており、階段係止用桟は、これらの複数の壁パネルに掛
け渡されているので、壁部に対する補強作用も同時に奏
している。
[0013] Furthermore, since the stair locking crosspiece is fixed in contact with the lower surface of the stair main body when the stair portion is completed, it also performs the function of reinforcing the installed state with respect to the stair main body. Furthermore, since the wall portion is formed of a plurality of wall panels, and the stair locking crosspiece is spanned over these plurality of wall panels, it also acts as a reinforcement for the wall portion.

【0014】[0014]

【実施例】以下、図面に基づいて本発明の階段部の構築
方法の好適な実施例について説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the method of constructing a staircase section of the present invention will be described below with reference to the drawings.

【0015】まず、図1は、壁部立設工程にて形成され
た2つの壁部10及び12が示されている。階段本体は
、これら2つの壁部10及び12の間に設置される。 従って、これら2つの壁部10及び12は、階段の幅の
間隔をもって立設されている。また、本実施例では、壁
部10及び12は、それぞれ3つの壁パネル10a〜1
2c、12a〜12cから構成されている。
First, FIG. 1 shows two walls 10 and 12 formed in the wall erection process. The stair body is installed between these two walls 10 and 12. Therefore, these two wall portions 10 and 12 are erected with an interval equal to the width of the stairs. Further, in this embodiment, the wall sections 10 and 12 each include three wall panels 10a to 1
2c, and 12a to 12c.

【0016】次に、桟取付工程において、図1に示した
それぞれの壁部10及び12の階段設置側面に階段係止
用桟が取り付けられる。
[0016] Next, in the crosspiece attachment step, stairway locking crosspieces are attached to the stairway installation sides of each of the walls 10 and 12 shown in FIG.

【0017】図2は、この階段係止用桟20が取り付け
られた一方の壁部12が示されている。図示のように、
階段係止用桟20は、1本の柱状体に形成されており、
適切な階段傾斜角をもって壁部12に取り付けられてい
る。また、この階段係止用桟20は、壁部12を構成す
る3つの壁パネル12a〜12cの全てにわたって取り
付けられている。なお、この取付は、それぞれの壁パネ
ル12a〜12cに釘やねじなどをもって固定されるも
のである。
FIG. 2 shows one wall portion 12 to which the stair locking crosspiece 20 is attached. As shown,
The stair locking crosspiece 20 is formed into a single columnar body,
The staircase is attached to the wall part 12 with an appropriate slope angle. Moreover, this stair locking crosspiece 20 is attached over all three wall panels 12a to 12c that constitute the wall portion 12. Note that this installation involves fixing to each of the wall panels 12a to 12c with nails, screws, or the like.

【0018】また、図示していないが、他方の壁部10
の階段設置側面にも図2と同様に階段係止用桟20が取
り付けられている。
Although not shown, the other wall portion 10
Similarly to FIG. 2, a stair locking crosspiece 20 is attached to the side surface of the stair installation.

【0019】次に、階段本体をこの階段係止用桟20の
部分に係止させる階段本体仮設置工程が行われる。
Next, a stair main body temporary installation step is performed in which the stair main body is locked to the stair locking crosspiece 20 portion.

【0020】図3は、この工程の作業を示しており、階
段本体18をロープ19で吊り下げ、この階段本体18
の構成部材であるササラ桁14の底部が、階段係止用桟
20の上面に当接するように、階段本体18を下降させ
ていく。そして、図4に示したようにササラ桁14の底
面14aが、階段係止用桟20の上面に係止され、仮設
置が終了する。
FIG. 3 shows the work in this process, in which the stair main body 18 is suspended with a rope 19, and the stair main body 18 is
The stair main body 18 is lowered so that the bottom part of the flat girder 14, which is a component of the stair case, comes into contact with the upper surface of the stair locking crosspiece 20. Then, as shown in FIG. 4, the bottom surface 14a of the crossbeam 14 is locked to the top surface of the stair locking crosspiece 20, and the temporary installation is completed.

【0021】これにより、階段本体18は、適切な階段
傾斜角をもって設置されたこととなる。また、この仮設
置状態では、階段本体は、階段係止用桟20の上面を摺
動移動させることができるので、階段本体18の摺動方
向の正確な位置決めはその移動動作によって極めて簡単
に行うことができる。すなわち、階段本体18が、2つ
の階段係止用桟20に仮置きされた状態となっているの
で、持ち上げ動作等を行う必要がなく、少ない作業者に
よってもこの摺動方向の移動動作を行うことができ、そ
の位置決め作業は極めて容易となる。
[0021] Thereby, the stair main body 18 is installed with an appropriate stair inclination angle. In addition, in this temporarily installed state, the staircase main body can be slid on the upper surface of the staircase locking crosspiece 20, so the accurate positioning of the staircase main body 18 in the sliding direction can be extremely easily performed by the movement. be able to. That is, since the stair main body 18 is temporarily placed on the two stair locking bars 20, there is no need to perform lifting operations, etc., and this movement in the sliding direction can be performed even by a small number of workers. This makes the positioning work extremely easy.

【0022】そして、的確に位置決めされた階段本体1
8を両側の壁部10、12に固定する固定工程を行う。 この固定作業は、それぞれの壁部10及び12に対し、
階段本体18を当接させて行うものであり、ササラ桁1
4の部分を、当接されている壁パネルに、種々の手段、
例えば釘による打付けなどによって固定することによっ
て行う。
[0022] Then, the staircase main body 1 is accurately positioned.
8 to the walls 10 and 12 on both sides. This fixing work is carried out on each of the walls 10 and 12.
This is done by bringing the stair body 18 into contact with the main body 18 of the stairs.
4 to the wall panel that is in contact with it by various means,
This is done by fixing, for example by nailing.

【0023】この一連の工程によって、階段部の構築作
業が終了する。この後、階段本体18に対する蹴込み板
の取付や、化粧板の取付作業、さらには階段本体18の
下方側からの支持部材の設置などが行われる。
[0023] Through this series of steps, the construction work of the staircase portion is completed. After this, the work of attaching risers to the stair main body 18, attaching decorative boards, and furthermore installing support members from the lower side of the stair main body 18 are performed.

【0024】なお、階段本体18の固定工程終了後の状
態は、上記図5に示した階段部の構成と同様の構成とな
っている。
The state of the stair main body 18 after the fixing process is similar to that of the stair section shown in FIG. 5 above.

【0025】上記実施例によれば、比較的重量の重い階
段本体18を階段係止用桟20上に係止させることによ
って簡単に適切な傾斜状態で仮設置することができる。 そして、この仮置き状態のままさらに正確な位置調整を
行うことができるので、その重量にかかわらず位置決め
作業が極めて容易なものとなる。
According to the above embodiment, by locking the relatively heavy stair main body 18 onto the stair locking crosspiece 20, it can be easily temporarily installed in an appropriate inclined state. Further, since more accurate position adjustment can be performed in this temporarily placed state, positioning work becomes extremely easy regardless of the weight.

【0026】従って、作業時間も短縮化することができ
、建築現場ではなく、壁パネルを組み合わせることによ
って各ユニットを構成する工場におけるユニット製造工
程において、予め階段部の構築を行っておくことも可能
となる。
[0026] Therefore, the working time can be shortened, and it is also possible to construct the staircase section in advance, not at the construction site, but during the unit manufacturing process at the factory where each unit is constructed by combining wall panels. becomes.

【0027】これにより、階段部の構築されたユニット
をそのまま工事現場に運搬し、設置することによって建
築物の所定位置に迅速に階段部を設置することができる
。このように、階段部を当初から構築設置しておくこと
によって、建築現場における二階部分の作業時において
、作業者がこの階段を利用して二階部へ昇り降りするこ
とができるので、作業における便宜性の向上も達成され
ている。また、階段本体18が固定された状態において
は、図4に示したように、階段本体18は階段係止用桟
20に支持された状態となっているので、階段係止用桟
20は、この階段部の補強作用をも奏する。さらに、階
段係止用桟20が、壁部を構成する複数の壁パネルに掛
け渡されているので、同時に壁部の補強機能も果してい
る。
[0027]Thereby, by transporting and installing the unit in which the stairway has been constructed as is to the construction site, the stairway can be quickly installed at a predetermined position in the building. In this way, by constructing and installing the stairs from the beginning, when working on the second floor at the construction site, workers can use the stairs to go up and down the second floor, making the work more convenient. Improvements in sexual performance have also been achieved. In addition, when the stair main body 18 is fixed, as shown in FIG. 4, the stair main body 18 is supported by the stair locking crosspiece 20. It also has the effect of reinforcing this staircase part. Furthermore, since the stairway locking crosspiece 20 is spanned across a plurality of wall panels constituting the wall, it also serves the function of reinforcing the wall.

【0028】[0028]

【発明の効果】以上説明したように、本発明に係る階段
部の構築方法によれば、階段本体の的確な傾斜角及び正
確な位置調整による設置を極めて簡単な動作によって行
うことができる。
As described above, according to the method for constructing a staircase section according to the present invention, the staircase body can be installed with an accurate inclination angle and accurate position adjustment through extremely simple operations.

【0029】これにより、パネル工法における階段部の
構築作業を迅速に行うことができ、建築作業の簡易化、
迅速化がより向上される。
[0029] As a result, the construction work of the staircase part in the panel construction method can be carried out quickly, simplifying the construction work,
Speed is further improved.

【図面の簡単な説明】[Brief explanation of drawings]

【図1】実施例の壁部立設工程を示す壁部の概略斜視図
である。
FIG. 1 is a schematic perspective view of a wall showing a wall erecting process of an example.

【図2】桟取付工程を示す壁部の概略斜視図である。FIG. 2 is a schematic perspective view of a wall portion showing a crosspiece attachment process.

【図3】階段本体仮設置工程における仮設置作業状態を
示す説明図である。
FIG. 3 is an explanatory diagram showing a temporary installation work state in a staircase main body temporary installation process.

【図4】階段本体仮設置工程における階段本体の設置状
態を示す説明図である。
FIG. 4 is an explanatory diagram showing the installation state of the stair main body in the stair main body temporary installation step.

【図5】パネル工法における従来の階段部の構造を示す
概略斜視図である。
FIG. 5 is a schematic perspective view showing the structure of a conventional staircase part in the panel construction method.

【符号の説明】[Explanation of symbols]

10、12  壁部 14  ササラ桁 16  段板 18  階段本体 20  階段係止用桟               
                   MH0123
01
10, 12 Wall portion 14 Sakara girder 16 Step plate 18 Stair main body 20 Stair locking crosspiece
MH0123
01

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】  階段の両側面にそれぞれ複数の壁パネ
ルにて形成された壁部が当接固定されて形成される階段
部の構築方法において、前記階段の両側の壁部を立設す
る壁部立設工程と、該壁部立設工程において立設された
壁部のそれぞれの階段設置側面に、床面に対して所定の
階段傾斜角をもって、かつササラ桁の底部の少なくとも
一部を係止できるように階段係止用桟を取り付ける桟取
付工程と、該桟取付工程後に、少なくとも両側のササラ
桁間に段板を予め取り付けてなる階段本体を、前記階段
係止用桟にササラ桁底面を係止させることによって仮設
置する階段本体仮設置工程と、前記仮設置された階段本
体を両側壁部に固定する固定工程と、を含むことを特徴
とする階段部の構築方法。
1. A method for constructing a staircase in which walls formed of a plurality of wall panels are abutted and fixed on both sides of a staircase, wherein the walls on which the walls on both sides of the staircase are erected. At least a part of the bottom of the flat girder is attached to each stair installation side surface of the wall section erected in the section erection process and the wall section erection process, with a predetermined staircase inclination angle relative to the floor surface. A step for attaching a stair locking crosspiece so that the stairs can be stopped; and after the step for attaching the step, a stair main body, in which treads are preliminarily attached between at least the crossbeams on both sides, is attached to the bottom surface of the crossbeam to the stairway locking crosspiece. A method for constructing a staircase section, the method comprising the steps of temporarily installing a staircase main body by locking the staircase main body, and fixing the temporarily installed staircase main body to both side walls.
JP3106832A 1991-04-11 1991-04-11 How to build stairs Expired - Lifetime JPH07107308B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3106832A JPH07107308B2 (en) 1991-04-11 1991-04-11 How to build stairs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3106832A JPH07107308B2 (en) 1991-04-11 1991-04-11 How to build stairs

Publications (2)

Publication Number Publication Date
JPH04312666A true JPH04312666A (en) 1992-11-04
JPH07107308B2 JPH07107308B2 (en) 1995-11-15

Family

ID=14443715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3106832A Expired - Lifetime JPH07107308B2 (en) 1991-04-11 1991-04-11 How to build stairs

Country Status (1)

Country Link
JP (1) JPH07107308B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165348A (en) * 2017-05-23 2017-09-15 苏州城发建筑设计院有限公司 Antidetonation staircase structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165348A (en) * 2017-05-23 2017-09-15 苏州城发建筑设计院有限公司 Antidetonation staircase structure

Also Published As

Publication number Publication date
JPH07107308B2 (en) 1995-11-15

Similar Documents

Publication Publication Date Title
US7882665B2 (en) Construction configurations and construction methods of steel houses
US20100058687A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
JP6850665B2 (en) Stair structure and manufacturing method of steel stairs
JPH07292986A (en) Device and method for constructing long-span roof
JPH04312666A (en) Construction method for stair
EP1181423B1 (en) Inner stairs for building and method of constructing it
JP2612646B2 (en) How to build stairs
CA2639339A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
JP2009024449A (en) Building internal staircase and method of constructing the same
US6341459B1 (en) Method and apparatus for expedited construction of a building
JP2000352169A (en) Inner stair for building, its construction method and assembly jig for erection therefor
JP2621748B2 (en) All-weather temporary shed
JPH11200480A (en) Verandah handrail wall mounting structure
JP2018016964A (en) Stairway substrate structure, stairway, and construction method of stairway
JPH06305656A (en) Work execution of elevator shaft
JP2649057B2 (en) How to build stairs in buildings
JPH11200478A (en) Installing structure of veranda handrail wall
JP2598008Y2 (en) Floor structure and bundle of steel building balcony
JPH07259287A (en) Stair and fitting method thereof
JP2844096B2 (en) How to build stairs in buildings
JP2573734Y2 (en) Steel frame stairs
JP2000073457A (en) Support structure for floor panel
JPH08199796A (en) Temporary staircase with landing and multi-stage construction method of temporary staircase with landing in shaft
JPH084276A (en) Temporary scaffold structure for ceiling of building unit
JPH05321322A (en) Floor structure for balcony

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960430